HomeMy WebLinkAbout159-03 RESOLUTION159-03
RESOLUTION NO.
A RESOLUTION APPROVING CHANGE ORDER # 10 TO THE
CONTRACT WITH CROSSLAND CONSTRUCTION COMPANY,
INC. IN THE AMOUNT OF TWO HUNDRED SIX THOUSAND
SEVEN HUNDRED ONE DOLLARS ($206,701.00) TO INSTALL
LOW VOLTAGE EQUIPMENT AT THE NEW FAYETTEVILLE
PUBLIC LIBRARY.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas,
hereby approves Change Order # 10 to the contract with Crossland Construction
Company, Inc. in the amount of Two Hundred Six Thousand Seven Hundred
One Dollars (5206,701.00) to install low voltage equipment at the new
Fayetteville Public Library. A copy of Change Order # 10, marked Exhibit "A" is
attached hereto and made a part hereof.
PASSED and APPROVED this 215I day of October, 2003.
T:
Byt 7OntMutt—)
SONDRA SMITH, City Clerk
APPROVED:
By:
1.01
DAN COODY, May r
2 0 0 0103 ITION
AIA DOCUMENT
Change Order
(It:grunions on reverse side)
G701-2000
PROJECT: CHANGE ORDER NUMBER: 10
(Name and address)
DATE: 26 SEPTEMBER 2093
ARCHITECT'S PROJECT NUMBER:2°°°°1343°
21 MAY 2092
GENERAL CONSTRUCTION
FAYETTEVILLE PUBLIC LIBRARY
401 WEST MOUNTAIN STREET
FAYETTEVILLE ARKANSAS 72701
TO CONTRACTOR:
(came and arldrers)
CROSSLAND CONSTRUCTION COMPANY INC
ATTENTION: JOHN PRIEST- PROJECT MANAGER
2510 WEST HUDSON ROAD
ROGERS ARKANSAS 72756
CONTRACT DATE:
CONTRACT FOR:
THE CONTRACT IS CHANGED AS FOLLOWS:
(Include. where dill lik able. any unds,puted ammo° attributable to pre 'Jiffy OW
M Co
.ICI fl Change Ihrrenms
OWNER
ARCHITECT
CONTRACTOR
FIELD
OTHER
Provide fire alarm and detection system, security intrusion system, closed circuit television system, and voice and
data cabling systems work as described in Proposal Request 10, excluding conduit for these systems.
The original (Contract Sum) (Fristereesetod44.0.m.kkm-Pries+ .as $17,633,931.00
The net change by previously authorized Change Orders s 957,822.80
'Fhe (Contract Suni)+GesesP84thisid-kAakiikkkkmalki.:44 prior to this Change Order was $ 190991079329
The (Contract Sum) cr.) .knn1a".4 MAYin""" Pri".4 will be (increased) (J
sd) by this Change Order in the amount of s 206,700.90
The new (Contract Sum) 4c.t16461400.4440N44444.40-Pfitei including this Change Order will be 08,798,45410
The Contract Time will be (ineraag-u1).(-1--44 (unchanged) by ( 0 ) days.
'Me date of Substantial Completion as of the date of this Change Order therefore is 19 JULY 2994
NOTE: This Change Order does not include changes in the Contract Sun), Contract Time or Guaranteed Maximum l'rice which
have 'leen authorized hy Construction Change Directive for which the cred or time are in dispute as described in Subparagraph
7.38 o( AIA Document Aim.
Not valid until signed by the Architect, Contractor and Owner.
AFHJ ARCHITECTS
PO BOX 790
FAYETTEVILLE, AR 72702
el (Typed name)
Associate Arthited
BY
2Ptice015
DATE
CROSSLAND CONST. CO. INC.
PO BOX 907
ROGERS, AR 72756
CONTRACTOR (Ivprd name)
CITY OF FAYETTEVILLE
113 WEST MOUNTAIN ST
FAYETTEVILLE, AR 72701
OWN (Typed name)
• re)
JOHN PRIEST
BY
e/04/0 3
DATE
!titynature)
MAYOR DAN COODY
BY
/det7,9,
DATEi
02000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its
provisions without written permission of the AIA violates the copyright laws of the United States and will subject
the violator to legal prosecution.
WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution.
1
td,
0 2 0 0 0 Ai*.
AIA DOCUMENT G701-2000
CHANGE ORDER
The American Institute
of Architects
1735 New York Avenue, N.W.
Washington, D.C. 20006-5292
02000 AiA09
AIA DOCUMENT G701-2000
INSTRUCTIONS
The American Institute
of Architects
1735 New York Avenue, N.W.
Washington, D.C. 20006-5292
2
Instructions
GENERAL INFORMATION
PURPOSE. This document is intended for use in implementing changes in the Work agreed to by the
Owner, Contractor and Architect. Execution of a completed G7o1 form indicates agreement upon all the
terms of the change, including any changes in the Contract Sum (or Guaranteed Maximum Price) and.
Contract Time.
RELATED DOCUMENTS. This document was prepared for use under the terms of AIA general conditions,
including AIA Document Azoi, General Conditions of the Contract for Construction, and the general
conditions contained in AIA Document A1o7, Abbreviated Owner -Contractor Agreement Form for
Construction Projects of Limited Scope—Stipulated Sum.
USE OF CURRENT DOCUMENTS. Prior to using any AIA document, the user should consult the AIA, an
AIA component chapter or a current AIA Documents Price List to determine the current edition of each
document.
REPRODUCTIONS. AIA Document G7o1 is a copyrighted work and may not bezreproduced or -excerpted
from in substantial part without the express written permission of the AIA. The G7oi document is intend-
ed to be used as a consumable—that is, the original document purchased by the user is intended to be con-
sumed in the course of being used. There is no implied permission to reproduce this document, nor does
membership in The American Institute of Architects confer any further rights to reproduce G7o1 in whole
or in part.
A limited license is hereby granted to retail purchasers to reproduce a maximum of TEN copies of a com-
pleted or executed G7m, but only for use in connection with a particular project.
COMPLETING THE G701 FORM
DESCRIPTION OF CHANGE IN THE CONTRACT
Insert a detailed description of the change or reference specific exhibits describing in detail the change to
be made in the Contract by this Change Order, including any Drawings, Specifications, documents or
other supporting data to clarify the scope of the change.
DETERMINATION OF COSTS
Insert the following information in the blanks provided, and strike out the terms in parentheses that do
not apply:
• the original Contract Sum or Guaranteed Maximum Price;
• the net change by previously authorized Change Orders (note that this does not include changes
authorized by Construction Change Directive unless such a change was subsequently agreed to by the
Contractor and recorded as a Change Order);
• the Contract Sum or Guaranteed Maximum Price prior to this Change Order;
• the amount of increase or decrease, if any, in the Contract Sum or Guaranteed Maximum Price;
and
• the new Contract Sum or Guaranteed Maximum Price as adjusted by this Change Order._
CHANGE IN CONTRACT TIME
Insert the following information in the blanks provided, and strike out the terms in parentheses that do
not apply:
• the amount in days of the increase or decrease, if any, in the Contract Time; and
• the date of Substantial Completion, including any adjustment effected by this Change Order.
EXECUTION OF THIS DOCUMENT
When the Owner and Contractor, in concurrence with the Architect, have reached agreement on the
change to be made in the Contract, including any adjustments in the Contract Sum (or Guaranteed
Maximum Price) and Contract Time, the G7oi document should be executed in triplicate by the two par-
ties and the Architect, each of whom retains an original.
WARNING: Unlicensed photocopying violates u5. copyright laws and will subject the violator to legal prosecution.
NAME OF FILE:
CROSS REFERENCE:
Item #
Date
•
Resolution No. 159-03
Document
•
1
10.21.03
Res. 159-03 w/change order
2
10.06.03
Staff Review Form w/attachments
draft resolution
memo to mayor & city council
memo to city council
copy of memo to Bob Kohlor
copy of potential change orders
copy of
proposed change order
copy of
potential change order charges
proposal request detail outline
low voltage system price proposal
copy of
Itr from Beaver Electric Corp.
3
10. A7, Qj
memo to Louise Schaper
NOTES:
X AGENDA REQUEST
CONTRACT REVIEW
GRANT REVIEW
•
STAFF REVIEW FORM
let5
111
etazkzoci
09-30-031)04:20 aliptenic701,7
eo *o
2.4
For the Fayetteville City Council Meeting of: October -142003
FROM:
Louise Schaper Library General Govemment
Name
Division Department
ACTION REQUIRED: To approve a contract adjustment in the amount of $206,701 with Crossland
Construction Company for low voltage equipment including fire alarm and detection system, security intrusion
and detection system, and digital communications cabling systems to be installed in the new Fayetteville
Public Library located at 401 W. Mountain Street.
COST TO CITY:
$206,701.00
21,891,640
Cost of this request Category/Project Budget
4150k9150-5804-00 16,304,454
Account Number Funds Used to Date
99073 5,5871186
Project Number
Remaining Balance
New Library
Program Category / Project Name
New Library
Program / Project Category Name
Library Construction Fund
Sales Tax Improvement Fund
Fund Name
BUDGET REVIEW:
2udget Manager
X Budgeted Item
Date
Budget Adjustment Attached
CONTRACT/GRANT/LEASE REVIEW:
Accounting Manager
0 if
City Attot-ney
/
Date
Io
/Date
I ternal Miditor
Ucips
/03
Date
l° I It -3
Purchasing Manager Date
STAFF RECOMMENDATION:
Division Head
Department Director
Financ & Internal Services Dir.
e(' 1A- LC1
Date
Date
Date
Date --
/PAZ 3
Cross Reference
New Item:
Previous Ord/Res#:
Yes
7°424 3
Pe -
5.3 - Oa.
Orig. Contract Date 561 0A
Orig. Contract Number
RECEIVED
SEP 3 0 2003
CITIOFFAYE tVILIE
Mayor
Description
Date
Staff Review Form - Page 2
Meeting Date Odober14,2003
Comments:
Budget Manager
Accounting Manager
City Attorney
Purchasing Manager
Internal Auditor
Finance & Internal Services Director
Chief Administrative Officer
Reference Comments:
RESOLUTION NO.
A RESOLUTION APPROVING CHANGE ORDER # 10 TO THE
CONTRACT WITH CROSSLAND CONSTRUCTION COMPANY,
INC. IN THE AMOUNT OF TWO HUNDRED SIX THOUSAND
SEVEN HUNDRED ONE DOLLARS ($206,701.00) TO INSTALL
LOW VOLTAGE EQUIPMENT AT THE NEW FAYETTEVILLE
PUBLIC LIBRARY.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas,
hereby approves Change Order # 10 to the contract with Crossland Construction
Company, Inc. in the amount of Two Hundred Six Thousand Sev9n--- • Tithed
One Dollars ($206,701.00) to install low voltage equipmersoCat the new
Fayetteville Public Library. A copy of Change Order # 10; nib {Kra Exi ibit "A" is
attached hereto and made a part hereof. ,----- j 1
nri
I
PASSED and APPROVED this 21s1 day f October420 i
3
A WITH, City Clerk
N COODY, Mayor
For City Council Agenda October 14, 2003
To: Mayor Dan Coody and City Council
From: Louise Schaper, Library; Hugh Earnest, Urban Development
Date: October 1, 2003
Subject: To approve a contract adjustment in the amount of $206,701 with
Crossland Construction Company for low voltage equipment including fire alarm
and detection system, security intrusion and detection system, and digital
communications cabling systems to be installed in the new Fayetteville Public
Library located at 401 W. Mountain Street.
Background
From the beginning of the design process of the new hbrary the architects and library
management teams have strived for efficiency and effectiveness in planning for
operations. These essential components — fire detection, security, and communications
— are critical in the assurance of life safety and long term life cycles for building
operations.
This request for a contract adjustment includes intrusion detection cabling and
equipment, IP -based closed circuit surveillance cabling and equipment, fire alarm and
detection cabling and equipment, and communications cabling (copper + fiber optic)
and equipment. This item was deferred for further study prior to the City Council
approving the construction contract between the City of Fayetteville and Crossland
Construction Company. See attached table. We have used the additional time to
conduct value engineering, design analysis, and drawing revisions. Over the past
twelve months countless meetings with contractors, subcontractors, and vendors have
been held to isolate the best equipment and pricing for the long-term benefit of the
project. The associated contract for this work achieves to position the building in the
most efficient and cost-effective manner by awarding the work to the vendors with the
most compatible systems and pricing available.
Status
Crossland's procurement process included a bid request by subcontractor Beaver
Electric resulting in SBC Communications winning the bid for providing
Communications cabling and equipment and the IP -based CCTV cabling and
equipment Simplex Grinnell won the bid for cabling and equipment for Fire Alarm and
Detection and Building Intrusion Detection. The procuring process of the low voltage
equipment includes long lead times. It is important that this process commence in a
timely manner to ensure enough time for manufacturing, delivery, and testing. Conduit
for this work is not included in this contract and will be procured under a separate
document.
Recommendations
We recommend that City Council approve the contract adjustment in the amount of
$206,701 for the low voltage equipment.
Date: December 11,2002, rev. 1/16/03, 1/23/03, 5/5/03, 9/29/03
To: Fayetteville City Council Aldermen
From: Louise Schaper, Executive Director, Fayetteville Public Library
Subject: Project Budget and Contract Approvals
This table identifies those requests related to the construction of the Blair Library that Council has approved, as well
as forthcoming requests. Our intent is to ensure that Council is aware of all requests that are within our
523,341,655 budget for the tumkey project as approved by the FPL Board on May 2, 2002 and those items that are
outside of this budget. At this time, there am no items approved or requested outside of this budget. Some of the
forthcoming items, i.e. furnishings, may be procured directly by the FPL Foundation.
We have added to this table those items related to the CIP funded site improvements (utility burial, drainage,
sidewalks etc.) approved in CIP ($671,995).
Item
Within
budget?
Source(s)
Budget
Est. date
approval
Date
Approved
Amount
Notes
Blair
Library Construction,
Furnishing and Equipping
Crossland
contract for
construction
Yes
sales tax
+ private
5/21/02
$17,633,931
Includes
site
funds
$221,995
improvements
for off -
from CIP
Contingency
Yes
sales tax
• private
$830,000
5/21/02
$700,000
$167,676
approved
remaining
contingency
of
Exterior
cladding: APC
replacement
Yes
sales
+
tax
private
$949,658
11/02
11/19/02
$402896
Deferred
will
planned
lintels
be at
and
« stairwell
from contred. APC
entrance as
brick will clad
towers.
Low voltage
equipment
Yes
sales
+
private
tax
10/14/03
$206. ma 90
Deferred
from contract
Low voltage
conduit
Yes
sales
+
private
tax
4Q03
Deferred
from contract
Landscape
Yes
sales
•
private
tax
1004
Deferred from contred
Intenor
signage
Yes
sales
+
prrvate
tax
2004
Deferred from contract
AV Equipment
Yes
sales
+
private
tax
2004
Deferred from contred
Meeting room
enhancements
Yes
sales
• private
tax
2004
Deferred from contred
Technology
related
items
Yes
sales
+
private
tax
$470,000
2003-04
Furnishings
Yes
private
$980,000
2003-04
Includes
work
shelving, seating,
stations etc
Smart
e.g. conveyor,
library,
Yes
sales
« private
tax
$.659,751
5/03
5/03
$395,632
Conveyor
self -check,
RFID
RFID
Self
-check
Moving costs
Yes
sales
+ pnvate
tax
$30,000
2004
Unfunded and
cut items.
No
$0
N/A
Such as staff
signage package,
room divider,
lockers,
meeting
piano.
full
Off-Srte improvements
Off-site
improvements
(see first item
above)
Yes, CIP
5/21/02
$221,995
In Crossland
funded from
improvements
Contract
CIP site
project
but
West Avenue
underground
utilities
Yes, CIP
$101,806
10/14/03
West Ave underground
utility permanent
equipment for
power and
residences.
•
AmirmoezFosterHaileyJohnson
MEMORANDUM
To: Bob Kohler
Copy: Sean Wagner
From: Jim Foster
Reference: Fa
&Air Library, PR 10
Architects & Planners
Scptcmbcr 26, 2003
The Arch' ommend approval of the low voltage equipment and cable
included in t ttached partial response to Proposal Request 10. To be resolved later
is the amount required for conduit for these systems.
After the project was bid low voltage was broken out as $340,000. Exhibit C to the
Agreement removed $340,000.00 from the bid amount for fire alarm and detection
systems, security intrusion systems, closed circuit television systems, and voice and
data cabling systems work as required by Section 16720, Section 16726, Section
16729, and Section 16740. The overall project budget was concurrently adjusted to
include several deferred items including $260.000 for low voltage systems and
$16,000 for cable tray system. Out of these two $276,000 budget items there has
been committed $33,478.95 in Change Order #4 and Construction Change Directive
46 with a maximum amount of $20,000 to allow conduit rough in to proceed.
The attached Potential Change Order #22 in the amount of $206,700.90 has been
thoroughly reviewed by the design team and should be considered as Change Order
10 to the contract. Low voltage systems were redesigned to reduce scope and
accommodate newer more flexible technology. The remaining sum in the budget for
the balance of this work, after the limit of CCD 6 is reached, will be $15,820. Every
effort is being made to stay within this budget but realistically we expect the final
cost to exceed this budget line item.
Post Office Box 790 • 100 West Center, Suite 302 • Fayetteville, AR 72702 • 479-442-5565 • FAX 479-442-8849
•
Crossland Construction Company
Fayetteville Public Library
2A0720
401 West Mountain Street
Fayetteville, AR 72701
Poteilial Change Orders I
Detailed Report
Date Range: All Dates
Printed on: 9/17/03
0033 PCO a22 - PR #10 Low Voltage System
Date 9/17/03
Category
Reason
Reference
User Defined Field
Pending
Architect DirectNe
Total Orig Est
Total Prop'd
Days Reqed
Days Apped
Date Recrd
Date Done
Closed
Notify
Total Orig Est
Total Prop'd
,Total Apped
0.00
O.CO
No
No
OW
206,70090
0.W
COR No PCCO No
Reference Document
Notes
Item No 1Company-
Budget Allocation
'tern Description
ccoi fAmirmoezFosterHailevJohnsi Approximate Changes
Low Voltage System
Budget Code
Orig Esti Prop And
Appr Amt
Item Notes
CO No
0.00 1 700.90 OW
RECEIVED
SEP 2 2 2003
AMIRMOEZ • FOSTER
HAILEY • JOHNSON
so.
ContralAdministration
G709 Work Changes Proposal Request
•
(Instruct ons on the rev rse 4)
PROJECT (Name and address):
FAYETTEVILLE PUBLIC LIBRARY
401 WEST MOUNTAIN STREET
FAYETTEVILLE, ARKANSAS 72701
OWNER (Name and address):
CITY OF FAYETTEVILLE
113 WEST MOUNTAIN STREET
FAYETTEVILLE, ARKANSAS 72701
FROM AntiaRkAUBUDDMOCVASSOCIATE ARCHITECT
AMIRMOEZ FOSTER HAILEY JOHNSON
PO BOX 790
FAYETTEVILLE, ARKANSAS 72702-0790
TO CONTRACTOR (Name and address):
CROSSLAND CONSTRUCTION COMPANY INC.
ATTN: JOHN PRIEST, PROJECT MANAGER
PO BOX 907
ROGERS ARKANSAS 72756
Please submit an itemized proposal for changes in the Contrac: Sum and Contract Time for proposed modifications to the Contract Documents
described herein. Within TFtil ( 10 ) days Ire Contractor must submit this proposal or notify the Architect. in wicting.
of the dale on which proposal submission is anticipated.
THIS IS NOT A CHANGE ORD(R, A CONSTRUCTION CHANGE DIRECTIVE OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED IN THE
PROPOSED MODIFICATIONS,
PROPOSAL REQUEST NUMBER Ten 10)
DATE OF ISSUANCE:
CONTRACT FOR:
Distribution List:
Owner
Architect
Consultant
Contractor
Field
Other
May 13, 2003
GENERAL CONSTRUCTION
CONTRACT DATE: MAY 21, 2002
ARCHITECT'S PROJECT NUMBER: 2000073-00
ESCRIPTION (Insert a weitten description of the Work):
Provide a proposal for incorporating additional scope of work consistent with attachments. This work is subject to the
overhead and profit limits established in paragraph 8.1.7.1 of Exhibit 'C' of the Contract for Construction. This scope
of work includes: Fire Alarm and Detection, Building Intrusion Detection, IP -based Closed Circuit Surveillance, and
Communications Cabling System. This will require complete and detailed information from the electrical sub-
contractor and third tier sub -contractors. The format for the proposal is included below.
Due to integration requirements with the Owner's future network equipment, we are requesting a minimum of four (4)
separate qualified third -tier contractors for the communications cabling systems. There are specific qualifications for
third tier sub -contractors for the Communications Cabling specified in Section 16740 (rev.4/2003), and copies of
required certifications must be attached to the proposal. Pricing is requested to be in the detail indicated in the
Proposal Request Detail Outline attached.
ATTACHMENTS (Lrs; attached documents that support description):
A. Proposal Request Detail Outline
B. Specifications Section 16720, Fire Alarm and Detection System
C. Specifications Section 16726, Secunty Intrusion and Detection System
D. Specifications Section 16740, Digital Communications Cabling Systems
E. Seven sheets of Drawings with latest revision date of 05/08/03:
LV -101, LV -101.5, LV -102, LV -103, LV -104, LV -104.5, LV105,
REQUESTED T TH
• abeiswne-La•-s-n-s
SSOCIATE ARCHITECT
James R. Foster, FAIA
(Signature) (Printed name and title
i •
Docpment G709 Work Changes Proposal Request .0 2001 The American Inst.:cre of Architects • Washington. OC • wwwaa on;
To recut popyrigni viciations at AlA Contract DC:Comer:5 e.marl The Ametean Institute ot Architects- legal
COunSel _payee.-
Org
GRAND TOTAL FOR CHANGE
CCC OH/P for Subs at 2.50%
CCC Overhead © 15.00%
%oot @PU08333
CCC Insurance ©
Subcontractor Total
Labor Direct Cost
Material Direct Cost Total
Cost Summary
Leerier Electric
Z
Cu
3
CD
Subcontractor Pricing
0
CD
if.
n
-9
SI
1 Material & Labor Direct Cost
Project Name:
Potential Change Order #
Date:
Description of Request:
4-9
0
=
CA
ia
'CCTV is based cc
'value engineered
'extent or the labor
q
s
Iintrvion defechan
-,
g
c
3
03
0
I.
If
Z
.5
9
c
n
E
r II
pg.
r
so
r•
3
a,
E
g
!,'
I,
—
q
b'
3
4°
0
a
$ 206,700.90
2,145 45 1
IA
429.09
CA
$ 204,062 00
$ 204,062 001
444,
n
C
3
a coax cable system and!
Please note that the alter
97
i
C
•
3
..
g
-t
and matenai related to the I
Id material for any the relr
cabling system The attic
e
es
i
a
a
i
a
:in is for fire alarm & dote
Description of Wol
.....
Quantity
POTENTIAL CHANGE ORDER REQUEST
Fayetteville Public Library
22
9/17/03 Days Requested PrIce Good For 14 Days
PR at10 • Modifications to Low Voltage System
al
ta
c
i•
'‘,7
n
-
a
WWI
g
;
•
c
a
0
2
"
r
-)
3>
-I
0
-4
o
—t
0
-t.
n
:he apprcnif c4
nate deduct tor the
W.
5
L•li...g
E
it"-.
a
-t--.
a
3
2
T
.
is•
4.
•
v
a
Is
3
i
s
••
a
9
-
5
lc
rk
MATERIAL SU
xf< AS APPLICABLE
MATERIA
I Cost
1 Sub P
. TOTAL]
BTOTAL
8 375%
C
=
.=
cc/ ][. CA
071 . el Oil .
0 0 0
vo
1•2
g
a*
.-.) d.). .-.)
c n c =
-%m co n (7,
-.
..
MA-7FM
062.00
062 00
ricing
4.
I.
9.
9.*
4.
999.
4996
see
v.
v.
4A
4A
401
I Material Cost
.1"
co
—
>
3
R.
3
0
..<
I—.
.
Dez•Foster-Hailey.Johnson
of Fayetteville, Arkansas
[Layout Eng & (1) Laborer
Carpenter & (2) Laborer
[Concrete Finisher
[Carpenter & (1) Laborer
[Laborer
0
co
13
0
3
g
-•
[Operator w/ Equipment
[Description
CCC Crew Type
LABOR SUB'
LABOR BURDEN
LABOR'
hr
R:
2;
hr
hr
R.
-7
7,
7,
7
Hours
777,77777,Z
hr
Crew Type
0
-9,
ni
o
0o
3..t•
-•
6
401
.t.
4.
4A
--4,
s
40
401
I Labor Cost
IA
*A
4A
4
4A
4A
V*
0
0
19
--...
2
en
4,
-4,
130 00 1
-4
0
8
5r.[ 10
2500 1
8
30 00 1
so oo I
g
•
Sent By: Crossland Construction;• 14795713748;
Jul -11,03 5:49PM; Page 2
LOW VOLTAGE SYSTEM PRICE PROPOSAL
PROPOSAL REQUEST #10
For
FAYETTEVILLE PUBLIC LIBRARY
401 WEST MOUNTAIN
FAYETTEVILLE, ARKANSAS
ARCHITECT:
Meyer, Scherer & Rockcastle, Ltd.
119 North 2nd Street
Minneapolis, MN 55401-1420
GENERAL CONTRACTOR:
Crossland Construction
2510 West Hudson Road
Rogers, Arkansas 72756
ELECTRICAL CONTRACTOR:
Beaver Electric Corporation
208 N. Block P. O. Box 1071
Fayetteville, Arkansas 72702
PHONE• 442-8755
FAX: 442-0938
SEP -17-2003 17:04 BEAVER ELECTRIC CO.
• •
BEAVER ELECTRIC CORPORATION
208 N. Block P.O. Box 1071
Fayetteville, Arkansas 72702
Phone: (479) 4424755 Fax: (479) 442-0938
PROPOSAL CONTRACT
Date: 09-17-03
Crossland Construction
3015 East Skelly Drtve
Tulsa, Ok 74105
Ph.479-571-2322 Fax 479-571-3748
Ph.620.429-1414 Fax 620.429-8948
Att. John Priest,
Subject: Request for change order* C -0010R3,
Re: Low Voltage Proposal,
Dear Mr. Priest,
P.01/0e
Change Order Num: Mal
Be advised of the following changes to Fayetteville Pubfic Library per Work Change Proposal number
Ten. As request new fire alarm per Section 16720, security intrusion and detection system per Section
16725, IP -Based network CCTV Monitoring System per section 16729 and digital communications
cabling systems per Section 16740.
Scope of Work:
Provide new low voltage systems per drawings dated 0508.03 and the following sheets LV -101, LV -
101.5, LV -102, LV -103, LV -104, LV -104.5 and LV -105.
Bid *1 Simplex
Scope of Work MMMMnal Tu Labor
Fire Alarm and Detection Cabling $ 3,100 Included $ 6,173 $ 4644 Total
Fire Alarm and Detection Equipment $ 9,7377
q pment $ 24,750 Included $ S.9B4 $ 1.537 $ 32.281
Fire Alarm and Detection Conduit
Scope of Work Material Tax Labor O&P Total
Building Intrusion Detection Cabling $ 3,950 Included $ 5,185 $ 456 $ 9,592
Building Intrusion Detection Equipment $ 4,276 Included $ 3.950 $ 411 3 3,537
Building Intrusion Detection Conduit
(Beaver,
SEF -1? -2003 1?:05 BEALEEP ELECTRIC co.
•
• Page 2
Bid et2 SBC
Scone of Work Material
Communications t atlling (copper)
Communications Cabling (fiber optic) $ 41,460
Communications Cable Tray $ 6,433
Communications Related Equipment
Communications Conduit(Beaver)
P.M 'CZ
•
September 17. 2303
Tax Labor Q841 Total
Included $ 30.955 $ 3,620
Included $ 4,080 $ 526
Scone of WorkMaterial Tax Labor O&P
IP based CCN System Cabling $ 53,342 Included f 4,500 E 2,892
IP -based CCN System Equipment THIS PRICE tS LUMP SUM
IP -based CCTV System Conduit (Heaver)
Communications Alternate Cosi Savings different Data Rack (dedua) $ <1 800 00>
Communications Alternate Cost Savings different Patch Cable (deduct) $ <2.000.00>
$ 76.035
$ 11.039
Total
$60,734
ALLOW 4-8 WEEKS FCR DELIVERY OF EQUIPMENT AFTER WRITTEN RELEASE AND
EQUIPMENT SUBMITTIAL APPROVAL
Prices quoted will be canceled W not accepted within 30 days. Terms are Net 30 days.
All cabling win be tested at time of rough in, K any wiring problems after rough in are detected,
cables will be repaired at an additional cost Furthermore, if any electrical equipment are
damaged (cut pull strings, mud rings removed, mud rings not cut in by sheetrock ect) will be
replaced at additional cost.
Please review the folowirg exclusions:
1)
2)
3)
4)
5)
6)
7)
Overtime. (Our pnce is based on a continuous wont schedule with normal working hours
from 7:OOam. To 3:30 Monday thru Friday.
Saw cutting of existing concrete.
Patching of existing concrete and sheetrock.
X-raying of existing concrete.
Removal of concrete and sheelrock spats.
Backing for Low Voltage equipment.
Painting.
Please respond in venting ASAP.
/John Williams
Project Manager
CcAustin Blevins
FAYETTEV&LE
THE CITY OF FAYETTEVILLE. ARKANSAS
DEPARTMENTAL CORRESPONDENCE
•
To: Louise Schaper
Fayetteville Public Library
From: Clarice Buffalohead-Pearman
City Clerk Division
Date: October 27, 2003
Re: Res. No. 159-03
Attached is an executed copy of the above resolution, approved by the City Council on October
21, 2003, authorizing Change Order No. 10 to the contract, with Crossland Construction
Company, Inc. to install low voltage equipment at the new library.
Also, this date Mr. Bob Kohler picked up four original signed change orders from the city clerk's
office.
This resolution and attachments will be recorded in the city clerk's office and microfilmed. If .
anything else is needed please let the clerk's office know.
/cbp
attachments
cc Nancy. Smith, Internal Auditor