HomeMy WebLinkAbout136-03 RESOLUTION136-03
RESOLUTION NO.
A RESOLUTION APPROVING AMENDMENT NO. 1 TO THE
ENGINEERING CONTRACT WITH McCLELLAND
CONSULTING ENGINEERS IN THE AMOUNT OF ONE
HUNDRED THIRTY-NINE THOUSAND TWENTY DOLLARS
(S139,020.00) FOR THE NORTH COLLEGE AVENUE WATER
LINE REPLACEMENT PROJECT; APPROVING A TEN PERCENT
(10%) PROJECT CONTINGENCY; AND APPROVING A BUDGET
ADJUSTMENT FOR SAME.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
FAYETTEVILLE, ARKANSAS:
OF
Section 1. That the City Council of the City of Fayetteville, Arkansas
hereby approves Amendment No. 1 to the Engineering Contract with
McClelland Consulting Engineers in the amount of One Hundred Thirty -Nine
Thousand Twenty Dollars ($139,020.00) for the North College Avenue Water
Line Replacement Project.
Section 2. That the City Council of the City of Fayetteville, Arkansas
hereby approves a ten percent (10%) project contingency in the amount of
Thirteen Thousand Nine Hundred Two Dollars ($13,902.00).
Section 2. That the City Council of the City of Fayetteville, Arkansas
hereby approves a budget adjustment in the amount of Four Hundred Eighty
Thousand Seven Hundred Dollars ($480,700.00) for same.
PASSED and APPROVED this 16th day of September, 2003.
•
•
By:
itu
SONDRA SMITH, City Clerk
APPROVED:
By
•
• •
AMENDMENT NO. 1
CITY OF FAYETTEVILLE
AGREEMENT FOR ENGINEERING SERVICES
NORTH COLLEGE WATER MAIN RELOCATION
MAPLE STREET TO NORTH STREET
This Amendment No. 1 is hereby made to the basic Agreement for Engineering Services
made between the City of Fayetteville, Arkansas and McClelland Consulting Engineers,
Inc. as executed September 17, 2002.
Engineering services to be provided under this Amendment No. 1 are as defined in
ARTICLE 1 and compensation shall be as defined in ARTICLE 2.
ARTICLE 1
Services to be provided under Amendment No. 1 shall include design and
construction observation services for relocated water mains along North College Avenue,
between Maple Street and North Street. The water main locations shall be as described
under the Alternative No. 2 pipe layout as listed in the applicable Engineering Report
dated June, 2003. Said engineering services shall include, but not be limited to:
1. Field surveys as required for:
a). Preparation of Plans and Detailed Specifications.
b). Preparation of easements, highway utility permits, etc.
2. Preparation of Plans and Detailed Specifications for the water mains
identified under Alternative No. 2 in the Engineering Report.
3. Preparation of a cost estimate of proposed facilities.
4. Obtain agency approval of Plans and Detailed Specifications, as required.
5. Assist in obtaining Highway Department approval of utility permits.
6. Preparation of construction easement documents, as required.
7. Bid advertising and bidding services.
Proposal 2003 Nonh College/Maple Succt Relocation
•
• •
8. Bid evaluation/recommendations.
9. Basic engineering services during construction.
10. Full time construction observation.
11. Project closeout and record drawings.
ARTICLE 2
Compensation for services to be provided in this Amendment No. 1 shall be
determined as follows:
1. For field surveys for design purposes, a lump sum price of $32,820.00.
2. For easement surveys and easement preparations services a unit price per
easement of $400/each.
3. For Basic Design Services, to include Items 2,3,4,5,7,8,9, and 11 as
defined in ARTICLE 1 above, a lump sum of $52,600.00.
4. For full time construction observation services, a lump sum price of
$44,000.00.
It is estimated that approximately 24 easements will be required, resulting in an
estimated cost for easement preparation of $9,600. The resulting total cstimated
fee for the above scope of work is therefore $139,020.00.
Changes, modifications, or amendments in scope, price or fees to this contract
shall not be allowed without a prior formal contract amendment approved by the
• Mayor and the City Council in advance of the change in scope, cost of fees.
Proposal 2003 North College/Maple Street Relocation 2
• •
ARTICLE 3
McClelland Consulting Engineers shall begin work under this Amendment No. 1
within ten (10) days of the authorization to proceed. It is anticipated that the time
required to complete field surveys and preliminary designs, including draft plans and
specifications, for review by the City of Fayetteville, will be approximately five months.
Upon receipt of review comments from the City of Fayetteville, the final plans and
specifications shall be completed and ready for final review by the City of Fayetteville
and Arkansas Department of Health in one month. Subsequent tasks shall be completed
as scheduled and authorized by the City of Fayetteville.
ARTICLE 4
Freedom of Information Act. City contracts and documents prepared while
performing city contractual work are subject to the Arkansas Freedom of Information
Act. If a Freedom of Information Act request is presented to the City of Fayetteville,
McClelland Consulting Engineers, Inc., will do everything possible to provide the
documents in a prompt and timely manner as prescribed in the Arkansas Freedom of
Information Act (A.C.A. §25-19-010 et. seq.). Only legally authorized photocopying
costs pursuant to the FOIA may be assessed for this compliance.
ARTICLE 5
All other conditions and requirements of the original Agreement for Engineering
Services, as executed September 17, 2002 remain in full force and effect.
Proposal 2003 North College/Maple Street Relocation 3
• •
ARTICLE 6
IN WITNESS WHEREOF, the parties hereto have caused this Agreement
Amendment to be duly executed as of the date and year first herein written.
CITY OF FAYE'ITEVILLE, ARKANSAS MCCLELLAND CONSULTING
ENGINEERS, INC.
By:
Dan Coody, Mayor
o ,&t) rd fh
a•
o C. Quinn, President
ATTEST:
R II y�l�/
Obert W.
White, Vice -President
Smith,City Clerk
Proposal 2003 North College/Maple Street Relocation 4
•
•
CITY OF FAYETTEVILLE
NORTH COLLEGE WATER MAIN RELOCATION
MAPLE STREET TO NORTH STREET
ENGINEERING COST ESTIMATE
I. BASIC DESIGN SERVICES
A. Design Services:
Preparation of Plans, Detailed Specifications, Contract Documents and Utility Permit
Applications
Classification
Project Manager
Project Engineer 11
Project Engineer
Computer Technician
Chief Draftsman
Draftsman I1
Draftsman I
Clerk/Typist
B. Bidding Services:
Project Manager
Draftsman 11
Clerk/typist
C. Project Closeout Services:
Project Manager
Project Engineer 1
Chief Draftsman
Draftsman 1
Cleric/Typist
Estimated Hours
152
40
62
48
146
88
88
72
16
4
12
18
12
20
28
8
J:\2002\022161\Engineering Cost Estimate 6.232003 dnc
Subtotal
Subtotal
Subtotal
Rate Estimated Cost
$105.00 $15,960.00
$ 85.00 $ 3,400.00
$ 65.00 $ 4,030.00
$ 55.00 $ 2,640.00
$ 60.00 $ 8,760.00
$ 49.00 $ 4,312.00
$ 34.00 $ 2,992.00
$ 37.00 S 2,664.00
$44,758.00
$105.00
$ 49.00
$ 37.00
8105.00
$ 65.00
$ 60.00
$ 34.00
$ 37.00
$ 1,680.00
$ 196.00
S 444.00
$ 2,320.00
$1,890.00
$ 780.00
$1,200.00
$ 952.00
$ 296.00
$5,118.00
• •
D. Direct Expenses for l3asic Design Services:
Mileage
Reproduction & Misc.
240 miles $ 0.32
Subtotal
$ 76.80
$327.20
5404.00
ESTIMATED TOTAL, BASIC DESIGN SERVICES 552,600.00
II. CONSTRUCTION OBSERVATION SERVICES
Based on 5 -month construction period
Project Manager 100 $105.00 $10,500.00
Construction Observer II 40 $ 65.00 $ 2,600.00
Construction Observer 1 800 $ 38.00 $30,400.00
Clerk/Typist 8 $ 37.00 $ 296.00
Mileage and Expenses $ 204.00
ESTIMATED TOTAL $44,000.00
III. EASEMENTS
A total of 24 easements is estimated, mainly for the lines that parallel North College. The
balance of the lines are presumed to be installed in street right of ways instead of on
easements.
24 easements at 5400.00/each = $9,600.00
IV. DESIGN SURVEYS
See the attached breakdown for estimated surveying costs on a line segment basis. These
costs total $32,820.00.
1-\2002\022161\Engineering Cost EstImata 6.23.2003 doc
• •
FAYETTEVILLE WATER MAIN REPLACEMENT
SURVEY COST ESTIMATE
July 24, 2003
(MAIN #1) Maple Street (survey both sides of road)
2 -Man Field Crcw 20hr @ $95.00/hr 51,900.00
Surveyor 2hr @ $60.00/hr 5120.00
Computer Technician 15hr @ $55.00/hr 5825.00
SUB TOTAL $2,845.00
(MAIN #2) Davidson West of College (survey both sides of road)
2 -Man Field Crew 24hr @ 595.00/hr
Surveyor 3hr @ $60.00/hr
Computer Technician l8hr @ $55.00/hr
(MAIN #3) Davidson East of College (survey both sides of road)
2 -Man Field Crew 16hr @ $95.00/hr
Surveyor 2hr @ $60.00/hr
Computer Technician l2hr `t, 555.00/hr
52,280.00
5180.00
$990.00
SUB TOTAL 53,450.00
SUB TOTAL
51,520.00
5120.00
5660.00
52,300.00
(MAIN #4) Washington South of Davidson (survey both sides of road)
2 -Man Field Crew 24hr @ $95.00/hr 52,280.00
Surveyor 3hr @ $60.00/hr 5180.00
Computer Tcchnician 18hr @ $55.00/hr 5990.00
SUB TOTAL 53,450.00
(MAIN #5) West Side of Collage, Davidson to Trenton
2 -Man Field Crew 8hr @ $95.00/hr
Surveyor lhr @ $60.00/hr
Computer Technician 6hr @ $55.00/hr
(MAIN #6) Washington North of Rebecca (survey both sides of road)
2 -Man Field Crew 16hr @ $95.00/hr
Surveyor 2hr @ $60.00/hr
Computer Technician 12hr @ $55.00/hr
(MAIN #7) Prospect Street (survey one side of road)
2 -Man Field Crew 14hr @ $95.00/hr
Surveyor 1.Shr @ 560.00/hr
Computcr Technician l0hr @ $55.00/hr
(MAIN #8) Pollard Avenue (survey one side of road)
2 -Man Field Crcw 14hr @ $95.00/hr
Surveyor 1.5hr @ 560.00/hr
Computer Tcchnician lOhr @ $55.00/hr
5760.00
560.00
$330.00
SUBTOTAL 51,150.00
$1,520.00
$120.00
5660 00
SUB TOTAL 52,300.00
51,330.00
590.00
5550.00
SUB TOTAL 51,970.00
51,330.00
590.00
5550 00
SUB TOTAL 51,970.00
(MAIN #9) Clebum East of Collage (survey both sides of road)
2 -Man Field Crew 28hr @ $95.00/hr
Surveyor 3hr @ $60.00/hr
Computer Technician 21 hr @ $55.00/hr
SUB TOTAL
52,660.00
$180.00
$1.155.00
53,995.00
(MAIN # 10) West of College, Maple to Davidson (survey one side of road)
2 -Man Field Crcw 16hr @ $95.00/hr 51,520.00
Surveyor 2hr @ $60.00/hr $120.00
Computcr Technician 12hr @ $55.00/hr $660.00
SUB TOTAL $2,300.00
(MAIN 411) East of College, Maple to Davidson (survey one side of road)
2 -Man Field Crew 16hr @ $95.00/hr
Surveyor 2hr @ $60.00/hr
Computer Technician l2hr @ $55.00/hr
SUB TOTAL
$1,520.00
5120.00
$660.00
52,300.00
(MAIN # 12) East of College, North of Davidson (survey one side of road)
2 -Man Field Crew 8hr @ $95.00/hr 5760.00
Surveyor 1hr @ $60.00/hr $60.00
Computer Technician 6hr @ $55.00/hr $330.00
SUB TOTAL $1,150.00
(MAIN 413) East of College, Prospect to Cleburm (survey one side of road)
2 -Man Field Crew 12hr @ $95.00/hr 51,140.00
Surveyor 1hr @ $60.00/hr $60.00
Computer Technician 9hr @ $55.00/hr $495.00
SUB TOTAL 51,695.00
(MAIN # 14) East of College, Cleburn to Baxter (survey one side of road)
2 -Man Field Crcw 8hr @ $95.00/1u
Surveyor 1hr @ $60.00/hr
Computer Technician 6hr @ 555.00/hr
(MAIN #15) Trenton Blvd. & Lollar Lane Intersection
2 -Man Field Crew 6hr @ $95.00/lu
Surveyor 1hr @ $60.00/hr
Computer Technician 3hr @ $55.00/hr
5760.00
$60.00
$330.00
SUB TOTAL 51,150.00
$570.00
$60.00
5165.00
SUB TOTAL $795.00
TOTAL $32,820.00
•I
r .rn
Gil:_.A..—_._=w_.__e.______.__—_._.__n:
'
ti 11,
I I
1
.I
E,' a•
A
it
4t I
!
:I I•
-
j
I i
a
-- ---- —.
- ----
T -------
----,
r---- _....—__.
_
I i
!�I
I
arc
I
I
it .., cmnr I_
III II
I
I
PREVIOUSLY
ABANDONED 20'
AND 2'
raa ,mi
a l
._I'
__ ;
I
I �'• I
;,
I'
V FM ABANDON .' xv CN
/CA_P
{ ;'i
I
0
----- _.o —
—.• t.wr---.
••
•
e
I
r
1
I
[
`�J�e�
I
i
II
�
i
_
ABANDOCAP
N i
2' .�
-
PREVIOUSLY
ABANDCHEO 20'
KV FM.
`PROPOSCD 8'
CAP 4-
•' SED 8'
-
NEVFM
i
PROPOSED 2' n.
i_.__._.
...
BVBIil_ .. • ,, ____. _.�
KV FM CILBURM
1
_
-
STREET
1 I
4
V
I
I
CONNt CT 2'
10 8
I II
CAP 2' 1—
IAB ZNDON
/�
ABANDW 2' CAP B'�
F— ._...--.__—,.
1
;!�j
I I
V
ret—.
}}
O -
JI
7
I
I
RO
PROPOSED 2'
igI
•
I
II
ABANDON 6'
PAC NUSLY
ABANDONED 20'
CONNECT 2•
as
FH
iI
KV
—_
/rn
ems-«
/ACV
/ PROPOSED 8'
__ ________
... _.—._—.y
_ __—.—
iFIG�
11�/■
CAP 6' 11i
CAP 2 T/v
¢
_--
PROPOSED B'
ABANDQI 2 1/4'
''_a .._�:"
-- ---
�,
iBCC
/ ABANDON r I
AP 2' >
I -
Y
PRCPOSCD
�--
8' -
I
� I•I
--
L_-
I
I
.__.._
<I
4,
I
'
—
'—�'
I
._.I
a l I NEW FMS
I
AP B'
ABANDON 6'
_ L PRCPOSCD 8'
IiI Fi NEW fM\
IW A
PROPOSED 6' FIRE LIMO
PRIOSED 8'
'
RE[T'-- :
-- I.
I-------1
1
I.
. I 4:
------------
!
I
1 I_
!"I
,.
= I
I
1
• I ABANDYry 2'
I II i
I J
PROPPDSE r
I III
KV FN..
.. OPOSED 2'
ABANDON 6'
u
.I
1.
I PR[POSCD e'
ABANDo .'
+
i
_—
..r..
.,1
I.
i
I
!
I
I
I
1 ABAND4 •
CAP 6' AND 4'
_
-a
I AP • -
I
ISI
Its I PROPOSED 12'
�ICCNCCTICB
�4?
I PROPOSED 6' I'
1
I
I
${g
I
I
FIGURE NO. 6
NORTH COLLEGE WATER MAIN REPLACEMENT
ALTERNATIVE N0. 2
REPLACEMENT MAINS
WITH NORTH COLLEGE CROSSINGS MINIMIZED 1
LEGEND I
PROPOSED I
EXISTING WATER TO BE WATER
MAINS ABANDONED MAINS
4' OR SMALLER
IrS
n .r
8'
10'
OVER 12'
.N --N_
NCV OR REPLACEMENT FIRE HYDRANT Bo*
e
• City of Fayetteville, Arkansas •
Budget Adjustment Form
s . / 34 - 0
Budget Year
2003
Department
Division:
Program:
Community Planning & Engineering
Engineering
Water & Sewer Fund Projects
Date Requested -
9/19/2003
Adjustment Number
03-119
Project or Item Requested:
$480,700 is requested in the North College Water Line
Replacement capital project.
Project or Item Deleted:
Funding from various water/sewer capital projects that are
completed in 2003 with excess funds.
00038 - White River Bridge 45 East Waterline
02120 - W&S Improvements - Defined by Study
02067 - Water & Sewer Cost Sharing
01021 - East Ridgeway - Water Line Extension
01022 - Hinkle Mobile Home Park - Waterline Repl
02040 - 1-540 Sewer Rehabilitation
02031 - Rodgers Drive Water Tank
Justification of this Increase:
The funding is needed to cover the projected
construction cost of the project which will be submitted to
City Council at a future date.
Justification of this Decrease:
There is sufficient funds remaining to finish 2003
objectives.
Account Name
Water line improvements
Account Name
Water line improvements
Water line improvements
Water line improvements
Water line improvements
Water line improvements
Water line improvements
Water line improvements
Increase Budget (Decrease Revenue)
Account Number
5400 5600 5808
Amount Project Number
00 480,700 02030 1
Decrease Budget (Increase Revenue)
Account Number
5400 5600 5808 00
5400 5600 5808 00
5400 5600 5808 00
5400 5600 5808 00
54000$ 00
5400 00
5400 5600 5808 00
Amount
41,230
105,951
165,664
37,244
25,000
74,067
31,544
Project Number
00038
02120
02067
01021
01022
02040
02031.
1
1
1
1
1
1
1
Approval Signatures
Requested By
Budget Manager
spa/ l nment Director
Finance & intcyrfaJ Service. 'rector
Date
9-21v3
Date
- 26- 03
Date
9-zs--63
Date
91/7223
Date
Type: A
Budget Office Use Only
13 C
Date of Approval
Posted to General Ledger
Posted to Project Accounting
Entered in Category Log
et 4443
Initial Date
110—q4_ a3
Initial Date
Initial Date
Initial Date
NAME OF FILE:
CROSS REFERENCE:
Item #
Date
Resolution No. 136-03
Document
1
08/26/03
Staff Review Form w/attachments
draft resolution
memo to Mayor/City Council/Earnest/Conklin/Coover
copy of vicinity map
copy of Figure 6 -North College Water Main Replacement
copy of Table 4 Cost Estimate Summary
copy of Recommendations (McClelland)
copy of Res No 142-02
2
09/19/03
memo to Sid Norbash
NOTES.
••
STAFF REVIEW FORM — FINANCIAL OBLIGATION
X AGENDA REQUEST
x CONTRACT REVIEW
GRANT REVIEW
qith/o3
/36-63
For the Fayetteville City Council meeting of September 16, 2003
FROM:
Sid Norbash y� / Engineenng CP& E
Name Division Department
ACTION REQUIRED: Approval of the Amendment No. 1 to the Engineering Contract with
McClelland Consulting Engineers in the amount of$139,020, for the N. College Ave. -Water
Line Replacement Project. Also approval of a 10% Project Contingency in the Amount of
$13,902.
Approval of a Budget Adjustment in the amount of $480,700.
COST TO CITY:
$152,922
Cost of this Request
5400-5600-5808-00
Account Number
02030-20
Project Number
$ 862,1542 N. College
Cat$ 1e3.36 r 9 t Budget 2003
Funds Used To Date 2003
$ 8481789.41
Remaining Balance 2003
Ave W/L Replcmt.
Program Category/Project Name
Water & Sewer lmpvts.
Program/Project Category Name
Water & Sewer
Fund Name
BUDGET R IEW:
Budgeted Item
Cl
Budget
anager
Date
X
Budget Adjustment Attached
CONN RACT/G T/LEASE REVIEW:
•r `7 7/i tiej
ACcounti: Mypaper Dalokrt(
0,3
City Attorney Date
I
—114.0
1 uor
Pu horsing Manager
1, 03
Date
STAFF RECOMMENDATION: Approval
N
'V vision 'ea,
ep• , nt h for
st
4
.Avii
. j/
I .O
ate
1
-03
Date
Date
Mance
,
n ma
i'/ /
Chie 1 tstrati
tees
r
,
r late
Ma
1/1/03
Date
Date
Received in Mayor's Once
Cross Reference •
Prev Ord/Res #: 142-02
Orig. Contract Date: 9-17-2002
Orig. Contract No: 868
New Item: Yes_ No X
ate
3
t
it
• •
STAFF REVIEW FORM
Description N. College Ave. Water Line Replacement Project
Meeting Date August 5, 2003
Comments: Reference Comments:
Budget Manager
Accounting Manager
Internal Auditor
City Attorney
Page 2
Purchasing Manager
Finance and Internal Services Director
Chief Administrative Officer
•
• •
RESOLUTION NO.
A RESOLUTION APPROVING AMENDMENT NO. 1 TO THE
ENGINEERING CONTRACT WITH McCLELLAND
CONSULTING ENGINEERS IN THE AMOUNT OF ONE
HUNDRED THIRTY-NINE THOUSAND TWENTY DOLLARS
($139,020.00) FOR THE NORTH COLLEGE AVENUE WATER
LINE REPLACEMENT PROJECT; APPROVING A TEN PERCENT
(10%) PROJECT CONTINGENCY; AND APPROVING A BUDGET
ADJUSTMENT FOR SAME.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas
hereby approves Amendment No. 1 to the Engineering Contract with
McClelland Consulting Engineers in the amount of One Hundred Thirty -Nine
Thousand Twenty Dollars ($139,020.00) for the North College Avenue Water
Line Replacement Project.
Section 2. That the City Council of the City of Fayetteville, Arkansas
hereby approves a ten percent (10%) project contingency in the amount of
Thirteen Thousand Nine Hundred Two Dollars ($13,902.00).
Sechon 2. That the City Council of the City of Fayetteville, Ark
hereby approves a budget adjustment in the amount of Four Hun • d f ig
Thousand Seven Hundred Dollars ($480,700.00) for same.
PASSED and APPROVED this 16th day of Septembdr 0
APPROVe.
DY, Mayor
FAYETTEVISLE •
THE CITY OF FAYETTEVILLE, ARKANSAS
To: Fayetteville City Council
Thru:
From:
Date:
Subject:
Dan Coody, Mayor
Hugh Earnest, CAO
Tim Conklin, Director CP&E
Gary Coover, City Engineer
Sid Norbash, Staff Engineer
July 31, 2003
North College Water Main Replacement Project
Amendment No. I to the Engineering Contract
McClelland Consulting Engineers, Inc.
BACKGROUND
College Avenue water main improvements relate to the upgrading of aging infrastructure.
Water supply lines under College Avenue (between North and Maple Streets) are
undersized, subject to recurring failures and unable to meet fire protection needs. This
capital project was identified as a priority in 2002 with the associated engineering
analysis of altematives being commissioned to McClelland Engineers in September of
2002.
The completed study has been approved by the city staff, concluding that out of three
altematives, Alternative 2 (see attached Table No. 4) is the preferred solution. This
alternative has a slightly higher initial construction cost; however, the benefits in terms of
system function, capacity and reliability warrant the increased costs. This recommended
solution has a further advantage of using a configuration that avoids dead end water lines
that pose water quality concerns. It also reduces the number of water lines crossing North
College Avenue.
In the revised system layout, pipelines are located so as to facilitate ease of maintenance
and repair. This is one of the designated capital improvement priorities set forth in the
Fayetteville Capital Improvement Plan.
DISCUSSION / STATUS
McClelland Engineering has fulfilled the scope of their current agreement with the City
of Fayetteville, having furnished the necessary engineering analysis. City staff concurs
113 WEST MOUNTAIN 72701 479-521-7700
FAX 479-575-8257
1
• •
with the selection of Alternative Number 2 as the recommended project strategy, and
have proceeded with the negotiation of the enclosed amendment to the current
professional service agreement
The enclosed contract amendment reflects the costs of usual and customary engineering
services for the design, bidding and construction phases of the project as well as the
additional services necessary for the acquisition of needed rights-of-way. The costs for
the listed scope of services are deemed reasonable, given the scope and complexity of
this project.
This project calls for replacement of approximately:
260 feet
4362 feet
305 feet
1665 feet
12" water line
8" Water line
6" Water line
2" Water Line
TIME FOR COMPLETION OF DESIGN- five months
The design. bidding, and construction phase services set forth in the proposed agreement
are associated with the Fayetteville Vision 2020 Guiding Principles listed below:
1- Well maintained City Infrastructure and Facilities
The completion of the College Avenue water main improvements is necessary to sustain
the quality, reliability and adequacy of our public water supply services.
The updated project budget for this project includes the following internal and external
costs:
Construction Cost $702,054
Preliminary Study *$ 17,378 (actual)
Design/Bidding/Construction Services $152,922
Right -of -Way Purchase $360,000
Internal Project Charges $ 25,000
Contingencies $ 85,500
TOTAL ESTIMATED PROJECT COSTS 51,342,854
* McClelland's contract for the study phase was in the amount of $28,894; howevcr. the
actual cost was $17,378.
The agenda request includes a Budget Adjustment to fully fund this proposed project,
updating its budget to reflect the current cost predictions.
2
• •
RECOMMENDATIONS
To provide the proper and responsible management of the Fayetteville Water Supply
System, the City Administration recommends that the Fayetteville City Council approve
a contract with McClelland Engineering for $139,020. This action provides for the
progression of the Project from preliminary design (initiated in September 2002) through
construction. A Budget Adjustment is included with this request to provide full funding
of the capital improvement project based upon the most recent cost prediction. The
financial summary for the College Avenue Water Main Project is as follows, based upon
a budget of $1,324,854.00.
Predicted Total Project Cost $1,342,854.00
Current Budget Amount 862,154.00
Recommended Budget Adjustment $480,700.00
A budget adjustment to fund this capital project is included as a component of this City
Council Approved Request. It should be noted that the principal source of the increased
project cost is the anticipated right-of-way purchase cost of $360,000.00. This need for
right-of-way could not be qualified until the preliminary pipeline routes were confirmed.
During the final design phase of this Project, City Staff and the engineering consultant
will strive to minimize this cost component.
3
3
10
13 1
North t
1! 16/11�-a
�zs
_
of
i I
I
iC
1$':
. I
Nurld __-__--
6,NLu
J*
_'.._—ryr
_
r'
•.
.
_—�
�_ a�
1
I 1 ARE VIDUSIY
ABANDONED 2D'
__
;1
. ••
AND 2'
—�
I
—�
f
Cgill
4
C
b
MV FH ABANDON .'
...„....NEV FH
CAP .•
5
0 —
u
•
0•mo,,.
I
I
CAP 2'
Aoy1DE
CC-
PREVIOUSLY
ABANDEKD 2D'
PCW rH
\ PRIPp$[D B'
\ ' " 0 8'
MEV rH�
••i
v
/PROPOSED 2'
ICV FH
/
LCBURN . 5 • •
✓`TEV rN CILMWRN
STREET
•
Ry/�-
NCAP 2'
`
•
CO
10 8
C 2
iABA2ND0N/
ABAIMICH Y CAP D,1
M«�
Y
5' PREMISED 2'
_
• ABAND[BI 6'
PREVIOUSLY
ABANDONED 20'
`ya uda
I !
COMECT
D 2'
'V
FM
/ ACV r
lea.
...•.
/ PROPOSED B'.�
_ . •yam
TEV M-.
\' -
CAP 6'
r
• CAP 2 1/4'
IL----ST .•
STRf1F 4A
PRIED 8'
ABANDpI 2 1/4'
II
IF
�'
ABANDON 2' 1
2'
ivz
s
PROMISED
D'�{
—inLI__
----
NEV r
•
I i �_
1
AP By
ABANDON 6'
.1
I
'
I" I 'Cy rN /
I
'
I
PRIPOSCDD'
riain.
II y
151. Irct
NEW EH -N..
PROPOSED 6' FIRE LINE
PROMISED B'
—.
I--"—.:.
RIR
—
r .
vr—
DAVIDBOKF
. ----. ..
7RCf_--_
__-
I
•
TI
1
ARAN
I
DN 2'
11
2'
rcv rN
PROPOSED 2'
,'--
PROPOSED B'
m
_•r_
ABANDPROPISED
QI .'
I•
. I i
L
®— o
I
ARAN I I I
AND
ABANDON 6'
CAP 6' 4'
[a
I
a--.
_.,
.
_C
_
Ir
:i
12'
1
1
m
PRWUSCD 6' I
CORCCTION 1
I'
1
IPROPOSED
I
FIGURE NO 6
NORTH COLLEGE WATER MAIN REPLACEMENT
ALTERNATIVE N0. 2
REPLACEMENT MAINS
WITH NORTH COLLEGE CROSSINGS MINIMIZED
LEGEND
DOSED
CXISTINO WATER TO BE WATER
MAINS ABANDOCD MAINS
.' OR SMALLER
y. -r-
EV
0' Al
12'
-04---**-
OVER 12'
n--a-
NEV OR REPLACEMENT FIRE HYDRANT I••(9