HomeMy WebLinkAbout106-03 RESOLUTIONRESOLUTION NO. 106-03
A RESOLUTION TO APPROVE AN AMENDMENT TO
THE ARCHITECT CONTRACT WITH WITTENBERG,
DELONY AND DAVIDSON INCREASING THE FEE BY
THE AMOUNT OF $15,000.00 FOR ENGINEERING SERVICES
ASSOCIATED WITH FIRE STATION NUMBER SEVEN
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas
hereby approves an amendment to the contract with Wittenberg, Delony and
Davidson attached as Exhibit A in which the City agrees to increase the fee by
the amount of $15,000.00 for engineering services associated with Fire Station
Number 7.
00EE t Vit`/ PASSED and APPROVED this the 15th day of July, 2003.
el APPROV D:
1'
ID* C0\'.
ATTEST:
By: <Ap,.u(,u✓ Mafo
Sondra Smith, City Clerk
By: A L✓/ ' //.
DAN COODY, May1"
•IICROFILMEU 3 ��T 6 ��"03
WITTENBERG. DELONY d DAVIDSON ARCHITECTS V, 6, y. LA,ifaMia rs
2434E Joyce Blvd. Ms. 10
FA E EVALE AR72703
479/ U2CCJ1
479/ 251-0231 FAX
1A/D43
I:
TO
City of Fayetteville
Building Services
1 13 W. Mountain
Fayetteville, AR 72701
DATE: March 10, 2004 PROJECT NUMBER: 03-006
ATTENTION: Dr. Coy Hurd
RE: Fayetteville Fire Station No. 7
WE ARE SENDING YOU.
❑ SHOP DRAWINGS
❑
COPY OF LETTER
❑ SPECIFICATIONS
❑ PLANS
❑ PRINTS
❑ SAMPLES
❑ FLOPPY DISK
❑ CHANGE ORDER
❑ P/u by Coy
O ATTACHED
O UNDER SEPARATE COVER VIA
COPIES
DATE
NO.
DESCRIPTION
3
Owner and Contractor Agreement signed by
Contractor
PLEASE CHECK AND ADVISE IF ENCLOSURES ARE NOT AS LISTED.
THESE ARE TRANSMITTED (AS CHECKED BELOW)
❑ FOR APPROVAI
❑ FOR YOUR USE
❑ FOR YOUR INFORMATION
O AS REQUESTED
O REVIEWED FOR GENERAL COMPLIANCE
❑ FOR REVIEW AND COMMENT 0 REVIEWED FOR NOTED COMMENTS
O RETURNED FOR CORRECTIONS
❑ RESUBMIT _ COPIES FOR APPROVAL
❑ SUBMIT COPIES FOR DISTRIBUTION
❑ RETURN CORRECTED PRINTS
REMARKS Please have Mayor Coody sign all three copies. Retain one for your files and return 2
copies to this office for distribution to the Contractor and our files.
COPY TO: File
BY
John Van Horn. VEI Alt Richard Alderman, AIA
•
•
1997 Edition -Electronic Format
AIA Document A101-1997
Standard Form of Agreement Between Owner and Contractor
where the basis of payment is a STIPULATED SUM
AGREEMENT made as of the Eighth day of March in the year of Two Thousand Four
an r.ords, indicate do. month and rear/
BETWEEN t4reO9.wrer the City of Favetteville
addre” and other m(onnaunn7
CITY OF FAYELTEVILLE
113 WEST MOUNTAIN
FAME 1 ! EVI(.LE. ARKANSAS
ContaclI Mr. Coy Hurd
Ph. (479) 575-8361 Fx: (479) 575-8223
and the Contractor.
/.\antes address and other rnformuon7
V E GENERALCONTRACTORS
202 EAST 39TH STREET
RUSSLEVILLE. ARKANSAS 72802
Contact: John Van Horn
Ph: (479) 968-5060 Fx: (479) 968-4573
The Project is:
(. n,,e and location)
NEW FAYETTEVILLE FIRE STATION NO. 7
635 NORTH RUPPLE FaQAD
FAYETTEVILLE, ARKANSAS
The Architect is:
s:une, ad,ln•s..utd other information)
WITTENBERG DELONY & DAVIDSON. INC.
2434 EAST JOYCE BOULEVARD. SUITE 19
FAYETTEVILLE. ARKANSAS 72293
Contact: Richard Alderman. AIA/Princioal
Ph: (479) 442_C§81 Fx: (479) 251-0231
The ^s. -m r The City of Fayetteville and Contractor agree as follows.
ARTICLE 1 THE CONTRACT DOCUMENTS
The Cotttrac: Documents consist of this Agreement, Conditions of the Contract (General,
Supplementary and other Conditions), Drawings, Specifications, Addenda issued pnor to
execution of this Agreement, other documents listed in this Agreement and Modifications
issued after execution of this Agreement: these form the Contract, and arc as fully a Fan of
the Contract as if attached to this Agreement or repeated herein. The Contract represents the
entire and integrated agreement between the parties hereto and supersedes prior negotiations,
cepresentatious or agreements, either written or oral. An enumeration of the Contract
Documents, other than \codifications, appears in Article R.
ARTICLE 2 THE WORK OF THIS CONTRACT
user Comment rayerev'le Fire Station No.71oo 703.006 rD .915. 1918. 1925. 1937, 1951, 1958, 1961. 1963. 1967.
1974, 1977. 1987. © 1997 by The American Institute of Architects. Reproduction of rhe material herein or
substantial quotation of its provisions without written permission of the AIA violates the copyright laws of rhe
United States and will subject rhe violator to legal prosecution. WARNING: Unlicensed photocopying
violates US copyright laws and will subject the violator to legal prosecution. This document was
electronically produced with permission of rhe AIA and can be reproduced in accordance with your license
without violation until rhe dare of expiration as noted below. expiration as noted below. User Document:
97a101.ara 3/8/2004. AIA License Number 1010810, which expires on 7/3&2004
1
THIS DOCUMENT HAS IMPORTANT LEGAL
CONSEOUENCES. CONSULTATION WITH AN
ATTORNEY /5 ENCOURAGED WITH
RESPECT TO ITS COMPLETION OR
MODIFICATION. AUTHENTICATION OF THIS
ELECTRONICALLY DRAFTED ANA
DOCUMENT MAY BE MADE BY USING AIA
DOCUMENT 0401.
AIA Document A20IW1997, General
Conditions of rhe Contract for
Construction, is adopted in this document
by reference. Do not use with other
general conditions unless this document is
modified.
This document has been approved and
endorsed by The Associated General
Contractors of America.
01997 MAO
AIA DOCUMENT A101-1997
OWNER -CONTRACTOR AGREEMENT
The American Institute of Architects
1735 New York Avenue. N.W.
Washington. D.C. 200065292
•
• •
The Contractor shall fully execute the Work described in the Contract Documents, except to
the extent specifically indicated in the Contract Documents to be the responsibility of others.
ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
3.1 The date of commencement of the Work shall be the date of this Agreement unless a
different date is stated below or provision is made for the date to be fixed in a notice to
proceed issued by ,t,.. a .'ncr the City of Fayetteville.
(Insert the date of commencement u it differs from the dear of this Agreement or, ifepphccNc state that the rate wall
be tired in a notice to proceed I
If, pnor to the commencement of the Work, 41e -fawner the City of Fayetteville requires
time to file mortgages, mechanic's liens and other security interests, i-izieeeftierLs the City of
Fayetteville's time requirement shall be as follows:
3.2 The Contract Time shall he measured from the date of commencement.
3.3 The Contractor shall achieve Substantial Completion of the entire Work not later
than ag0 (three hundred) days from the date of commencement, or as follows:
(Insert number o/calendar dm's. Altemati✓eh; a calendar date mw be used kben coorduuted with the date of
commencement Unless Rated elsewhere m the Contract Documents. utters any requtremenb for earlier Substantial
THIS DOCUMENT HAS IMPORTANT LEGAL
CONSEQUENCES. CONSULTATION WITH AN
ATTORNEY 15 ENCOURAGED WITH
RESPECT TO 175 COMPLETION OR
MODIFICATION AUTHENTICATION OF THIS
ELECTRONICALLY DRAFTED AIA
DOCUMENT MAY BE MADE BY USING AIA
DOCUMENT 040?.
AIA Document A201.1997, General
Conditions of the Contract for
Construction. is adopted in this document
by reference. Oo not use with other
general conditions unless this document is
Comp/euon ofcertain portions of the Work / modified
From date of issuance by the City of Fayetteville of a "Notice to Proceed" including
all days. holidays and other calendar days. This document has been approved and
endorsed by The Associated General
, subject to adjustments of this Contract Time as provided in the Contract Documents. Contractors of Amens
(Insert pro.'nions, om1; for bgoadurd damages relating to /Where to complete on time or for bonus pnments for early
completion of the Whet )
ARTICLE 4 CONTRACT SUM
4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the
Contractor's performance of the Contract. The Contract Sunt shall be One Million Three
Hundred Forty Thousand. One Hundred and No 100 Dollars (s 1,340 100,00 ). subject
to additions and deductions as provided in the Contract Documents.
4.2 The Contract Sum is based upon the following alternates, if any, which arc described
in the Contract Documents and are hereby accepted by the C" -mr the City of Fayetteville:
l Sate the numbers w- other Identification ofaccepted altemae4 ft decisions on other alternates are to be made by the
City 01 I air(leydla• sub•eyuent to the execution of this Agreement. attach a schedule ofsucb other alternates ahm,ing
the ,amount for each and the due When that amount crptrrsl
4.3 Unit pnces, if any, are as follows:
$ 5.00 cy undercut unsuitable materials
$ 7.00 cy select fill and placement
ARTICLE 5 PAYMENTS
5.1 PROGRESS PAYMENTS
5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor
and Ceniftcates for Payment issued by the Architect, t-he-<C".3ser-the City of Fayetteville
shall make progress payments on account of the Contract Suns to the Contractor as provided
below and elsewhere in the Contract Documents.
User Comment. Fayerrev'le Tire Station No.71ob #03.006 0 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963. 1967,
1974. 1977. 1987, 0 1997 by The American Institute of Architects. Reproducion of the material herein or
substantial quotation of its provisions without written permission of rhe AIA violates the copyright laws of rhe
United Stares and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying
violates US copyright laws and will subject the violator to legal prosecution. This document was
electronically produced with permission of the AIA and can be reproduced in accordance with your license
without violation until rhe dare of expiration as noted below. expiration as noted below. User Document:
97a101.aia 3/812004. AIA License Number 1010810, which expires on 7/30/2004.
2
01997 MAO
AIA DOCUMENT A101.1997
OWNER -CONTRACTOR AGREEMENT
The American Institute of Architects
1735 New York Avenue. N.W.
Washington, D.C. 20006-5292
5.1.2 The period covered by each Application for Payment shall be one calendar month
ending on the last day of the month, or as follows:
5.1.3 Provided that an Application for Payment is received by the Architect not later than
the 25thday of a month, thte-ra..iier the City of Fayetteville shall make payment to the
Contractor not later than the 30th day of the FOIIOwinq month. If an Application for
Payment is received by the Architect after the application date fixed above, payment shall be
made by 1 -lie -Owner the City of Fayetteville not later than 30 days after the Architect
•. ..• processes and sends to the City of Fayetteville the Application for Payment.
5.1.4 Each Application for Payment shall be based on the most recent schedule of values
submitted by the Contractor in accordance with the Contract Documents. The schedule of
values shall allocate the entire Contract Sum among the various portions of the Work. The
schedule of values shall be prepared in such foml and supported by such data to substantiate
its accuracy as the Architect may require. This schedule, unless objected to by the Architect,
shall be used as a basis for reviewing the Contractor's Applications for Payment.
5.1.5 Applications for Payment shall indicate the percentage of completion of each
portion of the Work as of the end of the period covered by the Application for Payment.
5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress
payment shall be computed as follows:
1 Take that portion of the Contract Sulu properly allocable to completed Work as
determined by multiplying the percentage completion of each portion of the Work
by the share of the Contract bun allocated to that portion of the Work in the
schedule of values, less retainage of Ten percent ( 10 %). Pending final
determination of cost to thede.wler the City of Fayetteville of changes in the
Work, amounts not in dispute shah be included as provided in Subparagraph 7.3.8 of
Afr\ Document A_201 1997.
.2 Add that portion of the Contract Sum properly allocable to materials and equipment
delivered and suitably stored at the site for subsequent incorporation in the
completed construction (or, if approved in advance by tltek3wacr the City of
Fayetteville suitably stored off the site at a location agreed upon in writing), less
retainage of Ten percent (109o)• Storage of materials in a Sub -Contractors
Vendors or others company warehouse is not sufficient to be a claim for
stored materials and will not be made Dart of any Payment Application
.3 Subtract the aggregate of previous payments trade by the-Pwlief the City of
Fayetteville. and
.4 Subtract amounts, if any, for which the Architect has withheld or nullified a
Certificate for Payment as provided in Paragraph 9.5 of AIA Document A2ot-t997.
5.1.7 The progress payment amount determined in accordance with Subparagraph 5.1.6
shall he further modified under the following circumstances:
.1 Add, upon Substantial Completion of the \Vork, a sum sufficient to increase the total
payments to the full amount of the Contract Sum, Tess such amounts as the Architect
shall determine for incomplete Work, retainage applicable to such work and
unsettled claims; and
/Sub/uragneph ya y 0!.414 Document .4.md997 nvuires n•/nne ofJppbude manage upon Substantial
Completion of Work u7th consent of ninny. if Jay)
user Comment Fayerrcv'Ie Tire Station No.71oo rt03.006 0 1915, 1918, 1925, 1937, 1951. 1958, 1961, 1963. 196/.
1974. 1977, 1987. C 1997 by The American institute of Architects. Reproduction of the material herein or
substantial quotation of its provisions without written permission of rhe AIA violates the copyright laws of the
United States and will subject rhe violator to legal prosecution. WARNING: Unlicensed photocopying
violates US copyright laws and will subject the violator to legal prosecution. This document was
electronically produced with permission of the AIA and can be reproduced in accordance with your license
without violation until the date of expiration as noted below. expiration as noted below. User Document'
97a101.aia - 3/8/2004. AIA License Number 1010810 which expires on 7/30/2004.
3
THIS DOCUMENT HAS IMPORTANT LEGAL
CONSEOUENCES. CONSULTATION WITH AN
ATTORNEY IS ENCOURAGED WITH
RESPECT TO ITS COMPLETION OR
MODIFICATION. AUTHENTICATION OF THIS
ELECTRONICALLY DRAFTED AJA
DOCUMENT MAY BE MADE BY USING AJA
DOCUMENT D401.
AIA Document A20I- 1997, General
Conditions of rhe Contract for
Construction, is adopted in this document
by reference. Do not use with other
general conditions unless this document is
modified.
This document has been approved and
endorsed by The Associated General
Contractors of America.
01997 AUO
AIA DOCUMENT A101-1997
OWNER -CONTRACTOR AGREEMENT
The American Institute of Architects
1735 New Work Avenue, N.W.
Washington, D.C. 20006.5292
• •
.2 Add, if final completion of the Work is thereafter materially delayed through no fault
of the C:ontractor, any additional amounts payable in accordance with Subparagraph
9.1o.3 of AIA Document A201-1997.
5.1.8 Reduction or limitation of retainage, if any, shall be as follows:
pen is intended, prior to Substanud Completion ortbe entire Work. to reduce or Smit the retanage resulting from the
percentages inserted res Clauses 51 n 7 end 5./ n : above. end tills is not explained elsoshere in the Contract Documents,
insert here pronsions for such reduction or bmitution )
Any Reduction in retainage amount. as provided by State Law or otherwise will onlv
be made if the City of Fayetteville is in agreement that the Work has progress with
satisfactory (to the City of Fayetteville) workmanship and proper progress in
execution of the Work has been attained. Written consent of Surety to reduction in
Retainage must be provided by the Contractor.
5.1.9 Except v.ith tete C\.ti.r'. the City of Fayetteville's prior approval, the Contractor
shall not make advance payments to suppliers for materials or equipment which have not
been delivered and stored at the site.
5.2 FINAL PAYMENT
5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall he
made by the -Owner the City of Fayetteville to the Contractor when:
.1 the Contractor has fully per -Conned the Contract except for the Contractor's
responsibility to correct work as provided in Subparagraph 12.2.2 of AIA Document
A_nr1997, and to satisfy other requirements, if any, which extend beyond final
payment; and
.2 a final Certificate for Payment has been issued by the Architect.
3 The Contractor has completed all project "close-out" requirements as stated
in the Contract Documents including as -built record documents. lien releases
from sub -contractors. major vendors and suppliers and other requirements
indicated in the Contract Documents
5.2.2 The c t i eri-the City of Fayetteville's final payment to the Contractor shall be
made no later than 3o days after the issuance of the Architect's final Certificate for Payment,
or as follows: And when the Contractor completes the Deficiencv Work and obtains
approval of such from the City of Fayetteville.
5 2.3 No issuance of a Progress Payment. Final Payment Application or payment
of such by the City of Fayetteville. nor partial or entire use or occupancy of the Work
by the City of Fayetteville will release the Contractor. Sub -Contractors or other(s)
from the requirement to provide the Work in full accordance with the Contract
Documents. or shall be construed as acceptance of any work or materials not in
accordance with this Agreement and the Contract Documents.
ARTICLE 6 TERMINATION OR SUSPENSION
6.1 The Contract may be terminated by t -he C :n r the City of Fayetteville or the
Contractor as provided w Article 14 of AIA Document A201-1997-
6.2 The Work may he suspended by the-0..ater the City of Fayetteville as provided in
Article 14 of rVA Doculnent Ae0n-1997.
ARTICLE 7 MISCELLANEOUS PROVISIONS
User Commenr Fayertev'le Eire Station No.71oo 003.006 td 1915. 1918, 1925. 1937, 1951. 1958, 1961, 1963, 1967.
1974. 1977. 1987, 0 1997 by The American Institute of Architects. Reproduction of rhe material herein or
substantial quotation of its provisions without whiten permission of rhe AIA violates the copyright laws of the
United States and will subject :he violator to legal prosecution WARNING: Unlicensed photocopying
violates US copyright laws and will subject the violator to legal prosecution. This document was
electronically produced with permission of the AIA and can be reproduced in accordance with your license
without violation until the date of expiration as noted below expiration as noted below User Document:
97a101.aia -- 3/8/2004. AIA License Number 1010810. which expires on 7/30/2004.
4
THIS DOCUMENT HAS IMPORTANT LEGAL
CONSEOUENCES. CONSULTATION WITH AN
ATTORNEY /S ENCOURAGED WITH
RESPECT TO ITS COMPLETION 01?
MODIFICATION. AUTHENTICATION OF THIS
ELECTRONICALLY DRAFTED AIA
DOCUMENT MAY RE MADE BY USING AIA
DOCUMENT0401.
AIA Document A201.1997, General
Conditions of the Contract for
Construction, is adopted in this document
by reference. Do not use with other
general conditions unless this document is
modified
This document has been approved and
endorsed by The Associated General
Contractors of America.
01997 AiAO
AIA DOCUMENT A101-1997
OWNER -CONTRACTOR AGREEMENT
The American Institute of Architects
1735 New York Avenue, N.W
Washington, D.C. 20006.5292
• •
7.1 Where reference is made in this Agreement to a provision of AIA Document A2o1-
1997 or another Contract Document, the reference refers to that provision as amended or
supplemented by other provisions of the Contract Documents.
7.2 Payments due and unpaid under the Contract shall bear interest from the date
payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing
from time to titne at the place where the Project is located.
(Insert me o(mrcrrst agreed upon. i(anr7
None City of Fayetteville can not pay interest
LHun' /4t. s and requirements under the Federal Truth in Lending AN. similar state and local con tamer credit laws and
other regulauons at rhe-A..ner4 the Calif of Fayetteville''s and Contractor's principal places of business, the /ocauon
of the Protect and e/aeuttere may alrect the validity of dais provision. Legal advice thotdd be obtained with respect to
deletions or modrfscauons, and also regarding rrquuements such is written disclosures or waivers /
7.3 T to Owiie,iie •The City of Fayetteville's representative is:
lame address and other in/ormmon7
Qr, Coy Hurd
City of Fayetteville Building Services
113 West Mountain
Fayetteville. Arkansas 72701
Ph: (479) 575-8361 Fx: (479) 575-8223
7.4 The Contractor's representative is:
(Name. address and other information)
Mr. John Van Horn
VEI General Contractors
202 East 39th Street/ P,O. Box 1032 (72811).
ausselville. Arkansas 72802
Ph: (479) 968-5060 Fx: (479) 968-4573
7.5 Nc.thtr tae . ncr, the City of Favetteville's nor the Contractor's representative
,hall be changed without ten days written notice to the other patty.
7.6 Other provisions:
7.6.1 Increase in the price or fees of this contract shall not be allowed without a
prior formal contract amendment approved by the Mavor and the City Council in
advance of the increase in cost or fees,
7.6 2 Freedom of Information Act. City contracts and documents preoared while
performing city contractual work are subiect to the Arkansas Freedom of Information
Wit. If a Freedom of Information Act request is presented to the City of Fayetteville
the (contractor) will do everything possible to provide the documents in a a prompt
and timely manner as prescribed in the Arkansas Freedom of Information Act.
(A.0 A. 25-19-101 et.sea.). Only legally authorized photocopying Costs pursuant to
the FOIA may be assessed for this comoliance.
ARTICLE 8 ENUMERATION OF CONTRACT DOCUMENTS
8.1 The Contract Documents, except for Modifications
Agreement, arc enumerated as follows:
THIS DOCUMENT HAS IMPORTANT LEGAL
CONSEQUENCES. CONSULTATION WITH AN
ATTORNEY 15 ENCOURAGED WITH
RESPECT TO ITS COMPLETION OR
MODIFICATION. AUTHENTICATION OF THIS
ELECTRONICALLY DRAFTED AIA
DOCUMENT MAY BE MADE BY USING AIA
DOCUMENT 0401.
AIA Document A201.1997, General
Conditions of rhe Contract for
Construction, is adopted in this document
by reference. Do not use with other
general conditions unless this document is
modified
This document has been approved and
endorsed by The Associated General
Contractors of America.
01997 AIAS
issued after execution of this AIA DOCUMENT A101-1997
OWNER -CONTRACTOR AGREEMENT
8.1.1 The Agreement is this executed 1997 edition of the Standard
Between Owner and Contractor, AIA Doeuncnt Alot-t997.
The American Institute of Architects
Fon: of Agreement 1735 New York Avenue, N.W
Washington D C 20006.5292
User Comment Fayerrev'le Fire Station No.7Job 403.006 0 1915, 1918, 1925. 1937, 1951, 1958. 1961, 1963, 1967,
1974. 1977, 1987. C 1997 by The American Institute of Architects. Reproduction of the material herein or
substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the
united States and will subject rhe violator to legal prosecution. WARNING: Unlicensed photocopying
violates US copyright laws and will subject the violator to legal prosecution. This document was
electronically produced with permission of rhe AIA and can be reproduced in accordance with your license
without violation until the dare of expiration as noted below. expiration as noted below. User Document'
97a101 aia 3/8/2004. AIA License Number 1010810, which expires on 7/30/2004.
5
•
•
•
•
8.1.2 The General Conditions are the 1997 edition of the General Conditions of the
Contract for Construction, AIA Document A2o1-1997.
8,1.3 The Supplementary and other Conditions of the Contract are those contained in the
Project tvlanual dated February 9. 2004 and are as follows: See "Attachment A"
Document Title Pages
8.1.4 The Specifications are those contained in the Project Manual
Subparagraph 8.1.3, and arc as follows: See "Attachment A"
(17tber hit the Specifications bete or refer to an exhibit attached to t n Agreement.)
dated as
Section Title Pages
THIS DOCUMENT HAS IMPORT ANT LEGAL
in CONSEQUENCES. CONSULTATION WITH AN
ATTORNEY 15 ENCOURAGED WITH
RESPECT TO 1T5 COMPLETION CR
MODIFICATION. AUTHENTICATION OF THIS
ELECTRONICALLY DRAFTED AIA
DOCUMENT MAY BE MADE BY USING AIA
DOCUMENT 0401.
8.1.5 The Drawings are as follows, and are dated February 10 2004 unless a different
date is shown below: See "Attachment B"
(Either list the Dn.angs hen or re/2r to an e.rbrbrt attached to this Agreement.)
Number Title
Date
8.1.6 The Addenda, if any, are as follows: See "Attachment B"
Number
Date Pages
Portions of Addenda relating to bidding requirements arc not part of the Contract Documents
unless the bidding requirements are also enumerated in this Article 8.
8.1.7 Other documents, if any, forming pan of the Contract Documents are as follows:
(Lea here any additional documents that are intended to /brm part of for Contract Documents .4.M Document A_m-
iyq prostyles that bidding rryuurmrnts such at advertisement or meibuon to bid. Instructions to Bidders, sample
forms and the Contractor's bid arc not pan of the Contract Documents un/ns enumerated in this Agreement. Ther
.huidd be hNn/ ben only dmtrnda/ to he part o/ for Convict Documents )
This Agreement is entered into as of the day and year first written above and is executed in at
least three original copies, of which one is to be delivered to the Contractor, one to the
Architect for use in the administration of the Contract, and the remainder to Elie-Owsier the
City of Fayetteville.
OWN€RDan Coody Mir (Signature)
DAN &calf Moyvre
tAmted name and u
Ane
ac i
Sondra Smith City Clerk
lNTRACTOR Signature/
-w VW f iia,
(Amid name and title)
AIA Document A20I-1997, General
Conditions of rhe Contract for
Construction, is adopted in this document
by ref erence. Do not use with other
general conditions unless this document is
modified.
This document has been approved and
endorsed by The Associated General
Contractors of America.
01997 ALAI
DOCUMENT A101-1997
N,/•w NER-CONTRACTOR AGREEMENT
The American Institute of Architects
1735 New York Avenue, N.W.
Washington D C 20006-5292
user Comment Fayertevie Fire Station No.7Job x03.006 O 1915. 1918, 1925, 1937. 1951. 1958, 1961, 1963. 1967,
1974. 1977. 1987. O 1997 by The American Institute of Architects. Reproduction of the material herein or
substantial quotation of its provisions without written permission of the AIA violates the copyright laws of rhe
United Scares and will subject rhe violator to legal prosecution. WARNING: Unlicensed photocopying
violates US copyright laws and will subject the violator to legal prosecution. This document was
electronically produced with permission of rhe AIA and can be reproduced in accordance with your license
without violation until rhe date of expiration as noted below. expiration as noted below. User Document:
97a101.aia — 3/8/2004. AIA License Number 1010810 which expires on 7/30,2004.
6
FAYETTEVILLE FIRE STATION NO. 7
FAYETTEVILLE, ARKANSAS
WDD JOB # 03-006
"ATTACHMENT A"
Page 1 of 3
General Supplementary and other Conditions of the Contract are those contained in the Project
Manual dated February 9, 2004, and are as follows:
DOCUMENT NO.
00100
00200
00300
00310
00330
00400
00600
00700
00800
TITLE
BID SOLICITATION
INSTRUCTIONS TO BIDDERS &
COPY OF O/C AGREEMENT
WAGE RATES
OSHA GUIDELINES FOR TRENCH SAFETY
EXISTING CONDITIONS
BID FORM
BONDS
GENERAL CONDITIONS
SUPPLEMENTARY CONDITIONS
PAGES
The Specifications are those contained in the Project Manual dated February 9, 2004 and are as
follows:
SECTION NO.
TITLE
01100 SUMMARY OF WORK
01210 ALLOWANCES
01230 ALTERNATES
01300 SUBMITTALS AND SUBSTITUTIONS
01450 TESTING LABORATORY SERVICES
01500 TEMPORARY FACILITIES AND CONTROLS
01640 OWNER FURNISHED PRODUCTS
02200 SITE PREPARATION
02300 EARTHWORK
02360 TERMITE CONTROL
02375 TEMPORARY EROSION CONTROL
02630 DRAINAGE PIPING
02740 ASPHALTIC CONCRETE PAVING
02750 PORTLAND CEMENT CONCRETE PAVING
02760 PAVEMENT MARKING
02770 CONCRETE CURBS AND SIDEWALKS
02900 LANDSCAPING
1
I0
5
3
2
6
1
46
7
PAGES
5
1
2
10
3
3
4
5
10
2
2
3
3
4
1
4
1
• •
"ATTACHMENT A"
Page 2 of 3
03100 CONCRETE FORM WORK 5
03200 CONCRETE REINFORCEMENT 3
03300 CAST -IN-PLACE CONCRETE 8
03450 ARCHITECTURAL PRECAST CONCRETE 3
04100 MORTAR 2
04200 UNIT MASONRY 7
05100 STRUCTURAL STEEL 5
05300 METAL DECKING 3
05400 COLD FORMED STRUCTURAL STEEL FRAMING 5
05500 MISCELLANEOUS METAL 3
06100 ROUGH CARPENTRY 4
06170 LAMINATED WOOD BEAMS 3
06200 FINISH CARPENTRY 2
06400 ARCHITECTURAL WOODWORK 5
07150 DAMPPROOFING 2
07200 INSULATION 4
07240 EXTERIOR INSULATION AND FINISH SYSTEMS 6
07410 STANDING SEAM METAL ROOFING 5
07525 MODIFIED BITUMEN SHEET ROOFING 7
07600 FLASHING AND SHEET METAL 4
07850 FIRESTOPPING 6
07900 JOINT SEALANTS 6
08100 METAL DOORS AND FRAMES 5
08200 WOOD DOORS 4
08350 OVERHEAD/ROLLING DOORS 5
08400 ENTRANCES, STOREFRONTS, AND WINDOWS 4
08700 HARDWARE 9
08800 GLAZING 4
09250 GYPSUM DRYWALL 10
09260 EXTERIOR SHEATHING 2
09310 TILE 7
09510 ACOUSTICAL CEILINGS 3
09650 RESILIENT FLOORING 6
09680 CARPET 4
09900 PAINTING 6
09950 GLAZE COATING 2
10100 VISUAL DISPLAY BOARDS 2
10150 COMPARTMENTS AND CUBICLES 3
10350 FLAGPOLE 3
10400 IDENTIFYING DEVICES 2
10440 INTERIOR SIGNAGE 5
10520 FIRE PROTECTION SPECIALTIES 2
10800 TOILET AND BATH ACCESSORIES 2
• •
"ATTACHMENT A"
Page 3 0f 3
10950 MISCELLANWOUS SPECIALTIES 3
11450 RESIDENTIAL EQUIPMENT 3
12490 HORIZONTAL BLINDS 2
15010 GENERAL MECHANICAL REQUIREMENTS 13
15240 VIBRATIN ISOLATION 2
15250 MECHANICAL INSULATION 2
15330 WET PIPE SPRINKLER SYSTEMS 6
15370 RANGE HOOD EXTINGUISHING SYSTEM 2
15410 ROOF AND STORM DRAINAGE SYSTEM 3
15411 SANITARY DRAIN, WASTE AND VENT
PIPING SYSTEM 4
15412 DOMESTIC WATER PIPING SYSTEM 3
15413 NATURAL GAS PIPING SYSTEM 3
15440 PLUMBING FIXTURES 3
15456 GAS FIRED WATER HEATERS -COMMERCIAL GRADE 2
15610 FORCED AIR FURNACES 2
15623 GAS FIRED INTRA -RED SPACE HEATERS 2
15670 SPLIT SYSTEM CONDENSING UNITS 2
15860 FANS 2
15865 VEHICLE EXHAUST REMOVAL SYSTEM 5
15890 LOW PRESSURE DUCTWORK AND ACCESSORIES 3
16010 GENERAL ELECTRICAL REQUIREMENTS 8
16110 RACEWAYS 4
16120 WIRES AND CABLES 3
16130 BOXES AND ENCLOSURES 2
16140 WIRING DEVICES 3
16170 DISCONNECT SWITCHES 2
16190 SUPPORTING DEVICES 3
16195 ELECTRICAL IDENTIFICATION 3
16421 UNDERGROUND ELECTRICAL SERVICES 3
16422 TRANSIENT VOLTAGE SURGE SUPPRESSOR.
HIGH EXPOSURE 2
16450 GROUNDING 2
16471 CIRCUIT BREAKER LIGHTING PANELBOARDS,
240 VAC, MAX. 2
16472 CIRCUIT BREAKER POWER DISTRIBUTION 2
16485 CONTRACTORS 2
16621 ENGINE -GENERATOR SET -PACKAGED 3
16627 AUTOMATIC TRANSFER SWITCH 2
END OF ATTACHMENT "A"
FAYETTEVILLE FIRE STATION NO. 7
FAYETTEVILLE, ARKANSAS
WDD JOB # 03-006
"ATTACIL HENT B"
Page 1 of 2
The drawings are as follows, and are dated February 10, 2004, unless a different date is shown
below:
SHEET NO. TITLE DATE
COVER PAGE
CS PROJECT INFORMATION
1 OF 1 LOT SPLIT FOR WEST SIDE 5/30/03
C1.1 DEMOLITION PLAN 1/19/04
C1.2 SITE PLAN 1/19/04
C1.3 GRADING & DRAINAGE PLAN 1/19/04
C1.4 UTILITY PLAN (/19/04
C1.5 TREE PRESERVATION PLAN 1/19/04
C2.1 DETAIL SHEET 1 1/19/04
C2.2 DETAIL SHEET 2 1/19/04
C2.3 DETAIL SHEET 3 1/19/04
A1.1 FIRST FLOOR PLAN
A1.2 SECOND FLOOR PLAN
A1.3 RELECTED CEILING PLAN
A1.4 CLERESTORY AND ROOF PLANS
A2.1 ELEVATIONS
A3.1 BUILDING SECTIONS
A3.2 BUILDING SECTIONS
A3.3 BUILDING SECTIONS
A3.4 BULDING SECTINS
A3.5 WALL SECTIONS AND DETAILS
A3.6 WALL SECTIONS AND DETAILS
A3.7 WALL SECTIONS AND DETAILS
A3.8 WALL SECTIONS AND DETAILS
A4.1 INTERIOR ELEVATIONS
A4.2 MILLWORK SECTIONS
A5.1 SCHEDULES AND WALL TYPES
A5.2 DOOR AND WINDOW TYPES
A5.3 DOOR AND WINDOW DETAILS
S1.0 NOTES & SCHDULES
S1.1 FOUDATAIN PLAN
52.1 FOUDATION DETAILS
S3.1 FLOOR & LOW ROOF FRAMING PLANS
S3.2 ROOF FRAMING PLAN
S4.1 FRAMING DETAILS
S4.2 FRAMING DETAILS
• •
"ATTACHMENT B"
Page 2 of 2
U1.1 UTILITY SITE PLAN
P1.1 FIRST FLOOR PLUMBING DRAIN PLAN
P1.2 SECOND FLOOR PLUMBING DRAIN PLAN
P2.1 FIRST FLOOR PLUMBING SUPPLY PLAN
P2.2 SECOND FLOOR PLUMBING SUPPLY PLAN
P3.1 PLUMBING DETAILS
P3.2 PLUMBING SCHEDULES
M1.1 MECHNICAL FLOOR PLAN
M1.2 VEHICLE EXHAUST FLOOR PLAN
M2.1 MECHANICAL DETAILS
M2.2 MECHANICAL DETAILS
M3. I MECHANICAL SCHEDULES
E1.1 ELECTRICAL POWER PLAN -FIRST & SECOND FLOOR
E1.2 MECHANICL POWER PLAN- FIRST & SECOND FLOOR
E2.1 ELECTRICAL LIGHTING PLAN -FIRST & SECOND FLOOR
E3. l ELECTRICAL DETAILS
E3.2 ELECTRICAL DETAILS
E3.3 ELECTRICAL DETAILS
E3.4 ELECTRICAL PANELBOARD SCHEDULES
NO
1
ADDENDA
DATE PAGES
February 19, 2004
Specification 07225-Nailablc Insulation (5 pgs)
ADD CLOT. ADD CIA2. ADD A1.OI.
ADD A1.02. ADD A1.03, ADD A1.04,
ADD M1.01. ADD MI.02
February 23, 2004
Specification 07240 (7 pgs)
ADD A2_01, ADD A2.02, ADD A2.03,
ADD A2.04, ADD A2.05, ADD 2.06.
February 23, 2004
END OF ATTACHMENT "B"
4 w/attachments
4 w/attachments
1
FAYETTEVI LiLE
THE CITY Of FAYETTEVUEE, ARKANSAS
•
DEPARTMENTAL CORRESPONDENCE
To: Coy Hurd
Building Services
From: Clarice Buffalohead-Pearman
City Clerk Division
Date: March 11, 2004
Re: V.E.I General Contractors/Wittenberg, Delony & Davidson
Attached are two originals of the agreement for work at Fire Station No. 7. The agreement will be
recorded in the clerk's office and microfilmed. If anything else is needed please let the clerk's
office know.
r
/cbp
attachments
cc: Nancy Smith, Internal Auditor
• •
2000 Edition - Electronic Format
AIA Document G606 - 2000
Amendment to the Professional Services Agreement
TO: Mr. Coy Hurd
(OI. ner's Representthve)
Amendment Nutnber. One
In accordance with the Agreement dated: the Seventeenth day of March in the vear Two
Thousand Three
between the Owner.
City of Fayetteville. Arkansas
City Administration Building
113 West Mountain Street
Fayetteville. Arkansas 72701
and the Architect:
Wittenberg Delonv & Davidson Inc
100 west Center. Suite 102
Fayetteville. Arkansas 72701
for the Project:
(Name and address)
New Wedingtpn Drive Fire Station (Station # 7)
Authorization is requested
(X ) to proceed with Additional Services or a Change in Services.
( ) to incur Additional Reunbursable F,xpenses.
As Follows:
Ftevisetl scope of work based on the design of a new station not re -using the previous
"proto-type" desgn
The following adjustments shall be made to compensation and time.
(Insert proissians in accordance Hath the Agreement, oras otherwise agreed by the paries I
Compensation:
Compensation for (3Ses will be a lump sum of $ 60 000 00 (not including other
services listed in Article 12 of the contract). using 3 City of Fayetteville construction
budget of 5990.000.00. Changes and modifications. or amendments in scope. price or
fees to this contract shall not be allowed without a prior formal contract amendment
approved by the Mayor and the City Council in advance of the change in scone. cost or
fees, See Article 12 of the contract for other additional services and conditions. If the
City adiusts the construction budget above the $990.000,00 amount. the compensation
will be further negotiated. See attached Letter of Understanding for additional
information
Time:
0 2000 by The American Institute of Architects. Reproduction of the material hereon or substantial quotation
of its provisions without written permission of the AIA violates the copyright laws of the United States and
will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws
and will subject the violator to legal prosecution. This document was electronically produced with permission
of the AIA and can be reproduced in accordance with your license without violation until the date of expiration
as noted below. User Document: amendsvcs.aia -- 6/17/2003. AIA License Number 1010610, which expires on
6/6/2003.
Electronic Format 6606 - 2000
AUTHENTICATION Or THIS ELECTRONICALLY
DRAPED AIA DOCUMENT MAY 01 MADE BY USING
AIA DOCUMENT DWI.
02000 AIAO
AIA DOCUMENT 6606-2000
AMENDMENT TO THE PROFESSIONAL
SERVICES AGREEMENT
The American Institute of Architects
1735 New York Avenue, N.W.
Washington. D.C. 20006-5292
No Chanoe
• •
ITTED BY:
(Sign ure)
RI and Alderman. AIA
AGRE
(-Cignakir
Dan Coody, Mayor
(Printed name and title) (Printed tume and tide)
(Date)
July 15, 2003
(Date)
AUINENI!CAI ION OF MIs ELECTRONICALLY
DRAFTED AIA DOCUMENT MAY CE MADE RV USING
AIA DOCUMENT 0401,
ONO) MAB
AIA DOCUMENT 6606-2000
AMENDMENT TO THE PROFESSIONAL
SERVICES AGREEMENT
The American institute of Architects
1735 New York Avenue. N.W.
Washington. D.C. 20006-5292
ID 2000 by The American Institute of Architects. Reproduction of rhe material herein or substantial quotation
of its provisions without written permission of the AIA violates the copyright laws of rhe United States and
will subject rhe violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws
and will subject the violator to legal prosecution. This document was electronically produced with permission
of the AIA and can be reproduced in accordance with your license without violation until the date of expiration
as noted below. User Document: amendsvcs.aia -- 6/17/2003. AIA license Number 1010810, which expires on
8/6/2003.
Electronic Format 6606 - 2000
WITTENBERG. DELONY & DAVIDSON ARCHiTECTS
-J-5 vee 9:vc. kite IC
+v; r,; ,•,:.. AR /210.+
RALF. -ode
1;C/25I L.3I FAX
May 27, 2003
Mr. Chris Bosch
Fire Chief
City of Fayetteville
303 W Center
Fayetteville, AR 72701
Re: Owner/Architect Agreement
Fire Station #7. Wedington Drive
Fayetteville. Arkansas
Dear Chief Bosch:
ARCHITECTS
I was ask by Vlavor Coody to review the project fee schedule on the above project. as it has been
developed to -date. based on the new information afforded the City of Fayetteville now that a site has
been selected for the project. Needless to sav the site is a beautiful piece of property that has manv trees
and Important environmental considerations that \\ ere not kno\tn then the original architect's
agreement was formulated. The current agreement between WD&D and the City is based on the re -use
of the existing drawings for the past two :ire stations ts6 and replacement #41. Re -using the exis::ng
plans on this Site. as selected. would drastically and we feel needlessly impacted the nature of the site by
not affording the City and the architect the opportunity to de\ ise a scheme better suited to this beautiitil
property and to have the building respond to :he unique environmental nature of the area. To that end I
have attached our proposal to change the fees listed in the current agreement to reflect a fee that is based
on a full design process not just the re -use of the previous pians. This change in :he agreement can be
accomplished by attachment of a modification :o the e\stmg : ereemeni so that the existing agreement
does not have to be completely re -worked.
At the same time I feel it is important to re -look at the construction cost component of the project also.
.A reasonable review of the projects construction budget. at this time. will make the overall project
develop more smoothly. as the Mayor reinforced it to me That a quality project was required. The
original project budget (as we understood it) was a hard construction budget of SS50.00.00. I have seen
several printed budgets for the project and do not really feel we know what the City's hard construction
budget is. The building with the addition of one bay to the existing plans is currently 7.600 square feet.
This equals a cost per square foot of about SIII.S5/sq.it. Based on the construction costs of other fire
stations in this area. this cost is below average. I have attached for your review the bid work-up of other
fire station projects bid over the last few years and then up -dated to 2003. We feel this clearly shows
that the cost per square foot for this building should be in the S130 to S1 45/sq.ft. range. if you apply this
cost to the current square footage it comes out to 5988.000.00 to S L 10-'_.000.00 not 5850.000.00. I feel
it is important that the City review this issue now and not later to the project. This issue of a proper
construction cost budget also affects the architect's fee.
• •
WITTENBERG, DELONY & DAVIDSON ARCHITECTS
2471E Joyce S'C. Sure 10
FAvERFvut A917703
479/442L081
479/25i 43231 FAX
Page two
Amended Agreement
5-27-2003
I want to say how important this project is to our firm and re -iterate that we have tried to be realistic and
not overly conservative (or conversely overly optimistic) with our hard construction cost projections for
the work. It is extremely important with any "public works" project that a realistic construction budget
is agreed upon and then a reasonable architect's fee can be worked out that allows the City of
Fayetteville and the architect to properly develop the project. You will see on the last page of the
attachments that we have proposed to revise the fee based on using a more realistic budget of
$990,000,00.00 (low side of numbers) and then we have applied a 6.5% fee to the work. This is less
than the standard 7% fee usually associated with projects of this size and complexity and I hope that
you, the Mayor and the City Fathers will see that we are trying to give the City the best possible project
at the least possible fee.
Sincerely
WITTENBERG, DELONY & DAVIDSON. INC.
Richard Alderman, AIA
Principal. Northwest Arkansas Office
attachments:
Listing of Recent Fire Station Bids - Worksheet
Bid Costs up -dated to 2003 - Worksheet
WD&D Proposed Adjustments to .Architect's fees
Fire Station Bid Records
(Fayetteville Fire Station #4 6,000 square feet
Bid: 12-1999
1
low bid
high bid
5611,520.00
5787,100.00
S101.92
5131.18
average 5699.310.00
5116.55
wtg. average
5675,538.00
5112.83
(Fayetteville Fire Station #6 6,000 square feet
Bid: 08-1998
1
low bid
high bid
5589,000.00
5684,324.00
598.16
5114.05
average 5636.662.00
S106.11
wtg. average
5646,273.00
5107.51
'Springdale Fire Station #1 23,400 square feet
Bid: 08-1998
1
low bid
high bid
52,635,812.00
52 933.200.00
5112.65
S125.36
average
52,784,506.00 5119.00
wtg. average
52,71 1,431.00
S115.88
(Springdale Fire Station #6 9,949 square feet
Bid: 11-1997
1
low bid
high bid
51.036,500.00
$1,140,000.00
5104.19
5114.59
average
$1,088,25000 S109.39
wtg. average
51,084,965.00
5109.06
Fire Station Bid Up -date
3% increase per year for construciton increase
Fay Fire Station a4
Fay Fire Station a6
Spring Fire Station a1
Spring Fire Station 136
1997 1998 1999 2000 2001 2002
$116.55
5106.11
5119.00
5109.39
5120.04 5123.64 5127.35
S109.29 5112.57 5115.95 5119.43
5122.57 $126.25 5130.04 5133.95
5112.68 5116.07 5119.56 5123.15 5126.85
Average
10% contingency
2003
5131.17
$123.01
5137.97
S130.65
S130.70
$13.07
(Adjusted Bid Average S143.77