Loading...
HomeMy WebLinkAbout36-02 RESOLUTION• AO • RESOLUTION NO, 36-02 A RESOLUTION APPROVING TASK ORDER NO. 10 WITH McCLELLAND CONSULTING ENGINEERS FOR ENGINEERING SERVICES AND CONSTRUCTION OBSERVATION ASSOCIATED WITH THE CONSTRUCTION OF A CORPORATE HANGAR COMPLEX AT THE FAYETTEVILLE MUNICIPAL AIRPORT; AND APPROVING A BUDGET ADJUSTMENT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council hereby approves Task Order No. 10 with McClelland Consulting Engineers for engineering services and construction observation associated with the construction of a corporate hangar complex at the Fayetteville Municipal Airport. Section 2. That the City Council hereby authorizes the Mayor to sign Task Order No. 10 with McClelland Consulting Engineers. Section 3. That the City Council hereby approves a Budget Adjustment in the amount of One Hundred Eighty -Five Thousand Three Hundred Five Dollars (5185,305.00). PASSED and APPROVED this 5Ihday of March, 2002. ER WOODRUFF, If Clerk APPROVED: By • NAME OF FILE: CROSS REFERENCE: Resolution No. 36-02 03/05/02 Resolution No. 36-02 Task Order No. 10 Corporate Hangar Complex with McClelland Consulting Engineers for engineering services and construction observation associated with the construction of a corporate hangar complex at the Fayetteville Municipal Airport 03/05/02 Copy of the Budget Adjustment Form 02/14/02 Memo to Mayor Coody and City Council Members thru Staff Review Committee, from Ray M. Boudreaux, Director, regarding Task Order #10, Corporate Hangar Complex 03/05/02 Staff Review Form 03/07/02 Memo to Ray M. Boudreaux, Aviation & Economic Development Director, from Heather Woodruff, City Clerk NOTES: TASK ORDER NO. 10 CORPORATE HANGAR COMPLEX STATE OF ARKANSAS COUNTY OF WASHINGTON Res. 31, - ORIGINAL This Task Order is written pursuant to the basic agreement entitled CITY OF FAYETTEVILLE, AGREEMENT FOR ENGINEERING SERVICES, executed on March 7, 2000. The referenced basic agreement pertains to proposed improvements to Drake Field, FayettevilleUs Municipal Airport. This Task Order entered into and executed on the date indicated below the signature block, by and between the City of Fayetteville (OWNER) and McClelland Consulting Engineers (ENGINEER) sets forth the project description, project schedule, and engineenng fees related to the Corporate Hangar Complex Apron and Taxiway improvements, Drake Field. SECTION I - PROJECT DESCRIPTION The project is to consist of: performing the surveying and preliminary engineering for initial phase of the Corporate Hangar Complex; providing preliminary cost estimates; and performing the engineering services associated with detailed design and construction of the initial phase of development. SECTION II - PROJECT SCHEDULE From the time the OWNER issues the Notice To Proceed (NTP), the ENGINEER will endeavor to execute the project within the following time penods: J:\DRAKE FIELD\CONTRACTS\Task Order 10.doc Co Co Co Task Completion After NTP A. Surveying: 10 calendar days B. Preliminary Engineering & Cost Estimates: 25 calendar days C. Submittal of detailed Design, 55 calendar days D. Advertise for bids: 85 calendar days SECTION III - SCOPE OF SERVICES The ENGINEER shall, generally, provide those services listed in the basic agreement which are applicable to this specific Task Order. Specifically, the project is likely to include: A. Surveying for the initial Phase of the Corporate Hangar Complex. B. Performing preliminary engineering for the initial Phase of the Corporate Hangar Complex; formulating preliminary construction cost estimates, and meeting with the City to discuss the project. C. Performing the detailed design of the initial Phase of the Corporate Hangar Complex. D. Advertising for competitive bids and recommending the award of a construction contract. E Construction Administration, Inspection and prepare "Record Drawings" for the completion of construction based upon the Contractor's mark-ups. F. Construction staking of a baseline. G. Construction Matenals Testing. J:\DRAKE FIELD\CONTRACTS\Task Order 10.doc Ilb SECTION IV - FEES AND PAYMENTS • The following fees are to be paid to the Engineer as compensation for his services: A. Surveying: B. Preliminary Engineenng; Cost Estimates, and Meetings C. Detailed Plans & Specs for: D. Bidding Service: E Construction Administration & Inspection: Contr. Admin Observation Record Drawings F. Construction Baseline Staking: G. Construction matenals testing: a lump sum of $ 1,500. a lump sum of $ 5,000. a lump sum of $ 5,000. a lump sum of $ 1,000. hourly rates, estimated to be $ 550. $ 5840. $ 310. a lump sum of $ 400. hourly rates & unit pnces, estimated to be $1,750. Appendix A presents hourly rates for personnel anticipated to be assigned to this project by the ENGINEER. Appendix B presents the basis of payments to the ENGINEER. SECTON V - BASIC AGREEMENT IN EFFECT: Except as amended specifically herein, the basic AGREEMENT FOR ENGINEERING SERVICES shall remain in full force as originally approved and executed. IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be duly executed as of the date and year first herein wntten. J:\DRAKE FIELD\CONTRACTS\Task Order 10.doc 1 • • w • FOR THE CITY OF FAYETTEVILLE: Attest: FOR McCLELLAND CONSULTING ENGINEERS, INC.: President Date:7.11114 J:\DRAKE FIELD\CONTRACTS\Task Order 10.doc Attest: APPENDIX A Hourly Rates for Personnel Drake Field, Fayetteville Municipal Airport CATEGORY Project Director Principal Engineer Engineer III Engineer II Engineer I Registered Surveyor Computer Technician Engineering Technician Survey Crew (2 man) Clerical Support CADD Technician III CADD Technician II CADD Technician I Soils Lab Supervisor Soils Technician II Soils Technician I J:\2002\022104\Appendix A Hourly Rates TOI O.doc BILLABLE HOURLY RATE RANGE $98 to $112 $81 to $98 $65 to $81 $49 to $65 $41 to $49 $41 to $49 $46 to $55 $46 to $57 $55 to $68 $22 to $38 $44 to $55 $32 to $44 $22 to $32 $38 to $44 $27 to $33 $22 to $27 APPENDIX'S" BASIS FOR PAYMENTS TO THE ENGINEER TAXI ORDER NO. TE CORPORATE NANGAR COMPLEX DRAKE FIELD. FAYETTEVILLE MUNICIPAL AIRPORT • ® -0A 0 I ,>064 \ a CONSTRUCTION UATERL MSTESTIMG ` -b /| j`||" 2: |` q 9 f- i -z fi TASK DESCRIRTICN . !| n _ - _- __ | PROJECT DIRECTOR ._ -_ ..- .._ ,|| .!r ._ �� .__..1__ , Emi . . .. ag . _ |:§ . ; a 8.5 CA DO TECH. I - . � ED . - ; g ?§ ' a " IC. --. ||§ .. !0 '§ ks | - HE .11 8:. .. 8_ _es- E :a- :_ |§ 1 E E .■ ;§ . _ is !] t/.E tƒ EETZNOED TOTAL APPENDIX'S" BASIS FOR PAYMENTS TO THE ENGINEER TAXI ORDER NO. TE CORPORATE NANGAR COMPLEX DRAKE FIELD. FAYETTEVILLE MUNICIPAL AIRPORT • PROJECT COST ESTIMATE CORPORATE HANGAR COMPLEX DRAKE FIELD FAYETTEVILLE MUNICIPAL AIRPORT 28 -Jan -2002 APRON RENOVATION Estimated Construction Cost Contingency (5%) Subtotal Engineering Design Bidding Phase Contr. Admin & Observation Construction Material Testing Estimated Apron Cost TAXIWAY & APRON EXPANSION Estimated Construction Cost Contingency (5%) Subtotal Engineering Design Bidding Phase Contr. Admin & Observation Construction Material Testing Estimated Taxiway & Apron Exp. Cost TOTAL ESTIMATED PROJECT COST J:1200210221041estimates1Corp-hang eomptex.wb3 Page 1 of 2 $71,120.00 $3,600.00 $74,720.00 $4,000.00 $400.00 $2,500.00 $700.00 $82,320.00 $105,700.00 $5,300.00 $111,000.00 $6,500.00 $600.00 $4,200.00 $1,050.00 $123,350.00 $205,670.00 APRON RENOVATION CORPORATE HANGAR COMPLEX DRAKE FIELD FAYETTEVILLE MUNICIPAL AIRPORT 28 -Jan -2002 OD TAXIWAY & APRON EXPANSION CORPORATE HANGAR COMPLEX DRAKE FIELD FAYETTEVILLE MUNICIPAL AIRPORT 28 -Jan -2002 Item Item Quantity Unit Unit Unit Price Extended Extended Remove Trees & Relocate Excavation 8 EA $ 600.00 CY $ 10.00 $ 4,800.00 $11,000.00 Excavate Tree Wells 250 CY $ 10.00 750 $ 2,500.00 CY $ 18.00 Select Borrow (24") 250 Topsoil Replacement CY $ 18.00 $ 15.00 $ 4,500.00 Topsoil Replacement Fabnc 1100 50 CY $ 10.00 $ 1.30 $ 500.00 Stabilization Crushed Stone Base (8") Fabnc TN 180 SY 18.00 $ 1.30 58,640.00 $ 234.00 Crushed Stone Base Coat 100 250 TN GA $ 18.00 2.40 $ 1,800.00 $600.00 Asphalt Leveling (2" to 3")) 435 Surface TN Course (4") $ 52.00 $ 22,620.00 TN $ 52.00 Asphalt Surface Course (2") 320 TN $ 52.00 Drainage $ 16,640.00 (18") 200 Tack Coat LF $ 450 GA $ 1.50 $6,000.00 $ 675.00 Grate Storm Inlets Drainage Pipe (12") 250 EA $ 2,600.00 LF $ 25.00 $2,600.00 $ 6,250.00 Junction Grate Inlets 1 EA 2 EA $ 2,600.00 52,600.00 $ 5,200.00 Remove Light Remove Curb and Gutter 1 EA 1 LS $ 3,500.00 5700.00 $ 3,500.00 Remove Light Pole & Cable Remove Light 1 EA Pole 2 EA $ 700.00 Encase Force $ 1,400.00 120 Seeding LF $ 30.00 1 53,600.00 LS $ 500.00 Sanitary Sewer Gpnder Pump Station Puma) $ 500.00 LS $ 25,000.00 $25,000.00 Subtotal Construction Cost $ 71,119.00 FHous@ orce Main TAXIWAY & APRON EXPANSION CORPORATE HANGAR COMPLEX DRAKE FIELD FAYETTEVILLE MUNICIPAL AIRPORT 28 -Jan -2002 J:12002W 221041estfmates\Corphang.comPtex.wb3 Page 2 or 2 Item Quantity Unit Unit Price Extended Excavation 1100 CY $ 10.00 $11,000.00 Select Borrow (24") 750 CY $ 18.00 $13,500.00 Topsoil Replacement 150 CY $ 15.00 $2,250.00 Stabilization Fabnc 1100 SY $ 1.30 $1,430.00 Crushed Stone Base (8") 480 TN $ 18.00 58,640.00 Pnme Coat 250 GA $ 2.40 $600.00 Asphalt Surface Course (4") 240 TN $ 52.00 512,480.00 Storni Drainage Pipe (18") 200 LF $ 30.00 $6,000.00 Grate Inlets 1 EA $ 2,600.00 $2,600.00 Junction Box 1 EA $ 2,600.00 52,600.00 Remove Light Pole 1 EA $ 700.00 5700.00 Remove Light Pole & Cable 1 EA $ 700.00 $700.00 Encase Force Main 120 LF $ 30.00 53,600.00 Sanitary Sewer Gpnder Pump Station Puma) 1 LS $ 25,000.00 $25,000.00 FHous@ orce Main (2") 250 LF $ 14.00 53,500.00 Water Une (2-1/2") 500 LF $ 15.00 $7,500.00 Double Water Meter Setting 1 EA $ 600.00 $600.00 Blow -off Assembly 1 EA $ 1,000.00 $1,000.00 Seeding 1 LS $ 2,000.00 52,000.00 Subtotal Construction Cost $105,700 00 J:12002W 221041estfmates\Corphang.comPtex.wb3 Page 2 or 2 City of Fayetteville, Arkansas Budget Adjustment Form Res. oz • Budget Year 2002 Depanment Division: Program: Aviation & Economic Development Airport Capital Date Requested 03/05/2002 Adjustment # Project or Item Requested: $185,305 is requested in the Contract Services account the cost of Corporate Hangar Complex aircraft parking ramp construction. Project or Item Deleted: To recognize $169,600 in State Grant Revenue and to use $15,705 in the Airport Use of Fund Balance. Justification of this Increase: This project will provide for the development of a corporate hangar complex area, utilizing existing unused pavement former vehicle parking. Justification of this Decrease: The Arkansas Department of Aeronautics is providing two grants under their 90/10% & 75/25% programs. Sufficient funding remains in projects to meet 2002 objectives. Sufficient funding remains to comply with City policy. Increase Espen e (Decrease Revenue) Account Name Amount Contract Services 185,305 Account Name State Grants Use of Fund Balance Account Number 5550 3960 5315 00 Decrease Expense (Increase Revenue) Amount Account Number 169,600 15.705 5550 0955 6805 00 5550 0955 4999 99 Project Number Project Number Reques ed By B dgtt anager Approval Signatures Date Date Date Budget Office Use Only Type. A B C Date of Approval Posted to General Ledger Posted to Project Accounting Entered in Category Log Blue Copy: Budget & Research / Yellow Copy: Requester E FAYETTEaLE THE CITY OF FAYETTEVILLE. ARKANSAS DANCOODY MAYOR AVIATION AND ECONOMIC DEVELOPMENT RAY M. BOUDREAUX. DIRECTOR 4500 School Ave.. Suite F Fayetteville. AR 72701 501 718 7042 TO: THRU: FROM: DATE: SUBJECT: Dan Coody, Mayor City Council Members Staff Review Committee Ray M. Boudreaux, Director February 14, 2002 Task Order #10, Corporate Hangar Complex Background: Airport Management has been approached by two local business people who have requested to lease airport property, and to construct larger, corporate style hangars at their expense. In order to accommodate this class of airport user, and to promote future growth of corporate aviation at Drake Field, re -development of unused airport property is desired. A preliminary plan which utilizes existing unused vehicle parking pavement south of the terminal building will provide an area to construct up to eight corporate hangars. Utilizing the existing pavement will reduce overall project costs, provide easy access from Hwy 71, and serve to further the goal of stimulating aviation related business activity at Drake Field. Purpose: The project constitutes two components. Under the Arkansas Department of Aeronautics Airport Grant (SAAG) program 90/10% grant classification, we will perform renovation to an unused asphalt vehicle parking area. Also included in the project under the SAAG 75/25% grant classification is construction of a small portion of additional ramp, and extension of taxiway to the existing terminal ramp. This will provide access to the runway from the new hangars. A conceptual drawing of the proposed project is attached for your information. Under a land lease arrangement with the airport, two privately financed 100' x 100' corporate type hangars will be built adjacent to the refurbished aircraft parking ramp. It is anticipated that the two initial hangars will stimulate other new corporate aircraft activity and hangar construction at Drake Field. Arkansas Department of Aeronautics will provide grant funding in the amount of $74,088, or 90% of a total project cost of $82,320 for Apron Renovation. Also approved by the State is $92,512, or 75% of a total project cost of $123,350, for Taxiway & Apron Expansion. The purpose of this request is to approve Task Order # 10, Engineering and Construction Observation for "Corporate Hangar Complex," and approval of a budget adjustment recognizing the state grant funding and total project cost. The Airport Board, at their meeting of February 7, 2002 approved of the project concept M X AGENDA REQUEST X CONTRAC 1' REVIEW IL -GRANT REVIEW For the Fayetteville City Council meeting of STAFF REVIEW FORM March 5, 2002 e FROM: Ray Boudreaux Airport Name Division Task Order #10 McClelland Consulting Engineers Aviation & Economic Development Department ACTION REQUIRED: A Resolution which approves and authorizes the Mayor to sign Task Order # 10 with McClelland Consulting Engineers, Inc., and approves a budget adjustment for the project. COST TO CITY: (16,103) State Grant Revenue $ 21,a55o Cost of this Request 5550-3960-5314-00 Account Number 98054 Project Number $ 476,593 Category/Project Budget $ 125,030 Funds used to date $ 351,563 Remaining Balance Professional Services Category/Project Name Airport Capital Exp Program Name Airport Fund Bl^DGVIEW: X Budgeted Item Budget Manager D to Administrative Services Dir. Date Budget Adjustment Attached Cg�RAC' 7G -I / NT/LEASE REVIEW: OZ Wet ccounting Mana>er Date Ince al A jr.r. Date GRANTING AGENCY �ugl rtcypi2 ADA Coordinator Date M/15104_. Arkansas Dept. of Aeronautics Pu chasing Officer Date Grants Coordinator Date STAFF RECOMMENDATION: Approval & signature of Mayor at Date Cross Reference New Item: Yes Prev. Ord/Res#: 01-25 Orig Cont. Date: 3/7/00 Orig Cont #: 747 No 1 STAFF REVIEW FORM Page 2 Description: Meeting Date: 03/05/2002 Task Order #10, McClelland Consulting Engineers, Inc. Comments: Budget Manager Reference Comments: Accounting Manager Reference Comments: City Attorney Reference Comments: Purchasing Officer Reference Comments: internal Auditor Reference Comments ADA Coordinator Reference Comments: Grants Coordinator Reference Comments: FAYETTEVALE THE CITY OF FAYETTEVIIIE. ARKANSAS DEPARTMENTAL CORRESPONDENCE • To: Ray M. Boudreaux, Aviation & Economic Development Director From: Heather Woodruff, City Clerk Date: March 7, 2002 Please find attached a copy of Resolution No. 36-02 approving Task Order No. 10 with McClelland Consulting Engineers for engineering services and construction observation associated with the construction of a corporate hangar complex at the Fayetteville Municipal Airport. I am returning two (2) original Task Orders to you. The third original will be microfilmed and filed with the City Clerk Your Budget Adjustment has been forwarded to the Budget & Research Division. cc: Nancy Smith, Internal Auditor Steve Davis, Budget Manager 010 03 Update Document Reference RES Date 3052002 City of Fayetteville ndex Maintenance Iter Action Ref. Taken Brief Description 36-02 TASK ORDER NO. 10 • 3/12/2002 7:48:01 Enter Keywords • RES. 36-02 TASK ORDER NO. 10 MCCLELLAND CONSULTING ENGINEER CONSTRUCTION OBSERVATION ASSC CORPORATE HANGAR COMPLEX FAYETTEVILLE MUNICIPAL AIRPORT HANGAR NO. 10 File Reference # • MICROFILM Security Class • Expiration Date Date for Cont/Referred: Name Referred to • • Retention Type: **** Active **** Cmdl-Return Cmd8-Retention Cmd4-Delete Cmd3-End Press 'ENTER' to Continue CmdS-Abstract Yes No (c) 1986-1992 Munimetrix Systems Corp.