RESOLUTION NO, 36-02
A RESOLUTION APPROVING TASK ORDER NO. 10 WITH
McCLELLAND CONSULTING ENGINEERS FOR ENGINEERING
SERVICES AND CONSTRUCTION OBSERVATION ASSOCIATED
WITH THE CONSTRUCTION OF A CORPORATE HANGAR
COMPLEX AT THE FAYETTEVILLE MUNICIPAL AIRPORT;
AND APPROVING A BUDGET ADJUSTMENT.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council hereby approves Task Order No. 10 with
McClelland Consulting Engineers for engineering services and construction
observation associated with the construction of a corporate hangar complex at
the Fayetteville Municipal Airport.
Section 2. That the City Council hereby authorizes the Mayor to sign Task
Order No. 10 with McClelland Consulting Engineers.
Section 3. That the City Council hereby approves a Budget Adjustment in
the amount of One Hundred Eighty -Five Thousand Three Hundred Five Dollars
(5185,305.00).
PASSED and APPROVED this 5Ihday of March, 2002.
ER WOODRUFF, If Clerk
APPROVED:
By
•
NAME OF FILE:
CROSS REFERENCE:
Resolution No. 36-02
03/05/02
Resolution No. 36-02
Task Order No. 10 Corporate Hangar Complex with McClelland
Consulting Engineers for engineering services and construction
observation associated with the construction of a corporate hangar
complex at the Fayetteville Municipal Airport
03/05/02
Copy of the Budget Adjustment Form
02/14/02
Memo to Mayor Coody and City Council Members thru Staff Review
Committee, from Ray M. Boudreaux, Director, regarding Task Order
#10, Corporate Hangar Complex
03/05/02
Staff Review Form
03/07/02
Memo to Ray M. Boudreaux, Aviation & Economic Development
Director, from Heather Woodruff, City Clerk
NOTES:
TASK ORDER NO. 10
CORPORATE HANGAR COMPLEX
STATE OF ARKANSAS
COUNTY OF WASHINGTON
Res. 31, -
ORIGINAL
This Task Order is written pursuant to the basic agreement entitled CITY OF
FAYETTEVILLE, AGREEMENT FOR ENGINEERING SERVICES, executed on March
7, 2000. The referenced basic agreement pertains to proposed improvements to Drake
Field, FayettevilleUs Municipal Airport. This Task Order entered into and executed on
the date indicated below the signature block, by and between the City of Fayetteville
(OWNER) and McClelland Consulting Engineers (ENGINEER) sets forth the project
description, project schedule, and engineenng fees related to the Corporate Hangar
Complex Apron and Taxiway improvements, Drake Field.
SECTION I - PROJECT DESCRIPTION
The project is to consist of: performing the surveying and preliminary engineering for
initial phase of the Corporate Hangar Complex; providing preliminary cost estimates;
and performing the engineering services associated with detailed design and
construction of the initial phase of development.
SECTION II - PROJECT SCHEDULE
From the time the OWNER issues the Notice To Proceed (NTP), the ENGINEER will
endeavor to execute the project within the following time penods:
J:\DRAKE FIELD\CONTRACTS\Task Order 10.doc
Co
Co
Co
Task Completion After NTP
A. Surveying: 10 calendar days
B. Preliminary Engineering & Cost Estimates: 25 calendar days
C. Submittal of detailed Design, 55 calendar days
D. Advertise for bids: 85 calendar days
SECTION III - SCOPE OF SERVICES
The ENGINEER shall, generally, provide those services listed in the basic agreement
which are applicable to this specific Task Order. Specifically, the project is likely to
include:
A. Surveying for the initial Phase of the Corporate Hangar Complex.
B. Performing preliminary engineering for the initial Phase of the Corporate
Hangar Complex; formulating preliminary construction cost estimates, and
meeting with the City to discuss the project.
C. Performing the detailed design of the initial Phase of the Corporate Hangar
Complex.
D. Advertising for competitive bids and recommending the award of a
construction contract.
E Construction Administration, Inspection and prepare "Record Drawings" for
the completion of construction based upon the Contractor's mark-ups.
F. Construction staking of a baseline.
G. Construction Matenals Testing.
J:\DRAKE FIELD\CONTRACTS\Task Order 10.doc
Ilb
SECTION IV - FEES AND PAYMENTS
•
The following fees are to be paid to the Engineer as compensation for his services:
A. Surveying:
B. Preliminary Engineenng; Cost
Estimates, and Meetings
C. Detailed Plans & Specs for:
D. Bidding Service:
E Construction Administration & Inspection:
Contr. Admin
Observation
Record Drawings
F. Construction Baseline Staking:
G. Construction matenals testing:
a lump sum of $ 1,500.
a lump sum of $ 5,000.
a lump sum of $ 5,000.
a lump sum of $ 1,000.
hourly rates, estimated to be
$ 550.
$ 5840.
$ 310.
a lump sum of $ 400.
hourly rates & unit pnces,
estimated to be $1,750.
Appendix A presents hourly rates for personnel anticipated to be assigned to this
project by the ENGINEER.
Appendix B presents the basis of payments to the ENGINEER.
SECTON V - BASIC AGREEMENT IN EFFECT:
Except as amended specifically herein, the basic AGREEMENT FOR ENGINEERING
SERVICES shall remain in full force as originally approved and executed.
IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be duly
executed as of the date and year first herein wntten.
J:\DRAKE FIELD\CONTRACTS\Task Order 10.doc
1 •
•
w •
FOR THE CITY OF FAYETTEVILLE:
Attest:
FOR McCLELLAND CONSULTING ENGINEERS, INC.:
President
Date:7.11114
J:\DRAKE FIELD\CONTRACTS\Task Order 10.doc
Attest:
APPENDIX A
Hourly Rates for Personnel
Drake Field, Fayetteville Municipal Airport
CATEGORY
Project Director
Principal Engineer
Engineer III
Engineer II
Engineer I
Registered Surveyor
Computer Technician
Engineering Technician
Survey Crew (2 man)
Clerical Support
CADD Technician III
CADD Technician II
CADD Technician I
Soils Lab Supervisor
Soils Technician II
Soils Technician I
J:\2002\022104\Appendix A Hourly Rates TOI O.doc
BILLABLE HOURLY
RATE RANGE
$98 to $112
$81 to $98
$65 to $81
$49 to $65
$41 to $49
$41 to $49
$46 to $55
$46 to $57
$55 to $68
$22 to $38
$44 to $55
$32 to $44
$22 to $32
$38 to $44
$27 to $33
$22 to $27
APPENDIX'S"
BASIS FOR PAYMENTS TO THE ENGINEER
TAXI ORDER NO. TE
CORPORATE NANGAR COMPLEX
DRAKE FIELD. FAYETTEVILLE MUNICIPAL AIRPORT
•
®
-0A
0
I
,>064
\
a
CONSTRUCTION UATERL MSTESTIMG
`
-b
/|
j`||"
2:
|`
q
9
f-
i
-z
fi
TASK DESCRIRTICN
.
!|
n
_
-
_-
__
|
PROJECT
DIRECTOR
._
-_
..-
.._
,||
.!r
._
��
.__..1__
,
Emi
.
.
..
ag
.
_
|:§
.
;
a
8.5
CA DO
TECH. I
-
.
�
ED
.
-
;
g
?§
'
a
"
IC.
--.
||§
..
!0
'§
ks
|
-
HE
.11
8:.
..
8_
_es-
E
:a-
:_
|§
1
E
E
.■
;§
.
_
is
!]
t/.E
tƒ
EETZNOED
TOTAL
APPENDIX'S"
BASIS FOR PAYMENTS TO THE ENGINEER
TAXI ORDER NO. TE
CORPORATE NANGAR COMPLEX
DRAKE FIELD. FAYETTEVILLE MUNICIPAL AIRPORT
•
PROJECT COST ESTIMATE
CORPORATE HANGAR COMPLEX
DRAKE FIELD
FAYETTEVILLE MUNICIPAL AIRPORT
28 -Jan -2002
APRON RENOVATION
Estimated Construction Cost
Contingency (5%)
Subtotal
Engineering Design
Bidding Phase
Contr. Admin & Observation
Construction Material Testing
Estimated Apron Cost
TAXIWAY & APRON EXPANSION
Estimated Construction Cost
Contingency (5%)
Subtotal
Engineering Design
Bidding Phase
Contr. Admin & Observation
Construction Material Testing
Estimated Taxiway & Apron Exp. Cost
TOTAL ESTIMATED PROJECT COST
J:1200210221041estimates1Corp-hang eomptex.wb3 Page 1 of 2
$71,120.00
$3,600.00
$74,720.00
$4,000.00
$400.00
$2,500.00
$700.00
$82,320.00
$105,700.00
$5,300.00
$111,000.00
$6,500.00
$600.00
$4,200.00
$1,050.00
$123,350.00
$205,670.00
APRON RENOVATION
CORPORATE HANGAR COMPLEX
DRAKE FIELD
FAYETTEVILLE MUNICIPAL AIRPORT
28 -Jan -2002
OD
TAXIWAY & APRON EXPANSION
CORPORATE HANGAR COMPLEX
DRAKE FIELD
FAYETTEVILLE MUNICIPAL AIRPORT
28 -Jan -2002
Item
Item
Quantity
Unit
Unit
Unit Price
Extended
Extended
Remove
Trees & Relocate
Excavation
8
EA
$ 600.00
CY
$ 10.00
$ 4,800.00
$11,000.00
Excavate
Tree Wells
250
CY
$
10.00
750
$ 2,500.00
CY
$ 18.00
Select
Borrow (24")
250
Topsoil Replacement
CY
$
18.00
$ 15.00
$
4,500.00
Topsoil
Replacement
Fabnc
1100
50
CY
$
10.00
$
1.30
$ 500.00
Stabilization
Crushed
Stone
Base (8")
Fabnc
TN
180
SY
18.00
$ 1.30
58,640.00
$
234.00
Crushed Stone
Base
Coat
100
250
TN
GA
$
18.00
2.40
$ 1,800.00
$600.00
Asphalt
Leveling
(2"
to 3"))
435
Surface
TN
Course (4")
$ 52.00
$ 22,620.00
TN
$
52.00
Asphalt
Surface
Course
(2")
320
TN
$ 52.00
Drainage
$ 16,640.00
(18")
200
Tack
Coat
LF
$
450
GA
$ 1.50
$6,000.00
$
675.00
Grate
Storm
Inlets
Drainage Pipe
(12")
250
EA
$ 2,600.00
LF
$
25.00
$2,600.00
$ 6,250.00
Junction
Grate
Inlets
1
EA
2
EA
$ 2,600.00
52,600.00
$ 5,200.00
Remove
Light
Remove
Curb
and
Gutter
1
EA
1
LS
$ 3,500.00
5700.00
$ 3,500.00
Remove
Light Pole
&
Cable
Remove
Light
1
EA
Pole
2
EA
$ 700.00
Encase
Force
$ 1,400.00
120
Seeding
LF
$ 30.00
1
53,600.00
LS
$ 500.00
Sanitary
Sewer
Gpnder
Pump Station
Puma)
$ 500.00
LS
$ 25,000.00
$25,000.00
Subtotal Construction Cost
$ 71,119.00
FHous@
orce Main
TAXIWAY & APRON EXPANSION
CORPORATE HANGAR COMPLEX
DRAKE FIELD
FAYETTEVILLE MUNICIPAL AIRPORT
28 -Jan -2002
J:12002W 221041estfmates\Corphang.comPtex.wb3
Page 2 or 2
Item
Quantity
Unit
Unit
Price
Extended
Excavation
1100
CY
$ 10.00
$11,000.00
Select
Borrow (24")
750
CY
$ 18.00
$13,500.00
Topsoil Replacement
150
CY
$ 15.00
$2,250.00
Stabilization
Fabnc
1100
SY
$
1.30
$1,430.00
Crushed
Stone
Base (8")
480
TN
$
18.00
58,640.00
Pnme
Coat
250
GA
$
2.40
$600.00
Asphalt
Surface
Course (4")
240
TN
$
52.00
512,480.00
Storni
Drainage
Pipe
(18")
200
LF
$
30.00
$6,000.00
Grate
Inlets
1
EA
$ 2,600.00
$2,600.00
Junction
Box
1
EA
$ 2,600.00
52,600.00
Remove
Light
Pole
1
EA
$ 700.00
5700.00
Remove
Light Pole
&
Cable
1
EA
$ 700.00
$700.00
Encase
Force
Main
120
LF
$ 30.00
53,600.00
Sanitary
Sewer
Gpnder
Pump Station
Puma)
1
LS
$ 25,000.00
$25,000.00
FHous@
orce Main
(2")
250
LF
$ 14.00
53,500.00
Water
Une
(2-1/2")
500
LF
$ 15.00
$7,500.00
Double
Water
Meter
Setting
1
EA
$ 600.00
$600.00
Blow
-off
Assembly
1
EA
$ 1,000.00
$1,000.00
Seeding
1
LS
$ 2,000.00
52,000.00
Subtotal Construction Cost
$105,700 00
J:12002W 221041estfmates\Corphang.comPtex.wb3
Page 2 or 2
City of Fayetteville, Arkansas
Budget Adjustment Form
Res. oz
• Budget Year
2002
Depanment
Division:
Program:
Aviation & Economic Development
Airport
Capital
Date Requested
03/05/2002
Adjustment #
Project or Item Requested:
$185,305 is requested in the Contract Services account
the cost of Corporate Hangar Complex aircraft parking
ramp construction.
Project or Item Deleted:
To recognize $169,600 in State Grant Revenue and to use
$15,705 in the Airport Use of Fund Balance.
Justification of this Increase:
This project will provide for the development of a
corporate hangar complex area, utilizing existing unused
pavement former vehicle parking.
Justification of this Decrease:
The Arkansas Department of Aeronautics is providing two
grants under their 90/10% & 75/25% programs.
Sufficient funding remains in projects to meet 2002
objectives.
Sufficient funding remains to comply with City policy.
Increase Espen e (Decrease Revenue)
Account Name Amount
Contract Services 185,305
Account Name
State Grants
Use of Fund Balance
Account Number
5550 3960 5315 00
Decrease Expense (Increase Revenue)
Amount Account Number
169,600
15.705
5550 0955 6805 00
5550 0955 4999 99
Project Number
Project Number
Reques ed By
B dgtt anager
Approval Signatures
Date
Date
Date
Budget Office Use Only
Type. A B C
Date of Approval
Posted to General Ledger
Posted to Project Accounting
Entered in Category Log
Blue Copy: Budget & Research / Yellow Copy: Requester
E
FAYETTEaLE
THE CITY OF FAYETTEVILLE. ARKANSAS
DANCOODY MAYOR
AVIATION AND ECONOMIC DEVELOPMENT
RAY M. BOUDREAUX. DIRECTOR
4500 School Ave.. Suite F
Fayetteville. AR 72701
501 718 7042
TO:
THRU:
FROM:
DATE:
SUBJECT:
Dan Coody, Mayor
City Council Members
Staff Review Committee
Ray M. Boudreaux, Director
February 14, 2002
Task Order #10, Corporate Hangar Complex
Background: Airport Management has been approached by two local business people
who have requested to lease airport property, and to construct larger, corporate style
hangars at their expense. In order to accommodate this class of airport user, and to
promote future growth of corporate aviation at Drake Field, re -development of unused
airport property is desired. A preliminary plan which utilizes existing unused vehicle
parking pavement south of the terminal building will provide an area to construct up to
eight corporate hangars. Utilizing the existing pavement will reduce overall project
costs, provide easy access from Hwy 71, and serve to further the goal of stimulating
aviation related business activity at Drake Field.
Purpose: The project constitutes two components. Under the Arkansas Department of
Aeronautics Airport Grant (SAAG) program 90/10% grant classification, we will perform
renovation to an unused asphalt vehicle parking area. Also included in the project under
the SAAG 75/25% grant classification is construction of a small portion of additional
ramp, and extension of taxiway to the existing terminal ramp. This will provide access to
the runway from the new hangars. A conceptual drawing of the proposed project is
attached for your information.
Under a land lease arrangement with the airport, two privately financed 100' x 100'
corporate type hangars will be built adjacent to the refurbished aircraft parking ramp. It
is anticipated that the two initial hangars will stimulate other new corporate aircraft
activity and hangar construction at Drake Field.
Arkansas Department of Aeronautics will provide grant funding in the amount of
$74,088, or 90% of a total project cost of $82,320 for Apron Renovation. Also approved
by the State is $92,512, or 75% of a total project cost of $123,350, for Taxiway & Apron
Expansion.
The purpose of this request is to approve Task Order # 10, Engineering and
Construction Observation for "Corporate Hangar Complex," and approval of a budget
adjustment recognizing the state grant funding and total project cost.
The Airport Board, at their meeting of February 7, 2002 approved of the project concept
M
X AGENDA REQUEST
X CONTRAC 1' REVIEW
IL -GRANT REVIEW
For the Fayetteville City Council meeting of
STAFF REVIEW FORM
March 5, 2002
e
FROM:
Ray Boudreaux
Airport
Name Division
Task Order #10
McClelland Consulting Engineers
Aviation & Economic Development
Department
ACTION REQUIRED: A Resolution which approves and authorizes the Mayor to sign Task Order # 10 with McClelland
Consulting Engineers, Inc., and approves a budget adjustment for the project.
COST TO CITY:
(16,103) State Grant Revenue
$ 21,a55o
Cost of this Request
5550-3960-5314-00
Account Number
98054
Project Number
$ 476,593
Category/Project Budget
$ 125,030
Funds used to date
$ 351,563
Remaining Balance
Professional Services
Category/Project Name
Airport Capital Exp
Program Name
Airport
Fund
Bl^DGVIEW: X Budgeted Item
Budget Manager D to Administrative Services Dir. Date
Budget Adjustment Attached
Cg�RAC' 7G
-I /
NT/LEASE REVIEW:
OZ
Wet
ccounting Mana>er Date Ince al A jr.r. Date GRANTING AGENCY
�ugl rtcypi2
ADA Coordinator Date
M/15104_. Arkansas Dept. of Aeronautics
Pu chasing Officer Date Grants Coordinator
Date
STAFF RECOMMENDATION:
Approval & signature of Mayor
at
Date
Cross Reference
New Item: Yes
Prev. Ord/Res#: 01-25
Orig Cont. Date: 3/7/00
Orig Cont #: 747
No
1
STAFF REVIEW FORM Page 2
Description: Meeting Date: 03/05/2002
Task Order #10, McClelland Consulting Engineers, Inc.
Comments:
Budget Manager Reference Comments:
Accounting Manager Reference Comments:
City Attorney Reference Comments:
Purchasing Officer Reference Comments:
internal Auditor Reference Comments
ADA Coordinator Reference Comments:
Grants Coordinator Reference Comments:
FAYETTEVALE
THE CITY OF FAYETTEVIIIE. ARKANSAS
DEPARTMENTAL CORRESPONDENCE
•
To: Ray M. Boudreaux, Aviation & Economic Development Director
From: Heather Woodruff, City Clerk
Date: March 7, 2002
Please find attached a copy of Resolution No. 36-02 approving Task Order No. 10 with
McClelland Consulting Engineers for engineering services and construction observation
associated with the construction of a corporate hangar complex at the Fayetteville Municipal
Airport. I am returning two (2) original Task Orders to you. The third original will be
microfilmed and filed with the City Clerk
Your Budget Adjustment has been forwarded to the Budget & Research Division.
cc: Nancy Smith, Internal Auditor
Steve Davis, Budget Manager
010 03
Update
Document
Reference
RES
Date
3052002
City of Fayetteville
ndex Maintenance
Iter Action
Ref. Taken Brief Description
36-02 TASK ORDER NO. 10
•
3/12/2002
7:48:01
Enter Keywords • RES. 36-02
TASK ORDER NO. 10
MCCLELLAND CONSULTING ENGINEER
CONSTRUCTION OBSERVATION ASSC
CORPORATE HANGAR COMPLEX
FAYETTEVILLE MUNICIPAL AIRPORT
HANGAR
NO. 10
File Reference # • MICROFILM
Security Class
•
Expiration Date
Date for Cont/Referred:
Name Referred to
•
•
Retention Type:
**** Active ****
Cmdl-Return Cmd8-Retention Cmd4-Delete Cmd3-End Press 'ENTER' to Continue
CmdS-Abstract Yes No (c) 1986-1992 Munimetrix Systems Corp.