HomeMy WebLinkAbout186-02 RESOLUTION• 1 RESOLUTION NO. 186-02 A RESOLUTION APPROVING A CONTRACT WITH MERIT ELECTRIC IN THE AMOUNT OF TWO HUNDRED FIFTY-SIX THOUSAND DOLLARS ($256,000.00) FOR THE INSTALLATION OF REPLACEMENT LIGHTING AT THE LAKE FAYETTEVILLE SOFTBALL COMPLEX; A PROJECT CONTINGENCY IN THE AMOUNT OF THIRTY-EIGHT THOUSAND FOUR HUNDRED DOLLARS ($38,400.00); AND A BUDGET ADJUSTMENT IN THE AMOUNT OF ONE HUNDRED FOUR THOUSAND EIGHT HUNDRED FIVE DOLLARS ($104,805.00). BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves a contract with Merit Electric in the amount of Two Hundred Fifty -Six Thousand Dollars ($256,000.00) for the installation of replacement lighting at the Lake Fayetteville Softball Complex Section 2. That the City Council of the City of Fayetteville, Arkansas hereby approves a Project Contingency in the amount of Thirty -Eight Thousand Four Hundred Dollars ($38,400.00). Section 3. That the City Council of the City of Fayetteville, Arkansas hereby approves a Budget Adjustment in the amount of One Hundred Four Thousand Eight Hundred Five Dollars ($104,805.00). PASSED and APPROVED this 3rd day of December, 2002. By: ;lam aid HEATHER WOODRUFF, City/ erk APPROVED: By: DAN COODY, Mayor NAME OF FILE: CROSS REFERENCE - Item # Date • Resolution No.186-02 Document 1 12/03/02 Resolution # 186-02 2 11/15/02 Staff review form 3 12/03/02 Budget adjustment 4 11/14/02 Purchase requisition 5 Agreement 6 12/09/02 Memo from Heather Woodruff, City Clerk to David Wright, Parks and Recreation NOTES: STAFF REVIEW FORM XX Agenda Request Contract Review Grant Review For the Fayetteville City Council meeting of: December 3, 2002 FROM: David Wright Name • Parks and Recreation Urban Development Division Department ACTION REQUIRED: Review and Approve Contract with Merit Electric for installation of new ballfield lighting at Lake Fayetteville Softball Complex in the amount of $256,000 with a project contingency amount of $38,400 for a total cost of $294,400, along with the approval of the needed budget adjustment. COST TO CITY: $294,400 Cost of this Request aaStY eO-ssroroo Account Number 01006 1 Project Number 0O 0 Catego /Project Budget 41015- 95" Funds Used to Date ffi9 1595 emking Balance BUDGET REVIEW: 1Budgeted Item Budget Manager X Budget Adjustment Attached Administrative Services Director CONTRACT/GRANT/LEASE REVIEW: {tet_2 : U/o Z Accounting Manager J Date GRANTING AGENCY: ADA Coordinator Purchasing Officer Date STAFF RECOMM DATION: Approve Contract AleaAy ..- D ivision Head Depart Admi Dir or rative Servi -s Director Ma or gem/ Of ya2 Date Date /I —Ir -oz. Datea latD e Lake Fay. Softball Complex Improv. Category/Project Name Park Improvements Program Name General Park Development Fund Date fibtdoa Date Cross Reference New Item: X Yes No Prev Ord/Res #: Orig Contract Date: • Page 2 STAFF REVIEW FORM Description Lake Fayetteville Softball Complex Lighting Meeting Date December 3, 2002 Comments: Reference Comments: Budget Coordinator Accounting Manager City Attorney Purchasing Officer ADA Coordinator Internal Auditor • Budget Year 2002 City of Fayetteville, Arkansas • Budget Adjustment Form Department: Urban Development Division: Parks & Recreation Program: Parks Development / Sales Tax Date Requested 12/3/2002 Adjustment Number Project or Item Requested: $104,805 is requested in the Lake Fayetteville Lighting capital project. Project or Item Deleted: $37,400 from the Lewis/Asbell Athletic Complex Improvements capital project. $67,405 from the Lake Fayetteville Softball Improvements capital project. Justification of this Increase: The additional funding is needed for the contract with Merit Electric, Inc. Justification of this Decrease: The Lewis/Asbell Athletic Complex parking lot project was deleted and had remaining funding. Currently, this project has a lesser priority than the Lake Fayetteville Lighting capital project. Increase Expense (Decrease Revenue) Account Name Account Number Amount Project Number Park improvements 4470 9470 5806 00 Park improvements 2250 9250 5806 00 37,400 01006 1 67,405 01006 1 Decrease Expense (Increase Revenue) Account Name Account Number Amount Project Number Building costs 4470 9470 5804 00 Park improvements 2250 9250 5806 00 37,400 01017 1 67 405 02043 1 (// equested By Approval Signatures Budget anager 1 Dep• • -• Dtr t. str LL ervices recto Admin Mayor Date Date OL Date lJ Q t Date Budget & Research Use Only Type: A B C () E Date of Approval Posted to General Ledger Posted to Project Accounting Entered in Category Log Date Initial Date Initial Date Initial Date Initial 4NM'03aa Admin. Services Director: Budget Manager: Data Processin Special Instructions: CO -.I 0) CO a W N -� Requester: ,Connie Edmonston Z a a m N N Il Vendor#: 49980 CITY OF FAYETTEVILLE Purchase Requisition _.. _.. _ (nota purchase order) SHIPPING/HANDLING Light Project #02-64 Lake Fayetteville Softball Complex Description: 0 C r 0) E. m E< N m —I o mz Unit of issue me: lectric, Inc. p N 9 $0.00 $0.00 f00.0s I Extended Cost 49 _N » 0 oO 69 CO J A 0 o b o o b o 0 O 0 O 0 0 b 2250-9250-5806.00 4470-9470-5806.00 Account Number: *Requester's Employee#: 101 N O i O 2 0 FOB Point: Fayetteville, AR Subtotal: Tax: $0.00 TOTAL: $256,000.00 O{ 0 0 0) 101006.1 ProjecuSubProject Number: Jjnsion 471 Divis�.or��jH,,eAad Approval: de _i co d Cr m Z 0 N d P.O. Number: Requisition No.: Expected Delivery Date: Date: 11/14/02 5 co 0 2 Fixed Asset # • • FAYETTEVILLE THE CITY OF FAYETTEVILLE, ARKANSAS TO: THRU: FROM: DATE: SUBJECT: Background • Mayor Coody and City Council Hugh Earnest, Urban Development Director 46( Connie Edmonston, Parks and Recreation Superintendent David Wright, Parks and Recreation Program Coordinator November 14, 2002 Award of Bid #02-64 and Approval of Contract for Lake Fayetteville Softball Lighting. Lake Fayetteville Softball Complex, home of approximately 800 youth and adult softball games per year, has been in dire need of new field lighting for many years. The current lighting fixtures are the original fixtures installed when the facility was developed. National Safety Standards are for Baseball/Softball Field lighting to have 50 footcandles in the infield and 30 in the outfield. Current footcandle measurement at Lake Fayetteville is well below this standard. Green Anderson was hired to evaluate the current status of the electrical wiring of the park, designing the specifications and overseeing the project with the contractor The replacement of the light poles, fixtures and electrical wiring will be the third step of renovations of this complex. The two prior steps included the replacement of the fencing and playground. Current Status Bids were opened on November 13, 2002 at 2:OOpm. Two bids were received. Merit Electric from Fayetteville, Arkansas, had the low bid for the project. Recommendation Parks and Recreation and Green Anderson have reviewed the bids and recommend the contract be awarded to Merit Electric, in the amount of $256,000, plus a 15 percent contingency of $38,400, for a total cost of $294,400. If you have any questions or need additional information, please call me at 444-3481 or Connie Edmonston at 444-3473. Attachments: Bid Tabulation Sheet Contract • • Section 00500 AGREEMENT BETWEEN CITY OF FAYETTEVILLE AND CONTRACTOR THIS AGREEMENT is dated as of the _ day of in the year 2002 by and between the City of Fayetteville, Arkansas and (hereinafter called CONTRACTOR). The City of Fayetteville and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The work generally consists of removal of existing light structures and providing and installing a new sports lighting system for Lake Fayetteville Softball Complex, and all items indicated in the Drawings and Specifications for the project. Article 2. ENGINEER. The Project has been designed by Green Anderson Engineers, Inc. 2233 N. Green Acres Rd. Fayetteville, AR 72703 who is hereinafter called ENGINEER and who is to act as the City of Fayetteville's representative, assume all duties and responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract documents. Article 3. CONTRACT TIME. 3.1. The Work shall be substantially completed within 40 working days after the Contract Time commences to run as provided in paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with paragraphs 14.07.B & C of the General Conditions within 50 working days after the date when the Contract Time commences to run. City of Fayetteville 10/24/02 Agreement Page -1 • • 3.2. Liquidated Damages. The City of Fayetteville and CONTRACTOR recognize that time is of the essence of the Agreement and that the City of Fayetteville will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1 above, plus and extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expense and difficulties involved in proving the actual loss suffered by the City of Fayetteville if the Work is not completed on time. Accordingly, instead of requiring any such proof, the City of Fayetteville and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay the City of Fayetteville Two hundred dollars ($200.00) for each day that expires after the time specified in paragraph 3.1 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within the time specified in paragraph 3.1 for completion and readiness for final payment or any proper extension thereof granted by the City of Fayetteville, CONTRACTOR shall pay the City of Fayetteville Two hundred dollars ($200.00) for each day that expires after the time specified in paragraph 3.1 for completion and readiness for final payment. Article 4. CONTRACT PRICE The City of Fayetteville shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined from the Bid Form pursuant to paragraphs 4.1 below: 4.1. for all Work other than Unit Price Work, an amount equal to the sum of the established lump sums for each separately identified item of Lump Sum Work; and Article 5. PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions or as modified in the Supplementary Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. 5.1. Progress Payments. The City of Fayetteville shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Applications for Payment as recommended by ENGINEER, on or about the 1st day of each month during construction as provided in paragraphs 5.1.1 and 5.1.2 below and SC -14.02. All such payments will be measured by the schedule of values established in paragraph 2.07 of the General Conditions and based on the number of units completed in the case of Unit Price Work or, in the event there is no schedule of values, as provided in the General Requirements. 5.1.1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below, but, in case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or the City of Fayetteville may withhold, in accordance with paragraphs 14.02.B.5 & 14.02.D of the General Conditions. City of Fayetteville 10/24/02 Agreement Page -2 • 90 percent of Work completed (with the balance of 10 percent being retainage), If Work has been 50 percent completed as determined by the ENGINEER, and if the character and progress of the Work have been satisfactory to the City of Fayetteville and ENGINEER, the City of Fayetteville, on recommendation of ENGINEER, may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of work completed, in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100 percent of the Work completed. 100 percent of materials and equipment not incorporated in the Work but delivered, suitably stored, and accompanied by documentation satisfactory to the City of Fayetteville as provided in paragraphs 14.02.B.5 & 14.02.D of the General Conditions. That is, if any such items are setup for that type payment in the Specifications. 5.1.2. Upon Substantial Completion, in an amount sufficient to increase total payments to CONTRACTOR to 98 percent of the Contract Price (with the balance of 2 percent being retainage), less such amounts as ENGINEER shall determine, or the City of Fayetteville may withhold, in accordance with paragraphs 14.02.B.5 & 14.02.D of the General Conditions. 5.3 Final Payment. Upon final completion and acceptance of the Work in accordance with paragraphs 14.07.B & C of the General Conditions, the City of Fayetteville shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraphs 14.07.B & C. Article 6. CONTRACTOR'S REPRESENTATIONS. In order to induce the City of Fayetteville to enter into this Agreement CONTRACTOR makes the following representations: 6.1. CONTRACTOR has examined and carefully studied the Contract Documents (including the Addenda listed in Article 7) and the other related data identified in the Bidding Documents including "technical data." 6.2. CONTRACTOR has visited the site and become familiar with and is satisfied as to the general, local, and site conditions that may affect cost, progress, performance, or furnishing of the Work. 6.3. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, performance, and furnishing of the Work. 6.4. CONTRACTOR has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to City of Fayetteville 10/24/02 Agreement Page -3 • • existing surface or subsurface structures at or contiguous to the site which have been identified in the Supplementary Conditions as provided in paragraph 4.02.A of the General Conditions. CONTRACTOR accepts the determination set forth in paragraph SC -4.02 of the Supplementary Conditions of the extent of the "technical data" contained in such reports and drawings upon which CONTRACTOR is entitled to rely as provided in paragraph 4.02 of the General Conditions. CONTRACTOR acknowledges that such reports and drawings are not Contract Documents and may not be complete for CONTRACTOR's purposes. CONTRACTOR acknowledges that the City of Fayetteville and ENGINEER do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect to Underground Facilities at or contiguous to the site. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all such additional supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress; performance, or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to the employed by CONTRACTOR and safety precautions and programs incident thereto. CONTRACTOR does not consider that any additional examinations, investigations, explorations, tests, studies, or data are necessary for the performance and furnishing of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. 6.5. CONTRACTOR is aware of the general nature of work to be performed by the City of Fayetteville and others at the site that relates to the Work as indicated in the Contract Documents. 6.6. CONTRACTOR has correlated the information known to CONTRACTOR, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. 6.7. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that CONTRACTOR has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and famishing of the Work. City of Fayetteville 10/24/02 Agreement Page -4 • • Article 7. CONTRACT DOCUMENTS The Contract Documents which comprise the entire agreement between the City of Fayetteville and CONTRACTOR concerning the Work consist of the following: 7.1 Advertisement for Bids 7.2 Instructions to Bidders 7.3 Bid Form 7.4 Notice of Selection 7.5 This Agreement (pages 1 to 7 inclusive). 7.6 Performance and Payment Bonds, (Exhibits A and B respectively). 7.7 Certificates of Insurance, (Exhibit C). 7.8 Notice to Proceed (00550) 7.9 General Conditions (pages 1 to 42, inclusive). 7.10 Supplementary Conditions (pages 1 to 11 inclusive). 7.11 Specifications as listed in the table of contents. 7.12 Drawings as listed in the table of contents. 7.13 Addenda numbers _ to inclusive. 7.14 The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto: 7.15 All Written Amendments and other documents amending, modifying or supplementing the Contract Documents pursuant to paragraph 3.04 of the General Conditions. The documents listed in paragraphs 7.2 et seq. above are attached to this Agreement (except as expressly not otherwise above). There are no Contract Documents other than those listed above in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraph 3.04 of the General Conditions. City of Fayetteville 10/24/02 Agreement Page -5 • • Article 8. MISCELLANEOUS. 8.1. Terms used in the Agreement which are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions. 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 8.3. The City of Fayetteville and CONTRACTOR each binds itself, its partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements and obligations contained in the Contract Documents. 8.4. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken and all remaining provisions shall continue to be valid and binding upon stricken provision or part thereof with a valid and enforceable provision that comes as close as possible expressing the intention of the stricken provision. 8.5. Changes, modifications, or amendments in scope, price, or fees to this contract shall not be allowed without a prior formal contract amendment approved by the Mayor and the City Council in advance of the change in scope, cost or fees. 8.6. Freedom of Information Act. City contracts and documents prepared while performing city contractual work are subject to the Arkansas Freedom of Information Act. If a Freedom of Information Act request is presented to the City of Fayetteville, the CONTRACTOR will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. §25-19-101 et. seq.). Only legally authorized photocopying costs pursuant to the FOIA may be assessed for this compliance. 8.7. This contract will be interpreted and enforced according to the laws of the State of Arkansas. City of Fayetteville 10/24/02 Agreement Page -6 IN WITNESS WHEREOF, •City of Fayetteville and CONTRACTS have signed this Agreement in quadruplicate One counterpart each has been delivered to the City of Fayetteville and ENGINEER, and two counterparts have been delivered to CONTRACTOR. All portions of the Contract Documents have been signed, initialed, or identified by the City of Fayetteville and CONTRACTOR or identified by ENGINEER on their behalf. This Agreement will be effective on , 2002 (which is the Effective Date of the Agreement). OWNER: City of Fayetteville By: Mayor CONTRACTOR: MERIT ELECTRIC By: PA. PRESIDENT Title [CORPORATE SEAL] * If a Corporation, attest by the Secretary. License No. 0018940203 City of Fayetteville 10/24/02 Agreement Page -7 FAYETTEVILtE THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE • To: David Wright, Parks and Recreation From: Heather Woodruff, City Clerk Date: December 9, 2002 Attached is a copy of Resolution No. 186-02 approving a contract with Merit Electric in the amount of $256,000.00 for the installation of replacement lightning at the Lake Fayetteville Softball Complex. I am also returning two signed copies of the contract to you. The original resolution and original contract will be microfilmed and filed with the City Clerk. cc: Nancy Smith, Internal Auditor