HomeMy WebLinkAbout181-02 RESOLUTION1 RESOLUTION NO. 181-02 A RESOLUTION APPROVING AN AMENDED CHANGE ORDER NUMBER 4 TO THE CONSTRUCTION CONTRACT WITH TOWNSHIP BUILDERS, INC. IN THE AMOUNT OF ONE HUNDRED NINETY-FIVE THOUSAND THREE HUNDRED DOLLARS ($195,300.00) FOR THE DOWNTOWN DICKSON ENHANCEMENT PROJECT (DDEP); APPROVING A REVISED IN-HOUSE ENGINEERING EXPENSE IN THE AMOUNT OF SEVENTY-FOUR THOUSAND SEVEN HUNDRED DOLLARS ($74,700.00); AND APPROVING A BUDGET ADJUSTMENT IN THE AMOUNT OF TWO HUNDRED SEVENTY THOUSAND DOLLARS ($270,000.00) FOR SAME. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of Fayetteville, Arkansas, hereby approves an amended Change Order Number 4 to the construction contract with Township Builders, Inc. in the amount of One Hundred Ninety -Five Thousand Three Hundred Dollars ($195,300.00) for the Downtown Dickson Enhancement Project (DDEP). The City Council does not agree to extend the time of completion of this contract. A copy of the amended Change Order Number 4, marked Exhibit "A" is attached hereto and made a part hereof. Section 2. That the City Council of Fayetteville, Arkansas, hereby approves a revised In -House Engineering expense in the amount of Seventy -Four Thousand Seven Hundred Dollars ($74,700.00). Section 3. That the City Council of Fayetteville, Arkansas, hereby approves a Budget Adjustment in the amount of Two Hundred Seventy Thousand Dollars ($270,000.00) for same PAFSOrprand APPROVED this 19th day of November, 2002. a :S C aa af By: //l/lirtl� (fiEATHER WOODRUFF, ity Clerk NAME OF FILE: CROSS REFERENCE: Item # Date • Resolution No.181-02 Document • 1 11/19/02 Resolution # 181-02 2 11/23/00 Change Order # 4 3 11/23/02 Staff review form 4 11/19/02 Budget adjustment 5 12/09/02 Memo from Heather Woodruff, City Clerk to Sid Norbash, Engineering NOTES: • CHANGE ORDER NO. 4 Project Title: Downtown Dickson Enhancement Project Project No. 98097-20 Contract No. 02-14 Contract Date 3-19-2002 Contractor: Township Builders. Inc. The following changes are hereby made to the contract documents: Addition to the contract: Section (A) per attached form $ 22.382.50 Section (B) per attached form $ 15,875.00 Section (C) Per attached form $157.042.50 Justifications: Total $195,300.00 The justifications for the above referenced cost items are outlined in sections 1, 2, and 3 of the letter of Atkins Engineers to the Mayor and City Council. These items were omitted from their original design. Original Contract Price: As adjusted by previous changes: This C.O. will increase contract by: The new contract price will be: $2.948.590.30 $2.995.429.30 $ 195,300.00 $3.190.729.30 • • Change Order #4 Page 2 Dickson St. Enhancement CHANGE TO CONTRACT TIME Township Builders will be granted 102 extra calendar days to complete the additional work. Therefore the substantial completion date will move from April 15, 2003 to July 26, 2003. The date of full completion will move from August 1, 2003 to November 10, 2003. APPROVALS REOUIRED To be effective this change order must be approved by the Owner if it changes the scope or objective of the project, or as may otherwise be required under the terms of the General Conditions of the Contract. Requested by Approved by Contractor Approved by Mayor ,/deze d;.4z-ltfrz/ Date // %eivt - Date t -J D% date- /(40-2.-- • CHANGE ORDER NO. _A_ • Project Title: Downtown Dickson Enhancement Project Project No. 98097-20 Contract No. 02-14 Contractor: Township Builders, Inc. Contract Date 3-19-2002 The following changes are hereby made to the contract documents: Addition to the contract: Section (A) per attached form Section (B) per attached form Section (C) Per attached form Justifications: $ 22,382.50 $ 15.875.00 $157,042.50 Total $195,300.00 The justifications for the above referenced cost items are outlined in sections 1, 2, and 3 of the letter of Atkins Engineers to the Mayor and City Council. These items were omitted from their original design. Original Contract Price: As adjusted by previous changes: This C.O. will increase contract by: The new contract price will be: $2.948.590.30 $2,995,429.30 $ 195,300.00 $3,190,729.30 • • Change Order #4 Page '2 Dickson St. Enhancement CHANGE TO CONTRACT TIME Township Builders will be granted 102 extra calendar days to complete the additional work. Therefore the substantial completion date will move from April 15. 2003 to July 26, 2003. The date of full completion will move from August 1, 2003 to November 10, 2003. APPROVALS REOUIRED To be effective this change order must be approved by the Owner if it changes the scope or objective of the project, or as may otherwise be required under the terms of the General Conditions of the Contract. Requested by fect, /`L+a,/ Date // 7—eaiZ Approved by Contractor /_%! �� Date //- 7IW Approved by Mayor / t l G6Y�i � date 3/424 NOV-07-2002 THU 04:28 PM THIP BUILDERS FAX N0. 5041043839 1 11/07/2802 17 13 479-575-8202 ENGINEERING C.O.F. CUMIN ORDER NO. ..A. P. 02 PAGE 82 Project Title; bowntown niekgo@ gylanasmont Bs'R'J1 Project No. 98097-90 Contract No. 0Z-14 Contract Date 3-79^2002 Contractor: Tawnehip sniliare Inc. The following changes are hereby made to the contract documents: Addition to the contraat: Section. (A) per attached form Scotian (3) per attached form ' Section (C) Per attached Ears Justifications: $ 22,382.50 $ 15.875.00 $151.O42.5O • Total 4195,300.00 -r.7====......======="1"--m= The justifications for the above referenced cost items are outlined in sections 1, 2, and 3 of the letter of Atkins Engineers to the Mayor.and City Council. These items were omitted from their original design. Original' Contract Price: a j94!.590.30 As adjusted by previous changes: � SQ29.30 This C.O. will increase contract by; $ 195-300.00 The new contract price will be: $3.190,729.30 _ NOV-07_2002 THU 04:28 PM TOIP BUILDERS 11/07/2802 17:13 479-575- 2 Change Order #4 Page 2 • Dickson St. Enhancement FAX NO. 501 ENGINEERING C.O.F. P. 03 PACE 03 CHANGE TO CONTRACT TIME • Township Builders will be granted 102 extra calendar days to complete the additional work. 00 '0 Auaust 1. 2003 to November 10, 2003- AEPROVALS REOOTRED To be effective this change order must be approved by the Owner if it changes the scope or objective .of the project, or as may otherwise be required under the terms of the General Conditions of the Contract. Requested by Date Approved by Contractor , �^'^ J..�+ Date50/L date (L/2 c17--- Approved by Mayor NOV-07-2002 THU 04:28 PM T1SHIP BUILDERS 11/07/2902 17 13 479-575-8202 FAX N0, 541143839 ENGINEERING C.O.F. MANOR ORDBR NO. • P, 02 PAGE 02 Project Title: Downtown nicksecUMWWWWOMMUMLJEIDMIRCt Project No. 98097-20 Contract No. OZ -14 Contract Date 3-19-2002 Contractor:.Townahin Builders inc The following changes are hereby made to the contract documents: Addition to the contract: 9vatioa (A) per attached fora Section Section (B) per attachod form (C) Per attached form $ 22,382,50 $ 15,675.00 Total $195,300.00 Justifications: The justifications for the above referenced cast items are outlined in sections 1, 2, and 3 of the letter of Atkins Engineers to the Mayor and City Council. These items were omitted from their Original design. Original'Contract Price: As adjusted by previous changes: This C.O. will increase contract by: The new contract price will be: ,S2 949.590,30 :2,995.429.30 $ 195-300.00' sa_ia0,729.30 '> NOV-07-2002 THU 04:28 PM TOW IP BUILDERS 11/07/2802 17 13 479-575-2 Change Order #4 Page 2 Dickson St. Enhancement CHANGE TO CONTRACT TIME • FAX NO. 501"839 P. 03 ENGINEERING C.O.F. PAGE 03 i Township Builders will be granted 1D2 extra calendar days to complete the additional work. �- -_ am' " _ 1 2003 to Crnly 2F. 2003- The rlate of full nnmnlrt<on will nova from August 1. 2003 to November 10. 2903_ APPROVALS REQUIRED To be effective this change order must be approved by the Owner if it changes the scope or objective ,of the project, or ae may otherwise be requited under the terms of the General Conditions of the Contract. Requested by Date Approved by Contractor t .- 4si. Date / -7-0?— Approved 7'0LApproved by Mayor ` �'� / dater/2'J —I 440V-07-2002 THU 04:28 PM TO IP BUILDERS 11/07/2082 17 13 479 -575 - FAX NO. 501 3839 ENGINEERING C.O.F. PAGE 82 P.02 ORANaa OBDRR NO. Project Title: bowntoup nickyen Ethan, ..•,.-.t Proloo* Project No. 98097-20 Contract No. 02.-14 Contract Date 3-19-2002 Contractor: Township Bulldogs Tne. The following changes are hereby made to the contract documents: Addition to the centraet: Stetion (A) per attached form $ 22,302.50 Section (S) par attached fere d 15.678.00 Section (C) Ter attached form $157 042.50 Total $195,300.00 = =116==romit=====laWala= Justifications: The justifications for the above referenced cost items are outlined in sections 1, 2, and 3 of the letter of Atkins Engineers to the Mayor and City Council. These items were omitted from their original design. Original' Contract Price: As adjusted by previous changes: This C.O. will increase contract by: The new contract price will be: 52.948.990.30 412.995.429 30 $ 191_300.00 NOV-07-2002 THU 04:28 PM TOWNSHIP BUILDERS 11/07/2002 17 13 479 -575 -BO Change Order #4 Page 2 Dickson St. Enhancement FAX NO. 5016 39 ENGINEERING C.O.F. CHANGE TO CONTRACT TIME Township Builders will be granted complete the additional work. P. 03 PAfIE 83 102 extra calendar days to will move from April 15. Thereforethe substantial coma io data 00 - � �0 puaust 1. 2003 to November 10, 200$a, ApPROV'tS REWIRED To be effective this change order must be approved by the Owner if it changes the scope or objective .of the project, or as may otherwise be required under the terms of the General Conditions of the Contract. Requested by Date Approved by Contractor Date 11-7 0 L Approved by Mayor L //� date / ` NOV-07-2002 THU 04:28 PM TeIP BUILDERS 4 11/07/2882 17:12 479-575-8202 FAX Na 501143839 P. 02 ENGINDE ING C.O.F. PAGE 02 CSANOK Q&DzR NO. _A_ Project Title: Downtown Dickson E» nawmwnt Prolpcf; Project No. 98097-20 Contract No. OZ -14 Contract Date 3-19-2002 Contractor: Township Sui3.dein tac The following changes are hereby made to the contract documents: Addition to the contract: Section 00 per attached form Section (3) per attached fora Section (C) Per attached form Total SUstiftcatione: S 22 382.50 $ 15.875.00 $157.042.50 $195,300.00 ======mm. --m= • The justifications for the above referenced cost items are outlined in sections 1, 2, and 3 of the letter of Atkins Engineers to the Mayor.and City Council. Theseitems were omitted from their original design. Original Contract Price: As adjusted by previous changes: This C.O. will increase contract by: The new contract price will be: 92,948. ;2.995. $ 195. $3.190, 5,89.30 429.30 300.00 729.10 NOV-07-2002 THU 04:28 PM TOWIP BUILDERS ✓ 11/07/2002 17:13 479 -575 - Change Order #4 Page 2 • Dickson St. Enhancement FAX NO. 501"839 ENGINEERING C.O.F. P. 03 PAVE 03 CHANGE TO CONTRACT TIME Township Builders will be granted 102 extra calendar days to complete the additional work. 00 - .0- P,uaust 1. 2003 to November 10, 2003- APPROVkLS REOUTREO To be effective this change order must be approved by the Owner if it changes the scope or objective .of the project, or as may otherwise be required under the terms of the General Conditions of the Contract. Requested by Approved by Contractor Date Date j/-7 a Approved by Mayor date •STAFF REVIEW FORM X AGENDA REQUEST X CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Council meeting of November 19. 2002 FROM: • Sid Norbash Engipeering Public Works Name Division parunent ACTION REQUIRED: Approval of: (1) the Change Order #4 to the construction contract with Township Builders, Inc., for Dickson Street Enhancement Project, in the amount of $195,300. (2) Additional funds for the in-house construction management, in the amount of $74,700.00. (3) The related Budget Adjustment in the amount of $270,000. COST TO CITY: Cost0oflE' [request $3.224.83Cate0g ry dg C,oudg Fency) Dickson Stanhry oeeanectcgecategory/Project 4470-9count47umber .00 und5�sed 10 Daze Program' et Improvements Proje9ctt N°umber $29.303.0(Sales Tax Remaining Balance Fund BUDGE "JEW: Bt get Coco m / X Budgeted Item _ Budget Adjustment Attached (to be famished) Administrative Services Director CONT CT/GRANT/LEASE REVIEW: a/54:941414 -11j ccountmg Manager City 'ftomey Purchasing Officer GRANTING AGENCY: Date flL�-u.Auu t �, 111Dat1810 a. (f b Date II$Oa- ate ADA Coordinator Date STAFF RECOMMENDATION: Approval of the Change Order #4, extra in-house eng. costs & budget adjustment. Date Cross Reference Date Admini ive Services Director / Date Mayor New Item: Yes _ NoX. Prev Ord/Res #: 52-02 ///2 1� Orig Contract Date: 3-19-2002 Date Orig Contract Number: 838 • • STAFF REVIEW FORM Descrip Di kson S . - Enhancement Project Meeting bate 11-19-2002 Change a • er #4 Comments: Reference Comments: Budget Coordinator Accounting Manager City Attorney Purchasing Officer ADA Coordinator Internal Auditor Page 2 FAYETTEVII1E THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE • To: Fayetteville City Council Thru: Dan Coody, Mayor Greg Boettcher, PWD Jim Beavers, City Engineer From: Sid Norbash, Staff Engineer Date: November 4, 2002 Re: Dickson Street Enhancement Project Change Order #4 to the construction Contract Background: The above referenced project is a Capital Improvement Project in progress, which is scheduled for construction completion in 2003. Change of Scope: There are three items that were omitted from the original design. Attached please find the explanation letter from Atkins Engineers, and the justifications for their recommendations. Attached please find Change Order #4, and the supporting documents containing the description and the breakdown of each cost item. Recommendations• The Staff recommends approval of: (1)Change Order #4 to he existing contract with Township Builders, Inc., for an increase in the contract, in the amount of $195,300.00 (2)The additional amount of $74,700 for in-house engineering services. (3)The related Budget Adjustment in the amount of $270,000.00 Funding: Sales Tax Funds. SN/sn Attachments: Copy of the Change Order #4 / Budget Adjustment • CHANGE ORDER NO. _A._ Project Title: Downtown Dickson Enhancement Project Project No. 98097-20 Contract No. 02-14 Contract Date 3-19-2002 Contractor: Township Builders. Inc. The following changes are hereby made to the contract documents: Addition to the contract: Section (A) per attached form $ 22.382.50 Section (B) per attached form $ 15.875.00 Section (C) Per attached form $157,042.50 Total $195,300.00 Justifications: The justifications for the above referenced cost items are outlined in sections 1, 2, and 3 of the letter of Atkins Engineers to the Mayor and City Council. These items were omitted from their original design. Original Contract Price: As adjusted by previous changes: This C.O. will increase contract by: The new contract price will be: $2,948.590.30 $2,995,429.30 $ 195,300.00 $3,120 729.30 • • • Change Order #4 Page 2 Dickson St. Enhancement CHANGE TO CONTRACT TIME Township Builders will be granted 102 extra calendar days to complete the additional work. Therefore the substantial completion date will move from April 15. 2003 to July 26. 2003. The date of full completion will move from August 1. 2003 to November 10. 2003. APPROVALS REOUIRED To be effective this change order must be approved by the Owner if it changes the scope or objective of the project, or as may otherwise be required under the terms of the General Conditions of the Contract. Requested by Approved by Contractor Approved by Mayor Date AW Date M/-&2 date a/430Z2— NOV-05-2002 TUE 04:05 PM TOWNS__.BUILDERS FAX N0. 501669 P. 02 Downtown Dickson Enhancement Project 1012002 Downtown Dickson Enhancement Project Change Order #4A Add the following work to the Base Bid to complete Change Order #4A: Item Estimated No. Ouantitv Unit Description olltent and Unit Price Bid Total Amount 1 1 Each Remove and Dispose of Grate Inlet Six Hundred dollars ($ 600.00 )/EA $ 600.00 amount written in words in figures in figures 2 10 Ton Aggregate Base Course (Class 7) Twenty Two dollars ($ 22.00 )/TON $ 220.00 amount written in words in figures in figures 3 20 Gallon Prime Coat Two dollars ($ 2.00 )/GAL $ 40.00 amount written in words in figures in figures 4 4 CY 10" PCC Base Course Ninety amount written in words dollars (S 90.00 )/CY $ 360.00 in figures in figures 5 2 Ton 2" ACHM Surface Course(PG70-22) Fifty amount written in words dollars (5 50.00 )/TON 5 100.00 . in figures in figures 6 108 Lin Ft 18" R. C. Pipe Culvert (Class 3) Forty Five amount written in words dollars (S 45.00 )/LF $ 4.860.00. in figures in figures 7 9 Cu Yd Selected Pipe and Conduit Bedding Twenty amount written in words dollars ($ 20.00 )/CY $ 180.00 • in figures in figures 8 25 Cu Yd Selected Pipe Backfill Twenty amount written in words dollars ($ 20.00 )/CY $ 500.00 in figures in figures 9 12 Cu Yd Class A Concrete Three Hundred Fifty amount written in words dollars ($ 350.00 )/CY $ 4.200.00. in figures in figures 00310-1