HomeMy WebLinkAbout177-02 RESOLUTION• RESOLUTION NO. 177-02 A RESOLUTION APPROVING CHANGE ORDER NUMBER 5 TO THE CONTRACT ENTERED INTO MAY 21, 2002 WITH CROSSLAND CONSTRUCTION COMPANY, INC. IN THE AMOUNT OF FOUR HUNDRED TWO THOUSAND EIGHT HUNDRED NINETY-FIVE DOLLARS AND EIGHTY-FOUR CENTS ($402,895.84) TO PURCHASE AND INSTALL EXTERIOR CLADDING FOR THE NEW FAYETTEVILLE PUBLIC LIBRARY. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of Fayetteville, Arkansas, hereby approves Change Order Number 5 to the contract entered into May 21, 2002 with Crossland Construction Company, Inc. in the amount of Four Hundred Two Thousand Eight Hundred Ninety -Five Dollars and Eighty -Four Cents ($402,895.84) to purchase and install exterior cladding for the new Fayetteville Public Library. A copy of Change Order Number 5, marked Exhibit "A" is attached hereto and made a part hereof. PASSED and APPROVED this 19th day of November, 2002. r I L v9• IL • tv:�. • \ "e;y By:� 4EATHER WOODRUFF, Clerk APPROVED: By NAME OF FILE: CROSS REFERENCE. Item # Date • Resolution No.177-02 Document • 1 11/19/02 Resolution # 177-02 2 11/23/02 Change Order # 5 3 11/23/02 Staff review form 4 12/06/02 Memo from Heather Woodruff, City Clerk to Louise Schaper, Library NOTES: Change Order (Instructions on reverse side) PROJECT: (Name and address) FAYETTEVILLE PUBLIC LIBRARY 401 WEST MOUNTAIN STREET FAYETTEVILLE ARKANSAS 72701 TO CONTRACTOR: (Name and address) CROSSLAND CONSTRUCTION COMPANY INC ATTENTION: JOHN PRIEST — PROJECT MANAGER 2510 WEST HUDSON ROAD ROGERS ARKANSAS 72756 2000 ED.ON AIA DOCUMENT CHANGE ORDER NUMBER: DATE: G701-2000 05 06 NOVEMBER 2002 ARCHITECT'S PROJECT NUMBER: 2000073-00 21 MAY 2002 GENERAL CONSTRUCTION CONTRACT DATE: CONTRACT FOR: OWNER ARCHITECT CONTRACTOR FIELD OTHER THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives.) ADD ARCHITECTURAL PRECAST CONCRETE (APC) AND BRICK CONSISTENT WITH REVISED DRAWINGS DATED 5/10/02: A251, A252, A253, A254, A351, A501, A502, A503, A504, A505, A508 8 A616. ADD BRICK EXTERIOR CLADDING TO TWO STAIR TOWERS. CHANGE APC TO STONE BELOW ELEVATION 1372.46' ON BOLLARDS AND PROVIDE APC CAPS ABOVE IN ELEVATIONS 8 8 10, A253. CHANGE STONE STEP MATERIAL TO BE OWNER PROVIDED PROVIDE APC AT CANOPIES ON PLAZA DECK BUT DELETE BRACKET DETAIL PORTION OF DETAIL 11/A513. The original (Contract Sum) (Guaranteed Mai it Pr:e.) was $ 17_631,931 00 The net change by previously authorized Change Orders $..._408,82-i.36__ The (Contract Sum) (G..e,,...t„.1 Ale..:........ Il:) prior to this Change Order was s18 040.752.36 The (Contract Sum) (C teeteMocd "1-r:irnum Peies) will be (increased) (deeeearx'} (urcba^g^' by this Change Order in the amount of $ 402,895.84 The new (Contract Sum) (Cueeee4e..d Price` including this Change Order will bit443,648.20 The Contract Time will be (;.,...e..,ed) (d........,.d) (anchange ) by ( ) days. The date of Substantial Completion as of the date of this Change Order therefore is08 JULY 2004 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive for which the cost or time are in dispute as described in Subparagraph 7.3.8 of AIA Document Azol. Not valid until signed by the Architect, Contractor and Owner. AFHJ ARCHITECTS PO BOX 790 FAYETTEVILLE, AR 72702 AMfCIH-FEET (Typed name) Associate A tiled (Signal' S FOSTER BY 6NOioy CROSSLAND CONST. CO. INC. PO BOX 907 ROGERS, AR 72756 CONTRACTOR (Typed name) nature) JOHN PRIEST BY DATE DATE CITY OF FAYETTEVILLE 113 WEST MOUNTAIN ST FAYETTEVILLE, AR 72701 O W N E ped name) (Si: nature DAN COODY, MAYOR BY 1// 3/(72—, DATE 02000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. 1 •8 e• w sea vs • 02000 AIA® AIA DOCUMENT G701-2000 CHANGE ORDER The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 • V 02000 AIA® AIA DOCUMENT G701-2000 INSTRUCTIONS The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 2 Instructions GENERAL INFORMATION _ PURPO..This document is intended for use in implementing changes in the Work agreed to by the • Owner, Contractor and Architect. Execution of a completed G7o1 form indicates agreement upon all the terms' of the change, including any changes in the Contract Sum'(or' Guaranteed Maximum Price) and Contract Time. RELATED DOCUMENTS. This document was prepared for use under the terms of AIA general conditions, including AIA Document Atm, General Conditions of the Contract for Construction, andihe.gerieral' conditions contained in AIA Document Aro7, Abbreviated Owner -Contractor. Agreemeni-Form for. Construction Projects of Limited Scope—Stipulated Sum. USE OF CURRENT DOCUMENTS. Prior to using any AIA document, the user should consult the AIA, an AIA component chapter or a current AIA Documents Price List to determine the current edition of each document. REPRODUCTIONS. AIA Document G7or is a,do`pyrighted. yvoik and may of be reproduced of excerpted from in. substantial part without the express written permission of the AIA The;G7or document is intend- ed to be used as a consumable—that is, the original document purchased: bythe user -is intended tobe con- sumed in the course of being used. There is no implied permission to reproduce this document, nor does membership in The American Institute of Architects confer any further rights to reproduce G7or in whole or in part. A limited license is heieby granted to retail purchasers to reproduce a maximum of TEN copies of a com- pleted or executed G7or, but only for use in connection with a particular project. COMPLETING THE G701 FORM DESCRIPTION OF CHANGE IN THE CONTRACT Insert a detailed description of ihe,chang`e-or reference specific exhibits describing in detail the change to .be made,in the Contract by this Change Order, including any Drawings, Specifications, documents or other supporting data to clarify the scope of the change. DETERMINATION OF COSTS Insert -the following information in the blanks provided, and strike out the terms in parentheses that do not apply: • the original Contract Sum or Guaranteed Maximum Price; • the net change by previously authorized Change Orders (note that this does not include changes authorized by Construction Change Directive unless such a change was subsequently agreed to by the Contractor and recorded as a Change Order); • the Contract Sum or Guaranteed Maximum Price prior to this Change Order; .the•amount-of increase or dad-ease:if any, in.the'Coht?act Sum or Guaranteed Mattimum. Price; . -' tr and'- -"--t•:4... 4. _ •m• • 7r' the new Contract Sum or Guaranteed Maximum'Price•as adjusted by this Change Order.-^ -'• �- CHANGE IN CONTRACT TIME Insert the following information in the blanks provided, and strike out the terms in parentheses that do not apply: • the amount in days of the increase or decrease, if any, in the Contract Time; and thedateof.SubstantialCompletion, including any adjustment effected by this Change Order._ _• EXECUTION OF THIS DOCUMENT When the Owner and Contractor, in concurrence with the Architect, have reached agreement on the change to be made in the Contract, including any adjustments in the Contract Sum (or Guaranteed Maximum Price) and Contract Time, the G7or document should be executed in triplicate by the two par- ties and the Architect, each of whom retains an original. WARNING: Unlicensed photocopying violates US. copyright laws and will subject the violator to legal prosecution. • AmirmoezFosterHaileyJohnson MEMORANDUM To: Hugh Earnest From: Jim Fost Architects & Planners November 20, 2002 Reference: Fayette ' e Public Library, Change Order #5 Prow ' ed for ayor Coody's signature, following last night's approval by City Counct , ' hange Order #5. After signature, the City should retain the original for its records. Call and I will pick up the rest. Post Office Box 790. 100 West Center, Suite 302 • Fayetteville, AR 72702.479-442-5565 • FAX 479-442-8849 • STAFF REVIEW FORM X AGENDA REQUEST X CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Council meeting of November 19 2002 • FROM: Louise Schaper Library Urban Development Name Division Department ACTION REQUIRED: Approve a contract adjustment in the amount of $402,895.84 with Crossland Construction Company Inc. for a portion of the exterior cladding material cost including brick, architectural precast concrete and stone per Exhibit C of the original contract dated May 21, 2002 with Crossland Construction Company. The original contract with Crossland Construction was $17,633,931; the new contract is $18,040,752.36. COST TO CITY: $402.895.84 $ 21 G1 9/ ail Cost of this Request Category/Project Budget 4150-9150-580400 (library fund) Account Number 99073-1 Project Number $ I? 633-73S Funds Used To Date $ x,933 576 Remaining Balance New Library Category/Project Name New Library Program Name Library Construction Fund Sales Tax Improvement Fund Fund BUDGET REVIEW: X Budgeted Item Budget Adjustment Attached Administrative Services Director CONTRACT/GRANT/LEASE REVIEW 36- A ivy Date Mg(oZ Date I I _g—oma Cityonaey Purchasing Manager Date GRANTING AGENCY: AA itor ADA Coordinator I( 18102r Date Date STAFF RECOMMENDATION: Staff recommends approval Division Head Date • ti ve Services Director 4 Date Cross Reference New Item: Yes Prey Ord/Res # 83-0), Orig Contract Date: 5.2 i 1 2110 2. C'un.-coct4 $ 3 • • • V FMETTEVIII 4 .'•.Pumx Agee • '.4 • DEPARTMENTAL CORRESPONDENCE TO: Hugh Earnest FROM: Louise Schaper, Library Director DATE November 7, 2002 SUBJECT: Change Order #5 Fayetteville Public Library Building Construction Background The cost of construction of the new Fayetteville Public Library was estimated throughout the planning and design process by independent cost estimators. When the winning bid was reviewed, some items exceeded those estimates by considerable amounts. The budget for those items was set aside for future decisions as time did not permit developing alternatives and associated costs. One of those items was the architectural precast concrete (APC) to be used on the two towers, window trim and front entry. The APC was removed from the contract with Crossland Construction and $450,000 was left in the overall project budget for replacement of this cladding material. Current Status Meyer, Scherer & Rockcastle issued revisions to the building elevations and details for pricing to replace much of the APC with bnck In locations where APC was judged to be critical to the image of the library or to durability, it has been retained. APC remains at the building entry, at all sills and coping and at the four canopies on the plaza Lintels and stair tower cladding have been changed to brick A small area has changed from APC to stone The cost reflected in this change order is $402,895.84; this represents a savings of approximately $48,000 from our $450,000 deferred budget for this item. Recommendation To approve change order number 5 which allows Crossland Construction Co. to purchase and install exterior cladding material that was not included in the original contract. • 4 rntoczFosterhlaiteyJohnson l: T Architects iv Planners November 7, 2002 Hugh Earnest Director of Urban Development City of Fayetteville 113 West Mountain Fayetteville, AR 72701 Ref: Fayetteville Public Library, Change Order #5 • Dear Mr. Earnest: The Architects recommend approval of attached Change Order #5 relative to changes in architectural precast concrete (APC), brick and stone. The amount is within the budget designated for this additional work Allow us to provide the background for this recommendation. When bids were received the low bid submitted by Crossland Construction Company exceeded the funds available. A number of changes were negotiated to bring the project cost in line with the budget. Analysis of individual costs identified masonry as much higher than estimated. Within the masonry bid, the most significant cost overrun was found to be APC. Time constraints prior to award did not permit developing alternative designs and associated costs. The contract was awarded with a deduction of $650,000 to delete all APC material. Concurrently, the overall project budget was adjusted to include a deferred cost of $450,000 for replacement of this cladding material The recommended change is less than this deferred budget item. Meyer Scherer & Rockcastle issued revisions to the building elevations and details for pricing to replace much of the APC with brick. In locations where APC was judged to be critical to the image of the library or to durability, it was retained. APC remains at the building entry, at all sills and copings and at the four canopies on the plaza. Lintels and stair tower cladding were changed to brick. A small area was changed from APC to stone. These changes saved over $247,000 without significantly impacting architectural quality. Please advise if further information is desired. Sincerely, AmirmoezFosterHaileyJohnson James R. Foster, FAIA Copy: Louise Schaper, Director, Fayetteville Public Library Bob Kohler, Owner's Project Representative Sean Wagner, Project Manager, Meyer Scherer & Rockcastle Latch Aminnuez. A IA James R. Foster. FAIA Zed Johnson, A IA William J. Browner, CSI John Krug, AIA Newton Hailey, Jr., AIA telin.l21*U Post Office !Lox 790 100 V✓,st Center Suite 302 Fayetteville, Ali 72702 telephone 501.442.5565 facsimile 501.442.8849 III (Instructions on reverse side) • Change Order PROJECT: (Name and Oddre,,) FAYETTEVILLE PUBLIC LIBRARY 401 WEST MOUNTAIN STREET FAYETTEVILLE ARKANSAS 72701 2000 ED, ON AIA DOCUMENT CHANGE ORDER NUMBER: DATE: G701-2000 05 06 NOVEMBER 2002 ARCHITECT'S PROJECT NUMBER: 2000073-00 21 MAY 2002 GENERAL CONSTRUCTION CONTRACT DATE: TO CONTRACTOR: CONTRACT FOR: (.vane and address) CROSSLAND CONSTRUCTION COMPANY INC ATTENTION: JOHN PRIEST— PROJECT MANAGER 2510 WEST HUDSON ROAD ROGERS ARKANSAS 72756 OWNER ARCHITECT CONTRACTOR FIELD OTHER THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Consrruetinn Change Directives.) ADD ARCHITECTURAL PRECAST CONCRETE (APC) AND BRICK CONSISTENT WITH REVISED DRAWINGS DATED 5/10/02: A261, A252, A253, A254, A351, A501, A502, A503, A504, A505, A508 & A515. ADD BRICK EXTERIOR CLADDING TO TWO STAIR TOWERS. CHANGE APC TO STONE BELOW ELEVATION 1372.W ON BOLLARDS AND PROVIDE APC CAPS ABOVE IN ELEVATIONS 8 & 10, A253. CHANGE STONE STEP MATERIAL TO BE OWNER PROVIDED. PROVIDE APC AT CANOPIES ON PLAZA DECK BUT DELETE BRACKET DETAIL PORTION OF DETAIL 11/A513. The original (Contract Sum) (Ceasawteed Ata,fi.e..... 1' e) was s 17,633,931.00 The net change by previously authorized Change Orders $_408,82.1.36_ The 406,821-36— The (Contract Sum) (C,......nt..J Pla..:n...,.. P.:.e) prior to this Change Order was s18,040 752.36 The (Contract Sum) i-) will be (increased)* t `;r —cal) {—se -range -14 by this Change Order in the amount of $ 402,895.84 The new (Contract Sun)) (Cuarante_J Alatrinu,a P6a3 including this Change Order will bit 443,648.20 The Contract Time will be E++...,......d) (J�c, ......d) (unchanged) by ( ) days. The date of Substantial Completion as of the date of this Change Order therefore is08 JULY 2004 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Islaximum Price which have been authorized by Construction Change Directive for which the cost or tint: are in dispute as described in Subparagraph 7.3.8 of AIA Document Amt. Not valid until signed by the Architect, Contractor and Owner. AFHJ ARCHITECTS PO BOX 790 FAYETTEVILLE, AR 72702 ARCi114E-ET (Typed name) Associate Archite (7 NO ✓ 0'1/ DATE CROSSLAND CONST. CO. INC. PO BOX 907 ROGERS, AR 72756 CONTRACTOR (Typed mane) (Signemrel JOHN PRIEST BY DATE 07000 The American Institute of Architects. provisions without written permission of the the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S CITY OF FAYETTEVILLE 113 WEST MOUNTAIN ST FAYETTEVILLE, AR 72701 OWN (Typed name) (yf¢ elan) DAN COODY, MAYOR BY DATE Reproduction of the material here „or substantial quotanon of its AIA violates the copyright laws e. •he United States and will subject . copyright laws and will subject the /iolasor to legal prosecution. 1 11/4 emote, , iira' 07000 AIA® AIA DOCUMENT G701-2000 CHANGE ORDER The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 1 • . rmo e z Fo s t e rHaileyJo has o n Architects & Planners I November 7, 2002 Hugh Earnest Director of Urban Development City of Fayetteville 113 West Mountain Fayetteville, AR 72701 Ref: Fayetteville Public Library, Change Order #5 • Dear Mr. Earnest: The Architects recommend approval of attached Change Order #5 relative to changes in architectural precast concrete (APC), brick and stone. The amount is within the budget designated for this additional work. Allow us to provide the background for this recommendation. When bids were received the low bid submitted by Crossland Construction Company exceeded the funds available. A number of changes were negotiated to bring the project cost in line with the budget. Analysis of individual costs identified masonry as much higher than estimated. Within the masonry bid, the most significant cost overrun was found to be APC. Time constraints prior to award did not permit developing alternative designs and associated costs. The contract was awarded with a deduction of $650,000 to delete all APC material. Concurrently, the overall project budget was adjusted to include a deferred cost of $450,000 for replacement of this cladding material. The recommended change is less than this deferred budget item. Meyer Scherer & Rockcastle issued revisions to the building elevations and details for pricing to replace much of the APC with brick In locations where APC was judged to be critical to the image of the library or to durability, it was retained. APC remains at the building entry, at all sills and copings and at the four canopies on the plaza. Lintels and stair tower cladding were changed to brick. A small area was changed from APC to stone. These changes saved over $247,000 without significantly impacting architectural quality. Please advise if further information is desired. Sincerely, AmirmoezFosterHaileyJohnson James R. Foster, FAIA Copy: Louise Schaper, Director, Fayetteville Public Library Bob Kohler, Owner's Project Representative Sean Wagner, Project Manager, Meyer Scherer & Rockcastle Laleh Arninnoez. AIA James R. Foster, FAIA Zed Johnson, AIA William J. Browner, CSI John Krug, AIA Newton Hailey, Jr., AIA Rrr.«i woo Post Office Box 790 100 West Center Suite 302 Fayetteville, AR 72702 telephone 501.442.5565 facsimile 501.442.8849 • • • • Change Order (Instructions on reverse side) PROJECT: (,Va,ue and address) FAYETTEVILLE PUBLIC LIBRARY 401 WEST MOUNTAIN STREET FAYETTEVILLE ARKANSAS 72701 2000 EDiON AIA DOCUMENT CHANGE ORDER NUMBER: DATE: 05 06 NOVEMBER 2002 ARCHITECT'S PROJECT NUMBER: 2000073-00 21 MAY 2002 GENERAL CONSTRUCTION CONTRACT DATE: TO CONTRACTOR: CONTRACT FOR: (Name and address) CROSSLAND CONSTRUCTION COMPANY INC ATTENTION: JOHN PRIEST— PROJECT MANAGER 2510 WEST HUDSON ROAD ROGERS ARKANSAS 72756 G701-2000 OWNER ARCHITECT CONTRACTOR FIELD OTHER THE CONTRACT 15 CHANGED AS FOLLOWS: (Include, where applicable. any undisputed amount attributable to previously executed Construction Change Directives.) ADD ARCHITECTURAL PRECAST CONCRETE (APC) AND BRICK CONSISTENT WITH REVISED DRAWINGS DATED 5110102: A251, A252, A253, A254, A351, A501, A502, A503, A504, A505, A508 & A515. ADD BRICK EXTERIOR CLADDING TO TWO STAIR TOWERS. CHANGE APC TO STONE BELOW ELEVATION 1372.46' ON BOLLARDS AND PROVIDE APC CAPS ABOVE IN ELEVATIONS 8 & 10, A253. CHANGE STONE STEP MATERIAL TO BE OWNER PROVIDED. PROVIDE APC AT CANOPIES ON PLAZA DECK.BUT DELETE BRACKET DETAIL. PORTON OF DETAIL 111A613. The original (Contract Sum) )Caner teed Mese' ^' ) was s 17,633$31 00 The net change by previously authorized Change Orders s 406,821 36 The (Contract Sum) ( ) prior to this Change Order was 48 040.752.36 The (Contract Sum) (Guaranteed h4^xirvu^t Prep) will be (increased)4'---sed) 4u^-h^rg^-14 by this Change Order in the amount of $ 402,895.84 The new (Contract Sum) (Cuarent_ed P9oxkxt..., Price) including this Change Order will blBr443,648.20 The Contract Time will be C.,.,_...,J) (d__..a.1) (unchanged) by ( ) days. The date of Substantial Completion as of the date of this Change Order therefore is08 JULY 2004 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive for which the cost or time are in dispute as described in Subparagraph 7.3.8 of AIA Document Awl. Not valid until signed by the Architect, Contractor and Owner. AFHJ ARCHITECTS PO BOX 790 FAYETTEVILLE, AR 72702 Aftc141rccT (Typed name) Associate Archite JAMES FOSTER BY G_Lo ✓ ov CROSSLAND CONST. CO. INC. PO BOX 907 ROGERS AR 72756 CONTRACTOR (Typed name) (Signature) JOHN PRIEST CITY OF FAYETTEVILLE 113 WEST MOUNTAIN ST FAYETTEVILLE, AR 72701 OWNE(Typed Mime) (Signature) DAN COODY, MAYOR BY BY DATE DATE 1 ` lZ)ln DATE 02000 The American Institute of Architects. Reproduction of the material here n or substantial quotation of its provisions without written permission of the AIA violates the copyright laws* 'he United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the ,iolaror to legal prosecution. 02000 AIA® AIA DOCUMENT G701-2000 CHANGE ORDER The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 FAYETTEVIIItE THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE To: Louise Schaper, Library From: Heather Woodruff, City Clerk Date: December 6, 2002 Attached is a copy of Resolution No. 177-02 approving change order # 5 to the May 21, 2002 contract with Crossland Construction Company, Inc., in the amount of $402,985.84 to purchase and install exterior cladding for the New Fayetteville Public Library. Four copies of the change order have already been returned to the Mayor's office to be returned to the contractor. The original resolution and original change order will be microfilmed and filed with the City Clerk. cc: Nancy Smith, Internal Auditor