Loading...
HomeMy WebLinkAbout162-02 RESOLUTIONRESOLUTION NO. 162-02 A RESOLUTION TO APPROVE A CONTRACT WITH CROSSLAND CONSTRUCTION, INC TO CONSTRUCT THE FIXED BASE OPERATIONS HANGER IN THE AMOUNT OF $634,000.00 PLUS A CONTINGENCY OF 63,400.00, THE ACCEPTANCE OF A STATE DEPARTMENT OF AERONAUTICS GRANT IN THE AMOUNT OF $200,000.00 AND APPROVAL OF A BUDGET ADJUSTMENT IN THE AMOUNT OF $697,400.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves a construction contract with Crossland Construction, Inc. to build the Fixed Base Operations Hangar in the amount of $634,000.00 plus a contingency of $63,400.00. Section 2. That the City Council of the City of Fayetteville, Arkansas hereby accepts the State Department of Aeronautics grant in the amount of $200,000.00 to assist in the construction of this FBO Hanger. Section 3. That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment in the amount of $697,400.00 for the construction of the Fixed Base Operations Hanger. PASSED and APPROVED this the 15th day of October, 2002. ATTEST. eather Woodruff, City Cl k APPROVED: By: NAME OF FILE: CROSS REFERENCE: Item # Date p Resolution No. 162-02 Document 1 10/15/02 Resolution # 162-02 2 10/15/02 Contract 3 10/03/02 Budget Adjustment 4 10/03/02 Staff Review Form 5 10/23/02 Memo from Heather Woodruff, City Clerk to Ray Boudreaux, Airport NOTES: ORIGINAL. CONTRACT OXHIE3IT A THIS AGREEMENT, made and entered into on the / S day of (%ylt-la 2002, by and between Crossland Construction Co., Inc. and the City of Fayetteville, Arkansas: WITNESSETH: That Crossland Construction Co., Inc., for the consideration hereinafter fully set out, hereby agrees with the City of Fayetteville as follows: 1. That Crossland Construction Co., Inc. shall furnish all the materials, and perform all of the work in manner and form as provided by the following enumerated Drawings, Specifications, and Documents, which are attached hereto and made a part hereof, as if fully contained herein and are entitled FBO Hangar for Fayetteville Municipal Airport, dated August, 2002. Advertisement for Bids Instructions to Bidders Bid and acceptance thereof Performance Bond Payment Bond General Conditions Supplementary Conditions Specifications Drawings (Bound Separately) 2. That the City of Fayetteville hereby agrees to pay to Crossland Construction Co., Inc. for the faithful performance of this Agreement, subject to additions and deductions as provided in the Specifications or Bid, in lawful money of the United States, the amount of: Six -hundred thirty-four thousand Dollars ($634,000.00) 3. The Work will be substantially completed within 150 days after the date when the Contract Time commences to run as provided in the Notice to Proceed. 4. Liquidated Damages: The City of Fayetteville and Crossland Construction Co., Inc. recognize that time is of the essence of this Agreement and that the City of Fayetteville will suffer financial loss if the Work is not completed within the time specified above, plus any extensions thereof allowed in accordance with the General Conditions. They also recognize the delays, expense, and difficulties involved in proving the actual loss suffered by the City of Fayetteville if the Work is not completed on time. Accordingly, instead of requiring any such proof, the City of Fayetteville and Crossland Construction Co., Inc. agree that as liquidated damages for delay (but not as a penalty) Crossland Construction Co., Inc. shall pay the City of Fayetteville Five Hundred Dollars (5500.00) for each day that expires after the time specified in Paragraph 3 for Substantial Completion. 5. That within 30 days of receipt of an approved payment request, the City of Fayetteville shall make partial payments to Crossland Construction Co., Inc. on the basis of a duly certified and approved estimate of work performed during the preceding calendar month by Crossland Construction Co., Inc., LESS the retainage provided in the General Conditions, which is to be withheld by the City of Fayetteville until all work within a particular part has been performed strictly in accordance with this Agreement and until such work has been accepted by the City of Fayetteville. f •\rinrnm. ntc and CPttinnc\rhncb\T nral Cuttinnc\Tmmrtnrary intnrnot Pape \f J ICA rnntrart rine, MGnn _ I That upon submission by C411,1and Construction Co., Inc. of evidentisfactory to the City of Fayetteville that all payrolls, material bills, and other costs incurred by Crossland Construction Co., Inc. in connection with the construction of the work have been paid in full, final payment on account of this Agreement shall be made within 60 days after the completion by Crossland Construction Co., Inc. of all work covered by this Agreement and the acceptance of such work by the City of Fayetteville. 7. It is further mutually agreed between the parties hereto that if, at any time after the execution of this Agreement and the Surety Bond hereto attached for its faithful performance and payment, the City of Fayetteville shall deem the Surety or Sureties upon such bond to be unsatisfactory or if, for any reason such bond ceases to be adequate to cover the performance of the work, Crossland Construction Co., Inc. shall, at his expense, within 5 days after the receipt of notice from the City of Fayetteville, furnish an additional bond or bonds in such form and amount and with such Surety or Sureties as shall be satisfactory to the City of Fayetteville. In such event, no further payment to Crossland Construction Co., Inc. shall be deemed to be due under this Agreement until such new or additional security for the faithful performance of the work shall be fumished in manner and form satisfactory to the City of Fayetteville. 8. No additional work or extras shall be done unless the same shall be duly authorized by appropriate action by the City of Fayetteville in writing. IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the day and date first above written, in three (3) counterparts, each of which shall, without proof or accounting for the other counterpart be deemed an original Contract. SEAL: • WITNESSES: CROSSLAND SONSTRUCTION CO. INC. By JCC n-' flr-1212i Name Pres r cbe..'fr ATTEST: erk Approved as to form: Title CITY OF FAYETTEVILLE, ARKANSAS Attorney for City of Fayetteville CATInrnmante and Cation\rhneh\1 nral Cottinne\Tomnnran, Intornot PHne\ 11 TeMrnntrart llnr nncnn _, • CONTRACT • • THIS AGREEMENT, made and entered into on the 11 day of Oc4tber c,�QOa , 2002, by and between Crossland Construction Co., Inc. and the City of Faye teville, Arkansas: WITNESSETH: That Crossland Construction Co., lnc., for the consideration hereinafter fully set out, hereby agrees with the City of Fayetteville as follows: 1. That Crossland Construction Co., Inc. shall furnish all the materials, and perform all of the work in manner and form as provided by the following enumerated Drawings, Specifications, and Documents, which are attached hereto and made a part hereof, as if fully contained herein and are entitled FBO Hangar for Fayetteville Municipal Airport, dated August, 2002. Advertisement for Bids Instructions to Bidders Bid and acceptance thereof Performance Bond Payment Bond General Conditions Supplementary Conditions Specifications Drawings (Bound Separately) 2. That the City of Fayetteville hereby agrees to pay to Crossland Construction Co., Inc. for the faithful performance of this Agreement, subject to additions and deductions as provided in the Specifications or Bid, in lawful money of the United States, the amount of: Six -hundred thirty-four thousand Dollars ($634,000.00). 3. The Work will be substantially completed within 150 days after the date when the Contract Time commences to run as provided in the Notice to Proceed. 4. Liquidated Damages: The City of Fayetteville and Crossland Construction Co., Inc. recognize that time is of the essence of this Agreement and that the City of Fayetteville will suffer financial loss if the Work is not completed within the time specified above, plus any extensions thereof allowed in accordance with the General Conditions. They also recognize the delays, expense, and difficulties involved in proving the actual loss suffered by the City of Fayetteville if the Work is _not completed on time. Accordingly, instead of requiring any such proof, the City of Fayetteville and Crossland Construction Co., Inc. agree that as liquidated damages for delay (but not as a penalty) Crossland Construction Co., Inc. shall pay the City of Fayetteville Five Hundred Dollars ($500.00) for each day that expires after the time specified in Paragraph 3 for Substantial Completion. 5. That within 30 days of receipt of an approved payment request, the City of Fayetteville shall make partial payments to Crossland Construction Co., Inc. on the basis of a duly certified and approved estimate of work performed during the preceding calendar month by Crossland Construction Co., Inc., LESS the retainage provided in the General Conditions, which is to be withheld by the City of Fayetteville until all work within a particular part has been performed strictly in accordance with this Agreement and until such work has been accepted by the City of Fayetteville. 114110( r•\n"rr,mantc anti Caftinnc\rhuch1T oral Cattinac\Tamnnror , Intamat P 6c\lJ WA\rnntrart tiny nncnn - 6. That upon submission by Crossland Construction Co., Inc. of evidencesatisfactory to the City of Fayetteville that all payrr, material bills, and other costs incurreCrossland Construction Co., Inc. in connection w the construction of the work have been paid in full, final payment on account of this Agreement shall be made within 60 days after the completion by Crossland Construction Co., Inc. of all work covered by this Agreement and the acceptance of such work by the City of Fayetteville. 7. It is further mutually agreed between the parties hereto that if, at any time after the execution of this Agreement and the Surety Bond hereto attached for its faithful performance and payment, the City of Fayetteville shall deem the Surety or Sureties upon such bond to be unsatisfactory or if, for any reason such bond ceases to be adequate to cover the performance of the work, Crossland Construction Co., Inc. shall, at his expense, within 5 days after the receipt of notice from the City of Fayetteville, furnish an additional bond or bonds in such form and amount and with such Surety or Sureties as shall be satisfactory to the City of Fayetteville. In such event, no further payment to Crossland Construction Co., Inc. shall be deemed to be due under this Agreement until such new or additional security for the faithful performance of the work shall be furnished in manner and form satisfactory to the City of Fayetteville. 8. No additional work or extras shall be done unless the same shall be duly authorized by appropriate action by the City of Fayetteville in writing. IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the day and date first above written, in three (3) counterparts, each of which shall, without proof or accounting for the other counterpart be deemed an original Contract. SEAL. WITNESSES: $v\LA\ E Anne M. Cheloha Notary Public - Arkansas Benton County My MPI Exp. 9/7/11 ATTEST: B CRO S AND CONSTRUC ON CO., Approved as to form: 'Name Title �e R Sw es ax. c„4„ \,30 r r - wTM e-( s duty la -n -az was 3 isr,2 A„ z M b1/43 ort C.Brr cj . CITY OFF FAYETTEVIILLLE, ARKANSAS � By �l/I �G�t'.�C,1ve- Mayor Attorney for City of Fayetteville r \rinrumante on,I Cattinne\rhuch\I nrol l'nttinne\Tamnnrer.. Imarnnat Filae\!11 kF\rnn,rart.lnr nnann _ TO CROSSLAND CONSTRUCTION CO., INC. 2510 West Hudson Road • ROGERS, AR 72756 (501) 631-7077 FAX (501) 631-7080 incrv`ril CAT•SVII-21 WE ARE SENDING YOU eSsE&Attached 0 Under separate cover via O Shop drawings 0 Prints O Copy of letter 0 Change order 4 DATE 10/17 0 ATTENTION To11 wy.ii Go) (vv..) RE: JOB NO. ❑ Plans 0 Samples the following items: 0 Specifications COPIES DATE NO. DESCRIPTION 3 Phi r— 3c> ,r+-, c9 c5,2. THESE ARE TRANSMITTED as checked below: ❑ For approval ‘..g For your use `❑ As requested ❑ Approved as submitted ❑ Approved as noted ❑ Returned for corrections ❑ Resubmit ❑ Submit ❑ Return copies for approval copies for distribution corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE 0 PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO I . L SIGNED. 11 enclosures are not as noted, kindly notify us at once. get Year 2002 Department: Division: Program: iity of Fayetteville, Arkansas Budget Adjustment Form Aviation & Economic Development Airport Capital 1SHIBIT 13 Date Requested 09/27/2002 Adjustment # Project or Item Requested: $697,400 is requested in the Building Costs account to construct a 150' x 125' hangar to support the Airport's Fixed Base Operation. (FBO) Project or Item Deleted: To recognize $200,000 in State grant revenue - Arkansas Dept. of Aeronautics grant #1926-02 $497,400 in the Capital program Professional Services account. Justification of this Increase: Investment in this facility supports the Airport's strategic goals for the future self sufficiency of Drake Field. Justification of this Decrease: Airport funds leverage State grant funds for hangar development. Sufficient funding remains in Prof Sery account to meet 2002 objectives. Sufficient funding remains to comply with City policy. Increase Expen e (Decrease Revenue) Account Name Amount Account Number Project Number Building Costs 697,400 5550 3960 5804 00 02130 1 Account Name State Grants Professional Services Decrease Expense (Increase Revenue) Amount Account Number Project Number 200,000 5550 0955 6805 00 02130 1 497 400 5550 3960 5314 00 02073 1 • Approval Signatures Requested By Date Dep Adm Mayor ate Budget Office Use Only Type: A B C Date of Approval Posted to General Ledger Posted to Project Accounting _ _ Entered in Category Log Blue Copy: Budget & Research / Yellow Copy: Requester E STAFF REVIEW FORM X AGENDA REQUEST X CONTRACT REVIEW GRANT REVIEW FBO Hangar Crossland Construction For the Fayetteville City Council Meeting of: October 15, 2002 FROM: Ray M. Boudreaux Name Aviation & Economic Development Airport Division Department ACTION REQUIRED: Resolution to approve a Contract iCLo s anneConstruction, Inc. to construct FBO Hangar. Includes a 10 % contingency amount. Approval -61W Approval-61Wbudget adjustment. Forward to the Mayor for signature. Approval of Arkansas Aeronautics Commission grant 1926-02 in the amount of $200,000 (50-50%) for construction of hangar to accommondate FBO expansion. COST TO CITY: $697,400.00 $ - FBO Hangar Cost of this request Category/Project Budget Program Category / Project Name 5550.3960.5804.00 $ - Capital Account Number Funds Used to Date Program / Project Category Name 0213a.1 $ - Airport Project Number • Remaining Balance Fund Name BUDGET REVIEW: Cisi) t M ager CONTRACT/GRANT/LEASE REVIEW: Budgeted Item X Budget Adjustment Attached Date Administrative Services Director Date CSn 4301Ods Det Internal ditor Date 7:7:2;)(9, �,.�:¢� / Ci�yt AAtorn Da e Purchasing Manager ADA Coordinator ;*EPOutIO ICI jl(o2— fUJ1. .. Date Grant Coordinator Date Date STAFF RECOMMENDATION• Staff recommends approval of contract and associated budget adjustment. Staff recommends approval ofgrant award 1926-02. Cross Reference Department Direct •,r Adminis jive Ser ces Director Date 2 Zarb Date Dane Mayor Date New Item: Yes No X Previous Ord/Res#: 046-02(eng. cntrct) Orig. Contract Date N/A Orig. Contract Number N/A FAYETTEVPILE THE CITY OF FAYETTEVILLE, ARKANSAS DAN GOODY, MAYOR TO: THRU: FROM: DATE SUBJECT: MEMORANDUM Dan Coody, Mayor Fayetteville City Council Members Staff Review Committee Ray M. Boudreaux, Director, Aviation September 27, 2002 FBO Hangar Construction Project 1 Background: The Fayetteville Municipal Airport has no hangars to lease. Since March, we have been full. The airport board at their June meeting approked the project to construct a newFBO Hangar. We started engineering and design immediatelyand on September 26 opened bids for the project. Seven bids were received. The engineer's estimate was $713,612.37. The lowest bid was from Crossland Construction Co. for $634,000. The second lowest was for $636,000 from Maranoni Construction. To continue expansion we need space for new tenants to store their aircraft as well as for overnight storage of transient aircraft. The new FBO hangar will allow a great degree of flexibility. New tenants can be placed in the large hangar until a newT Hangar could be built. The FBO hangar will hold up to 20 small aircraft. DHL has expressed interest in a heated hangar for periods of severe weather. Many corporate pilots have expressed similar interest. Our survey found 37 pilots, 20% of those responding were interested in a heated hangar including several from Drake Field. Those would move to the heated, full service hangar opening up some T Hangar units for new customers. This facility is the next step in the rebirth of the Fayetteville Municipal Airport, Drake Field as the premiere general aviation airport in Northwest Arkansas. Purpose: Accept the lowest responsive bid and award contract for construction of the FBO hangar to Crossland Construction Co. Budget Considerations: The lowest responsive bid of 634,000 plus 10% contingency. Funds are available. A State of Arkansas grant for $200,000 has been approved for this project. A Budget Adjustment is attached. Requested Action: Approve award of the contract for construction of the new FBO Hangar plus a 10% contingency to Crossland Construction Company. Attachments: Staff Review Form Contract Budget Adjustment Aviation and Economic Development Department Fayetteville Municipal Airport, Drake Field 4500 South School Avenue, Suite F Fayetteville, Arkansas 72701 Ray M. Boudreaux, Director SEP -1D-2002 TUE 05:03 PM FAYN, AIRPORT 4797187646 STATE OF ARKANSAS DEPARTMENT OF AERONAUTICS MIKE HUCKABEE GOVERNOR Gary Cummill Chu mum JnnGLuro Darryl Riddell vice•Chairinvt Wast Helena Margarita Fnmmna Roger, John A. Sparks Linle Ruck Ken lnhnsnn Pine Muff Kai Pyle Fort Smite Marlon Burton Little Ruck Little Rock National Airport • Ono Airp rtt Drive • 3rd Floor Little Rock, Arkansas 72202-4402 Telephone: (501) 376-6781 • Fax: (50l) 378.0820 Mr. Ray M. oudreaux, Director Fayettevil Municipal Airport 4500 So School — Suite F Fayetteville, Arkansas 72701 July 11, 2002 E EKED cul. 15 2002 �41aes 'd.:'4�_11 P. 02 JOHN K. KNIGHT DIRECTOR Dear Mr. Boudreaux: The Arkansas Aeronautics Commission in their meeting of July 10, 2002 approved a State Airport Aid Grant in the amount of $200,000.00 for construction of hangar to accommodate FRO expansion at Fayetteville Municipal Airport. (50-50%) Your grant has been assigned a number for identification purposes. Please use 1926-02 as your grant number when corresponding with our office concerning your project. You should advise the Director of this office if you find you will not be able to complete the project for the amount approved. An amendment request for the project may then be acted on at the next Commission meeting. The Commission will not be responsib;ie for any additional project costs unless the sponsor has received notification in advance. The Commission has asked that we call your attention to Page Three (3) of your applicatton for State Airport Aid. You agreed, when the application was submitted to start the project within three months after approval or the grant would be null and void. The next to the last paragraph requires that the project be completed within one year unless it is partially funded by the Federal Aviation Administration (FAA). Please advise if cin.umstances beyond your control prevent the completion within the allotted time, otherwise, the grant may be canceled. Payment of this grant may be made on completion of the project. Please request payment of this grant in writing and include your documentation for the project at that time. Sincerely, John K. Knight Director JK/cb SEP -30-2002 MON 04:31 PM FAYIIVN, AIRPORT 4797167646 411 ARKANSAS DEPARTMENT OF AERONAUTICS APPLICATION FOR STATE AIRPORT AID P. 03 The City/Count-y of Fayetteville , herein called "Sponsor", hereby makes application to the Arkansas Department of Aeronautics for State funds pursuant to Act 733 of 1977, for the purpose of aiding in financing a project for the development of a municipal airport located in the City of Fayetteville , Arkansas, Washington County. Date of Request: June 20, 2002 Name of Airport: Fayetteville Municipal Airport / Drake Field (FYV) Name and address of City/County Commission sponsoring request: City of Fayetteville Person to contact about project: 113 West Mountain St. Fayetteville, AR 72701 Phone/Fax Number:. Ray M. Boudreaux, Director 4500 S School Ave, Suite F Phone/Fax Number: 501-718-7642 501-718-7646 fax Name and address of Engineering Firm (If Applicable): McClelland consulting Engineers, Inc. Contact Person: Wayne Jones, P.E. PO Box 1229 Fayetteville, AR 72702-1229 Phone/Fax Number: 501-443-2377 Describe the work to be accomplished: Construct a new Fixed Base Operations Hangar South of the Main Terminal. At the present time there is no place for the FB0 to hangar aircraft ' remaining overnight. State and Local Project Costs: Please indicate: X 50-50% Match _ 75-25% Match 90-10% Match Total Cost of Project Local Share/Funds Local Share/In-Kind State Share $679, 215 $479,215 $200,000 Federal ATP Projects: N / Total Cost of Project Federal Share (90%) Local Share (5%) State Share SEP -30-2002 MON 04:31 PH FAYN, AIRPORT State Airport Aid Application Page Two 4797187646 P. 04 Provide the information listed below as it applies to your project: FUNDS: Source of Funds State Funding: Arkansas Department of Aeronautics Local Funding: The City of Fayetteville Municipal Airport Funds Source of In -Kind Services N/A Estimate starting date of project: August 1, 2002 Estimate completion date of project: November 30, 2002 Project will be for: New Airport Is land to be leased or purchased? NO Existing Airport _ XX Description of land and cost per acre: N/A Provide the Federal AIP Grant Number (Al? Projects Only) State Representatives for your area: State Senator David Malone - District 35 State Representative Sill Pritchard - District 8 SEP -30-2002 MON 04 31 P11 FAIN: State Airport Aid Application Page Three 4797187646 P. 05 The Sponsor agrees to furnish the Arkansas Department of Aeronautics a copy of the legal instrument affecting use of the property for an airport. In application for a new landing site or expansion of existing facility, the FAA Form 7480.1, Notice of Landing Area Proposal, must be approved by FAA before review for grant can be made by the state. No land purchased with State Grant Funds may be sold or disposed of without State Commission approval. All requests for sale or disposal of property will be considered on an individual case basis. No airport accepting State Grant funding may issue an Exclusive Rights Lease. All applications for navigational aids (such as NDB or ILS) must have FAA site approval before a state grant can be approved. All Grant applications involving Federal Airport Improvement Program (AIP) funding must be accompanied by the approved FAA application. If this project is approved by the Arkansas Department of Aeronautics, and is accepted by the sponsor,' it is agreed that all developments and construction shall meet standard FAA construction practices as outlined in the specifications of this agreement. Runways, Taxiways, Parking Ramps, etc., shall have a base and a thickness that will accommodate the weight of aircraft expected to operate at this airport. All grant applicants (City and/or County) are' totallyresponsible for compliance with all Federal, Stater_ County and City Laws, Statutes, Ordinances, Rules, Regulations, and Executive Orders concerning contracts and purchases for which this grant is approved and issued. All grant applicants must submit with their applications a completed Contract and Grant Disclosure and Certification Form. (Form F -1 -Pages 162). It is understood and agreed that should the sponsor fail to start this project within three (3) months of the Arkansas Department of Aeronautics' date of acceptance, that this grant is null and void. It is also agreed that this project, except FAA funded projects, shall be completed within one year from the date of acceptance of this grant by the Arkansas Department of Aeronautics,Applications for extension will be entertained if circumstances beyond the sponsor's control occur. Funds will be disbursed according to Department procedures and final inspection of completed project. (See Instruction Page). IN WITNESS WHEREOF, the sponsor has caused this Application for State Airport Aid to be duly executed in its name, this 25th day of June , 20 02 . Fa etteville Authorized S Ra M. Boudreaux Title gnature rector • • MCECONS UL TING McCLELLAND ENGINEERS, INC. / U(FIG.VH) 10 SEM l P.O. Box 1229 Fayetteville, Arkansas 72702-1 22 9 501-443-2377 FAX 501-443-9241 September 27, 2002 Mr. Ray Boudreaux Airport Manager 4500 South School. Suite F Fayetteville. AR 72702 Re: Bid Tabulation & Recommendation to Award FBO Hangar, Fayetteville Municipal Airport Dear Mr. Boudreaux: As you are aware, bids were opened for the referenced project on September 26, 2002. We were very pleased that seven bids were received, with the lowest bid coming from Crossland Construction Co., Inc. in the amount of $634,000. This was substantially under the Engineer's estimate of $713.612.37. Of the seven bids received, five were below the Engineer's estimate. l attribute that to a very competitive situation influenced somewhat by workload in Northwest Arkansas vs. number of qualified Contractors. Our company has worked successfully with Crossland Construction Co. before (on the Science Engineering Building, UA Campus). They have an established office in Rogers, AR (home office: Columbus, Kansas). They have an impressive list of completed projects — both larger and smaller than the FBO Hangar. They are licensed in the State of Arkansas to do "Municipal and Utility Construction" and their "Bid Limit" is unlimited. Without reservation, I recommend award of the Construction Contract for the FBO Hangar to Crossland Construction Co., Inc. in the Total Lump Sum Base Bid amount of $634,000. If you have questions about this matter, please contact me. Sincerely, McClelland Consulting Engineers, Inc. Encl: Bid Tab 1:\2002\022134\Boudreaux 9.27.02.doc September 26, 2002 2:00 p.m. DEDUCTIVE ALTERNATE #3 o O o V o 0 O O m N 0 O O 0 O 00 0 Di N 0 N 0 p CO CO N $1,310.00 1 w w w w w w 1 DEDUCTIVE ALTERNATE #2 O o o m O o 0 0 49 0 T- ro Ti w 0 o O cif 0 o i 0 0 v CO 0 Ti $1,639.00 4 w w w w w DEDUCTIVE ALTERNATE #1 o o No R o 0 o X00 N 0 H N 'p 00 0 o N Ti o N M w 0 O o Ti Ti ON) N 4 w w w w w ADDITIONAL UNDERCUT AND BACKFILL o 7 o 0 YI .9 0 1+1 00 0 r5 6 w 0 ui w o w w w TOTAL LUMP BASE BID O o o o o Tr' r7 va To O o o o o vi ( va to $692,000.00 $698,900.00 0 0 o 0 0 -i n w $720,035.00 0 0 O 0 0 ai o n a NAME OF BIDDER Crossland Construction Company, Inc. John P. Marinoni Construction SSI, Incorporated of NW Arkansas a vi O,a C 7 03 (Kirby Specialties Corporation East -Harding, Inc. Basic Constructs pany.A{ne,\ ib 0) w C0) 0 J:\2002\022134\Bid Tab.wb2 FAYETTEVIIIE THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE s To: Ray Boudreaux, Airport and Economic Development From: Heather Woodruff, City Clerk Date: October 23, 2002 Attached is a copy of the resolution approving the contract with Crossland Construction for an FBO Hangar. The original will be microfilmed and filed with the City Clerk. Cc: Nancy Smith, Internal Auditor AGENDA REQUEST CONTRACT REVIEW GRANT REVIEW • MICRO•LMEI) J igvaD3 &4angt Wit- .3 STAFF REVIEW FORM - FINANCIAL OBLIGATION For the Fayetteville City Council Meeting of: NA Change Order #3 Crossland Construction FROM: Ray M. Boudreaux Name Aviation & Economic Development Airport Division Department ACTION REQUIRED: Review and approval of Change Order #3 to Crossland Construction, Inc. comprising reconciliation of plan quantities, and minor changes requested/required by airport administration, to the FBO Hangar project. Signature of the Mayor required. COST TO CITY: $4,576.13 Cost of this request 5550.3960.5804.00 Account Number 02130-1 Project Number 756,690.00 FBO Hangar Category/Project Budget Program Category / Project Name 743,818.77 Capital Funds Used to Date Program / Project Category Name 12,871.23 Airport Remaining Balance Fund Name BUDGET REVIEW: /K Budgeted Item lg. Budget Adjustment Attached udget Manager Date CONTRACT/GRANT/LEASE REVIEW: Accou Manar • 1 City Attarhey STAFF RECOMMENDATION: n Head (o/Ilok? Staff recommends approval Date Department Director Finance & Internal Services Dir. nis rative Officer ate /LU C& t Qw Int rnal Auddtor p Purchasing Manager Received in Mayor's Office Cross Reference: Previous Ord/Res#: SAL t1, xo3 Date Orig. Contract Date:' 642 %Di Date Date 162-02 CO fan 10-3 Date (Q(1O(b3 Date 10/17/2002 Orig. Contract Number: 875 New Item: Yes X No • CHANGE ORDER • Order No. Date: Agreement Date: NAME OF PROJECT: FBO HANGAR - Fayetteville Municipal Airport 3 June 5, 2003 Oct. 15 2002 OWNER: CITY OF FAYETTEVILLE, ARKANSAS CONTRACTOR: Crossland Construction Company, Inc. The following changes are hereby made to the CONTRACT DOCUMENTS: 1. Perform additional work required to add manual wall switches to enhance the flexibility of controlling the hangar lighting. 2. Paint the overhead door and trim of the sliding door to match/blend with the metal building trim and the other walk-through doors to improve the appearance of the hangar. 3. Install conduit across the site to provide telephone service to the hangar building. 4. Reconciliation of the Landscaping "allowance" set up in the Bid Form results in the confirmation that the entire allowance of $5,000 was expended on landscaping for the project 5. Undercut/backfill with select material under the east -side column foundations (32 cubic yards). Justification: 1. Added flexibility for lighting control was deemed necessary by the Owner in response to patron usage. 2. The overhead door was provided with a factory -applied paint system that was expected to reasonably complement the metal building color scheme Once on-site, it was clear that the door color clashed with the other metal building component colors. 3. The conduit was installed in accordance with the requirements of the local telephone service provider. 4. Landscaping was always anticipated; extent was unknown initially. 5. Existing subgrade material under the eastern column foundations was wet, soft, and yielding. Change to CONTRACT PRICE: Original CONTRACT PRICE: Current CONTRACT PRICE adjusted by previous CHANGE ORDERS: The CONTRACT PRICE due to this CHANGE ORDER will be increased by: The new CONTRACT PRICE including this CHANGE ORDER will be: Change to CONTRACT TIME: The CONTRACT TIME will be increased by: 5 The date for completion of all work will be: May 10, 2003 Approvals Required: To be effective this Order must be approved by the Owner if it changes the scope or objective of the PROJECT, or as may otherwise be required by the GENERAL CONDITIONS. $634,000.00 $650,528.77 $ 4,576.13 $655,104.90 calendar days. (Date). Requested by: Recommended by: Approved by: ssland nstni!n Company, Inc. Cl nd C. suiting Engineers, Inc. City of Faye : ville C_\Documents and Settings \miohnson\Loral Settings \Temporary intern des \OLK45\c-order-3 Ldoc 6-6 -zoo Date 4-9"03 Date 6/1$/03 Date Staff Review Form - Page 2 Description Crossland Construction - Change Order #3 Meeting Date NA Comments: Budget Manager Accounting Manager City Attorney Purchasing Manager ADA Coordinator Internal Auditor Grants Coordinator Reference Comments: