HomeMy WebLinkAbout156-02 RESOLUTION1 • R RESOLUTION NO. 1 56-02 A RESOLUTION TO APPROVE AMENDMENT #3 TO THE ENGINEERING CONTRACT WITH CRAFTON, TULL AND ASSOCIATES, INC. TO INCREASE THE SCOPE OF WORK AND THE ENGINEERING FEES IN THE AMOUNT OF $71,301.69 FOR THE CLEVELAND STREET IMPROVEMENT PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment #3 to the engineering contract with Crafton, Tull and Associates, Inc. to increase the scope of the engineering work and increase the engineering fees in the amount of $71,301.69 to provide additional periodic construction operation for the Cleveland Street Improvement Project. PASSED and APPROVED this the 15th day of October, 2002. ATTEST: By: Air Ye_ eather Woodruff, City 'IC k APPROVED: By: NAME OF FILE: CROSS REFERENCE: Item # Date 1 Resolution No.156-02 Document so 1 10/15/02 Resolution # 156-02 2 09/30/02 Staff Review Form 3 09/27/02 Amendment # 3 Cleveland Street Improvements 4 12/05/02 Memo from Heather Woodruff, City Clerk to Sid Norbash, Engineering NOTES: STAFF REVIEW FORM .X._ AGENDA REQUEST _X__ CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Council meeting of October 15. 2002 FROM: Sid Norbash Engineering Public Works Name Division Department ACTION REQUIRED: Approval of the Amendment #3 to the engineering contract with Crafton, Tull and Associates, Inc., for Cleveland Street Improvements Project (Hall to Leverett). COST TO CITY: $71,301.69 $768,339 Cleveland St. Imprvts. Cost of this Request Category/Project Budget Category/Project Name 4470-9470-5809-00 Account Number 01011-10 Project Number $14.269 Capital Street Impvtes. Funds Used To Date Program Name $754,070 Sales Tax Remaining Balance Fund BUDGET Budget oord ' ator X Budgeted Item Budget Adjustment Attached Administrative Services Director CONTRACT/GRANT/LEASE REVIEW: GRANTING AGENCY: aZ ccounting Manager ✓ Date ADA Coordinator C J.9/f/ 9/,adz � ��. .� City Attorney Date Internal ditor Purchasing Officer Date Date 9/97/0 Date STAFF RECOMMENDATION: Approval of the amendment #3. 09.2 lot Date Cross Reference 9 21-tt Date Q -tl.oL Administrative Services Director Date Date New Item: Yes No X Prev Ord/Res N: 42-98 Orig Contract Date: 4-7-98 Orig Contract # 637 • • Staff Review Form Description/ Cleveland Street Impvts. Meeting Date 10-15-2002 Project Name Amendment #3 Comments: Reference Comments: Budget Director Accounting Manager City Attorney Purchasing Officer ADA Coordinator Internal Auditor • FAYETTEVILl.E THE CITY OF FAYETTEVILLE. ARKANSAS DEPARTMENTAL CORRESPONDENCE • To: Fayetteville City Council Thru: Dan coody, Mayor Greg Boettcher, PWD Jim Beavers, City Engineergram From: Sid Norbash, Staff Engineer Date: September 27, 2002 Re: Cleveland Street Improvements Project Amendment #3 to the Engineering Contract With Crafton, Tull, and Associates, Inc. The above referenced project has been designed by Crafton, Tull, and Associates, and the approval of the construction project is on this agenda. This contarct amendment will allow Crafton, Tull & Associates to perform construction management to the completion of this project. Staff is requesting approval of Amendment #3, in the amount of $71,301.69, to the original design and bid contract. SN/sn Attachments: Copy of Amendment #3 • SCOPE OF SERVICES / MAN-HOUR ESTIMTE CONSTRUCTION OBSERVATION & ENGINEERING DURING CONSTRUCTION CLEVELAND STREET IMPROVEMENT PROJECT FAYETTEVILLE, ARKANSAS September 25, 2002 • This scope of seri ces includes providing on-site daily construction observation for the Cleveland Street Improvement Project. Crafton, Tull & Associates, Inc. shall provide periodic construction observation to ensure compliance with the plans and specifications, monitor the progress and performance of the work, and review construction procedures in the field. It is estimated that 270 calendar days (180 workdays) will be required for the construction period of the project, from which the fee for engineering services during construction are estimated (8 hrs/day average). Should the Engineer's time to observe the construction project be lengthened significantly, the Engineer will be compensated for the construction observation services through an additional amendment to this Agreement. It is mutually understood and agreed that the Engineer will assist the Owner and the Contractor, but shall not be responsible for the manner, execution, or safety procedures of the Contractor's work. During construction, the Engineer will make minor revisions to the plans if needed and assist the contractor with technical questions. Upon completion of the construction project, the Engineer will provide Record drawings to the City in hard copy and electronic AutoCAD format. SUMMARY OF MAN-HOURS & COMPUTATION OF DIRECT LABOR COSTS UNITS RATE TOTAL Administrative Assistant Engineering Technician Construction Inspector Project Engineer Project Manager Sub -Total Direct Labor Overhead (185.82%) Fixed Fee COMPUTATION OF DIRECT EXPENSES 10.0 32.0 1108.0 50.0 10.0 Hours Hours Hours Hours Hours $13.40 $17.50 $17.60 $27.40 $58.20 $134.00 $560.00 $19,500.80 $1,370.00 $582.00 1210.0 $22,146.80 $36,745.97 $8,833.92 UNITS RATE TOTAL Travel Mileage (180 days @ 50 miles/day) Plan Sheet Plotting Printing and Reproduction Sub -Total Direct Expenses 9000 Miles $0.325 $2,925.00 25 Sheets $18.00 $450.00 100 Sheets $2.00 $200.00 $3,575.00 (TOTAL - Cleveland Street Construction Observation & Engineering During Construction $71,301.69 1 Man-hour Estimate ID TASK ADMIN. ASST ENGR. TECH CONST. INSPTR. PROJ. ENGR. PROJ. MGR. TOTAL HOURS 1 On -Site Construction Inspection (180 days @ 6 hrs./day avg.) 1080 1080 2 Plan Revisions as Necessary 16 4 20 3 Record Drawings 16 8 4 28 4 Pro ect Management 10 20 42 10 82 Sub -Total CTA Construction Observation 10 32 1108 50 10 1210 SUMMARY OF MAN-HOURS & COMPUTATION OF DIRECT LABOR COSTS UNITS RATE TOTAL Administrative Assistant Engineering Technician Construction Inspector Project Engineer Project Manager Sub -Total Direct Labor Overhead (185.82%) Fixed Fee COMPUTATION OF DIRECT EXPENSES 10.0 32.0 1108.0 50.0 10.0 Hours Hours Hours Hours Hours $13.40 $17.50 $17.60 $27.40 $58.20 $134.00 $560.00 $19,500.80 $1,370.00 $582.00 1210.0 $22,146.80 $36,745.97 $8,833.92 UNITS RATE TOTAL Travel Mileage (180 days @ 50 miles/day) Plan Sheet Plotting Printing and Reproduction Sub -Total Direct Expenses 9000 Miles $0.325 $2,925.00 25 Sheets $18.00 $450.00 100 Sheets $2.00 $200.00 $3,575.00 (TOTAL - Cleveland Street Construction Observation & Engineering During Construction $71,301.69 1 FAI'ETTEVIelLE THE CITY OF FAYETTEVIUE. ARKANSAS DEPARTMENTAL CORRESPONDENCE • To: Sid Norbash From: Heather Woodruff, City Clerk Date: December 5, 2002 Attached is a copy of Resolution # 156-02 to approve amendment # 3 to the engineering contract with Crafton, Tull and Associates, Inc. to increase the scope of work and the engineering fees in the amount of $71,301.69 for the Cleveland Street Improvement Project. I am returning 2 signed copies of the amendment. The originals will be microfilmed and filed with the City Clerk. cc: Nancy Smith, Internal Auditor RESOLUTION NO. 1 56-n2 A RESOLUTION TO APPROVE AMENDMENT #3 TO THE ENGINEERING CONTRACT WITH CRAFTON, TULL AND ASSOCIATES, INC. TO INCREASE THE SCOPE OF WORK AND THE ENGINEERING FEES IN THE AMOUNT OF $71,301.69 FOR THE CLEVELAND STREET IMPROVEMENT PROJECT BE 1T RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYEITEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment #3 to the engineering contract with Crafton, Tull and Associates, Inc. to increase the scope of the engineering work and increase the engineering fees in the amount of $71,301.69 to provide additional periodic construction operation for the Cleveland Street Improvement Project. PASSED and APPROVED this the 15th day of October, 2002. APPROVED: By: ATTEST. By: �� G=1f, City eather Woodruff, City erk �F . AGENDA REQUEST .X._' CONTRACT REVIEW GRANT' REVIEW STAFF REVIEW FORM For the Fayetteville City Council meeting of October 15. 2002 FROM: Bid Norbash jivvi Engineering Public Works Name Division Department ACTION REQUIRED: Approval of the Amendment #3 to the engineering contract with Crafton, Tull and Associates, Inc., for Cleveland Street Improvements Project (Hall to Leverett). COST TO CITY: S71.301.69 $768.339 Cleveland St. Imprvts. Cost of this Request Category/Project Budget Category/Project Name 4470-9470-5809-00 Account Number 01071-10 Project Number S14,269 Capital Street Impvtes. Funds Used To Date Program Name $754.070 Sales Tax Remaining Balance Fund BUDGET X Budgeted Item Budget Adjustment Attached udget oor ator Administrative Services Director CONTRACT/GRANT/LEASE REVIEW: GRANTING AGENCY: CO_ ccolutting Manager / Date ADA Coordinator Date i a2_2/ p4i de- ., Wake - City Attorney Date Internal ditor • Date Purchasing Officer Date STAFF RECOMMENDATION: Approval of the dD isio Head of z 00Z Date 9 27-dL Date ' Adminis _ative Services Director Date Mayor Date amendment #3. Cross Reference New Item: Yes No R Prev Ord/Res $: 42-98 Orig Contract Date: 4-7-98 Orifi Contract # 637 • • • • • Staff Review Form Description/ Cleveland Street Impvts. Meeting Date 10-15-2002 Project Name Amendment #3 Comments: Reference Comments: Budget Director O. . Accounting Manager City Attorney Purchasing Officer ADA Coordinator Internal Auditor FAYETTEVIL#E INEPT* OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE To: Fayetteville City Council Thru: Dan coody, Mayor • Greg Boettcher, PWD Psalm Jim Beavers, City Engineer From: Sid Norbash, Staff Engineer AV' Date: September 27, 2002 Re: Cleveland Street Improvements Project Amendment •3 to the Engineering Contract With Crafton, Tull, and Associates, Inc. The above referenced project has been designed by Crafton, Tull, and Associates, and the approval of the construction project is on this agenda. This contarct amendment will allow Crafton, Tull & Associates to perform construction management to the completion of this project. Staff is requesting approval of Amendment #3, in the amount of $71,301.69, to the original design and bid contract. SN/sn Attachments: Copy of Amendment #3 $71,301.69 1 SCOPE OF SERVICES / MAN-HOUR ESTIMw CONSTRUCTION OBSERVATION & ENGINE ING DURING CONSTRUCTION CLEVELAND STREET IMPROVEMENT PROJECT FAYETTEVILLE, ARKANSAS September 25, 2002 This scope of services Includes providing on-site daily construction observation for the Cleveland Street Improvement Protect. Crafton, Tull & Associates, Inc. shall provide periodic construction observation to ensure compliance with the plans and specifications, monitor the progress and performance of the work, and review constriction procedures In the field. It Is estimated that 270 calendar days (180 workdays) will be required for the construction period of the project, from which the fee for engineering services during construction are estimated (6 hrs/day average). Should the Engineer's time to observe the construction project be lengthened significantly, the Engineer will be compensated for the construction observation services through an additional amendment to this Agreement. It is mutually understood and agreed that the Engineer will assist the Owner and the Contractor, but shall not be responsible for the manner, execution, or safety procedures of the Contractor's work. ,! During construction, the Engineer will make minor revisions to the plans if needed and assist the contractor with technical questions. Upon completion of the construction project, the Engineer will provide Record drawings to the City in hard copy and electronic AutoCAD format. SUMMARY OF MAN-HOURS & COMPUTATION OF DIRECT LABOR COSTS UNITS RATE TOTAL Administrative Assistant Engineering Technician Construction Inspector Protect Engineer Project Manager Sub -Total Direct Labor Overhead (165.92%) Fbced Fee COMPUTATION OF DIRECT EXPENSES 10:0 32.0 1108.0 50.0 10.0 Hours Hours Hours Hours Hours $13.40 $17.50 $17.60 $27.40 $58.20 $134.00 $560.00 $19,500.80 $1,370.00 $582.00 1210.0 UNITS RATE $22,148.80 $38,745.97 $8,833.92 TOTAL Travel Mileage (180 days @50 miles/day) Pian Sheet Plotting Printing and Reproduction Sub -Total Direct Expenses 9000 Miles 25 Sheets 100 Sheets $0.325 $18.00 $2.00 $2,925.00 $450.00 $200.00 $3,575.00 TOTAL - Cleveland Street Constriction Observation & Engineering During Construction Man-hour Estimate ID TASK ADMIN. ASST. ENGR. TECH CONST. INSPTR. PROJ. ENGR. PROJ. MGR. HOURS TOTAL 1 Onsite Construction Inspection (180 days (g 6 hrs./day avg,) 1080 1080 2 Pian Revisions as Necessary 16 4 20 3 Record Drawings 16 8 4 28 4 Project Management 10 20 42 10 82 Sub -Total CTA Construction Observation 10 32 1108 j 50 10 1210 SUMMARY OF MAN-HOURS & COMPUTATION OF DIRECT LABOR COSTS UNITS RATE TOTAL Administrative Assistant Engineering Technician Construction Inspector Protect Engineer Project Manager Sub -Total Direct Labor Overhead (165.92%) Fbced Fee COMPUTATION OF DIRECT EXPENSES 10:0 32.0 1108.0 50.0 10.0 Hours Hours Hours Hours Hours $13.40 $17.50 $17.60 $27.40 $58.20 $134.00 $560.00 $19,500.80 $1,370.00 $582.00 1210.0 UNITS RATE $22,148.80 $38,745.97 $8,833.92 TOTAL Travel Mileage (180 days @50 miles/day) Pian Sheet Plotting Printing and Reproduction Sub -Total Direct Expenses 9000 Miles 25 Sheets 100 Sheets $0.325 $18.00 $2.00 $2,925.00 $450.00 $200.00 $3,575.00 TOTAL - Cleveland Street Constriction Observation & Engineering During Construction ROR • 41 (THU)OCT 10 2002 9:59/ 9:58/N0.6307149975 P 2 Crafton, Tull & Associates, Inc. P.O. Box 549 Rogers, AR 72757 479.636.4838 Fax 479.631 6224 www.orattull.com —CONTRACT AMENDMENT #3 October 10, 2002 Mr. Jim Beavers, P.E. City Engineer, City of Fayetteville 113 West Mountain Street Fayetteville, AR 72701 RE: Cleveland Street Improvement Project CTA Job No. 98073.01 Dear Mr. Beavers: In accordance with Section XIII of our Agreement for Engineering Services dated April 7, 1998, we request your consideration of an increase in the upper limit of compensation for our services per the City's request for our finn to provide Construction Phase Services. These services are descnbed as follows: Construction Phase Services: The City of Fayetteville requires Crafton, Tull & Associates, Inc. to provide on-site daily construction observation for the Cleveland Street Improvement Project. Crafton, Tull & Associates, Inc shall provide periodic construction observation to ensure compliance with the plans and specifications, monitor the progress and performance of the work., and review construction procedures In the field. ft is estimated that 270 calendar days (180 workdays) will be required for the construction period of the project, from which the fee for engineering) services Engin construction are estimated (6 hrslday average) time to observe the construction project be lengthened significantly, the Engineer will be compensated for the construction observation services this ment. ft Is mutually understood and agreed that the h an additional amendment ngineer will assist the Owner and the Contractor, but shall not be responsible for the manner, execution, or safety procedures of the Contractor's work. During construction, the Engineer will make minor revisions to the plans If needed and assist the contractor with technical questions Upon completion of the construction project, the Engineer will provide Record drawings to the City in hard copy h Section 22- and electronic AutoCAD format. This project will comply wit tered Professinnals 9-101 of the Arkansas Code, "Observation by Reg Required", shown In Attachment W. Architect's. Engineers & Surveyors . FtROM' • (THU)OCT 10 2002 9:51. 9:58/N0.6307149975 P 3 Cleveland Street Improvement Project 'Construction Phase Engineering Services Page 2of3 The additional compensation for the work described above is detailed In the attached man-hour estimate and fee proposal. This Contract -Amendment shall not change the fees for Phases A, B, C, and E described In the Agreement for Engineering Services, Section XII. The requested compensation is summarized below Construction Phase Services — costs not to exceed $62,467.77 Fixed Fee for Construction Phase Services $ 8 833.92 Total Additional Amount Requested $71,301.69 SUMMARY Previous Total Contract Amount Additional Requested Amount New Total Contract Amount $ 86,296.03 $ 71.301.69 $157,597.72 Based on the information contained herein, we respectfully request your consideration to increase the upper limit of our Agreement for Engineering Services. We trust that we have adequately documented this request, and should you have any questions or require any additional Information, please contact us at your convenience. Very Truly Yours, Crafton, Tull & Associates, Inc. Matt Crafton, P.E. Chief Operating Officer Enclosure IN WITNESS WHEREOF the parties hereto have caused the original Agreement to be amended and duly executed as of the date and year first herein written. CITY OF FAYETTEVILLE • • (THU)OCT 10 2002 9:541. 9:58/N0.6307149975 P 4 —Cleveland Street Improvement Project Construction Phase Engineering Services ATTEST• or .4 's/!r�%�L! / cii.�a t ATTEST: Tom Hopper, President • Crofton, Tull & Associates, Inc. (?✓ Matt Grafton, P.E. Chief Operating Officer Page 3 of 3 • • • • A (THU)OCT 10 2002 9:59/ST i :58/N0.6307149975 P 5 `/1h ANI As Engrossed: 213/19 #Mrol 1 Stam of Arkansas •�I77111 2 79th General Assembly SENATE BILL 93 3 Regular Session, 1993 — 4 Br Senators Malone and Bookou) 5 6 7 For An Act To Be Entitles B AS ACT TO AMEND AB$ANSAS CODE ANNOTATED 522-9-101 TO 9 REQUIRE ALL CONSTRUCTION OP ANY PUBLIC WORE-+` BE OBSERVED 10 EY A BXGISTBRED PROFESSIONAL ENGINEER OR ARcn rzcT; AND 11 FOR.OTBER PURPOSES." 12 Subtitle 13 14 "TO REQUIRE CONSTRUCTION OF ANY PUBLIC WOUS BE OBSERVED . 1S BY.A REGISTERED PROFESSIONAL ESGINEEn OR ANCEITECT." 16 17 BE I7 ENACTED BY TEE GENERAL ASSEMBLY OP TEE STATE 0P ARKANSAS: 18 19SECTION 1. Arkansas Code Axmotaced 122-9-101 is amended as follows: 20 "522-9-101. Observation by. registered proEaaaionals requtrdd. 21 (a) Neither the atate!aor any township, terata, m,mlcipalttT, village, Z2 or other political subdivision of the state shall' engage in the construction 23 of any public works involving engineering or architecture for which the plans, 24 specifications, and estimates have not been made by, and the construction 25 executed under the ebeervatioa of, a registered professional engineer or 26 architect, in their respective areas of ezpertiae,'Mbo are licensed to 27- practice under the lave of Arkansas. nblic works 28 (b) Nothing ?Tai this section shall be held to apply to any 'abate 29 wherin the contemplatedur construction expenditure for an englaeerlag project 30 doe's not exceed tveaty-five thousand dollars 02S,000) or for as architectural 31 project dose nor exceed seventy: -five thousand dollars (575,000).. 32 (c) This section shall not apply to any school district, county, 33 municipality, or-toe:Ship project which is planned and executed according to 34 plans and specifications furnished by authorised state sgeaciea 35 nature 36 sECTLON 2 A11•pravisiona of this act of a general and permanent mrd322 • .. AC 479 575 8202 97% P.02 • .,„.0%;10M° ROM^ • • • ds Encnved:213/53 2/5/33 (THU)OCT 10 2002 10:00110. 9:58/N0,6307149975 P 6 • 14C.1 c /i S8 93 1 are' amendatory to the Arkansas Code of 3.937 ,Annotated and the Arkansan Code 2 Revision Commission shall incorporate the aama in the Code. 3 4 SECTION 3. If any provision of this act or the application thereof to 5 any person or circumstance is hold invalid, such invalidity shall not affect 6 dther provisions or applications of the set which can be given effect without 7 the invalid provision or application, and to this and the provisions of this 8 act ara declared to be severable. 9• 10 SECTION 4 All lava and parts of laws in conflict 'with this act are 11 hereby repealed. 12 ./o/Senator Malone 13 14 15 16 19 20 21 22 23 24 25 zr 28 29 30 31 32 33 AP4 36 • OCT -09-2002 14:4$ 479 575 8202 97'4 P 03 • • . • • fpCrafton, TuII & Associates, Inc. P.O. Box 549 Rogers, AR 72757 479.636.4838 Fax 479.631.6224 www.craftull.com CONTRACT AMENDMENT #3 September 25, 2002 Mr. Jim Beavers, P E City Engineer, City of Fayetteville 113 West Mountain Street Fayetteville, AR 72701 RE: Cleveland Street Improvement Project CTA Job No. 98073.01 Dear Mr. Beavers. • In accordance with Section XIII of our Agreement for Engineering Services dated April 7, 1998, we request your consideration of an increase in the upper limit of compensation for our services per the City's request for our firm to provide Construction Phase Services. These services are described as follows: Construction Phase Services: The City of Fayetteville requires Crafton, Tull & Associates, Inc. to provide on-site daily construction observation for the Cleveland Street Improvement Project. Grafton, Tull & Associates, Inc shall provide periodic construction observation to ensure compliance with the plans and specifications, monitor the progress and performance of the work, and review construction procedures in the field. It is estimated that 270 calendar days (180 workdays) will be required for the construction period of the project, from which the fee for engineering services during construction are estimated (6 hrs/day average). Should the Engineer's time to observe the construction project be lengthened significantly, the Engineer will be compensated for the construction observation services through an additional amendment to this Agreement. It is mutually understood and agreed that the Engineer will assist the Owner and the Contractor, but shall not be responsible for the manner, execution, or safety procedures of the Contractor's work. During construction, the Engineer will make minor revisions to the plans if needed and assist the contractor with technical questions. Upon completion of the construction project, the Engineer will provide Record drawings to the City in hard copy and electronic AutoCAD format The additional compensation for the work described above is detailed in the attached man-hour estimate and fee proposal. This Contract Amendment shall Ar chit e c t s Engineers & Sur v e y or • Cleveland Street Improvementotect Construction Phase Engineering Services Page 2 of 3 not change the fees for Phases A, B, C, and E described in the Agreement for Engineering Services, Section XII. The requested compensation is summarized below: Construction Phase Services — costs not to exceed $62,467.77 Fixed Fee for Construction Phase Services $ 8,833.92 Total Additional Amount Requested $71,301.69 SUMMARY Previous Total Contract Amount Additional Requested Amount New Total Contract Amount $ 86,296.03 $ 71,301.69 $157,597.72 Based on the information contained herein, we respectfully request your consideration to increase the upper limit of our Agreement for Engineering Services. We trust that we have adequately documented this request, and should you have any questions or require any additional information, please contact us at your convenience. Very Truly Yours, Crofton, Tull & Associates, Inc. Aelinorr Matt Grafton P E Chief Operating Officer Enclosure IN WITNESS WHEREOF, the parties hereto have caused the original Agreement to be amended and duly executed as of the date and year first herein written. CITY OF FAYETTEVILLE