HomeMy WebLinkAbout151-02 RESOLUTION• RESOLUTION NO. i si-n7 A RESOLUTION TO APPROVE A CONTRACT WITH C -TEC, INC. IN THE AMOUNT OF $325,884.00 PLUS A PROJECT CONTINGENCY OF $32,588.00 FOR CONSTRUCTION OF THE SKATE PARK AT WALKER PARK AND APPROVAL OF A BUDGET ADJUSTMENT TO ACKNOWLEDGE RECEIPT OF $110, 623 00 IN STATE AND PRIVATE GRANTS AND DONATIONS BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves a contract with C -TEC, Inc., attached as Exhibit A, in the amount of $325,884.00 plus a project contingency of $32,588.00 for construction of the skate park at Walker Park. Section 2. That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment attached as Exhibit Bin the amount of $110,623.00 to acknowledge receipt of state and local grants and donations for the skate park. PASSED and APPROVED this the 1st day of October, 2002. ATTEST: Heather Woodruff, City e& APPROVED: By: DAN COODY, Mayo NAME OF FILE: CROSS REFERENCE: Item # Date • Resolution No.151-02 Document ffr 1 10/01/02 Resolution # 151-02 2 09/19/02 Contract with C -TEC, Inc. - $32,588 for construction of a $325,884 plus a contingency of skate park at Walker Park 3 10/02/02 Contract agreement C Tec, Inc. and City of Fayetteville 4 10/08/02 Memo to Eric Schuldt, Parks and Recreation from Heather Woodruff NOTES: fil11/491/ynorn 71,,P,..ea • • STAFF REVIEW FORM XX_ Agenda Request XX— Contract Review Grant Review For the Fayetteville City Council meeting of: October 1, 2002 FROM: Eric J. Schuldt Name Parks and Recreation Division • Urban Development Department ACTION REQUIRED• Award of bid n2-42 and approval of a contract with C TEC Inc in the amount of $725,884, plus a project contingency of$32,588 for a total cost of$358,472, and approval of a budget adjustment for construction of a skatepark at Walker Park. COST TO CITY: $358,472 $358,472 Cost of this Request 1010.11 09 1533.00 2250.9250 5806.00 1010.1 005,03 Account Number 00006 —1 Project Number $5,623 $75,000 $275,000 Category/Project Budget $35 $24,730 $19,832 Funds Used to Date $5,588 $50,270 $255,168 Remaining Balance Budgeted Item XX Budget Adjustment Attached Administrative Services Director CO .TRACT/ RANT/LEASE REVIEW Accounting Manager Date Purchas ng Officer ate Date GRANTING AGENCY: ADA Coordinator x Internal /Auditor Skate Park Category/Project Name Park Improvements Program Name Community Donations Parks Development Park Land Dedication 'Fund Date g/ufor Date STAFF RECOMI%jENDATION: Award of bid #02-42 and approval of contract and budget adjustment. Division Hee Date voZ Date Date Cross Reference New Item: Yes X No Prey Ord/Res #: Orig Contract Date: 1 I • FAYETTEVILLE THE CffY OF FAYETTEVILLE, ARKANSAS TO: THRU• FROM: DATE: SUBJECT: Mayor Coody and City Council Hugh Earnest, Urban Development Director Connie onston, Parks and Recreation Superintendent Eric chuldt, Parks Development Coordinator September 11, 2002 Award of Bid #02-42 and Approval of Contract for Fayetteville Skatepark at Walker Park. Background The Fayetteville Skatepark, which was designed in a series of public workshops with Fayetteville skaters, will be an 18,870 sq. ft. concrete facility. The skatepark will have beginner and advanced sections to accommodate all skill levels. Many of the elements within the skatepark will duplicate what the skaters use on our city streets. Purkiss-Rose, RSI was hired to design, hold public workshops and perform four construction site visits. Construction is intended to begin this fall, so that the skatepark will be ready for participant use in the spring. The project funds will come from the Capital Improvement Program, Park Land Dedication Funds, a $100,000 matching grant from the Arkansas Outdoor Recreation Grants Program, a $5,000 grant from the Tony Hawk Foundation and $5,623 from community donations. Current Status Bids were opened on September 11, 2002 at 2:00 p.m. Four bids were received. C -TEC Inc. had the low bid for the project. Recommendation Parks and Recreation Staff and Purkiss-Rose have reviewed the bids and recommend the contract be awarded to C -TEC, Inc. in the amount of $325,884, plus a ten percent contingency of $32,588 and approval of a budget adjustment. If you have any questions or need additional information, please call me at 444-3472 or Connie Edmonston at 444-3473. Attachments: Purkiss-Rose Recommendation Bid Tabulation Sheet Contract 0 O O O O v p v v p O O O O O E 1 • 0 0 sols AO NOI1v7ABV1 ❑❑❑ U g ❑ ❑ 5 b ❑ ❑ • • City of Fayetteville, Arkansas Budget Adjustment Form Budget Year 2002 Department: Urban Development Division: Parks & Recreation Program: Parks Development Date Requested 09/11/2002 Adjustment # Project or Item Requested: City Council approved State of Arkansas Department of Parks & Tourism's Outdoor Recreation Grants application on July 3, 2001. Additionally, City Council approved Tony Hawk Foundation grant application on September 3, 2002. Project or Item Deleted: None Justification of this Increase: To recognize grant revenue received. Justification of this Decrease: Increase Expen e (Decrease Revenue) Account Name Amount Account Number Project Number Park Improvements 105,000 2250 9250 5806 00 00006 1 Account Name Decrease Expense (Increase Revenue) Amount Account Number State Grants 100,000 Commercial Grants 5.000 2250 0925 4302 00 2250 0925 4305 00 Project Number Approval Signatures Admin. Se 1-17-0 1 - Date Date -/d uZ Date 1q-dz Date Mayor ' Date Budget Office Use Only Type: A B C E Date of Approval Posted to General Ledger Posted to Project Accounting Entered in Category Log Blue Copy: Budget & Research / Yellow Copy: Requester Special Instructions: Requester: John Nelson g Vendor #: Vendor Name: 1 C -TEC Inc CITY OF FAYETTEVILLE Purchase Requisition (not a purchase alder) •r v_D. Admin. Services Director: Budget Coordinator: Data Processing Mgr: SHIPPING/HANDLING Contract # Skatepark Construction Description: 1 #02-42 1 , 0 F co CD cA O� W 0_ 5,588.00 0) CM $ 255,168.00 i ? N a N O O O CT IA O co O O O CJ1 1 255,168.00 Extended cost N O O 1010.1533.00 2250.9250.5806.00 1010.1505.03 Account Number: 'Requester's Employee#: 1003 Ship To Code: 75 FOB Point: 00006.1 00006.1 U 00006.1 ProjecVSubProject Number: Extension: 406 <-x1 IN N x S 1 N F <3 N d I ZC O Io x V 33 Tax: (p 0 O 6 Q Expected Delivery Date: Date: 09/12/02 Lt. • • REQUEST FOR VENDOR FILE MAINTENANCE (CHECK ALL AVAILABLE RESOURCES, VENDOR LIST, ACCESS SYSTEM PRIOR TO SUBMISSION OF THIS REQUEST) DATE OF REQUEST: September 12, 2002 REQUESTED BY: DEPT./DIVISION: U.D. / Parks & Rec. EFFECTIVE DATE: TELEPHONE EXTENSION: 406 John Nelson NEW VENDOR: X VENDOR CHANGE: VENDOR RE-ENTRY: VENDOR #: VENDOR #: VENDOR NAME: C -TEC Inc STREET OR P.O. BOX: P 0 Box 363 CITY: York ATTN: STATE: NE ZIP CODE: 68467 REMITTANCE ADDRESS IF DIFFERENT FROM ABOVE: NAME: ADDRESS: CITY, ST, ZIP: PHONE: 402-362-5951 402-3Q,-to4(v2 Fax FEDERAL ID NUMBER: OR SOCIAL SECURITY NUMBER: 47-07R6-514 TVPF (1F (1PnAMI7ATIl1IJ CORPORATION (100): X PARTNERSHIP (2001: INDIVIDUAL (30014 EMPLOYEE (4001• PENSION (5001. NON-PROFIT (6001. PURCHASING OFFICE USE ONLY NEW VENDOR: ENTERED BY: VENDOR CHANGES: DATE: VENDOR RE-ENTRY: G. L. FILE: W-9 FORM MAILED: INVENTORY FILE: EF-13-132 FEI 1Q:33 AM CEO • FAX:4023626462 • FACE 2 Section 00500 AGREEMENT BETWEEN CITY OF FAYETTEVILLE ANI) CONTRACTOR THIS AGREEMENT is dated as of the day of in the year 2002 by and between the City of Fayetteville, Arkansas and .0 TLC, Incorporated (hereinafter called CONTRACTOR). The City of Fayetteville and CONTRACTOR in consideration of the mutual covenants hereinafter set forth, agrce as follows: Article 1. WORK. CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The work generally consists oi'the construction of an 18,870 sq. ft. skatepark, and all items indicated in the Drawings and Specifications for the project. Article 2. ENGINEER/LANDSCAPE ARCHITECT. The Provoet has been designed by Purk iss Rose - RSI 801 North Harbor Boulevard Fullerton; California 92832 Phone Number (714) 871-3638 Fax (714) 871-1188 who is hereinafter called ENGINEER/1.ANDSCAPE ARCHITECT and who is to act as the Ctty of Fayctteville's reprysentative, assume all duties and responsibilities, and have the rights and authority assigned to ENG1NEli'R/LANDSCAPE ARCH1l EC1 in the Contract Documents in cormection with completion of the Work in accordance with the Contract documents. Article 3: CONTRACT TIME. 3.1. The Work sh2tl be substantially completed within 90 consecutive calendar days alter the Contract Time commences to run as provided in paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with paragraphs 14.073 & C of the General Conditions within 14 consecutive calendar days after the date when the Contract Time commences to run. City of Faypia1i5.: 06/17/02 Agreement Page •1 Fi?-•3 12 tki 1i;:34 AM CTEC • FAX:402362e462 =AGE 3 1 .31. LiquidurvdDamages. The City ofFayettevitle atid CONTRACTOR recognize thattime is of the essence of the Agreement and that the City of Fayetteville will suffer financial loss if the Work isnot completed within the times specified in paragraph 3.1 above, plus and extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, eicperse and difficulties involved in proving the actual loss suffered by the City of Fayetteville if the Work is not completed on time. Accordingly, instead of requiring any such proof, the City of !Fayetteville and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay the City ofFayetteville Two hundred dollars ($200.00) for each day that expires after the time specified in paragraph 3.1 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail tb complete the retaining Work within the time specified in paragraph 3.1 for completion and readiness for falai payment or any proper extension thereof granted by the City of Fayetteville, CONTRACTOR shall pay the City of Fayetteville Two hundred dollars ($200.00) for each day that expires after the time specified in paragraph 3.1 for completion and readiness for final payment. Article 4. CONTRACT PRICE. The City of Fayetteville shalt pay CONTRACTOR for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the atnotmts determined from the Rid Forth pursuant to paragraphs 4.1 and 4.2 below: 4.1. .for all Work other than Unit Price Work, an amount equal to the sum of the established lump sums for each separately identified item of Lump Sum Work; and 4.2. for all .1 riit Price Work, an amount equal to the sum of the established Unit price for each sepurately identified item of Unit Price Work times the estimated quantity of that item as indicated m this paragraph 4.2. As provided -in paragraph 11.03 of the General Conditions estimated quantities are not guaranteed, and determinations of actual quantities and clatzifications are to be made by ENGINEER/ARCHITECT as provided' in paragraph.9.OR of the General Conditions. Unit prices have been computed as provided in paragraph 11.03./3 of the General Conditions. City o; Fayetkn llc 06/17!02 Agreement Page -2 FF -:3-112 Fnl la:34 AM • Article 5. PAYMENT PROCEDURES FAX:41123626462 • PAGE CON'T'RACTOR shall submit Applications for Payment in accordance with Article 14 of the General Condition or as modified in the Supplementary Conditions, Applications for Payment will be processed by ENOINEEIULANDSCAPE ARCHITECT as provided in the General Conditions. 5.1. Progress Payments. The City of Fayetteville shall make progress payments on account of the C ontraet Price on the basis of CONTRACTOR's Applications for Payment as recommended by TLNO1NEER%L:ANDSCPE ARCHITECT, on or about the 1st day of each month during construction as provided in paragraphs 5.1.1 and 5.1.2 below and SC -14.02. All such payments will be measured by the schedule of values established in paragraph 2.07 of the General Conditions and based at the number of units completed in the case of Unit Price Work or, in the event there is no schedule of values, as provided in the General Requirements, City of F ycttcvilk: 5.1.1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below, but, in case. less the aggregate of payments previously made and less such amounts as ENGINEER/LANDSCAPE ARCHITECT shall determine, or the City of Fayetteville may withhold. in accordance with paralpaphs 14.02.8.5 & 14.02.D ofthe General Conditions. 90 percent of Work completed (with the balance of 10 percent being retainage), if Work has been 50 percent completed as determined by the ENOINEERJLANDSCAPE ARCHITECT, and if thecharacter andprogressofthe Work have been satisfactory to the City of Fayetteville and ENGINEER/LANDSCAPE ARCHITECT, the City of Fayetteville, on recommendation of ENGINEER/LANDSCAPE ARCHITECT, may determine that as long as the character and progress of the Work retrain satisfactory to them, there will be no additional retainagc on account of work completed, in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100 percent of the Work completed. 100 percent of materials and equipment not incorporated in the Work but delivered, suitably stored, and accompanied by documentation satisfactory to the City of Fayetteville as provided in paragraphs 14.02.8.5 & 14.02.D ofthc General Conditions. That is, if any such hems are setup for that type payment in the Specifications. 5,1.2. Upon Substantial Completion, in an amount sufficient to increase totalpayments to CONTRACTOR to 98 percent of the Contract Price (with the balance of 2 percent being • retainage),: less such amounts as ENGINEER/LANDSCAPE ARCHITECT shall determine, or the City of Fayetteville may withhold, in accordance with paragraphs 14.02.1L5 &. 14.02.1) of the General Conditions. 06/17/02 Agreement Paas -9 SEP -13-92 FRI 1':;39 Am CTEC r"lin;4023626462 • PAGE 2 5.3 Final Payment. Upon final completion and acceptance of the Work in accordance with paragraphs 14.07.B & C of the General Conditions, the City of Fayetteville shall pay the remainder ofthe Contract Price as recommended by ENOINEER/I.ANUSCAPE ARCHITECT as provided hi said paragraphs 14.07.B & C. Article 6. CONTRACTOR'S REPRESENTATIONS, In order to induce the City of Fayetteville to enter into this Agreement CON'I'RACTOR makes the following representations: 6.1. CONTRACTOR has examined and carefully studied the Contract Documents (including the Addenda listed in Article 7) and the other related data identified in the Bidding Documents including "technical data" 6.2. CONTRACTOR has visited the site and become familiar with and is satisfied as to the general. focal, and site conditions that may affect cost, progress, performance, or furnishing ofthe Work.' 6.3. CONTRACTOR is Familiar with end is satisfied as to all federal, state, and local Laws and Regulations, that may affect cost, progress. performance, and furnishing of the Work. 6.4. CONTRACTOR has carefully studied all reports of explorations and tests of subsurface eonditimts at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site which have been identified in the Supplementary, Conditions as provided in paragraph 4.02.A of the General Conditions. CONTRACTOR accepts the determination set forth in paragraph SC -4.02 ofthe Supplementary Conditions of the extent of the "technical data" contained in such reports and drawings upon which CONTRACTOR is entitled to rely as provided in paragraph 4.02 of the General Conditions. CONTRACTOR acknowledges that such reports and drawings are not Contract Documents and may not be complete kr CONTR2CTOR's purposes. CONTRACTOR acknowledges that the City of Fayetteville and ENGINEER/LANDSCAPE ARCHITECT do not assume responsibility for the accuracy or completeness of inforltation and data shown or indicated in the Contract Documents with respect to Underground Facilities at or contiguous to the site. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all such •additiomtl supplementary examinations, investigations. cxplorations, tests, studies, and data Concerning Conditions (surface, subsurface, and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance, or furnishing of the Work or which relate to any aspect of the means, methods, teclmiques, sequences, and procedures of construction to the employed by CONTRACTOR and safety precautions and programs incident thereto. CONTRACTOR does not consider that any additional examinations, investigations, explorations. tests, studies, or data are necessary kr the performance and furnishing.ofthe Work at the Contract Price, within the Contract Times. and in accordance with the other terms and conditions Of the Contract Documents. City nryuyenevak 06/17/02 Awvancnt Page -0 SE? -'3-02 NEI .;;40 AM CBC • FAX:4023626462 • ?AME 6.5. CONTRACTOR is aware of the general nature of work to be performed by the City of Fayetteville and others at the site that relates to the Work as indicated in the Contract Documents. 6.6. CONTRACTOR has correlated the information known to CONTRACTOR, ittformationand observations obtained from visits to the site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies. and data ivith the Contract Documents. 6.7. CONTRACTOR has given ENGINEER/LANDSCAPF. ARCHITECT written notice of all conflicts, errors. ambiguities, or discrepancies that CONTRACTOR has discovered inthe Contract Documents and the written resolution thereof by FNCYINE. RJLANT)SCAPE ARCHITECT is acceptable to CONTRACTOR and the Contract Documents are generally sufficient to indicate and convey understanding of all tents and conditions for performance and furnishing of the Work. • City of FAvL;tcvi@; 06/17/02 /Lot nom net -5 SEP -13-2 13 r. ns Int '.1;40 AM [TEC • FAX:4023626462 PAGE 4 Article 7. CONTRACT DOCUMENTS The Contract Documents which comprise the entire agreement between the City of Fayetteville and CONTRACTOR concerning the Work consist of the following: 7.1 Advertisement lir Bids 7.2 Instructions to Bidders 73 Contractors Proposal 7.4 Bid Bond 7.5 Contractors Qualifications 7.6 Notice of Selection 7. This Agreement (pages 1 to 8 inclusive). 7.8 Performance and Payment Bonds. (Exhibits A and B respectively), 7.9 Cerlificates cif Insurance, (Exhibit C). 7,10 Notice u Proceed (00550) 7.11 General Conditions (pages 1 to 42, inclusive). 7.1.2 Supplementary Conditions (pages 1 to 13 inclusive). 7.11 Specifications as listed in the table of c:ontonts. 7.14 Addenda mimbers _ to , inclusive. '7.15 Six sets of drawings (not attached hereto) consisting of: a cover sheet and additional sheets numbered 1 through 9 with each sheet bearing the following general title: Fayetteville Skate Park. 7.16 The following which may be delivered or issued after the Effective Date ofthe Agreement and are not attached hereto: 7:16.1 All Written Amendments and other documents amending: modifying or supp R * ting the Contract .Documents pursuant to paragraph 3.04 of the General Conditions. The documents listed in paragraphs 7.2 et seq. above are attached to this Agreement (except as expressly non Chy o'Fayettevillc 06/17/02 Agrta—hent Page -6 SEF -13-)2 rnI 11:40 AY'. CTEC otherwise above). • PAX:4323626d62• PACE There are no Contract Documentsothet than those listed above in this Article 7. The Contract Documents may ony be amended. modified or supplemented as provided in paragraph 3.04 of the General Conditions. Article 8. -MISCELLANEOUS. 8.1. Terms used in the Agreement which are defined in Article 1 ofthe General Conditions will have the meanings indicated in the General Conditions. 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and. specifically^hui without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 8.1 'the City of Fayetteville and CONTRACTOR each binds itself, it partners, successors, assigns. and legal representatives to the other party hereto, Sts partners, successors, assigns, and legal representatives in respect to all covenants, agreements and obligations contained in the Contract Documents. 8:4. Any provision or partofthe Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken and all remaining provisions shall continue to be valid and binding upon stricken, provision or part thereof with a valid and enforceable provision that comes as close as possible expressing the intemion of the stricken provision. City Of Nayarnilie 06/17/02 Agreement Page .7 SEP -i;-02 FRI 1';41 Art C;EC FAX:4023626462 PAGE 6 IN WITNESS WHEREOF. tayofFayetteville and C.ONEW. rvs. l-slgicutwo - in quadruplicate. One counterpart each has been delivered been city cifered to FONfRACTOR ayetteville and ENCINEER/l,ANfSCAPE ARCHITECT, and two counterparts d All portions of the Contract Documents have been signed, initialed, or identified by the City of Fayetteville and CONTRACTOR or identified by ENGINEER/LANDSCAPE ARCHITECT on their behalf. 2002 (which is the Effective Date of finis Agreement will be effective on the Agreement). OWNER: City of Fayetteville By: . .. — Mayor [CORPORATE SEAL] Attest Address for giving notices (If OWNER is a public body, attach evidence of authority to sign and resolution or other documents authorizing execution of Agreement.) City oflitlyenevilk CONTRA( TOR: Prestdent Title [CORPORATE SEAL] s Attest • If a Corporation, attest by the Secretary. Addrss for giving notices C TEC, Incorporated P.O. Bo 363 123 East 10th Street York, NE 68467 License No. 0064580493 Agent for service of process: (If CONTRACTOR is a corporation, attach evidence of authority to sign) 06/17/02 Agreement Pagt 4 • • City of Fayetteville, Arkansas Budget Adjustment Form Budget Year 2002 Department: Urban Development Division: Parks & Recreation Program: Parks Development Date Requested 09/11/2002 Adjustment # Project or Item Requested: City Council approved State of Arkansas Department of Parks & Tourism's Outdoor Recreation Grants application on July 3, 2001. Additionally, City Council approved Tony Hawk Foundation grant application on September 3, 2002. Project or Item Deleted: None Justification of this Increase: To recognize grant revenue received. Justification of this Decrease: Increase Expense (Decrease Revenue) Account Name Amount Account Number Project Number Park Improvements 105,000 2250 9250 5806 00 00006 1 Decrease Expense (Increase Revenue) Account Name Amount Account Number Project Number State Grants 100 000 2250 0925 4302 00 Commercial Grants 5 000 2250 0925 4305 00 ro Appval Signatures II nn nn,, .. Requested By Date Budget Manager Date Department Director Date Admin. Services Director Date Mayor Date - Budget Office Use Only Type: A B C D E Date of Approval _ Posted to General Ledger Posted to Project Accounting Entered in Category Log Blue Copy: Budget & Research / Yellow Copy: Requester • • Section 00500 AGREEMENT BETWEEN CITY OF FAYETTEVILLE AND CONTRACTOR THIS AGREEMENT is dated as of the day of (%(/ in the year 2002 by and between the City of Fayetteville, Arkansas and C TEC, Incorporated (hereinafter called CONTRACTOR). The City of Fayetteville and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK. CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The work generally consists of the construction of an 18,870 sq. ft. skatepark, and all items indicated in the Drawings and Specifications for the project. Article 2. ENGINEER/LANDSCAPE ARCHITECT. The Project has been designed by Purkiss Rose - RSI 801 North Harbor Boulevard Fullerton, California 92832 Phone Number (714) 871-3638 Fax(714)871-1188 who is hereinafter called ENGINEER/LANDSCAPE ARCHITECT and who is to act as the City of Fayetteville's representative, assume all duties and responsibilities, and have the rights and authority assigned to ENGINEER/LANDSCAPE ARCHITECT in the Contract Documents in connection with completion of the Work in accordance with the Contract documents. Article 3. CONTRACT TIME. 3.1. The Work shall be substantially completed within 90 consecutive calendar days after the Contract Time commences to run as provided in paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with paragraphs 14.07.B & C of the General Conditions within 14 consecutive calendar days after the date when the Contract Time continences to run. City of Fayetteville 06/17/02 Agreement Page -1 • • 3.2. Liquidated Damages. The City of Fayetteville and CONTRACTOR recognize that time is of the essence of the Agreement and that the City of Fayetteville will suffer financial loss if the Work. is not completed within the times specified in paragraph 3.1 above, plus and eattensio allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expense and difficulties involved in proving the actual loss suffered by the City of Fayetteville if the Work is not completed on time. Accordingly, instead of requiring any such proof, the City of Fayetteville and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay the City of Fayetteville Two hundred dollars ($200.00) for each day that expires after the time specified in paragraph 3.1 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within the time specified in paragraph 3.1 for completion and readiness for final payment or any proper extension thereof granted by the City of Fayetteville, CONTRACTOR shall pay the City of Fayetteville Two hundred dollars ($200.00) for each day that expires after the time specified in paragraph 3.1 for completion and readiness for final payment. Article 4. CONTRACT PRICE. The City of Fayetteville shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined from the Bid Form pursuant to paragraphs 4.1 and 4.2 below: 4.1. for all Work other than Unit Price Work, an amount equal to the sum of the established lump sums for each separately identified item of Lump Sum Work; and 4.2. for all Unit Price Work, an amount equal to the sum of the established unit price for each separately identified item of Unit Price Work times the estimated quantity of that item as indicated in this paragraph 4.2. As provided in paragraph 11.03 of the General Conditions estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by ENGINEER/ARCHITECT as provided in paragraph 9.08 of the General Conditions. Unit prices have been computed as provided in paragraph 11.03.B of the General Conditions. City of Fayetteville 06/17/02 Agreement Page -2 • • Article 5. PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions or as modified in the Supplementary Conditions. Applications for Payment will be processed by ENGINEER/LANDSCAPE ARCHITECT as provided in the General Conditions. 5.1. Progress Payments. The City of Fayetteville shall make progress payments on account ofthe Contract Price on the basis of CONTRACTOR's Applications for Payment as recommended by ENGINEER/LANDSCPE ARCHITECT, on or about the 1st day of each month during construction as provided in paragraphs 5.1.1 and 5.1.2 below and SC -14.02. All such payments will be measured by the schedule of values established in paragraph 2.07 ofthe General Conditions and based on the number of units completed in the case of Unit Price Work or, in the event there is no schedule of values, as provided in the General Requirements. City of Fayetteville 5.1.1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below, but, in case, less the aggregate of payments previously made and less such amounts as ENGINEER/LANDSCAPE ARCHITECT shall determine, or the City of Fayetteville may withhold, in accordance with paragraphs 14.02.B.5 & 14.02.D of the General Conditions. 90 percent of Work completed (with the balance of 10 percent being retainage), If Work has been 50 percent completed as determined by the ENGINEER/LANDSCAPE ARCHITECT, and ifthe character and progress ofthe Work have been satisfactory to the City of Fayetteville and ENGINEER/LANDSCAPE ARCHITECT, the City of Fayetteville, on recommendation of ENGINEER/LANDSCAPE ARCHITECT, may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of work completed, in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100 percent of the Work completed. 100 percent of materials and equipment not incorporated in the Work but delivered, suitably stored, and accompanied by documentation satisfactory to the City of Fayetteville as provided in paragraphs 14.02.B.5 & 14.02.D of the General Conditions. That is, if any such items are setup for that type payment in the Specifications. 5.1.2. Upon Substantial Completion, in an amount sufficient to increase total payments to CONTRACTOR to 98 percent of the Contract Price (with the balance of 2 percent being retainage), Tess such amounts as ENGINEER/LANDSCAPE ARCHITECT shall determine, or the City of Fayetteville may withhold, in accordance with paragraphs 14.02.B.5 & 14.02.D of the General Conditions. 06/17/02 Agreement Page -3