HomeMy WebLinkAbout146-02 RESOLUTIONRESOLUTION NO. 146-02
A RESOLUTION TO APPROVE TASK ORDER #13; A
CONTRACT WITH MCCLELLAND CONSULTING
ENGINEERS, INC. IN THE AMOUNT OF $59,290.00
TO ASSIST IN APPLYING FOR STATE FUNDING,
AND PROVIDING ENGINEERING SERVICES FOR THE
DESIGN AND CONSTRUCTION OF THE FIXED BASE
OPERATIONS HANGAR
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas
hereby approves Task Order #13 with McClelland Consulting Engineers in the
amount of $59,290.00 for engineering services for the design and construction of
the Fixed Base Operations Hangar and application for state funding. Task Order
#13 is attached as Exhibit A.
PASSED and APPROVED this the 17th day of September, 2002.
•
APPROVED:
By:
NAME OF FILE:
CROSS REFERENCE:
Item #
Date
Resolution No.146-02
Document
1
09/17/02
Resolution 146-02
2
09/17/02
Task Order No. 13 - FBO Hangar - Fayetteville Municipal
Airport
3
09/12/02
Staff Review Form - Approval of Task Order # 13
4
09/20/02
Memo to Ray M. Boudreaux, Aviation and Economic
Development/Airport from Heather Woodruff
NOTES:
•
•
.44
•
•
Res. It( -L-02„
TASK ORDER NO. 13
FBO HANGAR
FAYETTEVILLE MUNICIPAL AIRPORT
STATE OF ARKANSAS
COUNTY OF WASHINGTON
This Task Order is written pursuant to the basic agreement entitled CITY OF
FAYETTEVILLE, AGREEMENT FOR ENGINEERING SERVICES, executed on March
7, 2000. The referenced basic agreement pertains to proposed improvements to Drake
Field, Fayetteville's Municipal Airport. This Task Order entered into and executed on the
date indicated below the signature block, by and between the City of Fayetteville
(OWNER) and McClelland Consulting Engineers (ENGINEER) sets forth the project
description, project schedule, and engineering fees related to hangar Improvements at
the Fayetteville Municipal Airport.
SECTION I - PROJECT DESCRIPTION
The project is to consist of: assistance in applying for state funding for the project; the
preliminary engineering for a 150' x 125' Fixed Base Operator Hangar on the western
side of the airport property, south of the existing Terminal Building; preliminary and final
cost estimates; meetings with the City to review various aspects of the project; and
engineering services associated with detailed design and construction.
JA2002\022134\Task Order I3.doc
•
•
.
RES. /4 -10 -oz
SECTION II - PROJECT SCHEDULE
From the time the OWNER issues the Notice To Proceed (NTP), the ENGINEER will
endeavor to execute the project as expeditiously as possible to enable the Owner to
solicit competitive bids for construction during the month of September 2002.
SECTION III - SCOPE OF SERVICES
The ENGINEER shall, generally, provide those services listed in the basic agreement
which are applicable to this specific Task Order. Specifically, the project is likely to
include:
A. Assisting the City in making application for a grant from the Arkansas Department
of Aeronautics.
B. Surveying.
C. Performing preliminary engineering.
D. Formulating preliminary and final construction cost estimates.
E Meeting with the City to discuss design criteria, desired features, and schedule.
F. Performing the detailed design of the construction project as determined by the
City.
G. Coordinating with the Arkansas State Department of Aeronautics to secure their
review of the proposed project.
H. Advertising for competitive bids and recommending the award of a construction
contract.
J:\2002\022134\Task Order13.doc
• •
I. Construction administration and inspection.
J. Construction staking for a baseline and benchmark.
K. Construction materials testing.
L. Providing a set of "Record Drawings" at the completion of construction based
upon the Contractor's mark-ups.
Res.
SECTION IV - FEES AND PAYMENTS
The following fees are to be paid to the Engineer as compensation for his services:
A. Application to State: a lump sum of $800.
B. Preliminary Engineering: a lump sum of • $17,570.
C. Detailed Design: a lump sum of $15,630.
D. Bidding Service: a lump sum of $1,240.
E Construction Administration & Inspection: hourly rates, estimated to be $20,860.
F. Construction Staking: a lump sum of $690.
G. Construction materials testing: hourly rates & unit prices, estimated to be $2,500.
Appendix A presents hourly rates for personnel anticipated to be assigned to this
project as well as the basis of payments to be made to the ENGINEER.
SECTON V - BASIC AGREEMENT IN EFFECT:
Except as amended specifically herein, the basic AGREEMENT FOR ENGINEERING
SERVICES shall remain in full force as originally approved and executed.
J:\2002\022134\Task Order 13.doc
•
• •
FOR THE CITY OF FAYETTEVILLE:
By:
Attest:
May•
Date: &7-9/7-1
FOR McCLELLAND CONSULTING ENGINEERS, INC.:
By:
eyetti„e.a.,
1()
Presi
V'ce P esident
!:\2002\022134\Task Order 13.doc
•
RES. / 0Z.
-4-
•
/
A
CLERK SUB..CONS. 1 DIRECT 1 EXTENDED
TYPIST INSPECTOR MILEAGE FEE EXPENSE TOTAL
ess„„ ewe.
,
;
8$$$$$$$$$8$88888
!!|E§§|2!
§!}§!&£E
-.
,
888882882
!§'4.
'
0DSast
00E993
00'551341
O5'06t9
28$
!§§
.
q
820
2§!
;,
$
k
8
!
-
,
§
:
k
|
k
88
11
k§!�k|
!!
8
%-|
`
#
|
°
)
S8
°
4.
1
1
11
|!
|
7
88
|.
|
1 a 0 0 0 0 0 0 0 0 40 30.00
GRAND TOTAL, ENGINEERING SERVICES 4 i 60.5 1 16735 2 14.5 76 64.5 2 9 61.5 420 739
$10,300.00
|
0
,
-
se,
N
,
0
0
,0
as
0
n
1-,
n
0a
to
.0
0
)f|
0
co1
0
,
0
to
LICENSED
SURVEYOR
t6n nn
22|
a
"g.a,
itl
-
,
e0.
0
o
.
D
OPER 2
$49.00 1
1 4
37
§k$
,,.
'v;
P1
P
^;
0
0
0
k|2
|-
|
-
,
.
PROJECT
ENGINEER
360.00
-
.6,��,
w
2
30.75
@rn,
�,�|
.
.
„
_
gym|
3f.
.
,.,
.�.,
1
2
0.5
4
;;0INN_N;m----„
-
:
,
0
)§7
0
,-.
-0
--
0.
!|
| i
TASK DESCRIPTION
re
0fr
g
z
\
0.4
z
-o
K§
®,�§_
127-
��§:|
1
t
c
DES. DEVEL: GRADING PLAN/SET ELEVATIONS
DES. DEVEL: DRAINAGE PLAN/COORD. VV/APRON
DES. DEVEL: URLRY PLANAUTILUY SERVICES
DES. DEVEL: HANGAR PLAN/STRUCTURAL/RR
DES. DEVEL: PAVING SECTIONS
DES. DEVEL: AIRSIDE ACCESS PLAN
DES. DEVEL.: LANDSIDE ACCESS PLAN
DES. DEVEL.: ELECTRICAL PLAN
OUTLINE SPECIFICATIONS
UPDATE COST ESTIMATE
IN-HOUSE REVIEWS
MEETING WTH OWNER
SUBTOTAL, PRELIMINARY ENGINEERING
DETAILED PLANS
kE
\\
}�
.
1 DETAIL DES.: DRAINAGE PLAN & DETAILS
Vi
el
§!
\n
`u
, }/
DETAIL DES.: PAVING DETAILS
DETAIL DES.: AIRSIDE ACCESS PLAN DETAIL$
DETAIL DES.: LANDSIDE ACCESS PLAN DETAILS
DETAIL DES.: ELECTRICAL PLAN & DETAILS
SPECIFICATIONS
IN-HOUSE REVIEWS
FINAL COST ESTIMATE
REVIEW MEETING WITH OWNER
REVISIONS TO PLANS S SPECS
SUBTOTAL OETaII En orcins
BIDDING
§
!
(0
§
CONSTR. ADMINISTRATION
CONSTR. INSPECTION
SUBTOTAL, CONSTRUCTION PHASE
CONSTRUCTION STAKING
CONSTRUCTION MILS TESTING
§.�
\
0,
]cs
/
A
FAYETTEV&LE
THE CITY OF FAYETTEVILLE, ARKANSAS
DAN COODV, MAYOR
AVIATION AND ECONOMIC DEVELOPMENT
RAY M. BOUDREAUX, DIRECTOR
TO:
THRU:
FROM:
DATE
SUBJECT:
Dan Goody, Mayor
City Council Mem
Staff Review Comm
Ray M. Boudreaux, Dir
September 10, 2002
Task Order #13, FBO Hangar
•
4500 School Ave., Suite F
Fayetteville, AR 72701
501.718.71342
Background. Airport Management is developing goals for the future development of
unused airport property for the purpose of enhancing the future revenue potential of the
facility. The airport currently lacks any vacant hangar space.
Purpose: Task Order #13 authonzes the planning and engineering work for the
proposed 18,750 sq ft hangar. The hangar will accommodate up to twenty (20) single-
engine aircraft and could potentially generate $4,000 monthly in airport lease revenue,
plus potential fuel sales generated by additional airport based aircraft.
It is envisioned that the hangar will be managed by the Airport Operations (FBO)
program staff. The hangar will be operated as a Full Service," heated hangar, meaning
that airport staff will provide aircraft towing to the terminal ramp, fueling, minor cleaning,
de-icing, and other pre-flight preparations to aircraft owners.
The Airport Board, at their meeting of June 6, 2002 approved of the project concept and
initiation of Task Order #13, and requested the contract be forwarded to the City
Council for approval
Budget Considerations:
The FBO Hangar project is not included in the airport's Capital Improvements program
budget. However, sufficient budget funding exists in the Professional Services line item
for the engineering / design portion of the project. The project has received Arkansas
Department of Aeronautics grant funding approval (Dept. of Aeronautics grant # 1926-
02) of $200,000 for planning and construction of this project.
Requested Action: Staff recommends approval of, and signature by the Mayor of
the attached Task Order #13, with McClelland Consulting Engineers, Inc
RB/jn
Attachments: Task Order #13
•STAFF REVIEW FORM
AGENDA REQUEST
X CONTRACT REVIEW
GRANT REVIEW
For the Fayetteville City Council meeting of
•
1LC.\-e.U4-
W BO itzNga
FROM:
Ray M Boudreaux Aviation & Economic Development Airport
Name
Division Department
ACTION REQUIRED:
Approval of Task Order # 13 by resolution of the Fayetteville City Council. Signature of the Mayor.
COST TO CITY:
$59,290
Cost of this Request
5550.3960.5314.00
Account Number
$748,172 Professional Services
Category/Project Budget Category/Project Name
$176,906 Capital
Funds Used to Date Program Name
02073 $571,266 Airport
Project Number
Remaining Balance Fund
BUDGET REVIEW:
X
Budget Manager
Budgeted Item Budget Adjustment Attached
Administrative Services Director
CONTRACT/GRANT/LEASE REVIEW:
`diA nting Manager
City Attorney
ate
62 -
Purchasing Officer Date
GRANTING AGENCY.
?[/ro/oy
temal Auditor Date
ADA Coordinator Date
STAFF RECOMMENDATION:
QecomfwtwRs *Illative<
Division Head Date
Department Dire
Cross Reference
0 New Item: Yes
Date /
nistrative Services Director Date
Mayor
Date
Prev Ord/Res #: 25-00
Orig Contract Date:
Orig Contract Number:
03-07-2000
747
Description:
• •
STAFF REVIEW FORM
Page 2
Comments: Reference Comments:
Budget Coordinator:
Accounting Manager:
City Attorney:
Purchasing Officer:
ADA Coordinator:
Internal Auditor:
FAYETTEVILLE
TNF CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENTAL CORRESPONDENCE
•
To: Ray M. Boudreaux, Aviation & Economic Development/Airport
From: Heather Woodruff, City Clerk
Date: September 20, 2002
Please find attached a copy of Resolution No. 146-02 approving Task Order #13, a contract with
McClelland Consulting Engineers, Inc. to assist in applying for state funding, and providing
engineering services for the design and construction of the new Fixed Base Operations Hangar.
The original will be microfilmed and filed with the City Clerk.
cc: Nancy Smith, Internal Audit
Note: I am returning two (2) task orders to you.
015 04
Document
Reference Date
RES 9/17/2002
City 0 ayetteville
ntenance/inquiry
Item Action
Ref. Taken Brief Description
146 TASK ORDER 13/MCCLELLAND/FBO HANGAR
•
9/26/2002
11:33:44
Keywords •
File Reference #
Security Class
Expiration Date
Date for Cont/Referred:
Name Referred to
•
•
•
Cmdl-Return Cmd2-Check
CmdS-Abstract Yes No
RES 146-02
09/17/02
TASK ORDER #13
MCCLELLAND CONSULTING ENGINEER
CONTRACT
ENGINEERING SERVICES
FIXED
BASE
OPERATIONS
FBO