Loading...
HomeMy WebLinkAbout146-02 RESOLUTIONRESOLUTION NO. 146-02 A RESOLUTION TO APPROVE TASK ORDER #13; A CONTRACT WITH MCCLELLAND CONSULTING ENGINEERS, INC. IN THE AMOUNT OF $59,290.00 TO ASSIST IN APPLYING FOR STATE FUNDING, AND PROVIDING ENGINEERING SERVICES FOR THE DESIGN AND CONSTRUCTION OF THE FIXED BASE OPERATIONS HANGAR BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves Task Order #13 with McClelland Consulting Engineers in the amount of $59,290.00 for engineering services for the design and construction of the Fixed Base Operations Hangar and application for state funding. Task Order #13 is attached as Exhibit A. PASSED and APPROVED this the 17th day of September, 2002. • APPROVED: By: NAME OF FILE: CROSS REFERENCE: Item # Date Resolution No.146-02 Document 1 09/17/02 Resolution 146-02 2 09/17/02 Task Order No. 13 - FBO Hangar - Fayetteville Municipal Airport 3 09/12/02 Staff Review Form - Approval of Task Order # 13 4 09/20/02 Memo to Ray M. Boudreaux, Aviation and Economic Development/Airport from Heather Woodruff NOTES: • • .44 • • Res. It( -L-02„ TASK ORDER NO. 13 FBO HANGAR FAYETTEVILLE MUNICIPAL AIRPORT STATE OF ARKANSAS COUNTY OF WASHINGTON This Task Order is written pursuant to the basic agreement entitled CITY OF FAYETTEVILLE, AGREEMENT FOR ENGINEERING SERVICES, executed on March 7, 2000. The referenced basic agreement pertains to proposed improvements to Drake Field, Fayetteville's Municipal Airport. This Task Order entered into and executed on the date indicated below the signature block, by and between the City of Fayetteville (OWNER) and McClelland Consulting Engineers (ENGINEER) sets forth the project description, project schedule, and engineering fees related to hangar Improvements at the Fayetteville Municipal Airport. SECTION I - PROJECT DESCRIPTION The project is to consist of: assistance in applying for state funding for the project; the preliminary engineering for a 150' x 125' Fixed Base Operator Hangar on the western side of the airport property, south of the existing Terminal Building; preliminary and final cost estimates; meetings with the City to review various aspects of the project; and engineering services associated with detailed design and construction. JA2002\022134\Task Order I3.doc • • . RES. /4 -10 -oz SECTION II - PROJECT SCHEDULE From the time the OWNER issues the Notice To Proceed (NTP), the ENGINEER will endeavor to execute the project as expeditiously as possible to enable the Owner to solicit competitive bids for construction during the month of September 2002. SECTION III - SCOPE OF SERVICES The ENGINEER shall, generally, provide those services listed in the basic agreement which are applicable to this specific Task Order. Specifically, the project is likely to include: A. Assisting the City in making application for a grant from the Arkansas Department of Aeronautics. B. Surveying. C. Performing preliminary engineering. D. Formulating preliminary and final construction cost estimates. E Meeting with the City to discuss design criteria, desired features, and schedule. F. Performing the detailed design of the construction project as determined by the City. G. Coordinating with the Arkansas State Department of Aeronautics to secure their review of the proposed project. H. Advertising for competitive bids and recommending the award of a construction contract. J:\2002\022134\Task Order13.doc • • I. Construction administration and inspection. J. Construction staking for a baseline and benchmark. K. Construction materials testing. L. Providing a set of "Record Drawings" at the completion of construction based upon the Contractor's mark-ups. Res. SECTION IV - FEES AND PAYMENTS The following fees are to be paid to the Engineer as compensation for his services: A. Application to State: a lump sum of $800. B. Preliminary Engineering: a lump sum of • $17,570. C. Detailed Design: a lump sum of $15,630. D. Bidding Service: a lump sum of $1,240. E Construction Administration & Inspection: hourly rates, estimated to be $20,860. F. Construction Staking: a lump sum of $690. G. Construction materials testing: hourly rates & unit prices, estimated to be $2,500. Appendix A presents hourly rates for personnel anticipated to be assigned to this project as well as the basis of payments to be made to the ENGINEER. SECTON V - BASIC AGREEMENT IN EFFECT: Except as amended specifically herein, the basic AGREEMENT FOR ENGINEERING SERVICES shall remain in full force as originally approved and executed. J:\2002\022134\Task Order 13.doc • • • FOR THE CITY OF FAYETTEVILLE: By: Attest: May• Date: &7-9/7-1 FOR McCLELLAND CONSULTING ENGINEERS, INC.: By: eyetti„e.a., 1() Presi V'ce P esident !:\2002\022134\Task Order 13.doc • RES. / 0Z. -4- • / A CLERK SUB..CONS. 1 DIRECT 1 EXTENDED TYPIST INSPECTOR MILEAGE FEE EXPENSE TOTAL ess„„ ewe. , ; 8$$$$$$$$$8$88888 !!|E§§|2! §!}§!&£E -. , 888882882 !§'4. ' 0DSast 00E993 00'551341 O5'06t9 28$ !§§ . q 820 2§! ;, $ k 8 ! - , § : k | k 88 11 k§!�k| !! 8 %-| ` # | ° ) S8 ° 4. 1 1 11 |! | 7 88 |. | 1 a 0 0 0 0 0 0 0 0 40 30.00 GRAND TOTAL, ENGINEERING SERVICES 4 i 60.5 1 16735 2 14.5 76 64.5 2 9 61.5 420 739 $10,300.00 | 0 , - se, N , 0 0 ,0 as 0 n 1-, n 0a to .0 0 )f| 0 co1 0 , 0 to LICENSED SURVEYOR t6n nn 22| a "g.a, itl - , e0. 0 o . D OPER 2 $49.00 1 1 4 37 §k$ ,,. 'v; P1 P ^; 0 0 0 k|2 |- | - , . PROJECT ENGINEER 360.00 - .6,��, w 2 30.75 @rn, �,�| . . „ _ gym| 3f. . ,., .�., 1 2 0.5 4 ;;0INN_N;m----„ - : , 0 )§7 0 ,-. -0 -- 0. !| | i TASK DESCRIPTION re 0fr g z \ 0.4 z -o K§ ®,�§_ 127- ��§:| 1 t c DES. DEVEL: GRADING PLAN/SET ELEVATIONS DES. DEVEL: DRAINAGE PLAN/COORD. VV/APRON DES. DEVEL: URLRY PLANAUTILUY SERVICES DES. DEVEL: HANGAR PLAN/STRUCTURAL/RR DES. DEVEL: PAVING SECTIONS DES. DEVEL: AIRSIDE ACCESS PLAN DES. DEVEL.: LANDSIDE ACCESS PLAN DES. DEVEL.: ELECTRICAL PLAN OUTLINE SPECIFICATIONS UPDATE COST ESTIMATE IN-HOUSE REVIEWS MEETING WTH OWNER SUBTOTAL, PRELIMINARY ENGINEERING DETAILED PLANS kE \\ }� . 1 DETAIL DES.: DRAINAGE PLAN & DETAILS Vi el §! \n `u , }/ DETAIL DES.: PAVING DETAILS DETAIL DES.: AIRSIDE ACCESS PLAN DETAIL$ DETAIL DES.: LANDSIDE ACCESS PLAN DETAILS DETAIL DES.: ELECTRICAL PLAN & DETAILS SPECIFICATIONS IN-HOUSE REVIEWS FINAL COST ESTIMATE REVIEW MEETING WITH OWNER REVISIONS TO PLANS S SPECS SUBTOTAL OETaII En orcins BIDDING § ! (0 § CONSTR. ADMINISTRATION CONSTR. INSPECTION SUBTOTAL, CONSTRUCTION PHASE CONSTRUCTION STAKING CONSTRUCTION MILS TESTING §.� \ 0, ]cs / A FAYETTEV&LE THE CITY OF FAYETTEVILLE, ARKANSAS DAN COODV, MAYOR AVIATION AND ECONOMIC DEVELOPMENT RAY M. BOUDREAUX, DIRECTOR TO: THRU: FROM: DATE SUBJECT: Dan Goody, Mayor City Council Mem Staff Review Comm Ray M. Boudreaux, Dir September 10, 2002 Task Order #13, FBO Hangar • 4500 School Ave., Suite F Fayetteville, AR 72701 501.718.71342 Background. Airport Management is developing goals for the future development of unused airport property for the purpose of enhancing the future revenue potential of the facility. The airport currently lacks any vacant hangar space. Purpose: Task Order #13 authonzes the planning and engineering work for the proposed 18,750 sq ft hangar. The hangar will accommodate up to twenty (20) single- engine aircraft and could potentially generate $4,000 monthly in airport lease revenue, plus potential fuel sales generated by additional airport based aircraft. It is envisioned that the hangar will be managed by the Airport Operations (FBO) program staff. The hangar will be operated as a Full Service," heated hangar, meaning that airport staff will provide aircraft towing to the terminal ramp, fueling, minor cleaning, de-icing, and other pre-flight preparations to aircraft owners. The Airport Board, at their meeting of June 6, 2002 approved of the project concept and initiation of Task Order #13, and requested the contract be forwarded to the City Council for approval Budget Considerations: The FBO Hangar project is not included in the airport's Capital Improvements program budget. However, sufficient budget funding exists in the Professional Services line item for the engineering / design portion of the project. The project has received Arkansas Department of Aeronautics grant funding approval (Dept. of Aeronautics grant # 1926- 02) of $200,000 for planning and construction of this project. Requested Action: Staff recommends approval of, and signature by the Mayor of the attached Task Order #13, with McClelland Consulting Engineers, Inc RB/jn Attachments: Task Order #13 •STAFF REVIEW FORM AGENDA REQUEST X CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Council meeting of • 1LC.\-e.U4- W BO itzNga FROM: Ray M Boudreaux Aviation & Economic Development Airport Name Division Department ACTION REQUIRED: Approval of Task Order # 13 by resolution of the Fayetteville City Council. Signature of the Mayor. COST TO CITY: $59,290 Cost of this Request 5550.3960.5314.00 Account Number $748,172 Professional Services Category/Project Budget Category/Project Name $176,906 Capital Funds Used to Date Program Name 02073 $571,266 Airport Project Number Remaining Balance Fund BUDGET REVIEW: X Budget Manager Budgeted Item Budget Adjustment Attached Administrative Services Director CONTRACT/GRANT/LEASE REVIEW: `diA nting Manager City Attorney ate 62 - Purchasing Officer Date GRANTING AGENCY. ?[/ro/oy temal Auditor Date ADA Coordinator Date STAFF RECOMMENDATION: QecomfwtwRs *Illative< Division Head Date Department Dire Cross Reference 0 New Item: Yes Date / nistrative Services Director Date Mayor Date Prev Ord/Res #: 25-00 Orig Contract Date: Orig Contract Number: 03-07-2000 747 Description: • • STAFF REVIEW FORM Page 2 Comments: Reference Comments: Budget Coordinator: Accounting Manager: City Attorney: Purchasing Officer: ADA Coordinator: Internal Auditor: FAYETTEVILLE TNF CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE • To: Ray M. Boudreaux, Aviation & Economic Development/Airport From: Heather Woodruff, City Clerk Date: September 20, 2002 Please find attached a copy of Resolution No. 146-02 approving Task Order #13, a contract with McClelland Consulting Engineers, Inc. to assist in applying for state funding, and providing engineering services for the design and construction of the new Fixed Base Operations Hangar. The original will be microfilmed and filed with the City Clerk. cc: Nancy Smith, Internal Audit Note: I am returning two (2) task orders to you. 015 04 Document Reference Date RES 9/17/2002 City 0 ayetteville ntenance/inquiry Item Action Ref. Taken Brief Description 146 TASK ORDER 13/MCCLELLAND/FBO HANGAR • 9/26/2002 11:33:44 Keywords • File Reference # Security Class Expiration Date Date for Cont/Referred: Name Referred to • • • Cmdl-Return Cmd2-Check CmdS-Abstract Yes No RES 146-02 09/17/02 TASK ORDER #13 MCCLELLAND CONSULTING ENGINEER CONTRACT ENGINEERING SERVICES FIXED BASE OPERATIONS FBO MICROFILM Retention Type: **** Active **** Press Cmd 6 to update Out Cmd8-Retention Cmd3-End Press 'ENTER' to Continue (c) 1986-1992 Munimetrix Systems Corp.