HomeMy WebLinkAbout116-02 RESOLUTIONRESOLUTION NO. 116-02 A RESOLUTION AWARDING A CONTRACT TO JOHN MARINONI CONSTRUCTION CO., INC. IN THE AMOUNT OF TWO HUNDRED FORTY ONE THOUSAND FOUR HUNDRED SIXTEEN DOLLARS ($241,416.00) FOR HANGAR REHABILITATION AT THE FAYETTEVILLE MUNICIPAL AIRPORT; AND APPROVING A BUDGET ADJUSTMENT IN THE AMOUNT OF NINETY-TWO THOUSAND THREE HUNDRED SIXTY-SIX DOLLARS ($92,366.00). BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas, hereby awards a contract to John Marinoni Construction Co., Inc. in the amount of Two Hundred Forty One Thousand Four Hundred Sixteen Dollars ($241,416.00) for hangar rehabilitation at the Fayetteville Municipal Airport. Section 2. That the City Council of the City of Fayetteville, Arkansas, hereby approves a Budget Adjustment in the amount of Ninety -Two Thousand Three Hundred Sixty -Six Dollars ($92,366.00). PASSED and APPROVED this 16th day of July, 2002. APPROVED: By: DAN COODY, Mayor • NAME OF FILE: CROSS REFERENCE: Resolution No. 116-02 07/16/02 Resolution No. 116-02 07/16/02 Contract to John Marinoni Construction Co., Inc. 07/09/02 Memo to Mayor Coody and City Council Members 07/09/02 Copy of Budget Adjustment Form 07/16/02 Staff Review Form 07/18/02 Memo to Ray Boudreaux, Aviation & Economic Development Director, from Heather Woodruff, City Clerk NOTES: 10 410 • ORIGINAL • 4-5.//6-0,? 1997 Edition -Electronic Format AIA Document A101-1997 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a STIPULATED SUM AGREEMENT made as of the Ninth day 01,July in the year of Two thousand and twQ (In words. indicate don month and year) BETWEEN the Owner: (Same. address and other inform mionI City of Fayetteville 113 West Mountain Street Fayetteville. AR 727-01 and the Contractor: Mine. address and other information) John Marinoni Construction Co.. Inc 1142 N. Futrell Drive Fayetteville. AR 72703 The Project is: (Marne and location) Aircraft Hangar Rehabilitations Fayetteville. Arkansan The Architect is: (Same. address and other infomta:ion) Miller Boskus Lack Architects. P.A 5400 Greathouse Springs Road Sari gdale. AR 72762 The Owner and Contractor agree as follows. ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement; these form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other Than Modifications, appears in Article 8. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsibility of others. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. O 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 196/, 1974, 1977, 1987, 0 1997 by The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates US copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. User Document: hangar rehab a101.aia -- 7/9/2002. AIA License Number 1008414, which expires on 11/5/2002. 1 THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES. CONSULTATION WITH AN ATTORNEY 1S ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF TMS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING ALA DOCUMENT 0401. AIA Document A20I-1997, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. This document has been approved and endorsed by The Associated General Contractors of America. 01997 AIAS AIA DOCUMENT A1O1-1997 OWNER -CONTRACTOR AGREEMENT The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 C o. • • • (Insert the date of commencement if it differs from the date of this Agreement or. if applicable, state that the date will be fixed in a notice to proceed.) If, prior to the commencement of the Work, the Owner requires time to file mortgages, mechanic's liens and other security interests, the Owner's time requirement shall be as follows: 3.2 The Contract Time shall be tneasured from the date of commencement. 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than 90 days from the date of commencement, or as follows: (Inset number of calendar days. Alternatively. a calendar date map be used when coordinated with the dare of conunencement. Unless stated elsewhere in the Contract Documents, insert any requirements for earlier Substantial Completion of certain portions of the 'York.) , subject to adjustments of this Contract Time as provided in the Contract Documents. (insert provisions. rill y. for liquidated damages relating to failure to iatlipkte on time or for bonus pannellts lire early completion of the WYork. ) ARTICLE 4 CONTRACT SUM 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be Two Hundred Forty- one Thousand Four Hundred and Sixteen Dollars (s 241.416.00 ), subject to additions and deductions as provided in the Contract Documents. 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates. If decisions on other alternates are to Iv made by the Owner subsequent to the execution of this Agreement. attach a schedule of such other alternates showing the amount for each and the date when that amount expires) Deductive Alternate #1: Remove building insulation systems completely from project scope 4.3 Unit prices, if any, are as follows: Building Insulation 51.50 S.F Retrofit Roof Sub Purlins $ 0.20 S.F Roof Panels 51.75 S.F Siding Panels $3.50 S.F Liner Panels 53.00 S.F Gutters/Downspouts 510.00 L F ARTICLE 5 PAYMENTS 5.1 PROGRESS PAYMENTS 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sunt to the Contractor as provided below and elsewhere in the Contract Documents. 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: O 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 0 1997 by The American Institute of Architects. Reproduction of rhe material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates US copyright laws and wilt subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. User Document: hangar rehab a101.aia •- 7/9/2002. AIA License Number 1008414 which expires on 11/5/2002. 2 TMS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES. CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING ALA DOCUMENT D401. AIA Document A201.1997, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions urress this document is modified. This document has been approved and endorsed by The Associated General Contractors of America. 01997 AIA AIA DOCUMENT A101-1997 OWNER -CONTRACTOR AGREEMENT The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5297 • • • 5.1.3 Provided that an Application for Payment is received by the Architect not later than the firstday of a month, the Owner shall make payment to the Contractor not later than the twenty-fifth day of the same month. If an Application for Payment is received by the Architect after the application date fixed above, payment shall be made by the Owner not later Than days after the Architect receives the Application for Payment. 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as the Architect may require. This schedule, unless objected to by the Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. 5.1.5 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. 5.1.6 Subject to.other provisions of the Contract Documents. the amount of each progress payment shall be cotnputed as follows: .1 Take That portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the Contract Sunt allocated to that portion of the Work in the schedule of values, less retainage of ten percent ( IQ %). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute shall be included as provided in Subparagraph 7.3.8 of AIA Document Ata 1997. .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of ten percent ( iQn/o)• .3 Subtract the aggregate of previous payments made by the Owner; and .4 Subtract amounts. if any, for which the Architect has withheld or nullified a Certificate for Payment as provided in Paragraph 9.5 of AIA Document A2o1-1997. 5.1.7 The progress payment amount determined in accordance with Subparagraph 5.1.6 shall be further modified under the following circumstances: .1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to the-ftrfl mown' n' Ninety-five percent (95%) of the Contract Sum, less such amounts as the Architect shall determine for incomplete Work, retainage applicable to such work and unsettled claims; and (subparagraph Ras of AIA Document A2or499- requires release of applicable retainage upon Substantial Completion of Work with consent of surety. ifamv.) .2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Subparagraph 9.10.3 of AIA Document A2a1-1997. 5.1.8 Reduction or limitation of retainage, if any, shall be as follows: (Il it is intended. prior to Substantial Completion n/ the entire Work. to educe or limit the retainage resulting from the percentages inserted in Clauses 5.1.6., and 5.16.2 above. and this is not explained elsewhere in the Contract D,xwnenn, insert here provisions for such reduction or lirnitation.I O 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 196/, 1974, 1977, 1987, 0 1997 by The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates US copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. User Document: hangar rehab a101.aia -- 7/9/2002. AIA License Number 1008414 which expires on 11J5/2002. 3 THIS DOCUMENT HAS IMPORTANT LEGAL CONSEOUENCES. CONSULTATION WITH AN ATTORNEY 15 ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF TF85 ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE 8Y USING AIA DOCUMENT D401. AIA Document A201-1997, General Conditions of rhe Contract for Construction, is adopted in this document by ref erence. Do not use with other general conditions unless this document is modified. This document has been approved and endorsed by The Associated General Contractors of America. 01997 AIAO AIA DOCUMENT A101-1997 OWNER -CONTRACTOR AGREEMENT The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 • • 5.1.9 Except with the Owner's prior approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. 5.2 FINAL PAYMENT 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when: .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Subparagraph 12.2.2 of AIA Document Azol-1997, and to satisfy other requirements, if any, which extend beyond final payment; and .2 a final Certificate for Payment has been issued by the Architect. 5.2.2 The Owner's final payment to the Contractor shall be made no later than 3o days after the issuance of the Architect's final Certificate for Payment, or as follows: ARTICLE 6 TERMINATION OR SUSPENSION 6.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document Azol-1997. 6.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A2or1997. ARTICLE 7 MISCELLANEOUS PROVISIONS 7.1 Where reference is made in this Agreement to a provision of AIA Document Azor1997 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. 7.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below. or in the absence thereof, al the legal rate prevailing from time to time at the place where the Project is located. (linen rate of interest agreed upon, if any.) LLsun• lases arnl requirements under the Federal Truth in Lending Act, similar state and local consumer credit laws and other regulations as the Owner's and Contractor's principal places of business, the location of Project and elsewhere may of est the validity of this provision. Legal advice should be obtahnctl with respect to deletions or modifications, and also regarding requirevnents such as written disclosures or waiter. ) 7.3 The Owner's representative is: Mute, address and other information) ,lames Nickelson or Ray Boudreaux 4500 S. School Fayetteville. AR 72701 7.4 The Contractor's representative is: (,came, address and other information) John Marinoni John Marinoni Construction Co.. Inc 1142 N. Futrell Drive Fayetteville. AR 72703 7.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. 7.6 Other provisions: O 1915, 1918, 1925, 193/, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 0 1997 by The American Institute of Architects. Reproduction of the material herein w substantial quotation of its provisions without written permission of the AIA violates the copyright laws of rhe United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates US copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. User Document: hangar rehab a101.aia -- 7/9/2002. AIA License Number 1008414, which expires on 11/5/2002. 4 THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES. CONSULTATION WITH AN ATTORNEY 15 ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THI$ ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING A1A DOCUMENT D401. AIA Document A201-1997, General Conditions of the Contract for Construction, is adopted in this document by ref erence. Do not use with other genera' conditions unless this document is modified This document has been approved and endorsed by The Associated General Contractors of America. 01997 AIA® AIA DOCUMENT A1O1-1997 OWNER -CONTRACTOR AGREEMENT The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 • • ARTICLE 8 ENUMERATION OF CONTRACT DOCUMENTS 8.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: 8.1.1 The Agreement is this executed 1997 edition of the Standard Form of Agreement Between Owner and Contractor, AIA Document Aim -1997. 8.1.2 The General Conditions are the 1997 edition of the General Conditions of the Contract for Construction, AIA Document A2o1-1997. 8.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual dated June 17. 2002 , and are as follows: Document Title Pages 00800 Supplementary General Conditions 00800-1 through 00800-9 8.1.4 The Specifications are those contained in the Project Manual dated as Subparagraph 8.1.5, and are as follows: (Either list the Spat lications here or refer to an exhibit attached to this Agreement) Section Title Pages See attached Exhibit "A" 8.1.5 The Drawings are as follows, and are dated unless a different date is shown below: (Either list the Drawings here or refer to an exhibit attached m this Agreement.; Number Title Date See attached Exhibit "B" 8.1.6 The Addenda, if any, are as follows: Number No. 1 Date Pages Ju y 3.2002 05 THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES. CONSULTATION WITH AN ATTORNEY 15 ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE 81' USING AIA DOCUMENT 0401. AIA Document A201.1991 General Conditions of the Contract for Construction, is adopted in this document in by reference. Do not we with other general conditions unless this document is modified. Portions of Addenda relating to bidding requiremenis are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 8. 8.1.7 Other documents, if any, forming part of the Contract Documents are as follows: (List herr ally additional documents that are intended to (onn pant of the Contract Documents. AIA Document Am - :5w provides that kidding requirements such as advertisement or imitation to bid, Instructions to Bidden, sample forms and the Contractor's bid are not pan of the Contract Documents unless enumerated in this Agreement. They shou/d be listed herr only if intended to he pan of the Contract Documents.) Value Engineering - Letter Dated July 9. 2002 - Exhibit "C" This Agreement is entered into as of the day and year first written above and is executed in at least three original copies, of which one is to be delivered to the Contractor, one to the Architect for use in the administration of the Contract, and the remainder to the Owner. OWNER (Signature; • This document has been approved and endorsed by The Associated General Contractors of America. 01997 AIAS AIA DOCUMENT A101-1997 OWNER -CONTRACTOR AGREEMENT The American Institute of Architects A1735 New York Avenue, N.W. Washington, D.C. 20006-5792 CONTRACTOR (Sig !,tore) CEo O 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 0 1997 by The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of rhe AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U5 copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. User Document: hangar rehab a101.aia •• 7/9/7002. AIA License Number 1008414, which expires on 11/5/2002. 5 • • (Printed name and title) (Printed name and liar) • O 1915, 1918, 1925, 1957, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, O 1997 by The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates US copyright laws and will subject the violator to legal prosecution. This document was electron tally produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. User Document: hangar rehab a101.aia -- 7/9/2002. AIA License Number 1008414. which expires on 11/5/2002. 6 THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES. CONSULTATION WITH AN ATTORNEY 1S ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT 0401. AIA Document A201-1997, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general condition unless this document is modified This document has been approved and endorsed by The Associated General Contractors of America. 01997 AU0 AIA DOCUMENT A101-1997 OWNER -CONTRACTOR AGREEMENT The American Institute of Architects 1735 New York Avenue, N.W. Washington. D.C. 20006-5292 • • • DOCUMENT 00003 TABLE OF CONTENTS BIDDING REQUIREMENTS AND CONDITIONS OF THE CONTRACT 00030 Advertisements For Bids 00100 Instructions to Bidders (AIA Document A701) 00120 Supplementary Instructions to Bidders 00300 Bid Form Statement of Bidder's Qualifications 00520 Agreement Form 00600 Performance Bond 00610 Payment Bond 00700 General Conditions (AIA Document A201) 00800 Supplementary General Conditions Arkansas Prevailing Wage Rate Determination DIVISION 1 • GENERAL REQUIREMENTS 01010 Summary of Work 01030 Alternates 01100 Alteration Procedures 01300 Submittals and Substitutions 01500 Construction Facilities and Temporary Controls DIVISION 2 • SITE CONSTRUCTION 02070 Selective Demolition • 02100 Site Preparation 02200 Earthwork 02710 Subdrainage Systems DIVISION 3 - CONCRETE 03300 Cast -In -Place Concrete FAYETTEVILLE MUNICIPAL AIRPORT/DRAKE FIELD AIRCRAFT HANGAR REHABILITATIONS FAYETTEVILLE, ARKANSAS Exhibit "A" 00003-1 DIVISION 4 - MASONRY None In This Project DIVISION 5 - METALS 05500 Metal Fabrication and Miscellaneous Metal Work DIVISION 6 - WOODS AND PLASTIC 06100 Carpentry DIVISION 7 - THERMAL AND MOISTURE PROTECTION 07180 Water Repellent Coating 07210 Insulation 07215 Building Insulation Systems 07900 Joint Sealants DIVISION 8 - DOORS AND WINDOWS 08110 Steel Doors and Frames 08375 Hangar Door Repair 08410 Aluminum Entrances and Fixed Framing 08700 Hardware 08800 Glazing 08840 Polycarbonate Structured Sheet Glazing DIVISION 9 • 09900 DIVISION 10 DIVISION 11 DIVISION 12 FINISHES Painting - SPECIALITES - EQUIPMENT - FURNISHINGS None In This Project FAYETTEVILLE MUNICIPAL AIRPORT/DRAKE FIELD AIRCRAFT HANGAR REHABILITATIONS FAYETTEVILLE. ARKANSAS • 00003-2 DIVISION 13 - SPECIAL CONSTRUCTION 13122 13123 DIVISION 14 - DIVISION 15 - DIVISION 16 - None In Metal Building Repair Retrofit Roof Subpurlins CONVEYING SYSTEMS MECHANICAL ELECTRICAL This Project • END OF DOCUMENT FAYETTEVILLE MUNICIPAL AIRPORT/DRAKE FIELD AIRCRAFT HANGAR REHABILITATIONS FAYETTEVILLE, ARKANSAS 00003-3 • • Exhibit "B" Index of Drawings Sheet No. Title T1.0 Title Sheet SP.1 Site Plan and General Information D1.1 Demolition Plan - Hangar #1 D1.2 Demolition Plan - Hangar 02 D2.1 Demolition Elevations - Hangar #1 D2.2 Demolition Elevations - Hangar k2 A1.1 Plan Hangar #1 A1.2 Plan Hangar #2 A2.1 Elevations Hangar #1 A2.2 Elevations Hangar #2 A3.1 Plan Details A3.2 Canopy Details A3.3 Canopy Details Issue Date Revision Date 6/1 7/02 6/1 7/02 6/1 7/02 6/1 7/02 6/1 7/02 6/1 7/02 6/17/02 6/1 7/02 6/17/02 6/1 7/02 6/17/02 6/17/02 6/17/02 J VL'r'CWIJC 1CJ:CT rmun: • JOOMP.uIWON CMISACTION CS, INC. iu:y43f137 1 Exhibit "C" 1142 N. Hi (MALL DRIVE FAYETTEV11.1.F, ARKANSAS 72703 r: 1. 1 (501) 251-1316 251-1319 Fax July 9, 2002 Miller Boskus Lack Architects,1'.A. Fax 443-7139 Rc: Drake Field Aircraft Hanger Renovation Project Tear Roger We ullcr a credit of $3,300 fur reducing the gauge of the wall panels, trim, gutters and downspouts Iram 22 gauge to 24 gauge. Sincerely, John P. Marinoni CEO JLL-09-2002 10:41 P.01 FAYETTEALLE THE CITY OF FAYETTEVILLE, ARKANSAS DAN COODY, MAYOR TO: THRU: FROM: DATE SUBJECT: MEMORANDUM Dan Coady, Mayor City Council Members Staff Review Committee Ray M. Boudreaux, Director, Aviation and Economic Deve July 9, 2002 Hangar Rehabilitation Project • Background: Attached please find the contract for the hangar rehab of the two bines hangars that face South School. This project was originally awarded by the State Division of Aeronautics as a 50/50 grant April 11, 2001 ($81,007/$81,007). In order to comply with the City purchasing guidelines, an architect was hired and a design was completed for the project. Initial offering turned up one bidder, well over the budget. We revised the budget and the project and let the project a second time. The result is a project within the budget allowance. It is over the original estimate. Purpose: To approve the award of the project to Marononi Construction Company, Inc. for $241,416.00. Budget Considerations: A budget amendment is attached. Funds are available. Requested Action: Approval by the City Council and signature by the Mayor. Attachments: Staff Review Form Grant Agreement Aviation and Economic Development Department Fayetteville Municipal Airport, Drake Field 4500 South School Avenue, Suite F Fayetteville, Arkansas 72701 Ray M. Boudreaux, Director C 0 Cfty of Fayetievfle, Arkaem Budget Adjustment Form Res. 116-02 Budget Year 2002 Department Division: Program: Aviation & Economic Development Airport Capital Date Requested Adjustment N 07/09/2002 Projector ?tem Requested: $92,366 is requested in Building & Grounds Maintenance account for refurbishing two large hangars at Fayetteville Municipal Airport. Projector Item Deleted: To recognize $6,842 In additional State Grant Revenue and; to use $85,524 from the Airfield Lighting Rehab capital project. COPY Justification of this Increase: The project will provide for refurbishing two large hangars extending the usable life and providing an attractive appearance. Justification of this Decrease The Arkansas will provide 50% of the project cost up to $100.000. The lighting Rehab project was completed In 2001. Sufficient budget remains to campy wdh City policy. Account Name Building & Grounds Mant Account Name State Grants Airfield L&hung Rehab Increase Expense (Decrease Revenue) Amount 92.368 ... Account Number Project Number 5550 3960 5400_ 00_ _ 02074 Decrease Expense (Increase Revenue) Amount 6 842 EM Account Number _Nett Number 5550 0955 6805 00 5550 3960 7820 25 Approval Signatures Budget Office Use Only Date Type: A B c 1-17.-ov Date Date of Approval 1 ter) L Date Posted to General Ledger Posted to Project Accounting Entered in Category Log Blue Copy: Budget & Research / Yellow Copy: Requester /Date __-�r Dated_ E c s F • CIty of Fayetteville, Arkansas Budget Adjustment Form • Budget Year 2002 Department: Division: Program: Aviation & Economic Development Airport Capital Date Requested 07/09/2002 Adjustment 11 Project or Item Requested: $92,366 is requested in Building & Grounds Maintenance account for refurbishing two large hangars at Fayetteville Municipal Airport. Project or Item Deleted: To recognize $6,842 in additional State Grant Revenue and; to use $85,524 from the Airfield Lighting Rehab capital project. Justification of this Increase: The project will provide for refurbishing two large hangars extending the usable life and providing an attractive appearance. Justification of this Decrease: The Arkansas will provide 50% of the project cost up to $100,000. The Lighting Rehab project was completed in 2001. Sufficient budget remains to comply with City policy. Increase Expense (Decrease Revenue) Account Name Amount Building & Grounds Maint 92,366 Account Name State Grants Airfield LightintRehab Account Number Project Number 5550 3960 5400 00 02074 1 Decrease Expense (Increase Revenue) Amount 6,842 85.524 Account Number Project Number 5550 0955 6805 00 5550 3960_ 7820 25 Approval Signatures Requested By Date Budget Manager Department Director Admin. Services Director Mayor Date Date Date Date Budget Office Use Only Type. A B C D Date of Approval Posted to General Ledger Posted to Project Accounting Entered in Category Log Blue Copy: Budget & Research / Yellow Copy: Requester E X AGENDA REQUEST X CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Council meeting of • • STAFF REVIEW FORM 7 -Ib- 0Z FROM: Ray M. Boudreaux Name Aviation & Economic Development Airport Division Department ACTION REQUIRED: Approval and signature of the Mayor for a construction contract w/ Marinoni Con tructi for Manger Rehabilitation. Ppe.eva.0 q a Qn-o(tc.F G6.Sl-.eva o, o-aQ b. t_1 add „,.t44is .-Cso,.upw , COST TO CITY: $ 241,416 / (6,842) grant revenue $ tic •-1) l Hangar Rehabilitation Cost of this Request 5550.3960.5400.00 Account Number 02074 Protect Number Catepory/Propct Budget Categmy/Proled Name 37,267 / (18,633) grant revenue Airport Capital Exp Funds Used to Date Program Name Airport RemamIng Balance Fund BUDGET REVIEW: Budgeted Item 7—(l -o) - Budget Manager X Budget Adjustment Attached Administrative Services Director CONTRACT/GRANT/LEASE REVIEW: inetistAt_ Tuita urhastno Officer Cdy Attorney Date 7/lLv (( Date Ia.Iba— Date Pt STAFF RECOMMENDATION: �dpov _ aw�rt � t c_oJ•, e ucy GRANTING AGENCY: t �cA 4.7fr440a— Audtor Date ADA Coorolneto: Date Administrative Services Director Date Cross Reference New Item: Prev Ord/Res #: No Ortg Contract Date: Orig Contract Number. s F 0 • Description: 4A>v qcr vi -----a Comments: Budget Coordinator: • STAFF REVIEW FORM Page 2 Accounting Manager: City Attorney: Purchasing Officer: ADA Coordinator: Internal Auditor: Reference Comments: FAYETTEVILLE THE CITY OF FAYETTEVILLE. ARKANSAS DEPARTMENTAL CORRESPONDENCE • To: Ray Boudreaux, Aviation & Economic Development Director From: Heather Woodruff, City Clerk Date: July 18, 2002 Please find attached a copy of Resolution No. 116-02 awarding a contract to John Marinoni Construction Co., Inc. for hangar rehabilitation at the Fayetteville Municipal Airport. I am returning three (3) contracts to you. The original will be microfilmed and filed with the City Clerk. Your Budget Adjustment Form has been forwarded to the Budget and Research Division. Ci NI 07 cc Nancy Smith, Internal Audit Stephen Davis, Budget & Research 010 03 Update Document Reference RES Date 7162002 City It Ref. 116 f Fayetteville ndex Maintenance e Action Taken Brief Description HANGAR REHABILITATION AT FMA • 7/23/2002 16:20:55 Enter Keywords • RES. 116-02 CONTRACT JOHN MARINONI CONSTRUCTION CO $241.416 00 HANGAR REHABILITATION FAYETTEVILLE MUNICIPAL AIRPORT File Reference # • MICROFILM Security Class Expiration Date Date for Cont/Referred: Name Referred to • • • Cmdl-Return CmdS-Retention CmdS-Abstract Yes No Retention Type: **** Active **** Cmd4-Delete Cmd3-End Press 'ENTER' to Continue (c) 1986-1992 Munimetrix Systems Corp.