HomeMy WebLinkAbout73-01 RESOLUTIONRESOLUTION NO. 73-01
A RESOLUTION APPROVING A CONTRACT AMENDMENT IN THE
AMOUNT OF TWELVE THOUSAND DOLLARS ($12,000.00) WITH
GARVER ENGINEERS IN CONNECTION WITH GEOTECHNICAL
INVESTIGATIONS REQUIRED IN THE E.J. BALL LOT AND
APPROVING A BUDGET ADJUSTMENT FOR SAME
WHEREAS, preliminary geotechnical investigations have revealed subsurface
voids in three (3) out of four (4) borings; and
WHEREAS, the presence of these voids could limit construction options for
current design and future planning for the proposed parking deck; and,
WHEREAS, the E.J. Ball lot is approximately one-third larger than that originally
proposed, increasing the required number of test borings from five (5) to eight (8); and,
WHEREAS, information obtained by increasing boring depths by twenty feet
(20') should reduce these limitations.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council hereby Approves a contract amendment in the
amount of Twelve Thousand Dollars ($12,000.00) with Garver Engineers in connection
with geotechnical investigations required in the E.J. Ball lot and approving a budget
adjustment for same.
Section 2. That the City Council authorizes the Mayor to sign such an
amendment to the contract with Garver Engineers.
PASSED AND APPROVED this r day of June, 2001.
ATTEST:
By: .// 4.
eather Woodruff, City Cle k
APPROVED:
By:
DAN COODY, Ma
• •
Garver, Inc.
Engineers
3810 Front Street, Suite 10
Fayetteville, AR 72703
501-527-9100
FAX 501-527-9101
wvnv.garverinc.corn
May 16, 2001
Mr. Don Bunn, P.E.
Assistant Public Works Director
City of Fayetteville
113 West Mountain
Fayetteville, AR 72701
GARVERIENGINEERS
Re: Fayetteville Municipal Parking Deck - Professional Engineering Services Contract Amendment No. 2
Dear Mr. Bunn:
Please consider this our revised proposed Amendment No. 2 to our original contract for the Municipal
Parking Deck Project dated November 21, 2000. This amendment will cover a warranted increase in our
original $7,000 lump sum fee for geotechnical investigation services. This proposed increase is warranted
for the following reasons.
First, since the E.J. Ball lot is approximately one-third larger than the originally proposed lot, we needed to
increase the number of test borings from five to eight.
Second, rock discontinuities (voids) of varying thickness were encountered at depths of 33 to 37 feet in
three of the four test borings accomplished to date. The presence of these voids, or solution cavities, could
limit construction options for current design and future planning of the deck. Our experience with other
projects in the general area of the site indicates the rock below the solution cavities is generally sound and
strong. We recommend extending all eight of the test borings 20 feet into the unweathered shale, which
would result in total boring depths of 60 to 70 feet. Information obtained from the deeper borings should
reduce our limitations on construction options.
In summary, your acceptance of this proposed amendment will increase our lump sum fee for geotechnical
investigation services from $7,000 to $19,000.
•
We need to proceed with this work as soon as possible to avoid delaying the project. If this proposal is
acceptable to you, please sign the three copies and return one copy to me. As always, we appreciate the
opportunity to provide professional services to the City of Fayetteville and look forward to successful
completion of this project. Please call me with any questions or comments. Thank you.
Respectfully,
GARVER 1 ENGINE RS
rock Hoskins, P.E.
Vice President / Project Manager Date:
`- Approved by:
cc: John Maguire
Brentwood, TN • Fayetteville, AR • Huntsville, AL • Madison, MS • Little Rock, AR • Tulsa, OK
fljTttevi11e
of
CORRESPDENCE
• •
DEPARTMENTAL
May 14, 2001
To: Fayetteville City Council
From: Don Bunn, Asst. Public Works Director
Thru: Mayor Dan Coody
John Maguire, Administrative Services Director
Subject: Contract Amendment No. 2
Parking Deck Contract
Garver Engineers
Attached for your review and approval is a letter from Garver Engineers which constitutes
Contract Amendment No. 2 in connection wth their Parking Deck Contract wth the City of
Fayetteville. The request is to increase the geotechnical portion oftheir contract be
$12,000.00, from $7,000.00 to $19,000.00. The geotechnical frm has done 4 borings so
far on the property and have encountered voids on three (3) ofthem.
Garver feels that additional borings are necessaryin order to better define the extent of
the voids and to be in a better position to develop ;costs and design the boting
requirements. Also, the original figure for geotechnical investigations was based on the
smaller lot across from City Hall, not the larger E.J. Ball lot.
It is the recommendation of the Staff that Contract Amendment No. 2 be approved for
$12,000.00, and that the Council approve a budget adjustment.
410 City of Fayetteville, Arkansas • n \\\�
Budget Adjustment Form
- Budget Year
2001
Department: Sales Tax Capital
Division: Other Capital
Program: Parking Deck
Date Requested
May 22, 2001
Adjustment N
Project or Item Requested:
Additional funding is requested for the Parking Deck engineering
contract.
Project or Item Deleted:
Funding for this adjustment is from the Plainview Avenue project.
Justification of this Increase:
The additional funds are requested to enable the engineer
to perform additional geotechnical services on the
proposed sites for the parking deck.
Justification of this Decrease:
The project is complete and the funds are not required.
Increase Expen e (Decrease Revenue)
Account Name Amount Account Number Project Number
Engineering Services
2,149 4470 9470
5314 03 00064 1
Decrease Expense (Increase Revenue)
Account Name Amount Account Number Project Number
Street Improvements
2,149 4470 9470
5809 00 98031 1
Requested By
Approval Signatures
7'3 h'l +.1/4-1 0 1
Date
Date
Date
7?/Z 7
Date
42-)70ate
Budget Office Use Only
Type: A B C D E
Date of Approval
Posted to General Ledger
Posted to Project Accounting
Entered in Category Log
Bhre Copy: Budget & Research H: IBUDGETIPROJECTSIBud AdjIBA_20OJIPARK_DEC.WK4
c
E
t
•
Council Meeting of June 5, 2001
FROM Don Bunn
Name
AGENDA REQUEST FORM
Public Works Admin
Division
•
Mayor's Approval
Public Works
Department
ACTION REQUIRED Approval of the proposed contract amendment in the amount
of $12,000.00, and a budget adjustment.
COST TO CITY
$ $12,000.00
Cost of this Request
4470 9470 5314 02
Account Number
00064-1
Project Number
BUDGET/CONTRACT REVIEW
Budge
Coordinator
$ 280,609.00
Multi -Level Prk Deck
Category/Project Budget Category/Project Name
270,758.00
Other Improvements
Funds Used to Date Program Name
$ 9 851.00
Sales Tax, Capital
Funds Remaining Fund Category
X Budgeted Item X
Date
GUSIoL12,E ^-, 5046/
Budget Adj. Attached
Admin Services Director Date
Accounting Manager J Date ADA Coordinator
�A/�� 5/xs/( `�
Cit At
At ornev Date Internal Ijud�r
1
4 5 Sol
Purchasing Officer
Date
Date
5%a.(o 1
Date
STAFF RECOMMENDATION It is the recommendation of the Staff that the Council
approve Contract Amendment No. 2 with Garver Engineers for
$12,000. Staff recommends approval of a budget adjustment.
Asst. Public Works Director
D-•artment 1 ector
arin ervices Di
AA., _en
44
ctor
Mayor
21 May, 01
Date
Da
2.ash,
Da e
Cross Reference
New Item: Yes No
Prev Ord/Res # 158 00
Orig. Contract # 786
Date Orig. Contract Date 21 Nov, 01
05-24-01P02:28 RCVD
• •
RESOLUTION NO.
A RESOLUTION APPROVING A CONTRACT AMENDMENT IN THE
AMOUNT OF TWELVE THOUSAND DOLLARS ($12,000.00) WITH
GARVER ENGINEERS IN CONNECTION WITH GEOTECHNICAL
INVESTIGATIONS REQUIRED IN THE E.J. BALL LOT AND
APPROVING A BUDGET ADJUSTMENT FOR SAME
WHEREAS, preliminary geotechnical investigations have revealed subsurface
voids in three (3) out of four (4) borings; and
WHEREAS, the presence of these voids could limit construction options for
current design and future planning for the proposed parking deck; and,
WHEREAS, the E.J. Ball lot is approximately one-third larger than that originally
proposed, increasing the required number of test borings from five (5) to eight (8); and,
WHEREAS, information obtained by increasing boring depths by twenty feet
(20') should reduce these limitations.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council hereby Approves a contract amendment
in the amount of Twelve Thousand Dollars ($12,000.00) with Garver Engineers in
connection with geotechnical investigations required in the E.J. Ball lot and
approving a budget adjustment for same.
Section 2. That the City Council authorizes the Mayor to sign such an
amendment to the contract with Garver Engineers.
PASSED AND APPROVED this
ATTEST:
By:
Heather Woodruff, City Clerk
day of June, 2001.
Garver Inc
,a...._ AR T;)70
<s g, , co- mot
10
• •
May 16, 2001
Mr. Don Bunn, P.E.
Assistant Public Works Director
City of Fayetteville
113 West Mountain
Fayetteville, AR 72701
GARVERj ENGINEERS
Re: Fayetteville Municipal Parking Deck - Professional Engineering Services Contract Amendment No. 2
Dear Mr. Bunn:
Please consider this our revised proposed Amendment No. 2 to our original contract for the Municipal
Parking Deck Project dated November 21, 2000. This amendment will cover a warranted increase in our
original $7,000 lump sum fee for geotechnical investigation services. This proposed increase is warranted
for the following reasons.
First, since the E.J. Ball lot is approximately one-third larger than the originally proposed lot, we needed to
increase the number of test borings from five to eight.
Second, rock discontinuities (voids) of varying thickness were encountered at depths of 33 to 37 feet in
three of the four test borings accomplished to date. The presence of these voids, or solution cavities, could
limit construction options for current design and future planning of the deck. Our experience with other
projects in the general area of the site indicates the rock below the solution cavities is generally sound and
strong. We recommend extending all eight of the test borings 20 feet into the unweathered shale, which
would result in total boring depths of 60 to 70 feet. Information obtained from the deeper borings should
reduce our limitations on construction options.
In summary, your acceptance of this proposed amendment will increase our lump sum fee for geotechnical
investigation services from $7,000 to $19,000.
We need to proceed with this work as soon as possible to avoid delaying the project. If this proposal is
acceptable to you, please sign the three copies and return one copy to me. As always, we appreciate the
opportunity to provide professional services to the City of Fayetteville and look forward to successful
completion of this project. Please call me with any questions or comments. Thank you.
Respectfully,
GARVER 1 ENGINEERS
rock Hoskins P E
Vice President / Project Manager Date:
Approved by:
cc: John Maguire
Brentwood Trl • Favelie•. ilFe AR • Huntsville. AL • Madison. MS • Little Rock. AR • Tulsa. OK
• •
COMMENT SHEET
Project: Parking Deck
Engineer/Contractor: Garver Engineers
Notes to Reviewers:
FAYETTEVILLE
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENTAL CORRESPONDENCE
To: Don Bunn, Engineering
From: Heather Woodruff, City Clerk
Date: June 15, 2001
Attached is a copy of the resolution and signed contract amendment to the agreement with
Garver Engineers. I am also returning two originals to you. The original will be microfilmed
and filed with the City Clerk.
cc: Nancy Smith, Internal Audit
•
NAME OF FILE: Resolution No. 73-01
•
CROSS REFERENCE:
06/05/01
Resolution No. 73-01
06/05/01
Professional Engineering Services Contract Amendment No. 2 with
Garver Engineers in connection with Geotechnical Investigations
required in the E. J. Ball Parking Lot and approving a Budget
Adjustment
05/14/01
Departmental Memo to Fayetteville City Council from Don Bunn, Asst.
Public Works Director, thru Mayor Dan Coody, John Maguire,
Administrative Services Director, regarding Contract Amendment No. 2,
Parking Deck Contract, Garver Engineers
05/22/01
Copy of Budget Adjustment Form
06/05/01
Agenda Request Form
06/15/01
Departmental Correspondence to Don Bunn, Engineering, from Heather
Woodruff, City Clerk