Loading...
HomeMy WebLinkAbout45-01 RESOLUTIONRESOLUTION NO.45-01 A RESOLUTION APPROVING A CONTRACT AMENDMENT IN THE AMOUNT OF TWENTY-SIX THOUSAND SEVEN HUNDRED AND FIFTY DOLLARS ($26,750.00) WITH GARVER ENGINEERS IN CONNECTION WITH THE DESIGN OF THE PARKING DECK ON THE E J BALL LOT. WHEREAS, the original contract did not allow for the funding of a Programming Phase for the project; and WHEREAS, the City has now requested that Garver Engineers present altemative deck layouts, and participate in presentations to City Staff and the public; and WHEREAS, the E. J. Ball lot is approximately one-third larger than that originally proposed; and WHEREAS, the Off Street Parking Authority has agreed to reimburse the City for Fifty Percent (50%) of the increased expense up to Twelve Thousand Five Hundred Dollars ($12,500.00). BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council hereby Approves a contract amendment in the amount of Twenty -Six Thousand Seven Hundred and Fifty Dollars ($26,750.00) with Garver Engineers in connection with the design of the parking deck on the E. J. Ball lot. Section 2. That the City Council authorizes the Mayor to sign such an amendment to the contract with Garver Engineers. Section 3. That upon payment to Garver Engineers, the City will bill the Off Street Parking Authority for 50% of its payment, not to exceed $12.500. S: st‘FPA SED AND APPROVED this3rd day of April, 2001. t APPROVED: By: DA COODY, May 2E5 «5 le/. ATTEST: By: • eather Woodruff, City Clerk -.r NAME OF FILE: Resolution No. 45-01 CROSS REFERENCE: 04/03/01 Resolution No. 45-01 04/04/01 Professional Engineering Services Contract Amendment No. 1 in regards to the Fayetteville Municipal Parking Deck 03/14/01 Memo to Fayetteville City Council thru Mayor Dan Coody from Don Bunn regarding Engineering Contract Amendment/Fayetteville Municipal Parking Deck/Garver Engineers 04/03/01 Agenda Request Form 04/09/01 Departmental Memo from City Clerk NOTES: 1 • • Garver, Inc. Encineers 3810 Front Street. Suite 10 Faetteville, AR 72703 501-527-9100 FAX 501-527-9101 www_garverinc.uorr Mr. Don Bunn, P.E. Assistant Public Works Director City of Fayetteville 113 West Mountain Fayetteville, AR 72701 March 12, 2001 GARVER ENGINEERS Re: Fayetteville Municipal Parking Deck - Professional Engineering Services Contract Amendment No. 1 Dear Mr. Bunn: Please consider this our revised proposed Amendment No. I to our original contract for the Municipal Parking Deck Project dated November 21, 2000. During our original contract negotiations with Charlie Venable, we anticipated and proposed a contract that allowed for a significant amount of consideration and presentation of different deck alternatives and participation in several public meetings. We assumed a lot of public input would be required before the City could decide on what parking deck we would actually design and therefore proposed a Programming (or Study) Phase in our contract However, Mr. Venable insisted that the City's intent was for this to be a simple process with limited discussion of alternatives between Garver and the City Staff. Therefore, we modified our proposal to eliminate the Programming Phase in the contract which was executed. We now understand the City wants us to consider several deck alternatives for the E.J. Ball parking lot north of the originally considered lot. Since our design contract is based on a percentage of construction, if the characteristics of the new lot were similar to the original lot, the change in location for the deck would not require a modification of our agreement. But the fact that the new lot requires more design options to be evaluated due to its larger size and major change in elevation, coupled with the City's desire to consider several different alternatives and possibly allow for significant public input, we believe it is appropriate to propose an amendment to our contract. We propose to add a Programming Phase to our contract that will allow the following services. Programming Phase I - Study Alternative Layouts I. Consider and present a maximum of three deck layout and configuration alternatives, including traffic circulation options, for review by City Staff'. Coordinate with Perry Franklin. 2. Attend one meeting with City Staff to present and discuss the deck alternatives 3. Participate in a public meeting to gain input on the deck altematives. 4. The City will approve one alternative for further development. Programming Phase II - Develop Sketches and Refine Selected Alternative 1. Prepare preliminary site plan, exterior sketches, and a section of the approved deck altemative. 2. Participate in a meeting with City staff to present and discuss items outlined in I above. 3. Based on City instructions, revise the program of requirements and deck layout as required. 4. Provide a "planning quality" (order of magnitude) opinion of probable construction cost. Brentwood, TN • Fayetteville, AR • Huntsville, AL • Madison, MS • Little Rock, AR • Tulsa, OK • Mr. Don Bunn PE March 12, 2001 Page 2 After completion of Programming Phase II and with approval of the City of the program and deck layout, including architectural design features, Garver will begin Schematic Design under our Basic Services agreement. The City understands that the opinions of probable construction costs developed by the Engineer during the Programming Phase and the Basic Services Phase do not establish a limit for the construction contract amount. If the actual amount of the low construction bid exceeds the construction budget established by the City, the Engineer will not be required to re -design the project without additional compensation, unless the Engineer has not designed the project in accordance with written direction from the City. The Engineer will bill the Owner on the basis of actual salary costs for work time directly connected with work chargeable to this phase of the project, plus payroll additives and general overhead costs of 160% of direct labor costs, plus direct reimbursable expenses associated with this phase of the project, plus a percentage of a fixed fee, with a total "not to exceed" fee of $25,000 for the Programming Phase. A spreadsheet is attached that identifies the details of this proposed fee. Also, since the E J. Ball lot is approximately one-third larger than the originally proposed lot, we are requesting an increase in our lump sum surveying fee from $10,000 to $11,750, an increase of $1,750. We are also requesting a written Notice to Proceed for surveying and geotechnical work for the E J Ball Lot. Allowing us to begin these services will aid in the development of the Programming Phase and will expedite the design process. If this proposal is acceptable to you, please sign the three copies and return one copy to me. As always, we appreciate the opportunity to provide professional services to the City of Fayetteville and look forward to successful completion of this project. Please call me with any questions or comments. Thank you. Respectfully, GARVER i ENGINEERS bleed Approved by: Brock Hoskins, P.E. Vice President / Project Manager Date: cc: John Maguire Attachment 4/0( • AMENDMENT 1 • PROGRAMMING PHASE • 8• 11 a • • • II & k • • III a • • • g I a k • • 1 Z • • • i I a M M M Pi ii 9 ii . . I U z • . In 6 • • • Ii 11 • • o . . il a k . 0 Ma k • • I a k i . • Ina • • • ila k ne. 10 1 e e eea e Ill I • • • 1 I )i116I hill I 1 1 1- 8 a 8 a 8 e a • 8 a 8 a 8 • a 8888a lass; Garver, Inc. Eng,neers 3810 Front Street. Suite 10 Fayetteville. AR 72-03 501-527-9100 FAX 501-527-9101 wmv garvennc corr Mr. Don Bunn, P.E. Assistant Public Works Director City of Fayetteville 113 West Mountain Fayetteville, AR 72701 March 12, 2001 GARVER ENGINEERS Re: Fayetteville Municipal Parking Deck - Professional Engineering Services Contract Amendment No. 1 Dear Mr. Bunn: Please consider this our revised proposed Amendment No. 1 to our original contract for the Municipal Parking Deck Project dated November 21, 2000. During our original contract negotiations with Charlie Venable, we anticipated and proposed a contract that allowed for a significant amount of consideration and presentation of different deck alternatives and participation in several public meetings. We assumed a lot of public input would be required before the City could decide on what parking deck we would actually design and therefore proposed a Programming (or Study) Phase in our contract However, Mr. Venable insisted that the City's intent was for this to be a simple process with limited discussion of alternatives between Garver and the City Staff. Therefore, we modified our proposal to eliminate the Programming Phase in the contract which was executed. We now understand the City wants us to consider several deck alternatives for the E J Ball parking lot north of the originally considered lot. Since our design contract is based on a percentage of construction, if the characteristics of the new lot were similar to the original lot, the change in location for the deck would not require a modification of our agreement. But the fact that the new lot requiresmore design options to be evaluated due to its larger size and major change in elevation, coupled with the City's desire to consider several different alternatives and possibly allow for significant public input, we believe it is appropriate to propose an amendment to our contract. We propose to add a Programming Phase to our contract that will allow the following services. Programming Phase I - Study Alternative Layouts 1. Consider and present a maximum of three deck layout and configuration alternatives, including traffic circulation options, for review by City Staff Coordinate with Perry Franklin. 2. Attend one meeting with City Staff to present and discuss the deck alternatives. 3. Participate in a public meeting to gain input on the deck altematives. 4. The City will approve one alternative for further development. Programming Phase II - Develop Sketches and Refine Selected Alternative 1. Prepare preliminary site plan, exterior sketches, and a section of the approved deck alternative. 2. Participate in a meeting with City staff to present and discuss items outlined in I above. 3. Based on City instructions, revise the program of requirements and deck layout as required. 4. Provide a "planning quality" (order of magnitude) opinion of probable construction cost. Brentwood, TN • Fayetteville. AR • Huntsville, AL • Madison. MS • Little Rock, AR • Tulsa. OK Mr. Don Bunn, P.E. March 12, 2001 Page 2 After completion of Programming Phase II and with approval of the City of the program and deck layout, including architectural design features, Garver will begin Schematic Design under our Basic Services agreement. The City understands that the opinions of probable construction costs developed by the Engineer during the Programming Phase and the Basic Services Phase do not establish a limit for the construction contract amount. If the actual amount of the low construction bid exceeds the construction budget established by the City, the Engineer will not be required to re -design the project without additional compensation, unless the Engineer has not designed the project in accordance with written direction from the City. The Engineer will bill the Owner on the basis of actual salary costs for work time directly connected with work chargeable to this phase of the project, plus payroll additives and general overhead costs of 160% of direct labor costs, plus direct reimbursable expenses associated with this phase of the project, plus a percentage of a fixed fee, with a total "not to exceed" fee of $25,000 for the Programming Phase. A spreadsheet is attached that identifies the details of this proposed fee. Also, since the E J Ball lot is approximately one-third larger than the originally proposed lot, we are requesting an increase in our lump sum surveying fee from $10,000 to $11,750, an increase of $1,750. We are also requesting a written Notice to Proceed for surveying and geotechnical work for the E.J. Ball Lot. Allowing us to begin these services will aid in the development of the Programming Phase and will expedite the design process. If this proposal is acceptable to you, please sign the three copies and return one copy to me. As always, we appreciate the opportunity to provide professional services to the City of Fayetteville and look forward to successful completion of this project. Please call me with any questions or comments. Thank you. Respectfully, GARVER 1 ENGINEERS Approved by: Brock Hoskins, P E Vice President / Project Manager Date: cc: John Maguire Attachment INN 11 3 z . . 1113 0 . ii 3 k 0 e a t A 1• 0 i 2 3 t o 0 0 e - m 0 0 1 0 0 HI i a e 0 11 Z Z e 0 il S 0 es 0 a . . 11/5 z . 0 I a i . . Illak 0 0 ifa t 22 22 2 lit a k 0 e E -III In I/ 1 - 1-815 111 a 1 A 1 i a 1 1 • • 4 City of Fayetteville V To: Fayetteville City Council From: Don Bunn, Assistant Public Works Director Thru• Mayor Dan Coody Subject: Engineering Contract Amendment Fayetteville Municipal Parking Deck Garver Engineers Date: March 14, 2001 MEMORANDUM Attached for your review and approval is a contract amendment relating to engineering services for the planning and construction of a municipal parking deck. The purpose of the amendment is intended to add Programming Phases I and II to the Parking Deck Contract dated 21 November, 2000. Those Phases involve the presentation of 3 parking deck layouts on the E." Ball parking lot site and a presentation of the layouts to city staff and the public. Also included is a final presentation to city staff of the selected alternative. The cost of this work is a not -to -exceed amount of $25,000.00. Also included in the Amendment is an increase in the lump sum surveying fee of $1,750.00, from $10,000.00 to $11,750.00. This is because the E.J. Ball lot is some 1/3 larger than the originally proposed lot. This Amendment will add a total of $26,750.00 to the original contract. It is the recommendation of the Staffthat the Council approve the amendment. AGENDA REQUEST FORM Council Meeting of April 3, 2001 FROM Don Bunn Name Mayor's Approval Public Works Admin Division Public Works Department ACTION REQUIRED: Approval of Contract Amendment No. 1 with Garver Engineers in connection with the design of the Parking Deck on the E.J. Ball lot. Amendment amount: $26,750.00. COST TO CITY $ 26,750.00 Cost of this Request 4470 9470 5314 02 Account Number 00064-1 Project Number BUDGET/CONTRACT REVIEW j!_cto Budget,7anager lettifu Acc t ng Ma.:ger Atto- Purchasing Officer $ 280,609 Category/Project Budget 244,008 Funds Used to Date $ 36,601 Funds Remaining X Budgeted Item 3-22-200) Date triefiaL 3/Z3/61 Date 31.9,661 Date Multi -Level Prk Deck Category/Project Name Other Improvements Program Name Sales Tax, Capital Fund Category Budget Ad]. Attached Admin Services Director Date ADA Coordinator &At Date SYIAL 3172.1n Date Internalfjtuditor STAFF RECOMMENDATION: Staff recommends approval of Contract Amendment No. 1 with Garver Engineers in the amount $26,750.00. ss Public Works Director Date 15/2 -6(1i -V Date Cross Reference New Item: Yes No Prev Ord/Res # 158 00 Orig. Contract # 786 Orig. Contract Date 21 Nov, 00 COMMENT SHEET Project: Parking Deck Engineenng Contract Amendment Engineer/Contractor: Garver Engineers Notes to Reviewers: This item is to go to the Council at the Council Agenda Meeting of March 27 and to the Council Meeting on April 3, 2001. • • AGENDA REQUEST FORM Council Meeting of April 3, 2001 Mayor's Approval FROM Don Bunn Public Works Admin Public Works Name Division Department ACTION REQUIRED: Approval of Contract Amendment No. 1 with Garver Engineers in connection with the design of the Parking Deck on the E.J. Ball lot. Amendment amount: $26,750.00. COST TO CITY $ 26,750.00 Cost of this Request 4470 9470 5314 02 Account Number 00064-1 Project Number BUDGET/CONTRACT REVIEW Budget Manager Accounting Manager City Attorney Purchasing Officer $ 280,609 Category/Project Budget 244,008 Funds Used to Date $ 36,601 Funds Remaining X Budgeted Item Date Multi -Level Prk Deck Category/Project Name Other Improvements Program Name Sales Tax, Capital Fund Category Budget Ad]. Attached Admin Services Director Date Date ADA Coordinator Date Internal Auditor Date Date Date STAFF RECOMMENDATION: Staff recommends approval of Contract Amendment No. 1 with Garver Engineers in the amount $26,750.00. dfor ss Public Works Director Department Director Admin Services Director Mayor 4 Mar, 2000 Date Date Date Date Cross Reference New Item: Yes No Prev Ord/Res # 158 00 Orig. Contract # 786 Orig. Contract Date 21 Nov, 00 • i COMMENT SHEET Pro'ect• Parking Deck Engineering Contract Amendment Engineer/Contractor: Garver Engineers Notes to Reviewers: This item is to go to the Council at the Council Agenda Meeting of March 27 and to the Council Meeting on April 3, 2001. FAYETTEVII1LE THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE • To: Don Bunn, Public Works From: Heather Woodruff, City Clerk Date: April 9, 2001 Attached is a copy of the resolution approving the amendment to the contract with Garver Engineers for the proposed parking deck down town. I am also returning one original to you. The original will be microfilmed and filed with the City Clerk. cc: Nancy Smith, Internal Audit