HomeMy WebLinkAbout176-01 RESOLUTIONRESOLUTION NO.176-01 • A RESOLUTION APPROVING CHANGE ORDER #1 TO THE CONSTRUCTION CONTRACT WITH HARRISON DAVIS CONSTRUCTION COMPANY IN THE AMOUNT OF ONE HUNDRED THOUSAND ONE HUNDRED NINETY-TWO DOLLARS ($100,192.00) FOR THE PURCHASE AND INSTALLATION OF KITCHEN EQUIPMENT FOR THE FAYETTEVILLE SENIOR CENTER AT WAXHAWS; AND APPROVING A BUDGET ADJUSTMENT IN THE AMOUNT OF ONE HUNDRED THOUSAND ONE HUNDRED NINETY-TWO DOLLARS ($100,192.00) FOR SAME. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council hereby approves Change Order #1 to the construction contract with Harrison Davis Construction Company in the amount of One Hundred Thousand One Hundred Ninety -Two Dollars ($100,192.00) for the purchase and installation of kitchen equipment for the Fayetteville Senior Center at Waxhaws. Section 2. That the City Council hereby approves a Budget Adjustment in the amount of One Hundred Thousand One Hundred Ninety -Two Dollars ($100,192.00) for same. PASSED and APPROVED this 18th day of December, 2001. APPROVED: By: ATTEST: By HEATHER OODRUFF, Ci Clerk DAN COODY, Mayo NAME OF FILE - CROSS REFERENCE: Resolution No. 176-01 12/18/01 Resolution No. 176-01 12/07/01 Change Order No. 1 (Fayetteville Community Center)(Contractor, Harrison Davis Construction Co., Inc.) 12/11/01 Copy of the Budget Adjustment Form 12/28/01 Copy of letter to Daryl S. Rantis, Archtects, P.A., from Ben E. Smith, Project Manager, Harrison Davis Construction, regarding C.O. #1 12/28/01 Fax to City Clerk's Office from Harrison Davis Construction by Ben Smith 12/11/01 Memo to Mayor Coody & City Council from Hugh Earnest regarding Senior Citizen Center 12/07/01 Copy of letter to Mayor Coody from Rodney Ryan, President, Council on Aging, Inc. 12/06/01 Memo Dec. 5, 2001 Meeting Attendees, from Hugh Earnest, Urban Dev. Director, regarding 12/05 meeting on Senior Citizen Center 11/27/01 Copy of Bid Information from Daryl S. Rantis, Archtects, P.A. 01/16/01 Copy of Resolution No. 4-01 12/18/01 Staff Review Form 12/20/01 Memo to Hugh Earnest, Urban Development Director, from Heather Woodruff, City Clerk NOTES: • •' Change order: #1 Date: 12/07/2001 Request made by: Owner xxx Architect xxx Contractor: xxx Field: Other: WTI 3. NNW AIRCHITECTJ, �.�. 380 West Rock Street Fayetteville, AR 72701 (501) 443-9112 Project: Fayetteville Community / Senior Center 901 South College Ave. Fayetteville, Arkansas 72701 (Name, Address) Owner: Contract for: Fayetteville Community/ Senior Center City of Fayetteville Contract Dated:1/04/2001 To Contractor: Harrison Davis Construction CO. Inc. You are directed to make the following Changes to the original contract: ORIGINAL 1.Furnish and install all kitchen equipment as defined by Kitchen bid package dated. 11/27/01 Add. $72,400.00 2. Item #33: Furnish and install 10" x 72" Grated trench drain Completed in place & plumbed to Grease trap (By Fayetteville Mechanical contractor) Add $2,170.00 3. Item # 17 &34: Furnish and install Custom Steam Hood completed, and custom Exhaust Hood complete by Greenheck & Fayetteville Mechanical contractor Add $25,622.00 4. Furnish and install Furred down ceiling in back of the kitchen to 8'-6" from finished floor high in the part of kitchen defined by grid 29-36 east west and grid C1/B1- Al north south Add $000.00 This change order not valid until signed by the owner, The architect and the Signature of the Contractor indicates agreement herewith, including any adjustments in the contract sum or contract time. • The original Contract Price was $1,982,600.00 Net change by previous authorized change orders $000.00 The Contracted Price prior to this Change Order was 1,982,600.00 The Contracted Price will increase by this Change order $100,192.00 The new Contracted Price including this Change Order will be $2,082,792.00 The contract time will be changed by 14 calendar days The date of substantial completion as of the date of this change order therefore is: February 28, 2002 Approved Daryl S. Rantis ARCHITECT 380 W Rock ST. Faye eyille, AR 72701 A9DIYESS / 2.21.O( DATE Agreed To: Harrison Davis CONTRACTOR 1931-A West Dean Street Fayetteville, Arkansas 72703 Authorized: Mayor Dan Coody OWNER City of Fayetteville 113 West Mountain Fayetteville, Arkansas 72701 • City of Fayetteville, Arkansas Budget Adjustment Form .j Res. 176-01 Budget Year 2001 Department: Division: Program: Sales Capital Improvement Walker Park Senior Center Date Requested 12/11/2001 Adjustment 11 COPY, Project or Item Requested: Additional funding is requested for the construction contract for the Walker Park Senior Center. The additional funding requested is $100,192. Project or Item Deleted: None. The Council on Aging is providing the funds for the budget adjustment. Justification of this Increase: The funding is requested to fully fund a change order to the construction contract. Justification of this Decrease: The Council on Aging has been for construction cost of this is utilizing a portion of the with this adjustment. fund raising project and funds raised Increase Expen e (Decrease Revenue) Account Name Amount Building Cost 100,192 Account Number 4470 9470 5804 00 Decrease Expense (Increase Revenue) Account Name Amount Payments by Property Owners 100,192 Account Number 4470 0947 4420 00 Project Number 96092 1 Project Number Approval Signatures Requeste By Budget Mabager Date 11 -(1-o 1 Date Dep rector Date Mayor - 'Date Blue Copy: Budget & Research / Yellow Copy: Requester Budget Office Use Only Type: A B C Date of Approval Posted to General Ledger Posted to Project Accounting Entered in Category Log E H: tBUDGE71PROJECTSIBUD_ADJIBA_20011SENRCTR2.WK4 Dec 28 01 11:36a December 28, 2001 HARRISON DAVIS • s HDC 501-443-0136 p.2 • 1 01•1012SON OASIS CONSTRUCTION CO., INC. Licensed General Contractor DARYL S. RANTIS, ARCHITECTS, P.A. 380 West Rock Street Fayetteville, Arkansas 72701 RE: FAYETTEVILLE SENIOR CENTER AT WARHAWS CITY OF FAYETTEVILLE HDC PROJECT NO. 1035 SUBJECT: CHANGE ORDER NO. 1 Daryl, We are awaiting 12-07-01, with all three sets will be of Contract. Sincerely, a minimum of four sets of Change Order No. original execution of signatures. Mr. Davis returned to your office for distribution to EN E. SMITH, PROJECT MGR. CC: VIA FAX TO ADDRESSEE 1, approved will sign and the parties CC: FAYETTEVILLE CITY CLERK OFFICE, ATTN: Joan Blackard, VIA FAX 718-7695 BES/dlr 1931-A Deane Street, Fayetteville, AR 72703 • (501) 443-0996,n FAX: 443-0136 Dec 28 01 11:36a HARRISON DAVIS P A X 501-443-0136 p.1 • • TRANSMITTAL A 11.74 1I ARRISON DAVIS CONSTRUCTION CO., INC.( F A X TRANSMITTAL Licensed General Contractor COVER PAGE DATE: December 28, 2001 PLEASE DELIVER THE FOLLOWING PAGES TO: NAME: FAYETTEVILLE CITY CLERKS OFFICE FAX NO. 718-7695 LOCATION/DEPT. ATTN:Joan Blackard PROJECT/REFERENCE FAYETTEVILLE SENIOR CENTER @ WAXHAWS - CHANGE ORDER //1 TOTAL NUMBER OF PAGES (INCLUDING COVER PAGE) 2 • t(If not all transmittal pages are received, please call.) FROM HARRISON DAVIS CONSTRUCTION CO... INC. By Ben Smith ANY QUESTIONS. PLEASE CALL MESSAGE: BEN E. SMITIH,_PROJECT MGR. PHONE # (501) 443-0996 FAX t (501) 443-0136 ()HARD COPY(S) BY FCM TO FOLLOW CONFIDENTIALITY ALERT: This FAX contains confidential/privi- leged information belonging to the sender. Please deliver to the person or entity designated above. This alert warns unin- tended recepients that distribution4 disclosure, copying or use of the information contained in this document without approval of the sender or designated recipient is unauthorized and strictly prohibited. IF YOU HAVE RECEIVED THIS FAX IN ERROR, PLEASE IMMEDIATELY NOTIFY THE SENDER BY TELEPHONE. 1931-A Deane Street, Fayetteville, AR 72703 • (501) 443-0996, . ' 2, FAX: 443-0136 F F c 111 HARRISON DAVIS CONST. CIINC. Arkansas Licensed General Contra 1931-A Deane Street Fayetteville, AR 72703 443-0996 FAX: 443-0136 TO CITY OF FAYETTEVILLE 4iTtfr L fl '_ ©w ZARM 104TAd \OB 113 West Mountain Fayetteville, AR 72701 OAT( 1-03-02 ,ce mac. HDC 1035 Ian Joan Blackhard R[: FAYETTEVILLE NO. DESCRIPTION SENIOR CENTER AT WAXHAWS CITY OF FAYETTEVILLE WE ARE SENDING YOU I:2C Attached 0 Under separate cover via HAND CARRIED BY the following items: Ben Smith 0 Plans 0 Samples ❑ Shop drawings ❑ Copy of letter 0 Prints 0 Specifications ® Change order #1 0 THESE ARE TRANSMITTED ❑ For approval IC3 For your use REMARKS as checked below: ❑ Approved as submitted ❑ Approved as noted ❑ Resubmit copies for approval ❑ Submit copies for distribution 10 As requested 0 Returned for corrections 0 Return corrected prints ❑ For review and comment 0 ❑ FOR BIDS DUE 19 0 PRINTS RETURNED AFTER LOAN TO US Please distribute accordingly. Thank you COPY TO HDC 1035 C/O - CONTRACT FILE(S) SIGNED: BEN E. SMITH, PROJECT MGR. If encfe,ure, oe not •s noted. kindly notify us at once. COQI ES DATE NO. DESCRIPTION 3 SETS CHANGE ORDER #1 FULLY EXECUTED THESE ARE TRANSMITTED ❑ For approval IC3 For your use REMARKS as checked below: ❑ Approved as submitted ❑ Approved as noted ❑ Resubmit copies for approval ❑ Submit copies for distribution 10 As requested 0 Returned for corrections 0 Return corrected prints ❑ For review and comment 0 ❑ FOR BIDS DUE 19 0 PRINTS RETURNED AFTER LOAN TO US Please distribute accordingly. Thank you COPY TO HDC 1035 C/O - CONTRACT FILE(S) SIGNED: BEN E. SMITH, PROJECT MGR. If encfe,ure, oe not •s noted. kindly notify us at once. • FAYETTEVILLE • THE CITY OF FAYETTEVILLE, ARKANSAS Date: 12-11-01 To: The Mayor and Council From Hugh Earnest It. Subject: Senior Citizen Center Background The council is certainly aware that after several years of effort, a contract for construction of a Senior citizen Center was authorized by Resolution # 4-01 in January of this year. The contract was awarded to Harrison Davis Construction Company in the amount of $1,982,600 with no contingency built into the contract. It was understood by representatives from the Council on Aging that all change orders for work and material left out of the base contract would be their responsibility. It should also be noted that the financing for this project has drawn money from a temporary property tax millage that was collected for a year. In addition, the Community Development Department and the Parks Development fund have also contributed significant amounts toward this effort. Current Situation Over the past several weeks, there has been a great deal of concern over the pace of the construction since the issuance of the notice to proceed in February. Last Wednesday, representatives from all parties met at city hall for the specific purpose of clarifying roles and responsibilities among the parties. The meeting was very successful in achieving that objective. As was noted in the memo that the council received, there are more than a few issues, which remain to be resolved. However, assurances were received that the contract will be completed within the original budget and that the contractor of record wants to fulfill his obligation. The particular issue before the council at this time is a resolution to approve a change order in the amount of $100,192 for the installation of kitchen equipment that was not included in the base contract. Our position on this expenditure was clear. We have no authorization to expend any monies over the base contract and all expenditures over that 113 WEST MOUNTAIN 72701 501 521-7700 FAX 501 575-8257 • • amount will be the responsibility of the Council on Aging. The Council understands this position and has agreed in writing to pay for this equipment. Recommendation The Council on Aging has approved the kitchen equipment purchase on the recommendation of their architect and has committed in writing to pay for said equipment. From the city perspective, we will be closely monitoring this project and will be working with all parties over the next several weeks to develop a process to handle what all parties acknowledge will be inevitable. That inevitability is a number of change orders to this project during construction. We recommend that this change order be approved. COUNCIL ON AGING, inc. • Community Adult Center Adult Day Services Elderly Services & Nutrition Program (501) 582-1604 December 7, 2001 Mayor Dan Coody City of Fayetteville 113 W. Mountain St. Fayetteville, AR 72701 Dear Mayor Coody: REOF DEC 1 7 2001 CITY OF FAN L MANOR'S O[i-i During the past few months, the Council on Aging has discussed adding kitchen equipment to the new Fayetteville Senior Center. At this time, we are ready to bring this request to the City Council for approval. The new equipment and changes to the original design will cost $100,192.00 (see attached change request for detail). The Council on Aging will provide the funding for the kitchen design change and equipment. If you need any additional information, please feel free to contact me at 582-1604. I look forward to the completion of the new center and hope that we can continue to work together for Fayetteville's senior citizens. Sincerely, Rodney President For the Senior at the Center of Your World FAX (501) 521-5047 • 901 S. College Ave. Fayetteville, AR. 72701 COUNCIL ON AGING Inc. • • Community Adult Center Adult Day Services Elderly Services & Nutrition Program (501) 582-1604 December 7, 2001 Mayor Dan Coody City of Fayetteville 113 W. Mountain St. Fayetteville, AR 72701 Dear Mayor Coody: During the past few months, the Council on Aging has discussed adding kitchen equipment to the new Fayetteville Senior Center. At this time, we are ready to bring this request to the City Council for approval. The new equipment and changes to the original design will cost $100,192.00 (see attached change request for detail). The Council on Aging will provide the fundmg for the kitchen design change. If you need any additional information, please feel free to contact me at 582-1604. I look forward to the completion of the new center and hope that we can continue to work together for Fayetteville's senior citizens. Sincerely, Rodney an President For the Senior at the Center of Your World FAX (501) 521-5047 • 901 S. College Ave. Fayetteville, AR 72701 FAYETTEVILLE • THE CITY OF FAYETTEVILLE, ARKANSAS Date: December 6, 2001 To: December 5, 2001 Meeting Attendees: Minor Wallace, Bert Rakes - City of Fayetteville Mark Sugg, Daryl Rantis - Daryl S. Rantis Architects Ben Smith, Harrison Davis - Harrison Davis Construction Janet Linebaugh, Michael Cosgrove, Rodney Ryan, Andy Lucas, Cindy Webb - Council on Aging From: Subject: Hugh Earnest Urban Development Director December 5th meeting on Senior Citizen Center I offered to reduce to writing the extensive and productive meeting held on Wednesday to discuss the status of the construction of a Senior Citizens Center for the Council on Aging. The following list is presented as bullet points to insure clarity and brevity. As we agreed, all attendees will be responsible for reviewing these to insure that there is agreement on what was discussed and agreed upon. The list is presented in no particular order. • Hugh Earnest will be the principal contact for the City and will act as Project Manager. Minor Wallace will be the City representative on a day-to-day basis. • Hugh Earnest will be the authorized spokesperson for the City. All comments on this project from City staff will be his responsibility. • The Council on Aging will be responsible for designating a spokesperson • Harrsion Davis Construction Company committed to completion of the project. • The City commitment to this project is capped at $1,982,600. That amount is the contract between the City and Davis Construction. There is no contingency in the contract. • It was agreed that all change orders to the contract would be the fiscal responsibility of the Council on Aging. 113 WEST MOUNTAIN 72701 501 521-7700 FAX 501 575-8257 n E h • • December 5th meeting on Senior Citizen Center Page 2 • The City will process no change orders without a commitment of funds from the Council. City and Council representatives will determine the issue of what constitutes an acceptable commitment by December 14th, 2001. • There will be at a minimum bi-weekly meeting between the parties to ensure that acceptable progress is being made. • The architect agreed to fax meeting dates and an agenda to all parties as part of the preparation for the bi-weekly meetings. • Harrison Davis Construction will provide, at a minimum, a monthly progress report that summarizes their progress against the project time line. • The City will not process any change order that has not been approved by the representative from the Council on Aging. • The issue of additional days and the imposition of liquidated damages were not discussed. It will be dealt with over the next several months. CC. Mayor Dan Coody Ted Webber Steve Davis From: Dvyl S. Rends Daryl S. Renis Architects PA. Fax: S01.143 Moo: 501.43-9112 To: Ben Smith Daryl S. Rantis Architects, P.A. 380 West Rock Street Fayetteville, AR 72701 (501) 443-9112 November 27, 2001 Harrison Davis Construction Co., Inc. 1931-A Deane Street Fayetteville, Ar 72703 Attn: Ben Smith • Pepe 1 of 7 Thursday. November 29, 2001 2:13:15 AM BIDS MUST BE DELIVERED TO THE OFFICE OF DARYL S. RANTIS, ARCHITECT NO LATER THAN NOVEMBER 30, 2001 3:00 PM Note To Bidder: All equipment is to be hid as specified by make and model. If no cut sheet information is included in this package, provide Architect with appropriate information prior to bid. Equipment contractor to provide detail drawine of fuel/electric connections for specified equipment. Bid must include installation and connections for all equipment including those provided by the owner or others. The following is the equipment list for the Senior Center kitchen. The items and model numbers correspond to the cut sheets attached. All motors and equipment are to be 208 Volt - 3-phase unless otherwise noted or are not available in this configuration. #1 Deleted 2 Traulsen Model #GIP1010 Express Pass-Thru Refrigerator/ Self -Contained. Single section full hinged glass door. See drawing for door hinge position. 3 Traulsen Model #RHF132WP Pass -Thin Heated Cabinet/ Self -Contained. Full length door. See drawing for door hinge position. Include glass door and fluorescent lights options 4 Advance Tabco Stainless Steel Hand Sink Model 47 -PS -60. • Include mechanical equipment- (K-59, K-6, K-26, 7 -PS -14 P -Trap). 5 Deleted 6 Deleted 7 Deleted 8 Deleted 9 Three compartment stainless steel sink w/ side dram boards. Custom built. See drawing for layout 10 Clean dish stainless steel table ( 30" wide). Custom built. See drawing for layout, 11 Hobart Model #AM -14 Dishwasher. Electric heat with electric booster heater option. c h From: Daryl 3. Randa Daryl S. Rantla Archttacb P.A. Fax: 501443de olce: 501{439112 To: Ban Smith • Papa 2 of 7 Thursday. Novambar 29.2001 2:14:43 AM ease- 3 err. 3 The following is the equipment list for the Senior Center kitchen. The items and model numbers correspond to the cut sheets attached. All motors and equipment are to be 208 Volt - 3-phase unless otherwise noted or are not available in this configuration. 12 Stainless steel table w/ sink (30" wide). Custom built. See drawing for layout. Include T & S Food Service Model #B-0133 Pre -Rinse Unit 13 Salvajor Model #300 Food Waste Disposer 3HP - 3 Phase. Include. WR/WJ manual reversing switch. Include 15" cone assembly. 14 Dish separation table and garbage canister. See drawing #20 sheet Cl. Included in G.C. Primary Contract. Clean dish storage cabinet. Advance Tabco S.S. Work Table Model #CK -SS -245. Steam Line w/5 hot wells and 2 cold wells (12 feet long). Include sneeze guard with 24" pass-thru and tray slide. See drawing for layout Electric units and wet service plumbing. --� 17 Stearn hood over dishwasher. Provide under separate contract. 18 Soda and ice dispenser unit with water supply for drinking Owner to supply unit. 19 First aid kit- provide framing backing for wall mounted unit. Owner to supply unit. 20 Condiment table. Provide receptacles for electric appliances. Verify Design with Architect. Included in G.C. Primary Contract. 21 Manitowoc Model # QD-0453W water condenser ice machine. Manitowoc Model # S-400 ice storage bin. 22 Levelmatic Model #TFT -1418 self -leveling tray dispenser. Include one 6 hole silverware holder. 23 Stainless steel work table with heavy duty locking casters. Custom built (7'-6" long x 30" wide x 30" high including casters). 24 Soiled dish pass through. Provide stainless steel sill. 25 Large capacity microwave ovens (2 units). 26 Coffee & tea urns. Owner to supply units.. 27 Pick-up Room Shelving- Open wire metal adjustable shelves 63" tall with 3 shelves. 2- 24" wide x 60t' long units, I- 24" wide x 66" long unit, I- 24" wide x 54" long unit 28 Milk cooler. Owner to supply unit. 29 Salvajor Model #200 Food Waste Disposer 2HP - 3 Phase. Include WJ manual reversing switch with sink assembly (6'h" sink collar). 30 Green Model #FPC/1-4 electric heated tilting braising pan (40 gallon). Include fill faucet with swing spout and 2" tangent drawoff options. 31 Wolf Pacific Series 36" Single Oven Gas Range. Six burner top. 32 Stacked (2 unit) Blodgett-Zephire-G convection ovens. Gas fired. r, ' 33 10" x 72" (approx.) Grated drainage trench to grease trap. Provide under separate contract. - * 34 Approved vented hood ( must meet all state & local health and fire codes) . Provide under separate contract. 35 Custom walk-in cooler/freezer combination. See drawing for layout Freezer - 1- 15" wide x 54" long x 63" tall unit. Open wire adjustable metal 3 shelf unit. Cooler- Open wire adjustable epoxy/poly coated metal 3 shelf units, 1 - 15" wide x 54" long x 63" tall unit, 1 - 24" wide x 54" long x 63" tall unit . 36 Convection oven- (provided by owner- 220V Duke 'E' Series Model #E101 -E) • RESOLUTION NO. 4-01 --- C ,I . MICROFILMED A RESOLUTION AWARDING BID NO. 00-79IN THE AMOUNT OF $1,982,600 TO HARRISON DAVIS CONSTRUCTION CO. OF FAYETTEVILLE FOR THE CONSTRUCTION OF THE FAYETTEVILLE SENIOR CENTER; AND APPROVAL OF A BUDGET ADJUSTMENT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS* Section 1. That the City Council hereby awards Bid No. 00-79 in the amount of $1,982,600 to Harrison Davis Construction Co. of Fayetteville for the construction of the Fayetteville Senior Center; and authorizes the Mayor and City Clerk to execute an agreement for said amount. A copy of the agreement is attached hereto marked Exhibit "A" and made a part hereof. Section 2. The City Council hereby approves a budget adjustment in the amount of $78,083 increasing Building Cost, Acct. No. 4470 9470 5804 00, Project 96092 1 by decreasing Payments by Property Owners, Acct. No. 4470 0947 4420 00. A copy of the budget adjustment is attached hereto marked Exhibit "B" and made a part hereof. PASSED AND APPROVED this 161b day of January , 2001. s'At, .r .. APPROVED: By:C'dde3 By: ef�/ U6'��a'` C�'•� eather Woodruff, City k Charles D. Coody, Mayor, c F 0 • X Agenda Request ▪ Contract Review ▪ Grant Review • STAFF REVIEW FORM For the Fayetteville City Council meeting of December 18, 2001 • FROM: Hugh Earnest Name Division Urban Development Department ACTION REQUIRED: Approve a Resolution au horizing a change order for actiyitjes associated with construction of the Senior Citizen Center. Appin.oua-Q $ et_ b" oil os-6M,e.4- c5 0 COST TO CITY: too, 2. - cesr $ Q"o. i ge.V<nlue Cost of this Request 44410-94410-sB0¢-oo Account Number Project Number $ tIcinicom Category/Project Budget $ 1, 981, -1 oc) Funds Used to Date $ 519 -fro Remaining Balance Category/Project Name Program Name Sales 1-4,X, C.4P Fund BUDGET REVIEW Budget Manager Budgeted Item )( Budget Adjustment Attached Administrative Services Director CONTRACT/GRANT/LEASE REVIEW: Accounting Manager Date 244ttomey''(�/� - - W -amu 1all1I01 Purchasing Officer Date GRANTING AGENCY: ADA Coordinator Internal . ditor Date bablot Date STAFF RECOMMENDATION: Approval of the Resolution and Budget Adjustment Division Head Date Cross Reference .1 A Ai.v... l ` -‘)J Depjj t r, 'recto Date New Item: Yes No . . . I i � x.7101 strative Servjces Direc.;or ate Prev Ord/Res #: 4(1/A de (y Mappo.QA l&Dl oQG4e r t,9 g era Co -A— w` Orig Contract Date: s F Page 2 • • STAFF REVIEW FORM Description Meeting Date Comments: Reference Comments: Budget Coordinator Accounting Manager City Attorney Purchasing Officer ADA Coordinator Internal Auditor • STAFF REVIEW FORM • X Agenda Request _ Contract Review Grant Review For the Fayetteville City Council meeting of December 18, 2001 FROM: Hugh Earnest Urban Development Name Division Department ACTION REQUIRED: Approve a Resolution authorizing a change order for activities associated with construction of the Senior Citizen Center. COST TO CITY: Cost of this Request Account Number Project Number Category/Project Budget Category/Project Name Funds Used to Date Program Name Remaining Balance Fund BUDGET REVIEW: Budgeted Item Budget Adjustment Attached Budget Manager Administrative Services Director CONTRACT/GRANT/LEASE REVIEW: GRANTING AGENCY: Accounting Manager Date ADA Coordinator Date City Attorney Date Internal Auditor Date Purchasing Officer Date STAFF RECOMMENDATION: Approval of the Resolution and Budget Adjustment Date Cross Reference Date New Item: Yes No Date Prev Ord/Res #: Date Orig Contract Date: Division Head Depa ent Director Administrative Services Director Mayor