HomeMy WebLinkAbout154-01 RESOLUTIONRESOLUTION NO, 154-01
1
A RESOLUTION APPROVING A COST -SHARE WITH ST.
JOSEPH'S CATHOLIC CHURCH IN AN AMOUNT NOT TO
EXCEED SIXTY ONE THOUSAND TWO HUNDRED DOLLARS
($61,200.00) FOR THE PURPOSE OF WIDENING THE WEST SIDE
OF STARR DRIVE AND MAKING THE ASSOCIATED
DRAINAGE IMPROVEMENTS.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council hereby approves a cost -share with St.
Joseph's Catholic Church in an amount not to exceed Sixty One Thousand Two
Hundred Dollars ($61,200.00) for the purpose of widening the west side of Starr
Drive and making the associated drainage improvements.
PASSED and APPROVED this 20th day of November, 2001.
APPROVED:
By:
TH ' W • ODRUFF, 'fty Clerk
DAN COODY, May,
NAME OF FILE:
CROSS REFERENCE:
Resolution No. 154-01
r
11/20/01
Resolution No. 154-01
Agreement with St. Joseph's Catholic Church
11/27/01
Departmental Correspondence to Mayor Coody & Greg Boettcher,
Public Works Director, from Kit Williams, City Attorney, regarding
Starr Drive Cost -Share
11/26/01
Departmental Correspondence to Greg Boettcher, Public Works Director,
from Ron Petrie, Staff Engineer, regarding Starr Drive Improvements
Cost -Share Signed Agreements
11/01/01
Engineering Division Correspondence to Mayor Coody, thru Greg
Boettcher, PW Director, Jim Beavers, City Engineer, from Ron Petrie,
Staff Engineer, regarding Proposed Cost -Share with St. Joseph's
Catholic Church for the widening of Starr Drive to Local Street
Standards, plus enclosures
11/20/01
Staff Review Form
11/27/01
Memo to Ron Petrie, Engineering Division, from Heather Woodruff,
City Clerk
NOTES:
ORIGINAL •
AGREEMENT
Res. I54 -or
This shall serve as a formal agreement between the St. Joseph Catholic Church and the City of
Fayetteville in order for the City of Fayetteville to participate in a cost share to widen and
improve Starr Drive to Local Street Standards.
The City agrees to pay the actual documented construction costs and Engineering Costs for the
afore mentioned construction up to a maximum City cost of $61,200.00 as was bid by Nabholz
Construction Corporation. St. Joseph Catholic Church agrees to provide the necessary and
normal project management, inspection and testing as necessary for a complete and accepted
street widening and appurtenances.
It is understood that the contract for construction is between the St. Joseph Catholic Church and
their Contractor & Engineer and that the City has no contractual obligation with either the
Contractor and Engineer. The City's only obligation shall be to participate in a cost share not -to -
exceed amount of $61,200.00 maximum cost to the City.
If the future and actual construction prices exceed the estimate furnished by your Engineer, then
the cost -share agreement shall be required to be reevaluated and re -approved by the Mayor and/or
City Council as appropriate prior to construction
•
It is further understood that upon acceptance of the w' m rm sinra e t s
p p er�ct�igron,�t. �'oseph Catholic
Church will provide, to the City, a copy of the invoice(s) from the Contractor and a completed
lien waiver executed by the Contractor. The City will strive to make payment to St. Joseph
Catholic Church within thirty (30) days after receipt of the invoice(s) but cannot guarantee the
thirty day schedule.
Please note that this is a request for approval of a cost share only. The Mayor and/or City
Council will not consider the proposed cost share for approval without a formal agreement
signed in advance by an authorized representative of your organization. Please do not proceed
with the proposed construction unless/until the proposed cost share is approved by the Mayor
and/or City Council and the signed agreement furnished to you.
If you agree with these provisions, please sign the three original agreements in the space provided
and return to the City or your Engineer. Should you need any additional information please call
Ron Petrie at (501) 575-8206.
Approved City of Fa fi Ile
Dan Coody, Mayor
/// /o(
3; �. Ua
St. Joseph Catholic Church
Representative
Date Date
A
FAYETTEV?LLE
THE CITY OF FAYETTEVILLE, ARKANSAS
KIT WILLIAMS, CITY ATTORNEY
DAVID WHITAKER, ASST. CITY ATTORNEY
DEPARTMENTAL CORRESPONDENCE
s
LEGAL DEPARTMENT
TO: Dan Coody, Mayor
Greg Boettcher, Public Works Director
FROM: Kit Williams, City Attorney
DATE. November 27, 2001
RE: Starr Drive Cost -Share
Both the Mayor and the representative of St. Joseph Catholic
Church should initial the correction in the agreement.
The Mayor can sign this contract since it appears to comply with
an approved Resolution passed by the City Council at the last meeting.
Me
Gr
II
FAYE Ti°T E LL
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENTAL CORRESPONDENCE
RECF VE®
NUV 2001
TO: Greg Boettcher, Public Works Director
FROM: Ron Petrie, Staff Engineer air
DATE: November 26, 2001
RE• Stan Drive Improvements Cost -Share
Signed Agreements
Attached are two (2) copies of the signed agreements with the St. Joseph Catholic Church in order for
the City to cost -share to improve Starr Drive. If everything is to your satisfaction, please forward these
to the Mayor for his signature.
• •
FAYETTEVILLE
THE CITY OF FAYETTEVILLE, ARKANSAS
ENGINEERING DIVISION CORRESPONDENCE
TO:
THRU:
FROM:
DATE:
SUBJECT:
113 W. Mountain St.
Fayetteville, AR 72701
Telephone: 501-575-8264
Dan Coody, Mayor
Greg Boettcher, Public Works Director
Jim Beavers, City Engineer
Ron Petrie, Staff Engineer 107
November 1, 2001
Proposed Cost -Share in the amount of $61,200.00 with St. Joseph Catholic
Church for the widening of Starr Drive to Local Street Standards.
The St. Joseph Catholic Church was approved at the September 11, 2000 Planning Commission
Meeting to be located on Starr Drive to the south of Cherokee Drive. The Planning Commission
required the following offsite improvements to Starr Drive be made as part of the development
approval:
1. Adjacent to the site, the east side of Starr Drive will be widened to 14' with curb &
gutter including the removal and replacement of the existing subgrade.
2. To the north of the site in the County, the street will be overlayed and widened to
County Standards.
3. Purchase or obtain sufficient right-of-way for the above improvements.
The only portion of Starr Drive that will not be improved is the west side of the street opposite of
the proposed site. Although this portion of the street was previously a chip & seal County Road,
it is now located entirely within the City Limits. At this time, the street and the street subgrade is
deteriorating at a rapid pace.
Therefore, upon the recommendation of the Engineering Division, the City is requested to cost -
share with St. Joseph Catholic Church to widen the west side of the street in addition to the east
side. These improvements will require the removal & replacement of approximately 450 L.F. of
road surface & streetrenbgrade, install curb & gutter, and install underground storm pipes to
replace the open ditch.
Construction Costs to widen the west side of Starr Drive to Local Street Standards have been
received from St. Joseph Catholic Church's Engineer. The following are actual contract bid
prices for these improvements:
•
•
Mayor Dan Coody Page Two (2)
November 1, 2001
Street Paving & Miscellaneous Improvements
Drainage Improvements on the west side of Starr Drive
Subgrade Replacement
TOTAL CONSTRUCTION COSTS
Engineering & Construction Inspection
10%(+/-) Contingency
COST OF POSSIBLE COST -SHARE
$ 28,734.00
$ 18,304.00
$ 6,083.00
$ 53,121.00
$ 2,500.00
$ 5,579.00
$ 61,200.00
Based upon the information provided by the Budget & Research Division, a budget adjustment
will be proposed at the November 6, 2001 City Council Meeting to accommodate this proposed
project.
The final costs to the City will be based upon actual costs as documented by the St. Joseph
Catholic Church subject to review by the City and may, or may not exceed the bid price.
However, the City's share will not exceed $61,200.00 without additional authorization.
Enclosures:
Vicinity Map
Construction Drawing
Cost -Share Agreement
Bid Prices from Nabholz Construction Corporation
Purchase Requisition
Vendor Request Form
•
•
LSD00-22.00 - St. Josephs Church - One Mile Diameter
w
1400
0 1400 Feet
Planning Commission
September 11. 2000
r cnnn.n n rn,.nh
•
I.. ;
Wwin UM It CMITO• MOO
St NISI Y ,*m
- AfMOm
IDa
-.-'7 nyY1 MO0 ,
LOT w
W MOO1 1 Y.
1 W. 10.1an MAO
norral.11 Y TO
IDC
1O1
JN NIV W \l✓-•
• • On m•1
#• Tr' Rio
-aO .1.611.0.10.000
Nm
Lot d
Lan - \m1
ern.* d OL
TW Y num
▪ O ACNQ1l
OM) N
F.Pitt/ FRE$043-KA1.FFMAs 8 FI EN ROE P10. 501 464 9748
•
•
Sep. 01 2000 09:16AM PS
z
0
0
W
U)
0
0
W
W
0C
U)
cvoa 2L'nss xio anrIZOsN O
0
0
0
Planning Commission
September 11. 2000
V-I-1t.-ddUL 17:13 NiBHLLZ CONSTRUCTION
• 1
Nabholz Construction Corporation
PO Box 277, Rogers, AR 72757
Phone 101.631.5310
Fax 901.131-0116
15 -Oct -01
Mr. Ron Shelby
HigM.Jadaon.Aeeooiat a.PA
PO Boor 745
Rogers, AR 72757
Riit St Josephs Wick Church
Fayetteville, Manes
Job Number 021345
(WA Latter of Approved 03C ,SDE ONLY
Starr Road Improvements per mind CM Dry 0.16-01
Dear Ron:
1 50. 631 0286 F.02,05
Please' rewire( the edtached: Spreadsheet breakdown and robed eketchee
This LOA represents an amount of 5471038 and a time extension
In the amount of 0 calendar days -
TMs proposal Is for wdtbn acceptance by the date of 19Cd-01 and is
subject to esalstlon theraatbf.
Should you egra wAth the attsohed, Pleat indicate your acceptance by signing
below end retuning to the office. Ona signed, this doaonent fears a direct
part of the Contract
Respectfully submitted,
NabpeRtConaudion Corporation
Stave L Mandell
Project Manager, VP
Date: /0 ' /S'C
HtghtJaclaon.Aeeodatn.PA St Joseph! Catholic Church
Date: Date:
cr. Randy Hall wAttteehrnem
LOA Fib N 03C WEiwhdtaahment
OCT -15-c001 17:13
DATE:
10 -Oct -01
TIME:
10:10 AM
.....v. aaatan♦
NUMBER
•
r414BHOLZ CONSTRUCTION 1 50. 63: 0286 P. 03/05
LOA / 03C WEST SIDE MO
LOA DwaK4on !Oro' Rnd Iib oar iMoN1
PROJECT W{ME: !t JomMstCal A alai
PROJEOT LOCATION: F.yst, Adman
ARCHITECTS PROPOSAL DATE""a'""""""'""
ARCHITECT: ttalidaonAnoaiab.PA
E$T.DURATIONAlprts 13
601791.30: 46,020
BUSS RISK RATE.: DS 110.033 month
ITEM DESCRIPTION
w4^.—
0511012,
0
1;
11101
JOB 0: 021348
BLDG
SOFT % OF
TOTAL COST TOTAL
1000
2000
2030
2100
2100
2640
1400
aawdtrwM
DEMO AND SITE PREPARATION
STORM DRAINAGE
6E0400
PAVING .WEST mobs New OHIO to SONS
PAWING•WESTrow aim OMOObSN1A
CURWOUTTER
TEnn14G
•
SUBTOTAL
SUBCONTRACT BONDS
SUBTOTAL
BUILDERS RISK INSURANCE
OWNER PROTECTIVE INSURANCE
GENERAL LIABILITY INSURANCE
SUBTOTAL
PRF 6 PAYMNT BONG PREMIUM
SUBTOTAL
TOTAL BIO COST
Fw asoOSig 61bwnIncbd Work
Fw an 91bew*wad Work
FM on Ont6ad souk
SS,O
11004
SOD
0
17,120
4.030
600
0
0
0118
0.311
0n1
CLOD
037
OD9
0.01
000
0.00
ODQ
000
0.00
0.03
000
000
0.00
ODD
000
000
ODD
ODO
000
0.00
0.00
ODD
000
000
0.00
000
7.44%
M.61%
1103%
DID%
38A1%
SST%
123%
000%
OLIO%
000%
000%
ODA
000%
000%
000%
ODD16
040%
040%
000%
ODD%
0.00%
0.00%
0.00%
ODI%
0.00%
000%
0.00%
0.00%
OM%
0.00%
ODO 0.001.
000 0.00%
ODO 0.00%
000 000%
000 0.00%
000 0.00%
000 0.00%
000 0.00%
000 000%
000 000%
eta MILII am Mit aaeur+a
44,000 056 83.71%
0 0.00
44,000 055
49 0.00
3e 000
148 000
4.313 0.90
423 0.01
0.00
44.730 008
9e 000
0.06
0.00
1.01
2704
0
147,030
0.21%
93.71%
0.10%
0.06%
031%
94.21%
090%
95.11%
021%
4.®%
-0.00%
100.00%
•
Ur_I-10-4001 1x:14 rw8IiCLZ CONSTRICTION
• •
Nabholz Construction Corporation
PO Box 277, Ropers, AR 72757
Phoma 501• BS 5300
Fix 601-631.0266
15 -Oct -01
Mr. Ron Shelby
F lghtJ$caon.Artodarea.PA
PO Ban 748
Revere, AR 72757
Re: St. Joseph's Catholic Church
Fayetteville, Manses
Job Number 021346
(LOA Letter of Agin 09 U
Undercut Addle 38 AND/OR 3C, as required
Dear Ron:
1 50: 631 0286 P 84.0 0.`.
Please review the attached: Spreadehs.t brsaldorm and raised sketches.
This LOA represents an amount of $6,083 and a time edensfon
in the amount of 0 calendar days
This proposal Is tor written aeaptenoe by the date of 110-0c4-01 and is
sutnjat to escalation therealhr,
Should you agree with the sflaceed, please kidkde yes aooeptenoe by stgning
below and rsturntrg to the office. Once signed, this document forme a direct
part of the Contract
ReepsctNh' submitted,
Na
cion Corporation
Jtc
Steve L Marshall
Project Manager, VP
Date: /40 7 So.
HIghtJeckeon.AmodeteSPA St Joaephle Catholic Church
Date. Date:
oo: Randy Hall wfaGaohment
LOA Fla a 03 U wfattachmerd
OCT -15-2001 17:14
DATE
16-0d-01 ,
TAME:
1148AM
NUMBER
•
14d3140-2 CONSTRUCTION
LOA IP
LOA Dation
PROJECT NAME:
PROJECT LOCATION:
ARONDICT8 PROPOSAL OA
ARCHITECT;
£BT.DUMTIOIUnaOw
10217a130:
BUILDERS RISK RATES:
05 U
Undnat AM a 31:1 ANDIOR 3C, as
SL Amish% CSE* Chaah
haft Mantes
•
1 50: 631 0286 P.05,'05
T...."'"'...e.».."
HIOI5,21maA to .PA
13
4SXO
09 910,00 maim
ITEM DESORPTION
JOBB 011346
BLDG
SOFT %OF
TOTAL COST TOTAL
2000 2t UNDERCUT • IF REQUIRED
14 TEBTINO
SUBTOTAL
SUBCONTRACT BONDS
SUBTOTAL
BUILDERS RISK NSURANCE
OWNER PROTECTIVE INSURANCE
OENERAL LWBILTIY INSURANCE
SUBTOTAL
PERF & PAYMNT BONO PREMIUM
SUBTOTAL
TOTAL BID COST
Fre MAN Sihoatrafd Wok
Pm on Suka,t dod Wolk
Fr on rated mirk
5,40
300
012 69.76%
0.01 42311
0.00 0.00%
0.00 0006
0.00 000%
0.00 CUM
000 000%
0.00 0.00%
0.00 0006
0.00 OM%
O00 000%
0.00 000%
0.00 0.006
0.00 0.00%
000 MOOS
ODO 0006
0.00 0.00%
0.00 OM%
MOO O00%
000 0.016
0.00 000%
OM OM%
0.00 OM%
0.00 0.0%
OM 000%
OM 000%
0.00 0006
0.00 0AM%
0.00 OLE%
000 000%
000 OLE%
000 0137%
0133 0.m%
OM ODM%
040 ODE%
ODO 00016
000 O00%
0.00 ODE%
000 000%
0.00 ODD%
5.700 0.12 e3.71%
0 0.00 021%
5.700 0.12 63.71 %
6 o 0 0.10%
5 0.00 0.06%
19 0.00 0.31%
0730 0.12 9420%
66 0.00 0.90%
0.00
5.785 0.12 96.10%
13 0.00 0.2116
265 0.01 4.69%
0 0.00 -0.0%
64063 0.13 100.00%
TOTAL F 05
P Purchase Requisition
fret amadam older)
'Vendor1: —•-- Vendor Name:
New St. Joseph Catholic Church - Paul Warren
321 E. Lafayette Street [FOBPoInt
itY state Zip:
Ship To Code:
•
Fayetteville — AR 72701 090
Requester 'Requesters Employee*:
Ron Petrie 1461
--
Item I D —
Description: Quantity Unit Unk Extended Account Number.
11P—_ - --- - otlMue _ cat - em
Cost -Share for Starr Drive Street 61,200. 4470-9470-5809.00
and Dia3nage Improvements
SHIPPING/HANDLING
97086-40
i
g
g
f
[Requisition No.:
•
gco
5'
0
IQ
N!N. 41.
Date: —
11-02—01
Expected DeliveryDate:
ASAP
I Foxed
Amts
• STAFF REVIEW FORM •
X AGENDA REQUEST
CONTRACT REVIEW
GRANT REVIEW
For the Fayetteville City Council meeting of November 20, 2001
FROM:
Ron Petrie
Name
Engineering
t)Inlsinn
Public Works
- artment
ACTION REQUIRED: Approval of a cost share with St. Joseph Catholic Church in the amount of $61,200.00 for the
widening of Starr Drive and the associated drainage improvements.
COST TO CITY:
$ 61200.00
Cost of this Request
4470-9470-5809-00
Account Number
97086-0040
Project Number
$ 61,200.00
Category/Project Budget
$ 0 00
Funds Used To Date
$ 61,200.00
Remaining Balance
Starr Drive Cost Share
Category/Project Name
Program Name
Sales Tax Capital Improv.
Fund
BUD ET REVIEW:
X Budgeted Item
B t anager
Budget Adjustment Attached
Administrative Services Director
CONTRACT/GRANT/LEASE REVIEW:
ccounung Manager
iia(
ate
City At rney 0/0
Purchasing Officer
Date
GRANTING AGENCY:
Internal Auditor
ADA Coordinator
Grants Coordinator
Date
atDr-
tee—
1r—
atlS e —
STAFF
STAFF RECOMMENDATION: Approval of the cost share in the amount of $61,200.00 for the above described construction.
/- o/
Date
Cross Reference
New Item: Yes x No
Prev Ord/Res #:
Orig Contract Date:
Orig Contract Number:
s
F
• •
Page 2
STAFF REVIEW FORM
Description Starr Drive Widening & Drainage Improvements Cost Share Meeting Date November 20, 2001
Comments: Reference Comments:
Budget Manager
Accounting Manager
City Attorney
Purchasing Manager
Internal Auditor
ADA Coordinator
Grants Coordinator
•
X AGENDA REQUEST
CONTRACT REVIEW
GRANT REVIEW
STAFF REVIEW FORM
For the Fayetteville City Council meeting of November 20, 2001
•
FROM:
Ron Petrie
Nan?
ED nenng
Public Works
ACTION REQUIRED: Approval of a cost share with St. Joseph Catholic Church in the amount of $61,200.00 for the
widening of Starr Drive and the associated drainage improvements.
COST TO CITY:
$ 61200.00
Cost of this Request
4470-9470-5809-00
Account Number
97086-0040
Project Number
$ 61200.00
Category/Project Budget
$ 000
Funds Used To Date
$ 61,200.00
Remaining Balance
Starr Drive Cost Share
Category/Project Name
Program Name
Sales Tax Capital Improv.
Fund
BUDGET REVIEW:
X Budgeted Item
Budget Manager
Budget Adjustment Attached
Admuustrative Services Director
CONTRACT/GRANT/LEASE REVIEW:
Accounting Manager
City Attorney
Purchasing Officer
bate
bate
bate
GRANTING AGENCY:
Internal Auditor
ADA Coordinator
Grants Coordinator
atIS to
ate
atT�—
STAFF RECOMMENDATION: Approval of the cost share in the amount of$61,200.00 for the above described construction.
lli monB e�a-
Department Director
Administrative Services Director
Mayor
//-o1- o/
Date
ate
bate
bate
Cross Reference
New Item: Yes x No
Prev Ord/Res #:
Orig Contract Date:
Orig Contract Number:
FAYETTEVAJLE
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENTAL CORRESPONDENCE
•
To: Ron Petrie, Engineering Division
From: Heather Woodruff, City Clerk
Date: November 27, 2001
Please find attached a copy of Resolution No. 154-01 and approving a cost -share with St.
Joseph's Catholic Church for the purpose of widening the west side of Starr Drive and making
the associated drainage improvements. I am returning one original to you. The other original
will be microfilmed and filed with the City Clerk.
Your purchase requisition has been forwarded to the Internal Auditor
cc: Nancy Smith, Internal Audit
c
015 04
Document
Reference
RES
Date
11/20/2001
cit
Itel
Ref
154
of Fayetteville
Maintenance/Inquiry
Action
Taken Brief Description
COST-SHARE/ST JOSEPH'S CATHOLIC CH
2/12/2002
13:19:10
Keywords •
RES. 154-01
COST -SHARE
ST JOSEPH'S CATHOLIC CHURCH
$61,200.00
WIDENIGN
WEST SIDE
STARR DRIVE
DRAINAGE IMPROVEMENTS
File Reference # • COST-SHARE/2001
Security Class
Expiration Date
Date for Cont/Referred:
Name Referred to
•
•
Cmdl-Return Cmd2-Check
Cmd5-Abstract Yes No
Retention Type:
**** Active ****
Press Cmd 6 to Update
Out CmdB-Retention Cmd3-End Press 'ENTER' to Continue
(c) 1986-1992 Munimetrix Systems Corp.