Loading...
HomeMy WebLinkAbout11-01 RESOLUTION• • RESOLUTION NO. 11-01 A RESOLUTION APPROVING AMENDMENT NO. 1 TO THE ENGINEERING CONTRACT WITH GARVER ENGINEERS FOR THE WASTEWATER IMPROVEMENT PROJECT IN THE AMOUNT OF $37,860, INCREASING THE NOT -TO -EXCEED CONTRACT COST TO $429,392. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council hereby approves Amendment No. 1 to the Engineering Contract with Garver Engineers for the Wastewater Improvement Project, in the amount of$37,860, increasing the not -to -exceed contract cost to $429,392; and authorizes the Mayor and City Clerk to execute said contract. A copy of the Amendment No. 1 is attached hereto marked Exhibit "A" and made a part hereof. F t'IM AND APPROVED this 6th day of February , 2001. ATTEST: APPROVED: By: (1Tb Charles D. Coody, Mayor s y: �"re Heather Woodruff, City Clery • Garver, Inc. Engineers 3810 Front Street, Suite 10 Fayetteville, AR 72703 501-527-9100 FAX 501-527-9101 vmw.garverinc.corn January 23, 2001 Mr. Don Bunn, P.E. Assistant Public Works Director City of Fayetteville 113 West Mountain Fayetteville, AR 72701 R EXHIBIT A GARVER ENGINEERS Re: Fayetteville Wastewater Improvements - Professional Engineering Services Contract Amendment No. 1 Dear Mr. Bunn. Please consider this our revised proposed amendment to our original contract for the Preliminary Report Phase of the Wastewater Improvements Project. We have revised this amendment in accordance with your direction since reviewing our second submittal. As you know, our scope of work has increased in the following areas: > An additional 2.22 miles of force main including the mains from Pump Stations 13, 14, 15, 18, and 19. > An additional 0.35 mile of gravity line near the line we have designated as Line 1. > Additional coordination with the City and Consultants. > Investigation of cost reduction options including re-evaluating improvements using different design criteria. As you know, we submitted our draft report on December 22, 2000. At your direction, we are investigating the effect changes in design criteria will have on construction costs and will work with the City and RJN in an effort to further reduce estimated construction costs. At this point, we have reached the total fee amount in our original budget. Therefore, we sincerely need and appreciate your support of this amendment. Since our original fee was negotiated based on a specific scope of work, and since this increase in scope represents a significant amount of additional work, we believe it is appropriate to request this amendment to our original contract. We have submitted a breakdown of detailed information (attached spreadsheet) supporting this requested amendment. Your approval of this proposal will increase our "Not to Exceed" fee amount from $391,532 to $429,392, an increase of $37,860. If this proposal is acceptable to you, please sign the three copies and return one copy to me. As always, we appreciate the opportunity to provide professional services to the City of Fayetteville and look forward to successful completion of this project. Please call me with any questions or comments. Thank you. m Respectfully, X GARVER 1 ENGINEE ' S Brock Hoskins, P E. Vice President / Project Manager Approved by: Date: Z /1 2../ 69/ Brentwood, TN • Fayetteville, AR • Huntsville, AL • Madison, MS • Little Rock, AR • Tulsa, OK 0o AMENDMENT NO. 1 . AOdf1ONLL ENOINEERINO SERVICES CITY OF FAYETTEVLLE, ARKANSAS FAYETTEVILLE WASTEWATER IMPROVEMENTS- PRELIMINARY REPORT PHASE HOURLY RATE WORK (Edida Mnar.l WORK TASK DESCRIPTION Sero Project Manager rr Refect Manager e Serb Project Erg1+.r IT Pooled Esta h Serb Design Engineer Ir Design Endow Ir Protect S,wa M Eamon MMd 'oriet 1r Se Twit Draftsman 1r Ts* Draftsman IT Canal Ir Survey Craw la Tad Labor 1. Evaluation d Existing Law W Fut Derr** on lir System M9uuI 1.65 51101 pity * nos Le* 1 1. CRM.:slot lawnWMnam the City. 0 0 0 0 0 1 0 0 0 0 0 0 $2000 2. E.nwrbn d Ina moa. 0 0 0 0 2 6 0 0 0 0 0 0 $I70 CO a Damnation otfl conStruCts014y. 0 0 0 0 4 F 0 a 0 0 0 0 $22000 4. Delany*r. m band en 20 dMWyv Pojayvu 0 1 0 0 2 4 0 0 0 0 0 0 5102. CO S Ren ard Ryle Prapwden 0 0 0 0 1 1 0 0 0 4 0 0 s111.00 70,0 04 love rosin from Pump SIM** 13 1. Obtain existing Hornell* from llauy 0 0 0 0 0 1 0 0 0 0 0 0 520.00 2 Examination 0f lot route. 0 0 0 0 0 2 0 0 0 0 0 0 54000 3.E.arnralbn of M* mml JdMiy. 0 0 0 0 1 2 0 0 0 0 0 0 ses.ao a. Delon** IM SM bawd on 20 ed 50 -pr pojcl4u 0 1 0 0 1 2 0 2 0 0 0 0 514500 5. Ran and Prow Preparation 0 0 0 0 1 1 0 0 0 2 0 0 511,00 000 0 I foo hem Pu PStdbn No 14 I. Obtain existing Information from the City. 0 0 0 0 0 1 0 0 0 0 0 0 520.00 2.Ex.rrwlm of One routs. 0 0 0 0 2 4 0 0 0 0 0 0 5130.00 3. Erwin* oflM mnlid tgy. 0 0 0 0 4 4 0 0 0 0 0 0 1180 co 4. Determine IM sae b0) on 20 W 50y.w Rte lona 0 1 0 0 2 4 0 2 0 0 0 0 520.00 5. Ran*b Rolle Prepardbn 0 0 0 0 + 1 0 0 0 4 0 0 5117.00 Ll2e0 of law main from Pump Slybn No. 15 1. OM* existing Wamdbn iron 0v Cy 0 0 0 0 0 1 0 0 0 0 0 0 52000 2. Exa inn nof lot rout. 0 0 0 0 2 4 0 0 0 0 0 0 513000 S. E.mbtlbn of wrolMasy.. 0 0 0 0 4 4 0 0 0 0 0 0 $160.00 4. Canons the Ma bowl an 20*d Wyer RtleClbn. 0 1 0 0 2 4 0 2 0 0 0 0 1208 CO 5. Ran and Rolle Preparation 0 0 0 0 1 1 0 0 0 4 0 0 $11100 5.64311o1 late nun from Pump &don Nr. 15 I.[pin*sung HmndM mount by 0 0 0 0 0 1 0 0 0 0 0 0 520.00 2.Ern*Wm of line mute. 0 0 0 0 2 10 0 0 0 0 0 0 5250.0) 3. Examination of Ins mw1 t4*y. 0 0 0 0 4 4 0 0 0 0 0 0 5163.00 4. Determine lie size bead On 20 aro 50 -yaw Roj.dSs 0 1 0 0 2 4 0 2 0 0 0 0 520.03 S M ed Prof.* Repine* 0 0 0 0 1 1 0 0 0 0 0 0 5153.* 36705y force nen hon Pump SL*M. 1e 1. OMS srWep Normal* from Kw City. 0 0 0 0 0 1 0 0 0 0 0 0 520.00 2. EwmW*y t. rod.. 0 0 0 0 2 5 0 0 0 0 0 0 $210.00 3. Eae*e*01 Wemwu]tUy. 0 0 0 0 4 4 0 0 0 0 0 0 51000 4. DeIwn** Ole Poi bead O1120 are 50ya.ot]wl*a 0 1 0 0 2 4 0 2 0 0 0 0 5X..03 S Ran and Ron* Preparation 0 0 0 0 1 1 0 0 0 5 0 0 1135.00 Stdaly 0 6 0 0 41 112 0 10 0 25 0 0 534412.00 2. Report with R.canmrd W me and Col Estimates 1. Prepare draft noon and *OteyrKOm.rwd alternatives . 2 4 0 0 16 6 0 2 0 4 0 0 5552.03 2 2 0 0 8 4 0 2 0 0 0 0 SRO 05 2. Fluke cost ettnW.s for nmlmnYM Subtotal 4 0 0 0 24 12 0 4 0 4 0 0 51,346.00 3. Coordination with RJN. Black 5 Veatch, and MVO' 1. Additional Meetings, 5 12 0 0 10 0 0 0 0 0 0 0 5935.00 SuMaw 6 12 0 0 10 0 0 0 0 0 0 0 50360 4. ewration c4 Cost RMUC11 Mammoths', 1. R..vd,.bn W mponn*m using anw.m design vit.M. Una 1 0 1 0 0 4 5 0 0 0 0 0 0 5252.00 Una 2 0 1 0 0 4 8 0 0 0 0 0 0 5252.00 LM3 0 1 0 0 4 8 0 0 0 0 0 0 5252.00 LM4 0 1 0 0 8 10 0 0 0 0 0 0 5432.00 Lbs 0 1 0 0 1 0 0 0 0 0 0 0 5252.00 LMT 2 1 0 0 6 8 0 0 0 0 0 0 141800 Pump Siston No 13 dddag forte main 0 0 1 1 5 0 3 0 0 0 0 5255.03 Perry Opal No 14 PcludW2 Iocw man 1 0 0 1 1 5 0 3 0 0 0 0 5200 Pump lid* No. IS Inducing force main 1 0 0 1 1 5 0 3 0 0 0 0 5200 Rnp lid* M. IS ricking haw m* 1 0 0 1 1 5 0 3 0 0 0 0 1250 CO Rnp MSc," No. 15 icldag late mm 1 0 0 1 1 5 0 3 0 0 0 0 5200 Pro lid* No. t9 irldagbce mal 1 0 0 1 1 5 0 3 0 0 0 0 52Y.M Rory SW*No 21 2 0 0 2 1 6 0 3 0 0 0 0 534200 2. CmdYW*r.th City. 0 0 0 0 0 0 0 0 0 0 0 0 5102.00 3. Ms cost es. nmm.rd.Ibm ltd submit TN 1041. la 12 0 0 3i IS 0 6 0 0 0 0 52.022.00 Subtotal 20 24 0 a w w 0 27 0 0 0 0 55,052.00 Additional Salaries Subtotal Additional Labor and General and AdmInhMtNS Warhead 1150.0%) Additional Fixed Fee 05%) Additional Expenses 000001261s- Addt,nal 000r Cornml Testing EpllpmaF 1033G es* - MdNonal Tests AMitbnal Rep0dIJ l NPVdtg AM40nal Slrvey Supplies Additional Aerial PItography Additional Computer Rental Additional Travel Costs s0.00 51.500.00 5000.00 $0.00 $0.00 50.00 $000.00 512,160.00 511.240.00 14.540.00 $2,900.00 Additional Not to Eacite d Amount GARVERI ENGINEERS 137.060.00 NAME OF FILE: CROSS REFERENCE: • •j/9 . //0/ Date Contents of File Initials , /v 0/ �� 26 44.�GGa if/�9 . //- U 2_4? -0, • tai (d,„„ ) /u�Lc6 xeiond /6 . / Qa��i i Cts �/ avS„..eh x.,-,61,4a,„4,../,,O d X /isa,7irfq na/f�, ice,4,24 / b7..5i-0 / tai!?.//7 • i'/f'69-i �d2c. t ./d.7.4 VAIN /-a_e•e, /AL d4; MILL / ' • • CITY of FAYETTEVILLE DEPARTMENTAL CORRESPONDENCE DATE: //trio/ To: Fayetteville City Council From: Donald R. Bunn, Ass't P. W. Director Thru• Mayor Dan Coody Subject: Amendment No. 1 Wastewater Engineering Contract Garver Engineers On March 21, 2000 the City and Garver Engineers entered into an agr ement for certain services relating to development of a Preliminary Design Report in connection with our Wastewater Improvements Project. Specifically, their task was to evaluate outfall lines an pump stations on the east (White River) side of Fayetteville for 2020 and ultimate flow conditions. Their existing contract is for a maximum, not to exceed, amount of $391,532.00. Garver Engineers has requested that an amendment to their existing engineering contract with the City be amended to provide for work performed over and above the work scope as given in their contract. Their requested increase is for $37,860.00, or 9.6 percent. The request for an amendment and the Staff recommendation will be presented at the Agenda Meeting on Tuesday, January 30. PIE • • Garver, Inc. Engineers 3810 Front Street, Suite 10 Fayetteville, AR 72703 501-527-9100 FAX 501-527-9101 www.9arverinc.com January 23, 2001 Mr. Don Bunn, P.E. Assistant Public Works Director City of Fayetteville 113 West Mountain Fayetteville, AR 72701 GARVER ENGINEERS Re: Fayetteville Wastewater Improvements - Professional Engineering Services Contract Amendment No. 1 Dear Mr. Bunn: Please consider this our revised proposed amendment to our original contract for the Preliminary Report Phase of the Wastewater Improvements Project. We have revised this amendment in accordance with your direction since reviewing our second submittal. As you know, our scope of work has increased in the following areas: > An additional 2.22 miles of force main including the mains from Pump Stations 13, 14, 15, 18, and 19. > An additional 0.35 mile of gravity line near the line we have designated as Line 1. > Additional coordination with the City and Consultants. > Investigation of cost reduction options including re-evaluating improvements using different design criteria. As you know, we submitted our draft report on December 22, 2000. At your direction, we are investigating the effect changes in design criteria will have on construction costs and will work with the City and RJN in an effort to further reduce estimated construction costs. At this point, we have reached the total fee amount in our original budget. Therefore, we sincerely need and appreciate your support of this amendment. Since our original fee was negotiated based on a specific scope of work, and since this increase in scope represents a significant amount of additional work, we believe it is appropriate to request this amendment to our original contract. We have submitted a breakdown of detailed information (attached spreadsheet) supporting this requested amendment. Your approval of this proposal will increase our "Not to Exceed" fee amount from $391,532 to $429,392, an increase of $37,860. If this proposal is acceptable to you, please sign the three copies and return one copy to me. As always, we appreciate the opportunity to provide professional services to the City of Fayetteville and look forward to successful completion of this project. Please call me with any questions or comments. Thank you. Respectfully, GARVER1ENGINEERS Approved by: Brock Hoskins, P E. Vice President / Project Manager Date: Brentwood TN • Fayetteville, AR • Huntsville, AL • Madison, MS • Little Rock, AR • Tulsa, OK • • Additional Salary Sub101al Additional Labor and Grnw I and Administrative OaWnd (150.0%) Additional Fan Fa (15%) Additional Expenses Consultants Ad0ltbnal Odor Control Tapp EOlipnelt 6 33Ma1- Additional Tests AOd0ional RawmdumOIVP10ap Adder W Survey AIMsa atidalcmal Aerial Pmrop2phy Addabmal Computer Rental Additional Travel Costs $0.00 51.500.00 Sm0.02 10.00 10.00 5000 5000.00 512.160.00 516240.00 52.000.00 Additional Na to Exceed Amount GARVERIENGINEERS 137.060.00 N4ENOMENT NO. 1 -ADDITIONAL ENGINEERING CITY OF FAYETTEVLLE. ARKANSAS FAYETTEVILLE WASTEWATER IMPROVEMENTS - PRELIMINARY SERVICES REPORT PHASE HOURLY (EMMMAd RATE WORK Wawa) WORK TASK DESCRIPTOR Serax Project Manner V Aga Mmgn h 6nb Project Engineer h 119x= Entine h Saner 0gln Entrant h Donau Entfrwr h Ih1EO Snow In EaMm rental Sunlit h Senior 6NOiM In a -h. WIWI IF Survey Ow h 1MS LS= Mann' h 1. Evaluation of Existing Lbw ant Future Demands on to Swaim MOWS 1.655 II a grayly Si. uv L»1 MJ„bnpOtnl„'Uy. 0 0 0 0 0 0 0 0 0 0 0 szOm i EenyWen claw Imtt 0 0 0 0 2 e 0 0 0 0 0 0 517003A s Exa o a a o s 1z 0 0 0 00 00 0 1220.00S102031 _I,,Wa,evYal Determine Na Ws bawd n 20and 50 -war wisdom 0 1 0 0 4 0 S. Anal ROTO Avplrton 0 0 0 _ 0 1 1 0 0 0 4 0 0 S117.00 ]0 it of force man from RmWSltbn No. 13 1 Wan l e,mlW2 ittmtbn Wm ON bly. 0 0 0 0 0 1 0 0 0 0 0 0 I20 i Ftahutbnc as roma,. 0 0 0 0 0 2 0 0 0 0 0 0 54003540035 E,aramala,,,(t„tMmltWMy. 0 0 0 0 1 2 o 0 0 0 0sasm 0op Apinrin Ya at based win pet 5Oyeaw9etSe o 1 0 0 1 2 0 2 0 0 0 0 5143.03 S Mn an Ryna Phantom 0 0 0 0 1 1 0 0 0 2 0 0 S0+.00 070 P 01 lace man from Pump NMM Na. 14 LOM* wing Y/wmtlbn from Oa City. 0 0 0 0 0 1 0 0 0 O o o 12000 2 Esa,S nyaemle 0 0 0 0 2 4 0 0 0 0 0 0 1131 2 E+.aiwMys aeMYabLaY 0 0 0 0 4 4 0 0 0 0 0 0 51500C Aplmaa lire bawd caper 50.rt w9aba 0 1 0 0 2 4 0 2 0 0 0 0 $20620 5 Ran act Wale Promotion 0 0 0 0 + 1 0 0 0 4 0 0 S+17.03 I.12e E a +ate tan from Pep &tato No. 15 1 Obtainatangyymutpl tram Oa City 0 0 0 0 0 1 0 0 0 0 0 0 $20202 Examinational Ins routs.0 0 0 0 i 4 0 0 0 0 0 0 5130.00 5 Ema,,,naI 001 b„amn„y,ply. 0 0 0 0 4 4 0 0 0 0 0 0 i+mm 4 Detects as saw bawd or 2O at 5Opap9atom 0 1 0 0 2 4 0 2 0 0 0 0 fim.m 5 Manama was Preparation 0 0 0 0 1 1 0 0 0 4 0 0 1117.03 6043 du/ lye nor pan Pep Station M. 10 I Wail WNW lYwmSbn pan papy 0 0 0 0 0 1 0 0 0 0 0 0 Salm 2 Ermnalbn al ay rove 0 0 0 0 2 10 0 0 0 0 0 0 125000 2 Fiamtlm din vMmpeMOy. 0 0 0 0 4 4 0 0 0 0 0 0 simm 4 CeMrva to We bawl on 20 and 0 1 0 0 2 4 0 2 0 0 0 0 Simm S Rn to Pry.*RepfYYf 0 0 0 0 1 1 0 0 0 a 0 0 5153.00 UMW t Ise main nm Pump Winn Ni 19 1 Wan sway ymrrwbn nom yam MY -0 0 0 0 0 1 0 0 0 0 0 0 130.00 ..2 EaariwnoI Marys. 0 0 0 0 2 8 0 0 0 0 0 0 121003 Eantro yea arswwapMy. 0 0 0 0 4 4 0 0 0 0 0 0 .5150.034 Cxmia as WapsdpppaM 5O F0I.Stra 0 1 0 0 i 4 0 2 0 0 0 0 120000 S Ova Row Aepatbn 0 0 0 0 1 1 0 0 0 5 0 0 1135.00 Subtotal 0 6 0 0 a 92 0 10 0 23 0 0 53.612.00 Repan Anti aseemmencies Estimates 1. Repo pen nen W tion ol recommended entalMe 2 4 0 0 18 n 0 2 0 4 0 0 seez.m 2. WNW at etinsn lte¢naaraw tmtL. 2 2 0 0 a 4 0 2 0 0 0 0 1466.00 &IMyal 4 6 0 0 24 12 0 4 0 4 0 0 11.34100 Y 3. 0,00310•1100 with RJM Black S Welch. and PAW 1 MdavnS WNipa a 12 0 0 10 0 0 0 0 0 0 0 503503 Subtotal a 12 0 0 10 0 0 0 0 0 0 0 593500 4. Evaluation e1 Cel Reduction Nanutiea 1. MNalutbnOI irgwwmve using aurora at2 carte. Una 1 0 1 0 0 4 6 0 0 0 0 0 0 1252.00 N2 0 1 0 0 • 6 0 0 0 0 0 0 s25i.m tire .0 1 0 0 4 a 0 0 0 0 0 0 5252.00 Urn 4 0 1 0 0 6 10 0 0 0 0 0 0 543203 Una5 0 1 0 0 4 a 0 0 0 0 0 0 525200 Lie? 2 1 0 0 5 a 0 0 0 0 0 0 $41500 Pmp&ton No 13 Including ow man 1 0 0 1 1 5 0 S 0 0 0 0 5250.00 Pump WN* Na 14 ivltiig Imps main 1 0 0 1 1 5 0 5 0 0 0 0 5256.00 Pump SWM M. 15 Intim loran rosin 1 0 0 1 1 5 0 S 0 0 0 0 5250.00 Pump SNOW No. 18 Mdoq(pse main 1 0 0 1 1 5 0 3 0 0 0 0 5255.00 Pump Staten No. lS MatG Wo math 1 0 0 1 1 5 0 3 0 0 0 0 1258.00 WT. Matta W. 10yV diq Yuman 1 0 0 1 1 5 0 2 0 0 0 0 5x55.00 Pmp&tlm No.21 2 0 0 2 1 a 0 S 0 0 0 0 1342.00 2 (o.dMM awn CIE 0 e 0 0 0 0 0 0 0 0 0 0 5192.00 3 Revise cosnIsntea. remmaMtMw as awm2 Ina non. 10 12 0 0 32 16 0 a 0 0 0 0 $Z022.00 SubloW 20 24 0 5 e0 94 0 21 0 0 0 0 15062.00 Additional Salary Sub101al Additional Labor and Grnw I and Administrative OaWnd (150.0%) Additional Fan Fa (15%) Additional Expenses Consultants Ad0ltbnal Odor Control Tapp EOlipnelt 6 33Ma1- Additional Tests AOd0ional RawmdumOIVP10ap Adder W Survey AIMsa atidalcmal Aerial Pmrop2phy Addabmal Computer Rental Additional Travel Costs $0.00 51.500.00 Sm0.02 10.00 10.00 5000 5000.00 512.160.00 516240.00 52.000.00 Additional Na to Exceed Amount GARVERIENGINEERS 137.060.00 • • CITY of FAYETTEVILLE DEPARTMENTAL CORRESPONDENCE DATE: To: Fayetteville City Council From: Donald R. Bunn, Ass't P. W. Director Thru: Mayor Dan Coody Subject: Amendment No. 1 Wastewater Engineering Contract Garver Engineers On March 21, 2000 the City and Garver Engineers entered into an agreement for certain services relating to development of a Preliminary Design Report in connection with our Wastewater Improvements Project. Specifically, their task was to evaluate outfall lines an pump stations on the east (White River) side of Fayetteville for 2020 and ultimate flow conditions. Their existing contract is for a maximum, not to exceed, amount of $391,532.00. Attached is a letter from Garver Engineers requesting an amendment to their contract based on an expansion of their scope of work. The scope changes involved two main areas of work; 1) the evaluation of an additional 2.22 miles of force main and 0.35 miles of gravity sewer, and 2) the re- evaluation of the cost estimates based on adjusted design criteria. The amendment amount is proposed at $37,860.00, which is approximately 9.7 percent of the value of the original contract. The Staff believes that the contract amendment requested by Garver is reasonable and it is the recommendation of the Staff that Amendment No. 1 be approved. AGENDA REQUEST FORM Council Meeting of February 6,2001 Mayor's Approval FROM Don Bunn Public Works Admin Name Division ACTION REQUIRED Approval of Amendment No. Project Engineering Contract in the amount not -to -exceed contract cost to $429,392.00. COST TO CITY $ 37,860.00 Cost of this Request 5400 5700 5314 Account Number 98047 40 $ 602,336.00 Public Works Department 1 to the Garver Wastewater of $37,860.00, increasing the Category/Project Budget 00 563,280.00 Project Number BUDGET/CONTRACT REVIEW Bud.et C1•r• najr Ai. AL Accoun ng Man -ger City Attorney WALQ Purchasing Officer Funds Used to Date $ 39,056.00 Funds Remaining X Budgeted tem /-26,r206, Date /49/o/ Date Sewer Line/Pump Station Imp'v'ts, East Side Category/Project Name Program Name Water and Sewer in ervi Fund Category Budget Adj. Atta hed (%s7 Director ADA Coordinator Dake G, `` Date , Date tq,u Auditor�,,,�n4 1119/01 -30-01 Date Date STAFF RECOMMENDATION Staff recommends approval of the amendment as presented in the amount of $37,860.00 Ass 1/26/01 t Public Works Director Date e`• rtment P rector 1111/AAA ALLA4AAJ, dill L_ o vices i rector Cross Reference New Item: Yes No Prev Ord/Res # 38-00 Orig. Contract # 753 Contract Date Mar 21 '00 • FAYETTEVtLLE THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE • To: Don Bunn, Assistant Public Works Director From: Heather Woodruff, City Clerk Date: February 14, 2001 Attached is a resolution approving Amendment No. 1 to the engineering contract with Garver Engineers for wastewater improvement project. The original will be microfilmed and filed with the City Clerk. cc: Nancy Smith, Internal Audit