HomeMy WebLinkAbout11-01 RESOLUTION• •
RESOLUTION NO. 11-01
A RESOLUTION APPROVING AMENDMENT NO. 1 TO THE
ENGINEERING CONTRACT WITH GARVER ENGINEERS FOR
THE WASTEWATER IMPROVEMENT PROJECT IN THE
AMOUNT OF $37,860, INCREASING THE NOT -TO -EXCEED
CONTRACT COST TO $429,392.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1. That the City Council hereby approves Amendment No. 1 to the Engineering
Contract with Garver Engineers for the Wastewater Improvement Project, in the amount of$37,860,
increasing the not -to -exceed contract cost to $429,392; and authorizes the Mayor and City Clerk to
execute said contract. A copy of the Amendment No. 1 is attached hereto marked Exhibit "A" and
made a part hereof.
F t'IM AND APPROVED this 6th day of February , 2001.
ATTEST:
APPROVED:
By: (1Tb
Charles D. Coody, Mayor
s
y: �"re
Heather Woodruff, City Clery
•
Garver, Inc.
Engineers
3810 Front Street, Suite 10
Fayetteville, AR 72703
501-527-9100
FAX 501-527-9101
vmw.garverinc.corn
January 23, 2001
Mr. Don Bunn, P.E.
Assistant Public Works Director
City of Fayetteville
113 West Mountain
Fayetteville, AR 72701
R
EXHIBIT A
GARVER ENGINEERS
Re: Fayetteville Wastewater Improvements - Professional Engineering Services Contract Amendment No. 1
Dear Mr. Bunn.
Please consider this our revised proposed amendment to our original contract for the Preliminary Report
Phase of the Wastewater Improvements Project. We have revised this amendment in accordance with your
direction since reviewing our second submittal.
As you know, our scope of work has increased in the following areas:
> An additional 2.22 miles of force main including the mains from Pump Stations 13, 14, 15, 18, and 19.
> An additional 0.35 mile of gravity line near the line we have designated as Line 1.
> Additional coordination with the City and Consultants.
> Investigation of cost reduction options including re-evaluating improvements using different design
criteria.
As you know, we submitted our draft report on December 22, 2000. At your direction, we are investigating
the effect changes in design criteria will have on construction costs and will work with the City and RJN in an
effort to further reduce estimated construction costs. At this point, we have reached the total fee amount in
our original budget. Therefore, we sincerely need and appreciate your support of this amendment.
Since our original fee was negotiated based on a specific scope of work, and since this increase in scope
represents a significant amount of additional work, we believe it is appropriate to request this amendment to
our original contract. We have submitted a breakdown of detailed information (attached spreadsheet)
supporting this requested amendment. Your approval of this proposal will increase our "Not to Exceed" fee
amount from $391,532 to $429,392, an increase of $37,860.
If this proposal is acceptable to you, please sign the three copies and return one copy to me. As always, we
appreciate the opportunity to provide professional services to the City of Fayetteville and look forward to
successful completion of this project. Please call me with any questions or comments. Thank you.
m
Respectfully, X
GARVER 1 ENGINEE ' S
Brock Hoskins, P E.
Vice President / Project Manager
Approved by:
Date: Z /1 2../ 69/
Brentwood, TN • Fayetteville, AR • Huntsville, AL • Madison, MS • Little Rock, AR • Tulsa, OK
0o
AMENDMENT NO. 1 . AOdf1ONLL ENOINEERINO SERVICES
CITY OF FAYETTEVLLE, ARKANSAS
FAYETTEVILLE WASTEWATER IMPROVEMENTS- PRELIMINARY REPORT PHASE
HOURLY RATE WORK
(Edida Mnar.l
WORK TASK DESCRIPTION
Sero
Project
Manager
rr
Refect
Manager
e
Serb
Project
Erg1+.r
IT
Pooled
Esta
h
Serb
Design
Engineer
Ir
Design
Endow
Ir
Protect
S,wa
M
Eamon
MMd
'oriet
1r
Se Twit
Draftsman
1r
Ts*
Draftsman
IT
Canal
Ir
Survey Craw
la
Tad Labor
1. Evaluation d Existing Law
W Fut Derr** on lir System
M9uuI 1.65 51101 pity * nos Le* 1
1. CRM.:slot lawnWMnam the City.
0
0
0
0
0
1
0
0
0
0
0
0
$2000
2. E.nwrbn d Ina moa.
0
0
0
0
2
6
0
0
0
0
0
0
$I70 CO
a Damnation otfl conStruCts014y.
0
0
0
0
4
F
0
a
0
0
0
0
$22000
4. Delany*r. m band en 20 dMWyv Pojayvu
0
1
0
0
2
4
0
0
0
0
0
0
5102. CO
S Ren ard Ryle Prapwden
0
0
0
0
1
1
0
0
0
4
0
0
s111.00
70,0 04 love rosin from Pump SIM** 13
1. Obtain existing Hornell* from llauy
0
0
0
0
0
1
0
0
0
0
0
0
520.00
2 Examination 0f lot route.
0
0
0
0
0
2
0
0
0
0
0
0
54000
3.E.arnralbn of M* mml JdMiy.
0
0
0
0
1
2
0
0
0
0
0
0
ses.ao
a. Delon** IM SM bawd on 20 ed 50 -pr pojcl4u
0
1
0
0
1
2
0
2
0
0
0
0
514500
5. Ran and Prow Preparation
0
0
0
0
1
1
0
0
0
2
0
0
511,00
000 0 I foo hem Pu PStdbn No 14
I. Obtain existing Information from the City.
0
0
0
0
0
1
0
0
0
0
0
0
520.00
2.Ex.rrwlm of One routs.
0
0
0
0
2
4
0
0
0
0
0
0
5130.00
3. Erwin* oflM mnlid tgy.
0
0
0
0
4
4
0
0
0
0
0
0
1180 co
4. Determine IM sae b0) on 20 W 50y.w Rte lona
0
1
0
0
2
4
0
2
0
0
0
0
520.00
5. Ran*b Rolle Prepardbn
0
0
0
0
+
1
0
0
0
4
0
0
5117.00
Ll2e0 of law main from Pump Slybn No. 15
1. OM* existing Wamdbn iron 0v Cy
0
0
0
0
0
1
0
0
0
0
0
0
52000
2. Exa inn nof lot rout.
0
0
0
0
2
4
0
0
0
0
0
0
513000
S. E.mbtlbn of wrolMasy..
0
0
0
0
4
4
0
0
0
0
0
0
$160.00
4. Canons the Ma bowl an 20*d Wyer RtleClbn.
0
1
0
0
2
4
0
2
0
0
0
0
1208 CO
5. Ran and Rolle Preparation
0
0
0
0
1
1
0
0
0
4
0
0
$11100
5.64311o1 late nun from Pump &don Nr. 15
I.[pin*sung HmndM mount by
0
0
0
0
0
1
0
0
0
0
0
0
520.00
2.Ern*Wm of line mute.
0
0
0
0
2
10
0
0
0
0
0
0
5250.0)
3. Examination of Ins mw1 t4*y.
0
0
0
0
4
4
0
0
0
0
0
0
5163.00
4. Determine lie size bead On 20 aro 50 -yaw Roj.dSs
0
1
0
0
2
4
0
2
0
0
0
0
520.03
S M ed Prof.* Repine*
0
0
0
0
1
1
0
0
0
0
0
0
5153.*
36705y force nen hon Pump SL*M. 1e
1. OMS srWep Normal* from Kw City.
0
0
0
0
0
1
0
0
0
0
0
0
520.00
2. EwmW*y t. rod..
0
0
0
0
2
5
0
0
0
0
0
0
$210.00
3. Eae*e*01 Wemwu]tUy.
0
0
0
0
4
4
0
0
0
0
0
0
51000
4. DeIwn** Ole Poi bead O1120 are 50ya.ot]wl*a
0
1
0
0
2
4
0
2
0
0
0
0
5X..03
S Ran and Ron* Preparation
0
0
0
0
1
1
0
0
0
5
0
0
1135.00
Stdaly
0
6
0
0
41
112
0
10
0
25
0
0
534412.00
2. Report with R.canmrd W me and Col Estimates
1. Prepare draft noon and *OteyrKOm.rwd alternatives .
2
4
0
0
16
6
0
2
0
4
0
0
5552.03
2
2
0
0
8
4
0
2
0
0
0
0
SRO 05
2. Fluke cost ettnW.s for nmlmnYM
Subtotal
4
0
0
0
24
12
0
4
0
4
0
0
51,346.00
3. Coordination with RJN. Black 5 Veatch, and MVO'
1. Additional Meetings,
5
12
0
0
10
0
0
0
0
0
0
0
5935.00
SuMaw
6
12
0
0
10
0
0
0
0
0
0
0
50360
4. ewration c4 Cost RMUC11 Mammoths',
1. R..vd,.bn W mponn*m using anw.m design vit.M.
Una 1
0
1
0
0
4
5
0
0
0
0
0
0
5252.00
Una 2
0
1
0
0
4
8
0
0
0
0
0
0
5252.00
LM3
0
1
0
0
4
8
0
0
0
0
0
0
5252.00
LM4
0
1
0
0
8
10
0
0
0
0
0
0
5432.00
Lbs
0
1
0
0
1
0
0
0
0
0
0
0
5252.00
LMT
2
1
0
0
6
8
0
0
0
0
0
0
141800
Pump Siston No 13 dddag forte main
0
0
1
1
5
0
3
0
0
0
0
5255.03
Perry Opal No 14 PcludW2 Iocw man
1
0
0
1
1
5
0
3
0
0
0
0
5200
Pump lid* No. IS Inducing force main
1
0
0
1
1
5
0
3
0
0
0
0
5200
Rnp lid* M. IS ricking haw m*
1
0
0
1
1
5
0
3
0
0
0
0
1250 CO
Rnp MSc," No. 15 icldag late mm
1
0
0
1
1
5
0
3
0
0
0
0
5200
Pro lid* No. t9 irldagbce mal
1
0
0
1
1
5
0
3
0
0
0
0
52Y.M
Rory SW*No 21
2
0
0
2
1
6
0
3
0
0
0
0
534200
2. CmdYW*r.th City.
0
0
0
0
0
0
0
0
0
0
0
0
5102.00
3. Ms cost es. nmm.rd.Ibm ltd submit TN 1041.
la
12
0
0
3i
IS
0
6
0
0
0
0
52.022.00
Subtotal
20
24
0
a
w
w
0
27
0
0
0
0
55,052.00
Additional Salaries Subtotal
Additional Labor and General and AdmInhMtNS Warhead 1150.0%)
Additional Fixed Fee 05%)
Additional Expenses
000001261s- Addt,nal
000r Cornml Testing EpllpmaF 1033G es* - MdNonal Tests
AMitbnal Rep0dIJ l NPVdtg
AM40nal Slrvey Supplies
Additional Aerial PItography
Additional Computer Rental
Additional Travel Costs
s0.00
51.500.00
5000.00
$0.00
$0.00
50.00
$000.00
512,160.00
511.240.00
14.540.00
$2,900.00
Additional Not to Eacite d Amount
GARVERI ENGINEERS
137.060.00
NAME OF FILE:
CROSS REFERENCE:
•
•j/9 . //0/
Date
Contents of File Initials
,
/v 0/
��
26 44.�GGa if/�9 . //- U
2_4? -0,
• tai (d,„„ )
/u�Lc6
xeiond /6 . / Qa��i i
Cts �/ avS„..eh x.,-,61,4a,„4,../,,O
d
X /isa,7irfq na/f�, ice,4,24 /
b7..5i-0 /
tai!?.//7 • i'/f'69-i �d2c. t
./d.7.4
VAIN
/-a_e•e, /AL d4; MILL
/ '
• •
CITY of FAYETTEVILLE
DEPARTMENTAL CORRESPONDENCE DATE: //trio/
To: Fayetteville City Council
From: Donald R. Bunn, Ass't P. W. Director
Thru• Mayor Dan Coody
Subject: Amendment No. 1
Wastewater Engineering Contract
Garver Engineers
On March 21, 2000 the City and Garver Engineers entered into an agr ement for certain services
relating to development of a Preliminary Design Report in connection with our Wastewater
Improvements Project. Specifically, their task was to evaluate outfall lines an pump stations on the
east (White River) side of Fayetteville for 2020 and ultimate flow conditions. Their existing contract
is for a maximum, not to exceed, amount of $391,532.00.
Garver Engineers has requested that an amendment to their existing engineering contract with the
City be amended to provide for work performed over and above the work scope as given in their
contract. Their requested increase is for $37,860.00, or 9.6 percent.
The request for an amendment and the Staff recommendation will be presented at the Agenda
Meeting on Tuesday, January 30.
PIE
• •
Garver, Inc.
Engineers
3810 Front Street, Suite 10
Fayetteville, AR 72703
501-527-9100
FAX 501-527-9101
www.9arverinc.com
January 23, 2001
Mr. Don Bunn, P.E.
Assistant Public Works Director
City of Fayetteville
113 West Mountain
Fayetteville, AR 72701
GARVER ENGINEERS
Re: Fayetteville Wastewater Improvements - Professional Engineering Services Contract Amendment No. 1
Dear Mr. Bunn:
Please consider this our revised proposed amendment to our original contract for the Preliminary Report
Phase of the Wastewater Improvements Project. We have revised this amendment in accordance with your
direction since reviewing our second submittal.
As you know, our scope of work has increased in the following areas:
> An additional 2.22 miles of force main including the mains from Pump Stations 13, 14, 15, 18, and 19.
> An additional 0.35 mile of gravity line near the line we have designated as Line 1.
> Additional coordination with the City and Consultants.
> Investigation of cost reduction options including re-evaluating improvements using different design
criteria.
As you know, we submitted our draft report on December 22, 2000. At your direction, we are investigating
the effect changes in design criteria will have on construction costs and will work with the City and RJN in an
effort to further reduce estimated construction costs. At this point, we have reached the total fee amount in
our original budget. Therefore, we sincerely need and appreciate your support of this amendment.
Since our original fee was negotiated based on a specific scope of work, and since this increase in scope
represents a significant amount of additional work, we believe it is appropriate to request this amendment to
our original contract. We have submitted a breakdown of detailed information (attached spreadsheet)
supporting this requested amendment. Your approval of this proposal will increase our "Not to Exceed" fee
amount from $391,532 to $429,392, an increase of $37,860.
If this proposal is acceptable to you, please sign the three copies and return one copy to me. As always, we
appreciate the opportunity to provide professional services to the City of Fayetteville and look forward to
successful completion of this project. Please call me with any questions or comments. Thank you.
Respectfully,
GARVER1ENGINEERS
Approved by:
Brock Hoskins, P E.
Vice President / Project Manager Date:
Brentwood TN • Fayetteville, AR • Huntsville, AL • Madison, MS • Little Rock, AR • Tulsa, OK
•
•
Additional Salary Sub101al
Additional Labor and Grnw I and Administrative OaWnd (150.0%)
Additional Fan Fa (15%)
Additional Expenses
Consultants Ad0ltbnal
Odor Control Tapp EOlipnelt 6 33Ma1- Additional Tests
AOd0ional RawmdumOIVP10ap
Adder W Survey AIMsa
atidalcmal Aerial Pmrop2phy
Addabmal Computer Rental
Additional Travel Costs
$0.00
51.500.00
Sm0.02
10.00
10.00
5000
5000.00
512.160.00
516240.00
52.000.00
Additional Na to Exceed Amount
GARVERIENGINEERS
137.060.00
N4ENOMENT NO. 1 -ADDITIONAL ENGINEERING
CITY OF FAYETTEVLLE. ARKANSAS
FAYETTEVILLE WASTEWATER IMPROVEMENTS - PRELIMINARY
SERVICES
REPORT PHASE
HOURLY
(EMMMAd
RATE WORK
Wawa)
WORK TASK DESCRIPTOR
Serax
Project
Manner
V
Aga
Mmgn
h
6nb
Project
Engineer
h
119x=
Entine
h
Saner
0gln
Entrant
h
Donau
Entfrwr
h
Ih1EO
Snow
In
EaMm
rental
Sunlit
h
Senior
6NOiM
In
a -h.
WIWI
IF
Survey Ow
h
1MS LS=
Mann'
h
1. Evaluation of Existing Lbw
ant Future Demands on to Swaim
MOWS 1.655 II a grayly Si. uv L»1
MJ„bnpOtnl„'Uy.
0
0
0
0
0
0
0
0
0
0
0
szOm
i EenyWen claw Imtt
0
0
0
0
2
e
0
0
0
0
0
0
517003A
s Exa
o
a
a
o
s 1z
0
0
0
00
00
0
1220.00S102031
_I,,Wa,evYal
Determine Na Ws bawd n 20and 50 -war wisdom
0
1
0
0
4
0
S. Anal ROTO Avplrton
0
0
0 _
0
1
1
0
0
0
4
0
0
S117.00
]0 it of force man from RmWSltbn No. 13
1 Wan l e,mlW2 ittmtbn Wm ON bly.
0
0
0
0
0
1
0
0
0
0
0
0
I20
i Ftahutbnc as roma,.
0
0
0
0
0
2
0
0
0
0
0
0
54003540035
E,aramala,,,(t„tMmltWMy.
0
0
0
0
1
2
o
0
0
0
0sasm
0op
Apinrin Ya at based win pet 5Oyeaw9etSe
o
1
0
0
1
2
0
2
0
0
0
0
5143.03
S Mn an Ryna Phantom
0
0
0
0
1
1
0
0
0
2
0
0
S0+.00
070 P 01 lace man from Pump NMM Na. 14
LOM* wing Y/wmtlbn from Oa City.
0
0
0
0
0
1
0
0
0
O
o
o
12000
2 Esa,S nyaemle
0
0
0
0
2
4
0
0
0
0
0
0
1131
2 E+.aiwMys aeMYabLaY
0
0
0
0
4
4
0
0
0
0
0
0
51500C
Aplmaa lire bawd caper 50.rt w9aba
0
1
0
0
2
4
0
2
0
0
0
0
$20620
5 Ran act Wale Promotion
0
0
0
0
+
1
0
0
0
4
0
0
S+17.03
I.12e E a +ate tan from Pep &tato No. 15
1 Obtainatangyymutpl tram Oa City
0
0
0
0
0
1
0
0
0
0
0
0
$20202
Examinational Ins routs.0
0
0
0
i
4
0
0
0
0
0
0
5130.00
5 Ema,,,naI 001 b„amn„y,ply.
0
0
0
0
4
4
0
0
0
0
0
0
i+mm
4 Detects as saw bawd or 2O at 5Opap9atom
0
1
0
0
2
4
0
2
0
0
0
0
fim.m
5 Manama was Preparation
0
0
0
0
1
1
0
0
0
4
0
0
1117.03
6043 du/ lye nor pan Pep Station M. 10
I Wail WNW lYwmSbn pan papy
0
0
0
0
0
1
0
0
0
0
0
0
Salm
2 Ermnalbn al ay rove
0
0
0
0
2
10
0
0
0
0
0
0
125000
2 Fiamtlm din vMmpeMOy.
0
0
0
0
4
4
0
0
0
0
0
0
simm
4 CeMrva to We bawl on 20 and
0
1
0
0
2
4
0
2
0
0
0
0
Simm
S Rn to Pry.*RepfYYf
0
0
0
0
1
1
0
0
0
a
0
0
5153.00
UMW t Ise main nm Pump Winn Ni 19
1 Wan sway ymrrwbn nom yam MY -0
0
0
0
0
1
0
0
0
0
0
0
130.00
..2 EaariwnoI Marys.
0
0
0
0
2
8
0
0
0
0
0
0
121003
Eantro yea arswwapMy.
0
0
0
0
4
4
0
0
0
0
0
0
.5150.034
Cxmia as WapsdpppaM 5O F0I.Stra
0
1
0
0
i
4
0
2
0
0
0
0
120000
S Ova Row Aepatbn
0
0
0
0
1
1
0
0
0
5
0
0
1135.00
Subtotal
0
6
0
0
a
92
0
10
0
23
0
0
53.612.00
Repan Anti aseemmencies Estimates
1. Repo pen nen W tion ol recommended entalMe
2
4
0
0
18
n
0
2
0
4
0
0
seez.m
2. WNW at etinsn lte¢naaraw tmtL.
2
2
0
0
a
4
0
2
0
0
0
0
1466.00
&IMyal
4
6
0
0
24
12
0
4
0
4
0
0
11.34100
Y
3. 0,00310•1100 with RJM Black S Welch. and PAW
1 MdavnS WNipa
a
12
0
0
10
0
0
0
0
0
0
0
503503
Subtotal
a
12
0
0
10
0
0
0
0
0
0
0
593500
4. Evaluation e1 Cel Reduction Nanutiea
1. MNalutbnOI irgwwmve using aurora at2 carte.
Una 1
0
1
0
0
4
6
0
0
0
0
0
0
1252.00
N2
0
1
0
0
•
6
0
0
0
0
0
0
s25i.m
tire
.0
1
0
0
4
a
0
0
0
0
0
0
5252.00
Urn 4
0
1
0
0
6
10
0
0
0
0
0
0
543203
Una5
0
1
0
0
4
a
0
0
0
0
0
0
525200
Lie?
2
1
0
0
5
a
0
0
0
0
0
0
$41500
Pmp&ton No 13 Including ow man
1
0
0
1
1
5
0
S
0
0
0
0
5250.00
Pump WN* Na 14 ivltiig Imps main
1
0
0
1
1
5
0
5
0
0
0
0
5256.00
Pump SWM M. 15 Intim loran rosin
1
0
0
1
1
5
0
S
0
0
0
0
5250.00
Pump SNOW No. 18 Mdoq(pse main
1
0
0
1
1
5
0
3
0
0
0
0
5255.00
Pump Staten No. lS MatG Wo math
1
0
0
1
1
5
0
3
0
0
0
0
1258.00
WT. Matta W. 10yV diq Yuman
1
0
0
1
1
5
0
2
0
0
0
0
5x55.00
Pmp&tlm No.21
2
0
0
2
1
a
0
S
0
0
0
0
1342.00
2 (o.dMM awn CIE
0
e
0
0
0
0
0
0
0
0
0
0
5192.00
3 Revise cosnIsntea. remmaMtMw as awm2 Ina non.
10
12
0
0
32
16
0
a
0
0
0
0
$Z022.00
SubloW
20
24
0
5
e0
94
0
21
0
0
0
0
15062.00
Additional Salary Sub101al
Additional Labor and Grnw I and Administrative OaWnd (150.0%)
Additional Fan Fa (15%)
Additional Expenses
Consultants Ad0ltbnal
Odor Control Tapp EOlipnelt 6 33Ma1- Additional Tests
AOd0ional RawmdumOIVP10ap
Adder W Survey AIMsa
atidalcmal Aerial Pmrop2phy
Addabmal Computer Rental
Additional Travel Costs
$0.00
51.500.00
Sm0.02
10.00
10.00
5000
5000.00
512.160.00
516240.00
52.000.00
Additional Na to Exceed Amount
GARVERIENGINEERS
137.060.00
• •
CITY of FAYETTEVILLE
DEPARTMENTAL CORRESPONDENCE DATE:
To: Fayetteville City Council
From: Donald R. Bunn, Ass't P. W. Director
Thru: Mayor Dan Coody
Subject: Amendment No. 1
Wastewater Engineering Contract
Garver Engineers
On March 21, 2000 the City and Garver Engineers entered into an agreement for certain services
relating to development of a Preliminary Design Report in connection with our Wastewater
Improvements Project. Specifically, their task was to evaluate outfall lines an pump stations on the
east (White River) side of Fayetteville for 2020 and ultimate flow conditions. Their existing contract
is for a maximum, not to exceed, amount of $391,532.00.
Attached is a letter from Garver Engineers requesting an amendment to their contract based on an
expansion of their scope of work. The scope changes involved two main areas of work; 1) the
evaluation of an additional 2.22 miles of force main and 0.35 miles of gravity sewer, and 2) the re-
evaluation of the cost estimates based on adjusted design criteria.
The amendment amount is proposed at $37,860.00, which is approximately 9.7 percent of the value
of the original contract. The Staff believes that the contract amendment requested by Garver is
reasonable and it is the recommendation of the Staff that Amendment No. 1 be approved.
AGENDA REQUEST FORM
Council Meeting of February 6,2001
Mayor's Approval
FROM Don Bunn Public Works Admin
Name Division
ACTION REQUIRED Approval of Amendment No.
Project Engineering Contract in the amount
not -to -exceed contract cost to $429,392.00.
COST TO CITY
$ 37,860.00
Cost of this Request
5400 5700 5314
Account Number
98047 40
$ 602,336.00
Public Works
Department
1 to the Garver Wastewater
of $37,860.00, increasing the
Category/Project Budget
00 563,280.00
Project Number
BUDGET/CONTRACT REVIEW
Bud.et C1•r• najr
Ai. AL
Accoun
ng Man -ger
City Attorney
WALQ
Purchasing Officer
Funds Used to Date
$ 39,056.00
Funds Remaining
X Budgeted tem
/-26,r206,
Date
/49/o/
Date
Sewer Line/Pump Station
Imp'v'ts, East Side
Category/Project Name
Program Name
Water and Sewer
in ervi
Fund Category
Budget Adj. Atta hed
(%s7
Director
ADA Coordinator
Dake
G, `` Date
,
Date tq,u Auditor�,,,�n4 1119/01
-30-01
Date
Date
STAFF RECOMMENDATION Staff recommends approval of the amendment as
presented in the amount of $37,860.00
Ass
1/26/01
t Public Works Director Date
e`• rtment P rector
1111/AAA ALLA4AAJ,
dill L_
o vices i rector
Cross Reference
New Item: Yes No
Prev Ord/Res # 38-00
Orig.
Contract # 753
Contract Date Mar 21 '00
•
FAYETTEVtLLE
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENTAL CORRESPONDENCE
•
To: Don Bunn, Assistant Public Works Director
From: Heather Woodruff, City Clerk
Date: February 14, 2001
Attached is a resolution approving Amendment No. 1 to the engineering contract with Garver
Engineers for wastewater improvement project. The original will be microfilmed and filed with
the City Clerk.
cc: Nancy Smith, Internal Audit