Loading...
HomeMy WebLinkAbout109-01 RESOLUTIONRESOLUTION NO. 109-01 A RESOLUTION APPROVING A CONTRACT AMENDMENT NOT TO EXCEED THE AMOUNT OF TWENTY-FOUR THOUSAND NINE HUNDRED FORTY-SEVEN DOLLARS ($24,947.00) WITH GARVER ENGINEERS FOR ADDITIONAL CONCEPTUAL DESIGNS AND COST ESTIMATES FOR IMPROVEMENTS TO OLD MISSOURI ROAD FROM THE INTERSECTION WITH ROLLING HILLS DRIVE, NORTH TO THE MUD CREEK BRIDGE. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council hereby Approves a contract amendment not to exceed the amount of Twenty -Four Thousand Nine Hundred Forty -Seven Dollars ($24,947.00) with Garver Engineers for additional conceptual designs and cost estimates for improvements to Old Missouri Road from the intersection with Rolling Hills Drive, north to the Mud Creek Bridge. Section 2. That the City Council authorizes the Mayor to sign such an amendment to the contract with Garver Engineers. PASSED AND APPROVED this 7th day of August, 2001. ATTEST. By: APPROVED: By: • NAME OF FILE: Resolution No. 109-01 CROSS REFERENCE. 08/07/01 Resolution No. 109-01 08/08/01 Professional Engineering Services Contract Amendment No. 1 regarding Old Missouri Road Improvements 06/28/01 Departmental Correspondence to Dan Coody, Mayor, thru Greg Boettcher, PWDirector (Contract Review), from Jim Beavers, City Engineer, regarding proposed change order number one to the engineering services contract with Garver Engineers for Old Missouir Road Improvements Phase I 07/17/01 Staff Review Form 08/13/01 Departmental Memo to Jim Beavers, City Engineer, from Heather Woodruff, City Clerk NOTES: • ' Garver, Inc. Engineers 3810 Front Street, Suite 10 Fayetteville, AR 72703 501-527-9100 FAX 501-527-9101 www.garverinc.com June 28, 2001 Mr. Jim Beavers, P.E. City Engineer City of Fayetteville 113 West Mountain Fayetteville, AR 72701 GARVER ENGINEERS Re: Old Missouri Road Improvements - Professional Engineering Services Contract Amendment No. 1 Dear Jim: As requested, please consider this our proposed Amendment No. 1 to our original contract for Old Missouri Road Improvements dated February 20, 2001. After meeting on June 15 with Mayor Coody, Bob Davis, Greg Boettcher, and you, we understand that the City wants us to develop, evaluate, and present additional conceptual alternatives for Old Missouri Road from Rolling Hills to the Mud Creek Bridge and to participate in additional public meetings and coordination. Based on your direction as a result of our meetings on June 15 and 26, we understand we are to develop additional alternatives in accordance with the following guidelines. ✓ Reduce Construction Cost. Specific items discussed directly related to reducing construction cost included not raising the street near the creek as high as originally planned, narrowing typical section elements including street, sidewalk, and trail width at strategic locations, and using open ditches instead of underground pipes for storm drainage. Garver will also investigate other ways to save substantial construction cost on this project. ✓ Reduce Impact to Some Adjacent Properties. This primarily included discussion of revisions to the horizontal alignment and narrowing typical section elements including street, sidewalk, and trail width at strategic locations. ✓ Additional Options to Evaluate. Garver will make revisions in accordance with the direction from the City as herein stated. We will also present the following alternatives (options) for consideration by the City in accordance with the general guidelines in our original agreement for the Conceptual Design Phase. Option 4 — Option 3 (original report) with the following revisions: 1. Use 28 feet back to back street width from Farr to Stubblefield and from Elaine to Mud Creek Bridge 2. Revise curve near creek to be less sharp 3. Reduce amount roadway will be raised near creek 4. Use open ditches instead of underground stormwater pipes and inlets where possible 5. Allow existing sidewalk to remain on west side and allow 2 -ft buffer 6. Narrow trail to six feet on east side, except for in front of school 7. Move trail to west side of street north of Elaine Brentwood, TN • Fayetteville, AR • Huntsville, AL • Madison, MS • Little Rock, AR • Tulsa, OK • Mr. Jim Beavers June 28, 2001 Page 2 • • Option 5 — Raise the road near the creek, from Stubblefield to Elaine, as needed to eliminate flooding, and "straighten" the curve as much as possible without significant impacts to the creek. This option would include cross drainage improvements and construction of a new trail/sidewalk from Stubblefield to Elaine. Option 6— Option 5 plus widen the roadway from Rolling Hills to Farr Lane to allow for a left - turn lane for Butterfield Trail Elementary School. This option would including cross drainage improvements and construction of a new trail/sidewalk from Rolling Hills to Farr Lane. Option 7 — Option 6 plus add a sidewalk on the west side from Farr to Stubblefield. Option 8 — Option 5 plus widen the roadway only from Eaton to Farr to allow for a left -turn lane for Butterfield Trail Elementary School. This option would including cross drainage improvements and construction of a new trail/sidewalk from Eaton to Farr and construction of a new sidewalk on the west side from Farr to Stubblefield. No improvements would be made south of Eaton or north of Elaine. Since we have already completed the Conceptual Design Phase of our original agreement, and since the City wants us to develop and evaluate several additional conceptual alternatives, we believe it is appropriate to ask for this amendment to cover our additional costs. Approval of this amendment would increase our "Not to Exceed" fee for Design Phase Services by $24,947, as shown on the attached detailed spreadsheet. If this proposal is acceptable to you, please sign the three copies and return one copy to me. As always, we appreciate the opportunity to provide professional services to the City of Fayetteville and look forward to successful completion of this project. Please call me with any questions or comments. Thank you. Respectfully, GARVER I ENGINEER Approved by: Brock Hoskins, P.E. Vice President / Project Manager Date: IgI I I S. Mechanics! Engineering Subtotal EngLueing |(i!{� ' II. Structural Engineering / Ammend Conceptual Report li !ITa g I _ Ulkly Companies Cw'Elntlm ( IPunk Meetings with exhibits �/!|` ` / I1. CND EnCinMtlnp WORK TASK DESCRIPTION . . . . ,|/| . . 1 1 24 ., ,.. ..., . , ! \ . 0 ,! ! . . . . ] / c g a•. . ,,, , . .... \ / | . , . 1a ,... 8 ,.,.... ,; |! o . 0 0 , . ,;f! c g ° 0 ! !! o g , , ! §( g o . 0 ; . a L.2_1 . ,; ii o . .. 145 I . .. a ,,.,. ,§ i( . . .. ; I . 4,0 0 r �8 , . . ,]/| . 0 0 ,! || . . 0 0 ,|§| 0 0 I 0 ! 4 • • Garver, Inc. Engineers 3810 Front Street, Suite 10 Fayetteville, AR 72703 501-527-9100 FAX 501-527-9101 www.garverinc.com Mr. Jim Beavers, P E City Engineer City of Fayetteville 113 West Mountain Fayetteville, AR 72701 June 28, 2001 GARVERIENGINEERS Re: Old Missouri Road Improvements - Professional Engineering Services Contract Amendment No. 1 Dear Jim: As requested, please consider this our proposed Amendment No. 1 to our original contract for Old Missouri Road Improvements dated February 20, 2001. After meeting on June 15 with Mayor Coody, Bob Davis, Greg Boettcher, and you, we understand that the City wants us to develop, evaluate, and present additional conceptual alternatives for Old Missouri Road from Rolling Hills to the Mud Creek Bridge and to participate in additional public meetings and coordination. Based on your direction as a result of our meetings on June 15 and 26, we understand we are to develop additional alternatives in accordance with the following guidelines. ✓ Reduce Construction Cost. Specific items discussed directly related to reducing construction cost included not raising the street near the creek as high as originally planned, narrowing typical section elements including street, sidewalk, and trail width at strategic locations, and using open ditches instead of underground pipes for storm drainage. Garver will also investigate other ways to save substantial construction cost on this project. ✓ Reduce Impact to Some Adjacent Properties. This primarily included discussion of revisions to the honzontal alignment and narrowing typical section elements including street, sidewalk, and trail width at strategic locations. ✓ Additional Options to Evaluate. Garver will make revisions in accordance with the direction from the City as herein stated. We will also present the following alternatives (options) for consideration by the City in accordance with the general guidelines in our original agreement for the Conceptual Design Phase. Option 4 — Option 3 (original report) with the following revisions: 1. Use 28 feet back to back street width from Farr to Stubblefield and from Elaine to Mud Creek Bridge 2. Revise curve near creek to be less sharp 3. Reduce amount roadway will be raised near creek 4. Use open ditches instead of underground stormwater pipes and inlets where possible 5. Allow existing sidewalk to remain on west side and allow 2 -ft buffer 6. Narrow trail to six feet on east side, except for in front of school 7. Move trail to west side of street north of Elaine Brentwood, TN • Fayetteville, AR • Huntsville, AL • Madison, MS • Little Rock, AR • Tulsa, OK • • Mr. Jim Beavers June 28, 2001 Page 2 • • Option 5 — Raise the road near the creek, from Stubblefield to Elaine, as needed to eliminate flooding, and "straighten" the curve as much as possible without significant impacts to the creek. This option would include cross drainage improvements and construction of a new trail/sidewalk from Stubblefield to Elaine. Option 6 — Option 5 plus widen the roadway from Rolling Hills to Farr Lane to allow for a left - turn lane for Butterfield Trail Elementary School. This option would including cross drainage improvements and construction of a new trail/sidewalk from Rolling Hills to Farr Lane. Option 7 — Option 6 plus add a sidewalk on the west side from Farr to Stubblefield. Option 8 — Option 5 plus widen the roadway only from Eaton to Farr to allow for a left -tum lane for Butterfield Trail Elementary School. This option would including cross drainage improvements and construction of a new trail/sidewalk from Eaton to Farr and construction of a new sidewalk on the west side from Fan to Stubblefield. No improvements would be made south of Eaton or north of Elaine. Since we have already completed the Conceptual Design Phase of our original agreement, and since the City wants us to develop and evaluate several additional conceptual alternatives, we believe it is appropriate to ask for this amendment to cover our additional costs. Approval of this amendment would increase our "Not to Exceed" fee for Design Phase Services by $24,947, as shown on the attached detailed spreadsheet. If this proposal is acceptable to you, please sign the three copies and return one copy to me. As always, we appreciate the opportunity to provide professional services to the City of Fayetteville and look forward to successful completion of this project. Please call me with any questions or comments. Thank you. Respectfully, GARVER 1 ENGINEER Approved by: Brock Hoskins, P E Vice President / Project Manager Date: APPENDIX A - Amendment No. 1 CONCEPTUAL DESIGN - Extra Work • II gi 0 0 0 0 IIS 8 0 0 0 0 I,I gi 0 0 0 0 F Ile 2 0 0 0 0 J 8 g t i8 0 0 0 0 t oi . . 0 0 0 8 2 8 $ _ _ . _ _ M $ • . o e gt e 0 e e gi 0 0 e e e t 8 gym 5 t e e e e R B 2 e e e e g. .. . e 0 e a! gi -- I e 0.gmovAm a a e e 11! ; 1 8 A2 0 0 e 0 nigt e e e e 11 22 1 e._ e_ _.ry ry 4 a 0 0 e II 8t 0 0 0 0 WORK TASK DESCRIPTION Ili V F a .NNI.Ft NAIM-pNee I 1 ill i e!/y931 O 6 e' yip 8 $ O f Nm*MC.neplu.IR.pt 1 sows,. CINI Engjn..rlrq P 2$Y{y$ Y a C P e] • P ] 3 i . f I 8 8 8 8 8 8 3 8 8 e • 8 a 8 2 8 a a x 8 a 8 8 n8 S88S8 g S S S N 8 & a S S a PROFESSIONAL FEE (Profit) 8 0 FAYETTEVAE . THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE • To: Dan Coody, Mayor Thru: Greg Boettcher, Public Works Director Contract Review From: Jim Beavers, City Engineer Date: June 28, 2001 7'' Re: City Council Meeting July 17, 2001 Proposed change order number one to the engineering services contract with Garver Engineers for Old Missouri Road Improvements Phase 1. Based upon the May 29 Public Hearing, the June 7 Public meeting on-site and subsequent meetings with staff and/or administration on June 11, 15 and 26, it is requested that the consultant's contract be amended to employee Garver to prepare additional conceptual designs and costs estimates for alternatives which reduce to differing degrees the scope and costs of the project. The proposed change order is in the not to exceed amount of $24,947.00. Page 1 of 1 FAYETTEVIPLE THE CITY OF FAYETTEVILLE. ARKANSAS DEPARTMENTAL CORRESPONDENCE • To: Dan Coody, Mayor Thru: Greg Boettcher, Public Works Director Contract Review From: Jim Beavers, City Engineer Date• June 28, 2001 7" Re: City Council Meeting July 17, 2001 Proposed change order number one to the engineering services contract with Garver Engineers for Old Missouri Road Improvements Phase 1. Based upon the May 29 Public Hearing, the June 7 Public meeting on-site and subsequent meetings with staff and/or administration on June 11, 15 and 26, it is requested that the consultant's contract be amended to employee Garver to prepare additional conceptual designs and costs estimates for alternatives which reduce to differing degrees the scope and costs of the project. The proposed change order is in the not to exceed amount of $24,947.00. Pagel of 1 all STAFF REVIEW FORM ID _ AGENDA REQUEST CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Council meeting of July 17. 2001 FROM: Jim Beavers Engineering Public Works Name Divkinn Department ACTION REQUIRED: 1. Approval of change order number one in the not to exceed amount of $24,947 to the engineering services contract Garver Engineers for additional conceptual designs and cost estimates for improvements to Old Missouri Road from the intersection with Rolling Hills north to the Mud Creek Bridge. COST TO CITY: $24.947 Cost of this Request 4470-9470-5809.00 Account Number 00050-0010 Project Number $1.590.060 Old Missouri Road Phase 1 Category/Project Budget Category/Project Name $330.159 Street Funds Used To Date Program Name $1.259.901 Sales tax Remaining Balance Fund BUDGET REVIEW Budget Manager Budgeted Item Budget Adjustment Attached Administrative Services Director CONTRACT/GRANT/LEASE REVIEW Acco nting Mana er Date Purchasing Officer GRANTING AGENCY. (0) IAternalLM _ uditor Date ADA Coordinator Date Grant Coordinator Date STAFF RECOMMENDATION: Approval Div on ead ide 1. 411 Admi istrati e Services : trector nt D ector o/ Date 0 7-01-O Da e ?moo Mayor god 1 ate 7 /3//O( Date Cross Reference New Bern: Yes_ No x Prev Ord/Res IP 19-01 Orig Contract Date• 02/20/01 Orig Contract No: STAFF REVIEW FORM Description Old Missouri Road Phase 1 Meeting Date July 17 2001 Comments: Reference Comments: Budget Manager Accounting Manager City Attorney Purchasing Officer ADA Coordinator Internal Auditor • Grant Coordinator Page 2 • STAFF REVIEW FORM AGENDA REQUEST CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Council meeting of July 17. 2001 FROM: Jim Beavers Name ACTION REQUIRED: Et ''veering Division Public Works Department 1. Approval of change order number one in the not to exceed amount of $24,947 to the engineering services contract Garver Engineers for additional conceptual designs and cost estimates for improvements to Old Missouri Road from the intersection with Rolling Hills north to the Mud Creek Bridge. COST TO CITY: $24.947 Cost of this Request 4470-9470-5809.00 Account Number 00050-0010 Project Number $1.590,060 Category/Project Budget $330.159 Funds Used To Date $1 259 901 Remaining Balance Old Missouri Road Phase 1 Category/Project Name Street Program Name Sales tax Fund BUDGET REVIEW Budgeted Item Budget Manager Budget Adjustment Attached Administrative Services Director CONTRACT/GRANT/LEASE REVIEW Purchasing Officer GRANTING AGENCY* haemal/Auditor Date J ADA Coordinator Date Grant Coordinator Date STAFF RECOMMENDATION: Approval Divi{ton ead Dep nt Director D 7 -o2 -o/ Date Administrative Services Director Date Mayor Date Cross Reference New Item: Yes_ No_x Prev Ord/Res #- 19-01 Orig Contract Date: 02/20/01 Orig Contract No- FAYETTEVIIPLE THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE • To: Jim Beavers, City Engineer From: Heather Woodruff, City Clerk Date: August 13, 2001 Attached is a copy of the resolution approving the amendment to the contract with Garver Engineers in connection with the Old Missouri Road project. I am also returning two originals to you. The original will be microfilmed and filed with the City Clerk. cc: Nancy Smith, Internal Audit T