HomeMy WebLinkAbout109-01 RESOLUTIONRESOLUTION NO. 109-01
A RESOLUTION APPROVING A CONTRACT AMENDMENT
NOT TO EXCEED THE AMOUNT OF TWENTY-FOUR
THOUSAND NINE HUNDRED FORTY-SEVEN DOLLARS
($24,947.00) WITH GARVER ENGINEERS FOR ADDITIONAL
CONCEPTUAL DESIGNS AND COST ESTIMATES FOR
IMPROVEMENTS TO OLD MISSOURI ROAD FROM THE
INTERSECTION WITH ROLLING HILLS DRIVE, NORTH TO
THE MUD CREEK BRIDGE.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council hereby Approves a contract amendment
not to exceed the amount of Twenty -Four Thousand Nine Hundred Forty -Seven
Dollars ($24,947.00) with Garver Engineers for additional conceptual designs and
cost estimates for improvements to Old Missouri Road from the intersection with
Rolling Hills Drive, north to the Mud Creek Bridge.
Section 2. That the City Council authorizes the Mayor to sign such an
amendment to the contract with Garver Engineers.
PASSED AND APPROVED this 7th day of August, 2001.
ATTEST.
By:
APPROVED:
By:
•
NAME OF FILE: Resolution No. 109-01
CROSS REFERENCE.
08/07/01
Resolution No. 109-01
08/08/01
Professional Engineering Services Contract Amendment No. 1 regarding
Old Missouri Road Improvements
06/28/01
Departmental Correspondence to Dan Coody, Mayor, thru Greg
Boettcher, PWDirector (Contract Review), from Jim Beavers, City
Engineer, regarding proposed change order number one to the
engineering services contract with Garver Engineers for Old Missouir
Road Improvements Phase I
07/17/01
Staff Review Form
08/13/01
Departmental Memo to Jim Beavers, City Engineer, from Heather
Woodruff, City Clerk
NOTES:
• '
Garver, Inc.
Engineers
3810 Front Street, Suite 10
Fayetteville, AR 72703
501-527-9100
FAX 501-527-9101
www.garverinc.com
June 28, 2001
Mr. Jim Beavers, P.E.
City Engineer
City of Fayetteville
113 West Mountain
Fayetteville, AR 72701
GARVER
ENGINEERS
Re: Old Missouri Road Improvements - Professional Engineering Services Contract Amendment No. 1
Dear Jim:
As requested, please consider this our proposed Amendment No. 1 to our original contract for Old
Missouri Road Improvements dated February 20, 2001.
After meeting on June 15 with Mayor Coody, Bob Davis, Greg Boettcher, and you, we understand that
the City wants us to develop, evaluate, and present additional conceptual alternatives for Old Missouri
Road from Rolling Hills to the Mud Creek Bridge and to participate in additional public meetings and
coordination. Based on your direction as a result of our meetings on June 15 and 26, we understand we
are to develop additional alternatives in accordance with the following guidelines.
✓ Reduce Construction Cost. Specific items discussed directly related to reducing construction cost
included not raising the street near the creek as high as originally planned, narrowing typical section
elements including street, sidewalk, and trail width at strategic locations, and using open ditches
instead of underground pipes for storm drainage. Garver will also investigate other ways to save
substantial construction cost on this project.
✓ Reduce Impact to Some Adjacent Properties. This primarily included discussion of revisions to the
horizontal alignment and narrowing typical section elements including street, sidewalk, and trail
width at strategic locations.
✓ Additional Options to Evaluate. Garver will make revisions in accordance with the direction from
the City as herein stated. We will also present the following alternatives (options) for consideration
by the City in accordance with the general guidelines in our original agreement for the Conceptual
Design Phase.
Option 4 — Option 3 (original report) with the following revisions:
1. Use 28 feet back to back street width from Farr to Stubblefield and from Elaine to Mud
Creek Bridge
2. Revise curve near creek to be less sharp
3. Reduce amount roadway will be raised near creek
4. Use open ditches instead of underground stormwater pipes and inlets where possible
5. Allow existing sidewalk to remain on west side and allow 2 -ft buffer
6. Narrow trail to six feet on east side, except for in front of school
7. Move trail to west side of street north of Elaine
Brentwood, TN • Fayetteville, AR • Huntsville, AL • Madison, MS • Little Rock, AR • Tulsa, OK
•
Mr. Jim Beavers
June 28, 2001
Page 2
• •
Option 5 — Raise the road near the creek, from Stubblefield to Elaine, as needed to eliminate
flooding, and "straighten" the curve as much as possible without significant impacts to the
creek. This option would include cross drainage improvements and construction of a new
trail/sidewalk from Stubblefield to Elaine.
Option 6— Option 5 plus widen the roadway from Rolling Hills to Farr Lane to allow for a left -
turn lane for Butterfield Trail Elementary School. This option would including cross drainage
improvements and construction of a new trail/sidewalk from Rolling Hills to Farr Lane.
Option 7 — Option 6 plus add a sidewalk on the west side from Farr to Stubblefield.
Option 8 — Option 5 plus widen the roadway only from Eaton to Farr to allow for a left -turn
lane for Butterfield Trail Elementary School. This option would including cross drainage
improvements and construction of a new trail/sidewalk from Eaton to Farr and construction of a
new sidewalk on the west side from Farr to Stubblefield. No improvements would be made
south of Eaton or north of Elaine.
Since we have already completed the Conceptual Design Phase of our original agreement, and since the
City wants us to develop and evaluate several additional conceptual alternatives, we believe it is
appropriate to ask for this amendment to cover our additional costs. Approval of this amendment would
increase our "Not to Exceed" fee for Design Phase Services by $24,947, as shown on the attached
detailed spreadsheet.
If this proposal is acceptable to you, please sign the three copies and return one copy to me. As always,
we appreciate the opportunity to provide professional services to the City of Fayetteville and look
forward to successful completion of this project. Please call me with any questions or comments.
Thank you.
Respectfully,
GARVER I ENGINEER
Approved by:
Brock Hoskins, P.E.
Vice President / Project Manager Date:
IgI
I
I
S. Mechanics! Engineering
Subtotal EngLueing
|(i!{�
'
II. Structural Engineering
/
Ammend Conceptual Report
li
!ITa
g
I _ Ulkly Companies Cw'Elntlm
(
IPunk Meetings with exhibits
�/!|`
`
/
I1. CND EnCinMtlnp
WORK TASK DESCRIPTION
.
.
.
.
,|/|
.
.
1
1 24
.,
,..
...,
.
, ! \
.
0
,! !
.
.
.
.
] /
c
g
a•.
.
,,,
,
.
....
\ / |
.
,
.
1a
,...
8
,.,....
,; |!
o
.
0
0
,
.
,;f!
c
g
°
0
! !!
o
g
,
,
! §(
g
o
.
0
;
.
a
L.2_1
.
,; ii
o
.
..
145 I
.
..
a
,,.,.
,§ i(
.
.
..
; I
.
4,0
0
r
�8
,
.
.
,]/|
.
0
0
,! ||
.
.
0
0
,|§|
0
0
I
0
! 4
•
•
Garver, Inc.
Engineers
3810 Front Street, Suite 10
Fayetteville, AR 72703
501-527-9100
FAX 501-527-9101
www.garverinc.com
Mr. Jim Beavers, P E
City Engineer
City of Fayetteville
113 West Mountain
Fayetteville, AR 72701
June 28, 2001
GARVERIENGINEERS
Re: Old Missouri Road Improvements - Professional Engineering Services Contract Amendment No. 1
Dear Jim:
As requested, please consider this our proposed Amendment No. 1 to our original contract for Old
Missouri Road Improvements dated February 20, 2001.
After meeting on June 15 with Mayor Coody, Bob Davis, Greg Boettcher, and you, we understand that
the City wants us to develop, evaluate, and present additional conceptual alternatives for Old Missouri
Road from Rolling Hills to the Mud Creek Bridge and to participate in additional public meetings and
coordination. Based on your direction as a result of our meetings on June 15 and 26, we understand we
are to develop additional alternatives in accordance with the following guidelines.
✓ Reduce Construction Cost. Specific items discussed directly related to reducing construction cost
included not raising the street near the creek as high as originally planned, narrowing typical section
elements including street, sidewalk, and trail width at strategic locations, and using open ditches
instead of underground pipes for storm drainage. Garver will also investigate other ways to save
substantial construction cost on this project.
✓ Reduce Impact to Some Adjacent Properties. This primarily included discussion of revisions to the
honzontal alignment and narrowing typical section elements including street, sidewalk, and trail
width at strategic locations.
✓ Additional Options to Evaluate. Garver will make revisions in accordance with the direction from
the City as herein stated. We will also present the following alternatives (options) for consideration
by the City in accordance with the general guidelines in our original agreement for the Conceptual
Design Phase.
Option 4 — Option 3 (original report) with the following revisions:
1. Use 28 feet back to back street width from Farr to Stubblefield and from Elaine to Mud
Creek Bridge
2. Revise curve near creek to be less sharp
3. Reduce amount roadway will be raised near creek
4. Use open ditches instead of underground stormwater pipes and inlets where possible
5. Allow existing sidewalk to remain on west side and allow 2 -ft buffer
6. Narrow trail to six feet on east side, except for in front of school
7. Move trail to west side of street north of Elaine
Brentwood, TN • Fayetteville, AR • Huntsville, AL • Madison, MS • Little Rock, AR • Tulsa, OK
•
•
Mr. Jim Beavers
June 28, 2001
Page 2
•
•
Option 5 — Raise the road near the creek, from Stubblefield to Elaine, as needed to eliminate
flooding, and "straighten" the curve as much as possible without significant impacts to the
creek. This option would include cross drainage improvements and construction of a new
trail/sidewalk from Stubblefield to Elaine.
Option 6 — Option 5 plus widen the roadway from Rolling Hills to Farr Lane to allow for a left -
turn lane for Butterfield Trail Elementary School. This option would including cross drainage
improvements and construction of a new trail/sidewalk from Rolling Hills to Farr Lane.
Option 7 — Option 6 plus add a sidewalk on the west side from Farr to Stubblefield.
Option 8 — Option 5 plus widen the roadway only from Eaton to Farr to allow for a left -tum
lane for Butterfield Trail Elementary School. This option would including cross drainage
improvements and construction of a new trail/sidewalk from Eaton to Farr and construction of a
new sidewalk on the west side from Fan to Stubblefield. No improvements would be made
south of Eaton or north of Elaine.
Since we have already completed the Conceptual Design Phase of our original agreement, and since the
City wants us to develop and evaluate several additional conceptual alternatives, we believe it is
appropriate to ask for this amendment to cover our additional costs. Approval of this amendment would
increase our "Not to Exceed" fee for Design Phase Services by $24,947, as shown on the attached
detailed spreadsheet.
If this proposal is acceptable to you, please sign the three copies and return one copy to me. As always,
we appreciate the opportunity to provide professional services to the City of Fayetteville and look
forward to successful completion of this project. Please call me with any questions or comments.
Thank you.
Respectfully,
GARVER 1 ENGINEER
Approved by:
Brock Hoskins, P E
Vice President / Project Manager Date:
APPENDIX A - Amendment No. 1
CONCEPTUAL DESIGN - Extra Work
•
II gi
0
0
0
0
IIS 8
0
0
0
0
I,I gi
0
0
0
0
F
Ile 2
0
0
0
0
J 8
g t
i8
0
0
0
0
t
oi
.
.
0
0
0
8 2
8
$
_
_
.
_
_
M
$
•
.
o
e
gt
e
0
e
e
gi
0
0
e
e
e
t 8
gym 5 t
e
e
e
e
R B 2
e
e
e
e
g.
..
.
e
0
e
a! gi
--
I e
0.gmovAm
a
a
e
e
11! ;
1 8 A2
0
0
e
0
nigt
e
e
e
e
11 22
1
e._
e_
_.ry
ry
4
a
0
0
e
II
8t
0
0
0
0
WORK TASK DESCRIPTION
Ili
V
F
a
.NNI.Ft NAIM-pNee
I
1
ill
i
e!/y931
O
6
e'
yip
8
$ O
f Nm*MC.neplu.IR.pt
1 sows,. CINI Engjn..rlrq
P
2$Y{y$
Y
a
C
P
e]
•
P
]
3
i
.
f
I
8
8
8
8
8
8
3
8
8
e
•
8
a 8
2
8
a a
x
8
a
8
8
n8
S88S8
g S S S N
8 &
a S
S a
PROFESSIONAL FEE (Profit)
8
0
FAYETTEVAE
. THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENTAL CORRESPONDENCE
•
To: Dan Coody, Mayor
Thru: Greg Boettcher, Public Works Director
Contract Review
From: Jim Beavers, City Engineer
Date: June 28, 2001 7''
Re: City Council Meeting July 17, 2001
Proposed change order number one to the engineering services contract with Garver Engineers
for Old Missouri Road Improvements Phase 1.
Based upon the May 29 Public Hearing, the June 7 Public meeting on-site and subsequent meetings with
staff and/or administration on June 11, 15 and 26, it is requested that the consultant's contract be
amended to employee Garver to prepare additional conceptual designs and costs estimates for
alternatives which reduce to differing degrees the scope and costs of the project.
The proposed change order is in the not to exceed amount of $24,947.00.
Page 1 of 1
FAYETTEVIPLE
THE CITY OF FAYETTEVILLE. ARKANSAS
DEPARTMENTAL CORRESPONDENCE
•
To: Dan Coody, Mayor
Thru: Greg Boettcher, Public Works Director
Contract Review
From: Jim Beavers, City Engineer
Date• June 28, 2001 7"
Re: City Council Meeting July 17, 2001
Proposed change order number one to the engineering services contract with Garver Engineers
for Old Missouri Road Improvements Phase 1.
Based upon the May 29 Public Hearing, the June 7 Public meeting on-site and subsequent meetings with
staff and/or administration on June 11, 15 and 26, it is requested that the consultant's contract be
amended to employee Garver to prepare additional conceptual designs and costs estimates for
alternatives which reduce to differing degrees the scope and costs of the project.
The proposed change order is in the not to exceed amount of $24,947.00.
Pagel of 1
all
STAFF REVIEW FORM ID
_ AGENDA REQUEST
CONTRACT REVIEW
GRANT REVIEW
For the Fayetteville City Council meeting of July 17. 2001
FROM:
Jim Beavers
Engineering Public Works
Name Divkinn Department
ACTION REQUIRED:
1. Approval of change order number one in the not to exceed amount of $24,947 to the engineering services
contract Garver Engineers for additional conceptual designs and cost estimates for improvements to Old
Missouri Road from the intersection with Rolling Hills north to the Mud Creek Bridge.
COST TO CITY:
$24.947
Cost of this Request
4470-9470-5809.00
Account Number
00050-0010
Project Number
$1.590.060 Old Missouri Road Phase 1
Category/Project Budget Category/Project Name
$330.159 Street
Funds Used To Date Program Name
$1.259.901 Sales tax
Remaining Balance Fund
BUDGET REVIEW
Budget Manager
Budgeted Item
Budget Adjustment Attached
Administrative Services Director
CONTRACT/GRANT/LEASE REVIEW
Acco nting Mana er Date
Purchasing Officer
GRANTING AGENCY.
(0)
IAternalLM _
uditor Date
ADA Coordinator
Date
Grant Coordinator
Date
STAFF RECOMMENDATION: Approval
Div on ead
ide
1.
411
Admi istrati e Services : trector
nt
D
ector
o/
Date
0 7-01-O
Da e
?moo
Mayor
god
1
ate
7 /3//O(
Date
Cross Reference
New Bern: Yes_ No x
Prev Ord/Res IP 19-01
Orig Contract Date• 02/20/01
Orig Contract No:
STAFF REVIEW FORM
Description Old Missouri Road Phase 1 Meeting Date July 17 2001
Comments: Reference Comments:
Budget Manager
Accounting Manager
City Attorney
Purchasing Officer
ADA Coordinator
Internal Auditor
•
Grant Coordinator
Page 2
• STAFF REVIEW FORM
AGENDA REQUEST
CONTRACT REVIEW
GRANT REVIEW
For the Fayetteville City Council meeting of July 17. 2001
FROM:
Jim Beavers
Name
ACTION REQUIRED:
Et ''veering
Division
Public Works
Department
1. Approval of change order number one in the not to exceed amount of $24,947 to the engineering services
contract Garver Engineers for additional conceptual designs and cost estimates for improvements to Old
Missouri Road from the intersection with Rolling Hills north to the Mud Creek Bridge.
COST TO CITY:
$24.947
Cost of this Request
4470-9470-5809.00
Account Number
00050-0010
Project Number
$1.590,060
Category/Project Budget
$330.159
Funds Used To Date
$1 259 901
Remaining Balance
Old Missouri Road Phase 1
Category/Project Name
Street
Program Name
Sales tax
Fund
BUDGET REVIEW
Budgeted Item
Budget Manager
Budget Adjustment Attached
Administrative Services Director
CONTRACT/GRANT/LEASE REVIEW
Purchasing Officer
GRANTING AGENCY*
haemal/Auditor Date
J
ADA Coordinator
Date
Grant Coordinator
Date
STAFF RECOMMENDATION: Approval
Divi{ton ead
Dep nt Director
D 7 -o2 -o/
Date
Administrative Services Director
Date
Mayor
Date
Cross Reference
New Item: Yes_ No_x
Prev Ord/Res #- 19-01
Orig Contract Date: 02/20/01
Orig Contract No-
FAYETTEVIIPLE
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENTAL CORRESPONDENCE
•
To: Jim Beavers, City Engineer
From: Heather Woodruff, City Clerk
Date: August 13, 2001
Attached is a copy of the resolution approving the amendment to the contract with Garver
Engineers in connection with the Old Missouri Road project. I am also returning two originals to
you. The original will be microfilmed and filed with the City Clerk.
cc: Nancy Smith, Internal Audit