Loading...
HomeMy WebLinkAbout73-00 RESOLUTION0 0 RESOLUTION NO. 73 09 MICRQPILMED A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN AGREEMENT FOR ENGINEERING SERVICES WITH HAWKINS-WEIR ENGINEERS, INC., IN THE AMOUNT OF $289253.37, FOR THE DESIGN OF WATER AND SANITARY SEWER RELOCATIONS AND SYSTEM IMPROVEMENTS IN PREPARATION FOR THE WIDENING OF GARLAND STREET. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council hereby authorizes the Mayor and City Clerk to execute an agreement for engineering services with Hawkins -Weir Engineers, Inc., in the amount of $28,253.37, for the design of water and sanitary sewer relocations and system improvement in preparation for the widening of Garland Street. A copy of the agreement is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this6th day of June , 2000. ATTEST: By: / Heather Woodruff, City Clerl APPROVED: i`Z' By: Fred Hanna, Mayor 0 NAME OF FILE: Resolution No. 73-00 CROSS REFERENCE: 06/06/00 Resolution No. 73-00 Exhibit "A" (Copy of the Agreement) 05/08/00 Memo to Mayor Hanna thru Charles Venable from Jim Beavers (plus enclosures) 06/06/00 Staff Review Form 06/27/00 Memo to Jim Beavers, Engineering Division, from Heather Woodruff, City Clerk 01/17/01 Memo to Mayor Coody thru Greg Boettcher, Public Works Director, and Jim Beavers, City Engineer, from Sid Norbash, Staff Engineer, regarding Garland Avenue Water & Sewer Relocations/Amendment #2 to the Engineering Contract with Hawkins -Weir Engineers, Inc. 02/06/01 Copy of Resolution No. 13-01 (Approving Amendment No. 1 to the Engineering Contract with Hawkins -Weir Engineering, Inc.) 02/06/01 Copy of Staff Review Form 07/03/01 Copy of Resolution No. 93-01 (Awarding a construction contract to Gray Construction, Inc. for sewer relocation in conjunction with the Double Springs Bridge over Owl Creek) 12/07/01 Letter to Sid Norbash from Ronald R. Hawkins, P.E., R.L.S., Hawkins - Weir Engineers, Inc. of Subsequent Contract Amounts 02/25/02Amendment #2 to the Engineering Contract with Hawkins -Weir PSummary Engineers, Inc. Staff Review Form Memo to Sid Norbash, Engineering Division, from Heather Woodruff, City Clerk CITY OF FAYETTEVILLE AGREEMENT FOR ENGINEERING SERVICES EX�I STATE OF ARKANSAS COUNTY OF WASHINGTON This Agreement entered into and executed this -1.,f day of 2000) by and between the City of Fayetteville acting by and throug its Mayor hereinafter called the "OWNER" and Hawkins -Weir Engineers, Inc. with offices located in Van Buren, Arkansas hereinafter called the "ENGINEER". WITNESSETH: Whereas, the "OWNER" is planning to relocate water and sanitary sewer lines as necessary to accommodate the proposed widening of Garland Avenue from Maple Street to North Street per AHTD job 040273 and Whereas the "OWNER'S" forces are fully employed on other urgent work that prevents their early assignment to the aforementioned work; and Whereas, the "ENGINEER'S" staff is adequate and well qualified and it has been determined that its current work load will permit completion of the plans for the project on schedule; Now therefore, it is considered to be in the best public interest for the "OWNER" to obtain assistance of the "ENGINEER'S" organization in connection with said engineering services. In consideration of the faithful performance of each party of the mutual covenants and agreements set forth hereinafter, it is mutually agreed as follows: SECTION I - EMPLOYMENT OF ENGINEER The "OWNER" agrees to employ the "ENGINEER" to perform, and the "ENGINEER" agrees to perform, professional engineering services in connection with the project set forth in the Sections to follow; and the "OWNER" agrees to pay and the "ENGINEER" agrees to accept, as specified in the Sections to follow as full and final compensation for work accomplished in the specified time. SECTION II -DESCRIPTION OF THE PROJECT The Project consists of the engineering services required for the relocation and extension of water and sanitary sewer lines and improvements necessary to accommodate the widening and reconstruction of Garland Avenue from Maple Street to North Street per AHTD job 040273. 0 1 0 SECTION III - INFORMATION & SERVICES The "OWNER" will furnish any specifications, standards and other information which may relate to the project including GPS survey data. Aerial mapping data will be provided, free of charge, to the "ENGINEER" on magnetic media. SECTION IV - SERVICES TO BE FURNISHED BY THE "ENGINEER" DURING "DESIGN" PHASE The project will be designed and constructed to meet water and sewer standards in accordance with the "OWNER'S" Water and Sewer, and other related Standards. Construction specifications shall be based on "Standard Specifications for Highway Construction Edition 1996 of the AHTD" and latest special provisions and City of Fayetteville Specifications relating to the design of this project. The design concept with regard to water and sewer relocations, geometric, detours, right-of-way, utility easements, and other related items shall be submitted by the "ENGINEER" (in the form of a Preliminary Engineering Assessment) and approved by the "OWNER" prior to beginning design work. The "ENGINEER" shall provide all field survey data from field work for designing the project and this shall be tied to the "OWNER'S" GPS control network. The "ENGINEER" shall prepare and submit the following documents to the Owner. Conceptual Design Documents (25% complete) including: A. Existing conditions B. Proposed AHTD improvements C. Existing and proposed franchised utility locations D. Technical design memorandum E. Outline of specifications F. Narrative outlining design decisions, conclusions, and recommendations G. Cost Estimate Preliminary Design Documents (50% complete) including A. 50% complete construction plans 0 0 B. Draft copy of specifications and bid documents (excluding bid form/proposal) C. Cost Estimate Prefinal Design Documents (95% complete) including: A. Plans B. Specifications and Bid Documents C. Cost Estimate Final Design Documents (100% Complete) The "ENGINEER" shall conduct preliminary design to prepare preliminary construction plans including preliminary plans, preliminary specifications, and preliminary cost estimate. The "ENGINEER" shall provide surveying, mapping, and related services as required to prepare Right -of -Way / Easement documents for the "OWNER'S" use in acquisition activities. The "ENGINEER" shall furnish plans to all utility companies affected by the project and if necessary, shall conduct a coordination meeting among all affected utility companies to enable them to coordinate efforts for the necessary utility relocations. This coordination meeting will take place at the City Engineer's office. Prior to the start of construction, the "ENGINEER" shall establish benchmark for elevation control and tie layout work to Fayetteville's GPS. SECTION V - COORDINATION WITH "OWNER" The "ENGINEER" shall hold conferences throughout the design of the project with representatives of the " OWNER" to the end that the design, as perfected, shall have full benefit of the "OWNER'S" knowledge and be consistent with the current policies and construction practices of the "OWNER". The "OWNER" reserves the right to accept or reject any or all plans, but this stipulation will not relieve the "ENGINEER" of responsibility for the design of the project. SECTION VI - OFFICE LOCATION FOR REVIEW OF WORK Review of the work as it progresses under this Agreement shall be made at the "OWNER'S" City Engineers office. SECTION VII - DELIVERABLES The "ENGINEER" shall provide the following: E L A. Concept Phase — two (2) sets of plans and documents B. Preliminary Phase — two (2) sets of plans and documents C. Prefinal Phase — two (2) sets of plans and documents D. Final Phase - three (3) sets of plans and documents along with: (1) One (1) copy of all design calculations. (2) Originals of all drawings, specifications, and contract documents. (3) One (1) electronic copy of plans (in AutoCAD Release 14) and bid documents. E. Right of Way/Easement surveys including a right of way/easement map showing all property needed to be acquired by the Owner with legal descriptions for each individual parcel. SECTION VIII - ENGINEER RESPONSIBILITY DURING 'BIDDING" AND "CONSTRUCTION" PHASES During the 'Bidding" phase of the project, the 'ENGINEER" shall provide all engineering and administrative services needed to obtain bids for the construction project, evaluate the bids, and consult with and advise the "OWNER" as to the acceptability of the best bidder. During the "Construction" phase of work, the 'ENGINEER" shall provide administrative and engineering services including resident construction observation services to determine whether the Contractor has met the requirements of the design plans and specifications. The "ENGINEER" shall review the Contractors progress payment requests based on the actual quantities of contract items completed and accepted, and shall make a recommendation to the "OWNER" regarding payment. SECTION IX - SUBCONTRACTING Subcontracting by the 'ENGINEER" of any of the services provided herein shall require prior approval by the "OWNER". SECTION X - TIME OF BEGINNING AND COMPLETION The "ENGINEER" shall begin work under this Agreement within ten (10) days of notice to proceed and shall complete the plans for the construction contract within 90 calendar days. The above completion time is predicated upon the fact that the "OWNER" will cause to be processed approvals of interim work in an expeditious manner 15 days per submittal. SECTION XI - FEES AND PAYMENTS A. "Design" Phase Services: For, and in consideration of, the services to be rendered by the "ENGINEER", the "OWNER" shall pay the "ENGINEER" on the basis of actual salary costs for work time directly connected with work chargeable to the project, plus payroll additives and general overhead costs of % of direct labor costs, plus direct reimbursable expenses associated with the project, plus a fixed fee which are payable as follows: 1) "Design" phase services: 23,753.57 2) Fixed fee for "Design" services: 3.500.00 3) Reimburseables: 1,000.00 4) Engineering contract amount for "Design" phase services not to exceed: 28.253.57 The basis of this upper limit and justification for the fee is contained in Appendix "A" attached hereto. Subject to the City Council approval, adjustment of the upper limit may be made should the "ENGINEER" establish and the "OWNER" agree that there has been or is to be a significant change in scope, complexity or character of the services to be performed; or if the "OWNER" decides to shorten the duration of work from the time period specified in the Agreement for completion of work and such modification warrants such adjustment. Appendix "B" covers the classification of personnel and the salary rate for all personnel to be assigned to this project by the "Engineer". Final payment for Design services shall be made upon the "OWNER'S" approval and acceptance with the satisfactory completion of the "Design" phase for the project. B. "Construction" Phase Services: (This section may be added by Contract Addendum after the Design Phase is complete and a Contractor is selected. For "Construction" phase services rendered by the "ENGINEER", the "OWNER" shall pay the "ENGINEER" on the basis of salary costs for work -time directly connected with the project, plus payroll additives and general overhead costs of % of direct labor costs (plus direct reimbursable expenses associated with the project), plus a fixed fee which are as follows: 0 0 1) "Construction" phase services costs not to exceed: N/A 2) Fixed fee for "construction" phase services: N/A 3) Engineering contract amount for "Construction" phase services not to exceed N/A (based upon an assumed construction period not to exceed days.) The basis for this estimate is appendix C. The "ENGINEER" shall invoice the "OWNER" monthly for construction phase services, and the final payment for "Construction" phase services shall be made upon the "OWNER'S" approval and acceptance with the satisfactory completion of the "Construction" phase of the project. SECTION XII - CHANGES The "OWNER" may at any time, by written order, make changes within the general scope of the contract in the work and services to be performed. If any such change causes an increase or decrease in the cost of, or the time required for, performance of this contract, an equitable increase or decrease shall be made in the upper limit contract amount, including fee or time of required performance, or both, and the contract shall be modified in writing accordingly. Changes, modifications or amendments in scope, price or fees to this contract shall not be allowed without a formal contract amendment approved by the Mayor or the City Council in advance of the change in scope, price of fees. Any claim by the "ENGINEER" for adjustment under this clause must be asserted with thirty (30) days from the date of receipt by the "ENGINEER" of the notification of change; provided, however, that the "OWNER" if it decides that the facts justify such action, may receive and act upon any such claim assessed at any time prior to the date of final payment under this contract. Failure to agree to any adjustment shall be cause for a dispute concerning a question of fact within the meaning of the clause of this contract entitled SECTION XVII MISCELLANEOUS PROVISIONS, (1) Dispute Resolutions. However, nothing in this clause shall excuse the "ENGINEER" from proceeding with the contract as changed. SECTION XIIII - OWNERSHIP OF DOCUMENTS All documents, including original drawings, disks of CADD drawings and cross sections, estimates, specification field notes, and data are and remain the property of the "OWNER". The "ENGINEER" may retain reproduced copies of drawings and copies of other documents. SECTION XIV - POSTPONEMENT OR CANCELLATION OF THE CONTRACT It is understood that the "OWNER" will have the right to suspend or cancel the work at any time. A. Postponement - Should the "OWNER", for any reason whatsoever, decide to postpone the work at any time, the "OWNER" will notify the "ENGINEER", who will immediately suspend work. Should the "OWNER" decide during such suspension not to resume the work, or should such suspension not be terminated within a year, the work shall be cancelled as hereinafter provided. B. Cancellation - Should the "OWNER", for any reason whatsoever, decide to cancel or to terminate the use of the "ENGINEER'S" service, the "OWNER" will give written notice thereof to the "ENGINEER", who will immediately terminate the work. If the "OWNER" so elects, the "ENGINEER" may be instructed to bring a reasonable stage of completion to those items whose value would otherwise be lost. The "ENGINEER" shall turn over all data, charts, survey notes, figures, drawings and other records or information collected or produced hereunder whether partial or complete. Upon such termination of the "ENGINEER'S" services, the "ENGINEER" shall be paid on a proportional amount of the total fee, less prior partial payments, based on the ratio of work done to the total amount of work to be performed. 11 SECTION XVI - MISCELLANEOUS PROVISIONS Dispute resolution - Any dispute concerning a question of fact in connection with the work and having a financial value of $10,000, or less, shall be referred for determination to the Mayor of the City of Fayetteville whose decisions in the matter shall be final and conclusive. Disputes resulting from claims greater than $10,000 shall be subject to mediation. 2. Responsibility for Claims and Liability - The "ENGINEER" shalt save harmless the "OWNER" from all claim and liability due to its (the "ENGINEER'S") activities, or those subcontractors, its agents, or its employees during the time this contract is in force. 3. General Compliance with Laws - The "ENGINEER" shall comply with all federal, state and local laws and ordinances applicable to the work. The "Engineer" shall be a professional engineer, licensed in the State of Arkansas. 0 0 4. Engineer's Endorsement - The "ENGINEER" shall endorse and recommend all plans, specifications, estimates and engineering data furnished by it. All design shall be checked in accordance with accepted engineering practices. All plan quantities shall be checked and verified. SECTION XVII - SUCCESSORS AND ASSIGNS The "OWNER" and the "ENGINEER" each binds itself and its partners, successors, executors, administrators, and assigns to the other party of this Agreement, except as above, neither the "OWNER" nor the "ENGINEER" shall assign, sublet or transfer its interest in this Agreement without written consent of the other. Nothing herein shall be construed as creating any possible personal liability on the part of any officer or agent of any public body which may be party hereto. SECTION XVIII - COVENANT AGAINST CONTINGENT FEES The 'ENGINEER" warrants that it has not employed or retained by company or person, other than a bonafide employee working solely for the "ENGINEER", to solicit or secure this contract, and that it has not paid or agreed to pay any company or person, other than a bonafide employee working solely for the 'ENGINEER", any fee, commission, percentage, brokerage fee, gifts, or any other consideration, contingent upon or resulting from the award or making of this contract. For breach or violation of this warranty, the "OWNER" shall have the right to annul this contract without liability. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be duly executed as of the date and year first herein written. CITY OF FAYETTEVILLE By: ✓1/1 t� Mayor ATTEST:ice/ City Cle ENGINEER Name of the firm s By: v Authorized Representative ATTEST FAYETTEVtLLE • THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE To: Fred Hanna, Mayor Thru: Charles Venable, Public Works Director Contract Review From: Jim Beavers, City Engineero Date: May 8, 2000 ��o Re: Council Meeting June 6, 2000 Proposed engineering contract with Hawkins -Weir Engineers Garland Avenue water/sewer relocations The AHTD is planning to widen Garland (Highway 112) between Maple and North Street. In preparation of the proposed widening water and sanitary sewer relocations are necessary. The proposed water and sanitary sewer scope is relocate the existing 10 inch water line in Garland between Maple and Cleveland with a relocated 12 inch main, replace and encase the sanitary sewer at the intersection of Garland and Cleveland, and construct a new 12 inch water main along Garland between Cleveland and North Street to reinforce the water system in this area. Additional information can be found on page 106 of the CIP (copy enclosed). The AHTD schedule for widening is dependent upon right-of-way negotiations with Leverett Elementary and other properties along Garland. The public hearing has not yet been scheduled. Staff recommends that we proceed with the design in anticipation of the AHTD and School reaching an agreement. The engineering firm of Hawkins -Weir was chosen based upon a formal selection in accordance with State law and the City's policy for engineering selections. The proposed contract is for design and bidding only with a not -to -exceed price of $28,253.57 with a provision for a future amendment to add construction management if the City so desires. Enc: 1. Vicinity Map/CIP page 106 2. Two original contracts for signature. 0 CITY OF FAYETTEVILLE, ARKANSAS 2000 - 2004 CAPITAL IMPROVEMENTS PROGRAM PROJECT DETAIL PROJECT COST 2000 $ 540,000 2001 2002 2003 2004 TOTAL PROJECT COST $ 540,000 PROJECT DESCRIPTION & JUSTIFICATION: Garland Avenue (State Highway 112) relocations from Maple to North. Relocation of an existing 10 inch water main from Maple to Cleveland. New 8 inch or 12 inch water main from Cleveland to North, relocate the sewer crossing as necessary at Cleveland and east to west ties to the line at Lindell. The relocations are mandated due to the AHTD widening of Garland from Maple to North. The extension is requested to strengthen the water flow to the University and the Garland area. PROJECT STATUS (IF IN PROGRESS) : The AHTD has requested that the City provide the proposal for relocations by November 15, 1999. EFFECT OF THE PROJECT ON ANNUAL OPERATIONS Nominal maintenance on the water mains and gravity sewer mains. J�Z�j W PATRx A] :3 LAZ o ❑ w NORTH LN g 3 L�JL_r�L AOM4 ❑ E PINE J0 / i❑�� I 1:11A1:11A< < < NAWRpRN P2 � ❑� � o ]L CIFk1AND < < PROSPECT war/ � � Wilson. Park tNr st ¢ rAn.oR TR � w H ooucus ❑� IF]\ � � a a NAPLE 3 €' o4 LA z U IVERSITY i N '< 9 10 e O <❑ IB IS Fl�]FOTFA�RKANSASO RUCANE ❑ 106 PROJECT TITLE: Garland Avenue - Water/Sewer Relocations REQUESTING DIVISION: Water/Sewer & Engineering FUNDING SOURCE: Sales Tax Capital Improvements Fund PROJECT CATEGORY: Water & Sewer Improvements INITIAL YEAR PRIORITY: 1 PROJECT TYPE: REPLACEMENT Y EXPANSION Y PROJECT COST 2000 $ 540,000 2001 2002 2003 2004 TOTAL PROJECT COST $ 540,000 PROJECT DESCRIPTION & JUSTIFICATION: Garland Avenue (State Highway 112) relocations from Maple to North. Relocation of an existing 10 inch water main from Maple to Cleveland. New 8 inch or 12 inch water main from Cleveland to North, relocate the sewer crossing as necessary at Cleveland and east to west ties to the line at Lindell. The relocations are mandated due to the AHTD widening of Garland from Maple to North. The extension is requested to strengthen the water flow to the University and the Garland area. PROJECT STATUS (IF IN PROGRESS) : The AHTD has requested that the City provide the proposal for relocations by November 15, 1999. EFFECT OF THE PROJECT ON ANNUAL OPERATIONS Nominal maintenance on the water mains and gravity sewer mains. J�Z�j W PATRx A] :3 LAZ o ❑ w NORTH LN g 3 L�JL_r�L AOM4 ❑ E PINE J0 / i❑�� I 1:11A1:11A< < < NAWRpRN P2 � ❑� � o ]L CIFk1AND < < PROSPECT war/ � � Wilson. Park tNr st ¢ rAn.oR TR � w H ooucus ❑� IF]\ � � a a NAPLE 3 €' o4 LA z U IVERSITY i N '< 9 10 e O <❑ IB IS Fl�]FOTFA�RKANSASO RUCANE ❑ 106 JOB NO. 00078A ' GARLAND AVENUE WATER LINE AND SANITARY SEWER LINE RELOCATIONS CITY OF FAYETTEVILLE, ARKANSAS AHTD JOB 040273 APRIL 19, 2000 DESIGN FIELD ENGINEER ENGINEER TECH TECH CREW TASK IV II SENIOR III 2 -MAN CLERICAL 1. Review existing plans, atlas maps, & records & proposed AHTD tans to determine water line & sanitary sewer line conflicts 4 8 2. Discuss with AHTD project parameters & timetable 2 2 3. Coordinate with franchised utilities to determine their relocation needs & requirements 8 4. Conduct field survey to locate existing improvements, existing right of way & property lines 4 8 40 • 5. Coordinate with AHTD to determine property ownership's 4 6. Coordinate with City easement acquisition personnel to determine format of easement/right of way mapping 4 7. Develop property ownership 8 plat map 4 8 8. Prepare Conceptual Plans including: A. Existing conditions 8 48 4 48 8 B. Proposed AHTD improvements C. Existing & proposed franchised utility locations D. Technical design memorandum E. Outline of specifications F. Narrative outlining design decisions, conclusions, & recommendations ' G. Cost Estimate 9. Meet with City & go over Conceptual Plan package 8 8 10. Prepare Preliminary Plans including: A. 50% complete construction plans 4 16 4 16 8 B. Draft copy of specifications & bid documents (excluding bid form/proposal) C. Cost Estimate • 11. Meet with City & go over Preliminary Plan package 4 12. Submit preliminary plans to AHTD and franchised utility companies 4 13. Prepare easement(right of way acquisition maps including an overall easementfright of way map & individual tract maps for each affected property with legal description for each easement required 4 16 14. Deliver easement/right of way maps to City & meet with City's easement acquisition personnel 4 15. Prepare 95% Complete Plan Documents including: A. Plans B. Specifications & Bid Documents 8 24 8 40 8 16 C. Cost Estimate 16. QA/QC Review 8 8 17. Meet with City to Deliver & Discuss Plans 4 4 18. Prepare Final Drawings & Bid Documents 2 8 8 8 19. Submit Final Plan documents to AHTD 4 20. Assist the Owner is solicitation of bids, Ian/specification interpretation 4 \WA\00\00078A\TASKXLS Page 1 APPENDIX A JOB NO. 00078A GARLAND AVENUE WATER LINE AND SANITARY SEWER LINE RELOCATIONS CITY OF FAYETTEVILLE, ARKANSAS AHTD JOB 040273 APRIL 19, 2000 SUB TOTAL HOURS 72 138 68 112 48 32 TOTAL ALL HOURS 72 138 68 112 48 3211 TOTAL SALARY COST COST MULTIPLIER (OVERHEAD) SALARY COST PLUS OVERHEAD FIXED FEE REIMBURSEABLES (REVIEW FEES, EXPRESS DELIVERY, REPRODUCTION COSTS) TOTAL ENGINEERING FEE (NOT TO EXCEED) $9,897.32 2.4 $23,753.57 $3,500.00 $1,000.00 $28,253.57 \WA\00\00078A\TASK.XLS Page 2 APPENDIX A • • APPENDIX B Salary Cost of Employees Assigned to Job # 00078A Name Position Salary Cost Ronald R. Hawkins Project Manager $36.56 Keith Kestner Project Engineer $20.42 Steve Hendrix Design Technician $20.28 Mike Henson CAD Supervisor $14.15 Ron Ray CAD Technician $14.15 Ron Scbildhauer CAD Technician $14.15 Bill Jones Field Crew $24.20 Chuck Bainbridge Field Crew $24.20 Jan Hutton Clerical $10.05 0 STAFF REVIEW FORM MAY Q 9 2000 X AGENDA REQUEST CITVOFFAYETTEVILLE X CONTRACT REVIEW MAYORS OFFICE GRANT REVIEW For the Fayetteville City Council meeting of June 6, 2000 FROM Jim Beavers Engineering Public Works Name Division Department ACTION REQUIRED: Approval of an engineering design contract in the amount of $28,253.57 with Hawkins -Weir Engineers, Inc. for the design of water and sanitary sewer relocations and system improvements on Garland from Maple to North Street in preparation for the State AHTD widening of Garland from Maple to North Street. COST TO CITY: $28.253.57 cost of this Request 4470-9470-5808.00 Account Number 00018-1 Project Number $540.000 Project Budget Funds Used To Date $540,000 Remaining Balance Garland Ave - Water And sewer relocations Soh Project Name tri Water/Sewer Improvements Program Name Sales Tax Fund BUDGET REVIEW: L Budgeted Item ' Budget Adjustment Attached CONTRACT/GRANT/LEASE REVIEW: Administrative Services Di GRANTING AGENCY: Accoufiti n6 r Date ADA Coordinato Date ity Atto ey Date I rnal Auditor Date Purchasing Officer Date STAFF RECOMMENDATION: Approval Ai n Head ate Cross Reference e New Item: Yes De rtment Director Date Ail X11 & A40 .4 J 0 Prev Ord/Res # Ad 'n' tra Services Director Date _ Orig Contract Date: Date STAFF REVIEW FORM Page 2 Description Garland Ave water/sewer relocations and impvts Meeting Date June 6, 2000 Comments: Reference Comments: Budget Coordinator Accounting Manager City Attorney Purchasing Officer ADA Coordinator Internal Auditor FAYETTEVI0LLE THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE To: Jim Beavers, Engineering From: Heather Woodruff, City Clerk Date: June 27, 2000 Attached is a copy of the resolution approving the contract with Hawkins -Weir Engineers. I am also returning one original for you to distribute. The original will be microfilmed and filed with the City Clerk. Your purchase requisition has been forwarded to Yolanda Fields. cc: Yolanda Fields, Community Development FAYETTEVILE 0 THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE To: Dan coody, Mayor Thru: Greg Boettcher, PWD Jim Beavers, City Enginee7` From: Sid Norbash, Staff Engineer Otd✓ Date: January 17, 2001 Re: Garland Ave. Water 6 Sewer Relocations Amendment #2 to the Engineering Contract With Hawkins -Weir Engineers, Inc. Background: The above referenced project is a Capital Improvement Project in progress, which is scheduled for construction in 2002. The purpose of this project is to relocate water and sewer mains ir order to accommodate the improvements scheduled for Garland Ave. (Maple to North St.) by the Highway Department. Another Highway Department project underway is the Owl Creek Bridge Improvements on Double Springs Rd. This project necessitates some sanitary sewer adjustments and relocations. The Staff requested , and obtained approval that the design and the construction management of this project also be added to the existing engineering contract with Hawkins -Weir Engineers. This was achieved by executing the Amendment #1 to the existing contract in the amount of $50,500. Change of Scope: Garland Ave. Project was delayed by the Highway Department for negotiations with U of A and making some revisions to the North end of the project per City's request. Per Staff request Hawkins -Weir Engineers, Inc. Is being asked to separate the two projects ( Owl Creeks Bridge - Sewer Adjustments from Garland Ave. Widening). 0 0 Mayor Coody Page 2 The separate bidding and project management cost is $4,250, the extra work for the design phase of Garland Ave., To accommodate the revisions is $4,059. Recommendations: The Staff recommends approval of the Amendment #2 to the existing contract with Hawkins -Weir Engineers, in the amount not to exceed $8,309. Funding: The Council has already approved two contingency amounts for this project. $5,050 per Resolution # 13-01, and $6,236 per Resolution 93-01 for a total contingency amount of $11,286. The additional expense of $8,309 will be funded by the approved contingency. SN/sn Attachments: Copy of the Amendment #2 Copy of the Res. 13-01 Copy of Resolution 93-01 (2) RESOLUTION NO, 13-01 0 A RESOLUTION APPROVING AMENDMENT NO. 1 TO THE ENGINEERING CONTRACT WITH HAWKINS-WEIR ENGINEERING, INC., FOR GARLAND AVENUE WATER AND SEWER RELOCATION PROJECT TO INCLUDE THE ADDITION OF DOUBLE SPRINGS ROAD PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council hereby approves Amendment No. 1 to the engineering contract with Hawkins -Weir Engineering, Inc., for Garland Avenue water and sewer relocation project to include the addition of Double Springs Road Project; and authorizes the Mayor and City Clerk to execute said agreement. A copy of the agreement is attached hereto marked Exhibit "A" and made a part hereof. ) APPROVED this 6th day of February , 2001. By: ,. Heather Woodruff, City Cier ....�fat� Charles D. ... n STAFF REVIEW FORM X_ AGENDA REQUEST I/ _x_ CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Council meeting of February 6. 2001 FROM: Sid Norbash Engineering Public Works Name Division Department ACTION REQUIRED: Approval of the Arne Double Springs Rd. Project) to the Engineers, Inc. For Garland Ave. Relocations Project. Inent #l(which also includes addition of engineering contract with Hawkins -Weir (Maple to North St.)- Water S Sewer COST TO CITY: $137,600 (98036) Garland Ave. - Water $50.500 + $5.050 COntinaenry $540.000 (00018) 6 Sewer Relocations Cost of this Request Category/Project Budget Category/Project Name 4470-9470-5808.00 $ 2,540 (98036) 4470-9470-5808-00 $28.254 (00018) Account Number Funds Used To Date 98036-10 Owl Creek $134,960 (98036) 00018-10 Garland Ave. $511.746 (00018) Project Number Remaining Balance Sales Tax Fund Budget Adjustment Attached VIEW: GRANTING AGENCY: 0 / Da Date ADA Coordinator InternaloAuditor Date ///o(e Date Purchasing Officer Date _ STAFF RECOMMENDATION: Approval of the amendment #1. OI o o/ Date Cross Reference of -/v -D, New Item: Yes_ NO__3L D to IPrev Ord/Res #: 73-00 for a Orig contract Date: 6-6-2000 F ) / Orig Contract # 764 Date RESOLUTION NO. 93-01 i o A RESOLUTION AWARDING A CONSTRUCTION CONTRACT TO GRAY CONSTRUCTION, INC. IN THE AMOUNT OF FORTY- ONE THOUSAND FIVE HUNDRED SEVENTY-SEVEN DOLLARS AND NINETY-FIVE CENTS ($41,577.95) FOR SEWER RELOCATION IN CONJUNCTION WITH THE DOUBLE SPRINGS BRIDGE OVER OWL CREEK, AND APPROVING A FIFTEEN PERCENT (15%) PROJECT CONTINGENCY OF SIX THOUSAND TWO HUNDRED THIRTY-SIX DOLLARS ($6,236.00). BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council hereby Awards a construction contract to Gray Construction, Inc. in the amount of Forty -One Thousand Five Hundred Seventy -Seven Dollars and Ninety -Five Cents ($41,577.95) for sewer relocation in conjunction with the Double Springs Bridge over Owl Creek, and approving a fifteen percent (15%) project contingency of Six Thousand Two Hundred Thirty -Six Dollars ($6,236.00). Section 2. That the City Council hereby Approves a fifteen percent (15%) project contingency of Six Thousand Two Hundred Thirty -Six Dollars ($6,236.00). Section 3. That the City Council hereby Authorizes the Mayor to sign such a contract with Gray Construction, Inc. PASSED AND APPROVED this 3rd day of July, 2001. APPROVED: By: (Gi'1 &9�? DAN COODY, Mayor ATTEST: 6�7 • • HAWKINS-WEIR ENGINEERS, INC. rs„tn„ff*MOMMIAVZi� December 7, 2001 Mr. Sid Norbash Engineering Department City of Fayetteville 113 West Mountain Fayetteville, Arkansas 72701 Re: Garland Avenue Reconstruction Double Springs Road Sanitary Sewer Relocation HWEI Job No. 0007nonA Dear Mr. Norbash: DEC 1 0 * Please consider this as our request for additional engineering fees on the referenced projects. This letter will combine and summarize two earlier requests. As you are aware, the Double Springs Road Sanitary Sewer Relocation project was included with the Garland Avenue reconstruction plans. It was originally planned to build both projects concurrently and possibly with the same contractor. Due to delays on the Garland Avenue project, the City decided to bid and construct the Double Springs Road project independently. Our fee proposal for the additional work involved with the bidding, contract administration and inspection of the project separately is $4,250. Negotiations between the City, Arkansas Highway and Transportation Department and the University of Arkansas have resulted in necessary changes in the Garland Avenue reconstruction plans. I have estimated will require an increase in our fee of $4,058.72. Therefore, please consider this letter as our request to increase our engineering fee from $78,753.57 to $87,062.29, an increase of $8,308.72. I am enclosing herewith a summary sheet for the overall contract including this request. If additional information is needed please advise. Very truly yours, HAWKINS-W R ENGINEERS, INC. Ronald R. Hawkins, P.E., R.L.S. RRH/jeh P.S. It is my understanding you will advise me when we are to proceed with the Garland Avenue revisions. \00078A\SN 120701 RH.doc P.O. BOX 648 • VAN BUREN, ARKANSAS 72957-0648 • FAX: (501) 474-8531 • PHONE (501) 474-1227 • www.hawkins-weir.com I - I Summary of Subsequent Contract Amounts [RE EC 1 0 Ol City of Fayetteville, Arkansas HWEI Job No. 00078A - 00078a\Task-Tim 080701.x1a\coninct mvisiom I June 6, 2000 Nov. 29, 2000 Feb. 5, 2001 April 17, 2001 Proposed New Contract Attachement A Construction Phase "Owl Creek" Increase Total Service Attachment B Task Cost for services $23,753.57 $3,500.00 $41,000.00 $3,700.00 $3,558.72 $751512.29 Fixed fee for services $3,500.00 $500.00 $5,500.00 $550.00 $500.00 $10,550.00 Reimbursable $1,000.00 $0.00 $0.00 $0.00 $0.00 $1,000.00 Not to exceed Total $28,253.57 $41000.00 $46,500.00 $4,250.00 $4 058.72 $87,062.29 00078a\Task-Tim 080701.x1a\coninct mvisiom I Jan.17 '02 16:37 ICA FAX 720 P. 2 it •: 01/17/2602 17:17 501-575-6202 ENGINEERING C.O.F. Amendment t2 to the Eagineering contract with BawkLne geiz Eagicaers, Inc. PAGE 02 Project Title: Garland Ava_ Water k Ower Relneatione & Owl Creek Bridge - Sewer Relocation 98036-10 Project No.00018-10 Contract No. 764 Contract Date 6-6-2000 EngineeY: jj&whinn-Welt raolneer&. Tnc. The following changes are hereby made to the contract documents: (A))separate the bidding, and construction management for the above projects in the amount of $4,250. (E).Make the necessary revisions to the Garland Ave. Plans. Justification: (A) Per City Staff's request, so that we do not delay the construction of the AHTOra bridge on Owl Creek. (8) AHTD has made revisions that necessitate changes to our plans. Original Contract Price: $28.254 As adjusted by previous changes: psn,soG This change will increase contract by: $80308 The new contract price will be: SR7,062 CHANGE TO CONTRACT TIME The contract time will be increased by AQ calendar days. The new date for completion of all work under the contract will be Feehruar.. 28, 2002 APPROVALS REQUIRED To be effective this Amendment must be approved by the Owner if it changes the scope or objective of the project, or as may otherwise be required under the terms of the contract. Requested by Approved by 9 Approved by M Date /17% DMZ Date 1-17-0 Det/ G AGENDA REQUEST X CONTRACT REVIEW GRANT REVIEW MICROFILAWM STAFF�REVIEW FORM For the Fayetteville City Council meeting of (Mayor's Approval iZ�3 �3-rte GJrx- z/4)z S s F FROM: Sid Norbash Engineering Public Works Name Division Department ACTION REQUIRED: Approval of the Amend with Hawkins -Weir Engineers, Inc. For Water & Sewer Relocations Project. This the change of scope requested by modifications to the Highway plans. lent #2, to the engineering contract Garland Ave. (Maple to North St. - Amendment is necessitated because of the City Staff, and changes and COST TO CITY: $32,025 (98036) Garland Ave. - Water $8,308 $389.407 (00018) & Sewer Relocations Cost of this Request Category/Project Budget Category/Project Name 4470-9470-5808-00 $90818 (98036) 5400-5600-5808-00 $ (00018) Account Number Funds Used To Date 98036-10 Double Springs $22,207 00018-10 Garland Ave. $389,407 Project Number Remaining Balance Sales Tax Fund BUDGET REVIEW: X Budgeted Item Budget Adjustment Attached Coordinator CONTRACT/GRANT/LEASE REVIEW: tive Services GRANTING AGENCY: Date� ADA Coordinator Date 012 Z/6 a baa (oo a - Date Internal e itor Date aLx�lor Purchasinq Officer Date STAFF RECOMMENDATION: Approval of the amendment #2. �� o1 -2T -o2 Dir sio Head Date Cross Reference rzo0 02 -L5': -O? New Item: Yes_ Nom_ Deps-rt&nr Director Date ;!;S OZ Prev Ord/Res #: 73-00 Admi istrative Services Director Date Orig Contract Date: 6-6-2000 Orig Contract # 764 Mayor ate 0 Staff Review Form 0 Description/ Garland Ave. W&S Relocations Meeting Date 2-6-2001 Project Name Amendment #1, Co"4rac"- Comments: Reference Comments: Budget Director Accounting Manager City Attorney Purchasing Officer ADA Coordinator Internal Auditor E STAFF REVIEW FORM AGENDA REQUEST _x_ CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Council meeting of !•l it L4 r 4 1s wI 13 -Oct Gnu,\ate owe 0"" P.Q�-r I o/Ai f az✓ tni, Sid Norbash O*V Fnaineering Public Works Name Division Department ACTION REQUIRED: Approval of: Amendment #3 to the Engineering Contract with Hawkins -Wier Engineers, Inc. for Garland Ave. Water 6 Sewer Relocations project in the amount of $13,938.00 COST TO CITY: Garland Ave. - Water $13,938.00 6864.159 k Sewer Relocations Cost of this Request Category/Project Budget Cate gory/Project Name 4470-9470-5808-00 $755.308 / Sewer Improvements Account Number Funds Used To Dat 0� Name 00018-20 $108,851 /�tiJ 'ax Project Number Remaining Balance \`Y/�• BUDG.ZT X Budgeted Ite \ ,tment Attached /... ,t < _r lo— /S0Z Budget Coordinator Adm: _.es Director CON! /G REVIEW: GRANTING AGENCY: ng aga��E Da ADA Coordinator Date City At rney Date Internal A ditor Date Purchasing Officer Date _. STAFF RECOlyd+ENDATION: Approval of C.O. #3 Head Date irector Date ve Services Director Date New Item: Yes_ NOS Prev Ord/Res #: 73-00 Orig Contract Date: 6-6-2000 Orig Contract #764 Date 0 Staff Review Form • Description/ Garland Ave. W&S Relocations Meeting Date N/A Project Name Change Order #3 Comments: Reference Comments: Budget Director Accounting Manager City Attorney Purchasing Officer ADA Coordinator Internal Auditor D$-4-3.a� FAYETTEVIPI,E THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE To: Dan Coody, Mayor Thru: Greg Boettcher, PWD Jim Beavers, City Engineer From: Sid Norbash, Staff Engineer"' Date: October 11, 2002 • Re: Garland Ave. Water 6 Sewer Relocations Amendment #3 to the Engineering Contract With Hawkins -Weir Engineers, Inc. Background: The above referenced project is a Capital Improvement Project in progress, which is scheduled for construction in 2002. The purpose of this project is to relocate water and sewer mains in order to accommodate the improvements scheduled for Garland Ave. (Maple to North St.) by the Highway Department. Change of Scope: Due to the fact that the construction of this project is going to take longer than anticipated, the cost of the inspection for this project will increase. Hawkins -Weir has agreed to wave the fixed fee (profit) charged to the previous phases of our contract with them and only charge for the actual resident inspector's time. Recommendations: The Staff recommends approval of the Amendment #3 to the existing contract with Hawkins -Weir Engineers, in the amount not to exceed $13,938. 0 Funding: The Council has approved project contingencies as follows: *Project Contingency per Resolution 13-01 $5,050.00 *Project Contingency per Resolution 93-01 $6,236.00 *Project Contingency per Resolution 115-02 $108,952.00 Total approved contingency amount $120,238.00 Total used to date 81308.00 Balance of contingency $111,930.00 * please see attached documents SN/sn Attachments: Copy of the Amendment #3 Copy of the Res. 13-01 Copy of Resolution 93-01 Copy of Resolution 115-02 (2) 0 0 RESOLUTION -NO, -1— �3=0> A RESOLUTION APPROVING AMENDMENT NO. 1 TO THE ENGINEERING CONTRACT WITH HAWKINS-WEIR ENGINEERING, INC., FOR GARLAND AVENUE WATER AND SEWERRELOCATION PROJECT TO INCLUDE THE ADDITION OF DOUBLE SPRINGS ROAD PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council hereby approves Amendment No. 1 to the engineering contract with Hawkins -Weir Engineering, Inc., for Garland Avenue water and sewer relocation project to include the addition of Double Springs Road Project; and authorizes the Mayor and City Clerk to execute said agreement. A copy of the agreement is attached hereto marked Exhibit "A" and made a part hereof. ' -Toffl AND APPROVED this 6th day of February , 2001. rl� °. _..,.IV%W ...,�4 ATTESt: By: Heather Woodruff, City Cler APPROVED: 1 1 • Charles D. ..,� STAFF REVIEW FORM X_ AGENDA REQUEST x_ CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Council meeting of r-IiVM: Sid Norbash Name ACTION REQUIRED: Approval of the Amendment #1 (which also includes addition of Double .Springs Rd. Project) to the engineering contract with Hawkins -Weir Engineers, Inc. For Garland Ave. (Maple to North St.)- Water Sewer Relocations Project. 0 COST TO CITY: $137,600 (98036) Garland Ave. - Water $50.500 + a D50Cont+t Sewer Relocations ons Cost of this Request Category/Project Budget Category/Project Name 4470-9470-5808.00 $ 2,540 (98036) 4470-9470-5808-00 $28r254 (00018) Account Number Fluids Used To Date 98036-10 Owl Creek $134,960 (98036) 00018-10 Garland Ave. 5511 746 (00018) Project Number Remaining Balance X Budgeted VIEW: ��� '1 a //o a ff -j— Date Budget Adjustment Attached GRANTING AGENCY: ADA Coordinator inter al ud� � �A Purchasing Officer Date STAFF RECOMMENDATION: Approval of the amendment #1. Date J(/o1D1 Date OI o o/ Date Cross Reference 0Nkd New Item: Yes_ Nog. NaI ?rev Ord/Res #: 73-00 for Orig Contract Date: 6-6-2000 Orig Contract # 764 Date RESOLUTION NO. 93-01 A RESOLUTION AWARDING A CONSTRUCTION CONTRACT TO GRAY CONSTRUCTION, INC. IN THE AMOUNT OF FORTY- ONE THOUSAND FIVE HUNDRED SEVENTY-SEVEN DOLLARS AND NINETY-FIVE CENTS ($41,577.95) FOR SEWER RELOCATION IN CONJUNCTION WITH THE DOUBLE SPRINGS BRIDGE OVER OWL CREEK, AND APPROVING A FIFTEEN PERCENT (15%) PffOJECr CONTINGENCY OF SD( THOUSAND TWO HUNDRED THIRTY-SIX DOLLARS ( 6 236:00) BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section. 1. That the City Council hereby Awards a construction contract to Gray Construction, Inc. in the amount of Forty -One Thousand Five Hundred Seventy -Seven Dollars and Ninety -Five Cents ($41,577.95) for sewer relocation in conjunction with the Double Springs Bridge over Owl Creek, and approving a fifteen percent (15%) project contingency of Six Thousand Two Hundred Thirty -Six Dollars ($6,236.00). Section 2. That the City -Council hereby Approves a fifteen percent (15%) project contingency of Six - Thousand Two Hundred Thirty -Six Dollars ($61236.00): Section 3. That the City Council hereby Authorizes the Mayor to sign such a contract with Gray Construction, Inc. PASSED AND APPROVED this 3rd day of July, 2001. APPROVED: may/ By: DAN COODY, Mayor ATTEST: By: ATHER ODRUFF, Ci Clerk RESOLUTION NO. 115-02 6. A. RESOLUTION AWARDING A CONSTRUCTION CONTRACT TO BASIC CONSTRUCTION CO., INC. IN THE AMOUNT OF EIGHT HUNDRED TWENTY-FIVE THOUSAND NINE HUNDRED FORTY-SEVEN DOLLARS ($825,947.00) FOR THE GARLAND AVENUE WATER/SEWER RELOCATION PROJECT; APPROVAL OF A 15.2% PROJECT CONTINGENCY IN THE AMOUNT OF ONE HUNDRED EIGHT THOUSAND NINE HUNDRED FIFTY-TWO DOLLARS F$108,952,00)- AND A BUDGET ADJUSTMENT IN THE AMOUNT OF FOUR HUNDRED SEVENTY-FOUR THOUSAND SEVEN HUNDRED FIFTY-TWO DOLLARS ($474,752.00) FOR SAME. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Favetteville, Arkansas, hereby awards a construction contract to Basic Construction Co., Inc. in the amount of Eight Hundred Twenty -Five Thousand Nine Hundred Forty -Seven Dollars (5825,947.00) for the Garland Avenue Water/Sewer Relocation Project. Section 2. That the City Council of the City of Fayetteville, Arkansas, hereby approves a 15.2% Project Contingency in the amount of One Hundred Eight Thousand Nine Hundred Fifty -Two Dollars ($108,952.00). Section 3. That the City Council of the City of Fayetteville, Arkansas, hereby approves a Budget Adjustment in the amount of Four Hundred Seventy - Four Thousand Seven Hundred Fifty -Two Dollars ($474,752.00) for same. PASSED and APPROVED this 16th day of July, 2002. �t f �rErrF�, City Clerk APPROVED: By: DAN COODY, Mayo 0 • HAWKINS-WEIR ENGINEERS, INC. ENGINEERS CONSULTANTS September 25, 2002 Mr. Jim Beavers, P.E. City of Fayetteville Engineering Department 113 West Mountain Fayetteville, Arkansas 72701 Re: Utility Relocations Garland Avenue HWEI Job No. 00078A Dear Mr. Beavers: Please consider this as our request to increase our "not to exceed" fee on our existing contract from $87,062 to $101,000. As you know with this contract our fee is based on an hourly rate plus a fixed fee. In performing the duties required in the contract, we have exceeded the maximum fee allowed under the contract. The reason this has occurred is the project has gone on long past the original completion date. The project was originally scheduled for completion in early 2001. However, negotiations with AHTD concerning the street improvements (i.e. center median) and with the U of A and Fayetteville School system over easements/right-of-way caused the project to continue far longer than expected. All during the delay it was necessary for us to address questions, provide assistance in some areas of the easement/right-of-way negotiations, and make minor plan revisions to address some of the easement/right-of-way issues. I was in hopes that we could still fulfill our scope of services without exceeding our contract amount. However, it has become apparent that it is not possible. In an effort to measure the requested fee cap against a "standard" fee arrangement, I submit to you the total improvement cost of the Garland Avenue work (the existing contract plus the accelerated work on the north end of the project) plus the work on Owl Creek totals about $800,000. On a percentage basis, our requested $101,000 cap is approximately 12.5% of this amount. I believe you will agree our fee requested is more than reasonable given the following facts: we have actually administered three contracts,'provided full time inspections, provided easement surveys/descriptions, and the original one year project will now end up over two and one half years in length. 00078aU 13092502 R I -I . doc P.O. BOX 648 • VAN BUREN, ARKANSAS 72957-0648 • FAX: (479) 474-8531 • PHONE (479) 474-1227 • www.hawkins-weir.com 0 Mr. Jim Beavers, P.E. September 25, 2002 HWEI Job No. 00078A Page 2 0 Under the terms of the contract our fee is based on an hourly rate using our salary costs plus a fixed fee. I am willing to forego the fixed fee amount for all work proposed with this amendment. I believe this proposal is fair and reasonable and ask for you to process this for approval with your recommendation. Very truly yours, HAWKINS-WEIR ENG EERS, INC. X& 004 Ronald R. Hawkins, P.E., R.L.S. 1B092502RH.dw 0 Amendment #.3 to the Engineering Contract with Hawkins -Weir Engineers, Inc. September, 2002 40 Project Title: Garland Avenue Water & Sewer Relocations & Owl Creek Bridge - Sewer Relocation 98036-10 Project No. 00018-10 Contract No. 764 Contract Date 6/6/2000 Engineer: Hawkins -Weir Engineers, Inc. The following changes are hereby made to the contract documents: 1) The "not to exceed" contract amount is increased from $87,062 to $101,000. Justification: 1) The contract period will be extended to November 29, 2002 from February 28, 2002. This contract period extension is the result of easement/right-of-way negotiations and negotiations with the Highway Department concerning their improvement plans. The negotiations were beyond the control or authority of the Engineer. However, the negotiations and prolonged contract period resulted in additional time being spend by the Engineer to facilitate the project. Original Contract Price: As Adjusted by pervious changes: This change will increase contract by: The new contract price will be: Change to Contract Time: 28,254 58,808 101,000 The contract time will be increased and the new date for the completion of all work under the contract will be November 29, 2002. project, APPROVALS REQUIRED To be effective this Amendment must be approved by the Owner if it changes the scope or objective of the project, or as may otherwise be required under the terms of the contract. Requested by: Approved by Engineer: Approved by Mayor: 00078a W mendmenl #4.x1s Date Date -1/2 SA Date 0 Summary of Subsequent Contract Amounts City of Fayetteville, Arkansas HWEI Job No. 00078A Task June 6, 2000 Contract Nov. 29, 2000 Attachement A Feb. 5, 2001 Construction Phase Service Attachement B January 2002 Amendment September 2002 Amendment (#3) New Total Cost of services $239754.00 $3,500.00 $41,000.00 $7,258.00 $13,938.00 $89,450.00 Fixed fee for services $3,500.00 $500.00 $5,500.00 $1,050.00 $0.00 $10,550.00 Reimbursable $1,000.00 $0.00 $0.00 $0.00 $0.00 $1,000.00 Not to exceed Total $28,254.00 $4,000.00 $46,500.00 $8,308.00 $139938.00 $101,000.00 00078a\Task-Time 092502.x1s HAWKINS-WEIR ENGINEERS, INC. ENGINEERS CONSULTANTS September 25, 2002 Mr. Jim Beavers, P.E. City of Fayetteville Engineering Department 113 West Mountain Fayetteville, Arkansas 72701 Re: Utility Relocations Garland Avenue HWEI Job No. 00078A Dear Mr. Beavers: Please consider this as our request to increase our "not to exceed" fee on our existing contract from $87,062 to $101,000. As you know with this contract our fee is based on an hourly rate plus a fixed fee. In performing the duties required in the contract, we have exceeded the maximum fee allowed under the contract. The reason this has occurred is the project has gone on long past the original completion date. The project was originally scheduled for completion in early 2001. However, negotiations with AHTD concerning the street improvements (i.e. center median) and with the U of A and Fayetteville School system over easements/right-of-way caused the project to continue far longer than expected. All during the delay it was necessary for us to address questions, provide assistance in some areas of the easement/right-of-way negotiations, and make minor plan revisions to address some of the easement/right-of-way issues. I was in hopes that we could still fulfill our scope of services without exceeding our contract amount. However, it has become apparent that it is not possible. In an effort to measure the requested fee cap against a "standard" fee arrangement, I submit to you the total improvement cost of the Garland Avenue work (the existing contract plus the accelerated work on the north end of the project) plus the work on Owl Creek totals about $800,000. On a percentage basis, our requested $101,000 cap is approximately 12.5% of this amount. I believe you will agree our fee requested is more than reasonable given the following facts: we have actually administered three contracts, provided full time inspections, provided easement surveys/descriptions, and the original one year project will now end up over two and one half years in length. 00078aUB092502RH.doc P.O. BOX 648 • VAN BUREN, ARKANSAS 72957-0648 9 FAX: (479) 474-8531 • PHONE (479) 474.1227 • www.hawkins-weir.com 0 0 Mr. Jim Beavers, P.E. September 25, 2002 HWEI Job No. 00078A Page 2 Under the terms of the contract our fee is based on an hourly rate using our salary costs plus a fixed fee. I am willing to forego the fixed fee amount for all work proposed with this amendment. I believe this proposal is fair and reasonable and ask for you to process this for approval with your recommendation. Very truly yours, HAWKINS-WEIR ENG ERS, INC. 400 Ronald R. Hawkins, P.E., R.L.S. ]a092502RH.doe Amendment #a3 _ to the Engineering Contract with Hawkins -Weir Engineers, Inc. September, 2002 Project Title: Garland Avenue Water & Sewer Relocations & Owl Creek Bridge - Sewer Relocation 98036-10 Project No. 00018-10 Contract No. 764 Contract Date 6/6/2000 Engineer: Hawkins -Weir Engineers, Inc. The following changes are hereby made to the contract documents: 1) The "not to exceed" contract amount is increased from $87,062 to $101,000. Justification: 1) The contract period will be extended to November 29, 2002 from February 28, 2002. This contract period extension is the result of easement/right-of-way negotiations and negotiations with the Highway Department concerning their improvement plans. The negotiations were beyond the control or authority of the Engineer. However, the negotiations and prolonged contract period resulted in additional time being spend by the Engineer to facilitate the project. Original Contract Price: As Adjusted by pervious changes: This change will increase contract by: The new contract price will be: Change to Contract Time: 28,254 58,808 13,938 101,000 The contract time will be increased and the new date for the completion of all work under the contract will be November 29, 2002. project, APPROVALS REQUIRED To be effective this Amendment must be approved by the Owner if it changes the scope or objective of the project, or as may otherwise be required under the terms of the contract. Requested by: Approved by Engineer: Approved by Mayor: 00078aV+mendment #4.xls Date i/Zseed1r. Date- ; , 2 0 CI Summary of Subsequent Contract Amounts City of Fayetteville, Arkansas HWEI Job No. 00078A Task June 6, 2000 Contract Nov. 29, 2000 Attachement A Feb. 5, 2001 Construction Phase Service Attachement B January 2002 Amendment September 2002 Amendment (#3) New Total Cost of services $230754.00 $39500.00 $41,000.00 $7,258.00 $139938.00 $89,450.00 Fixed fee for services 1 $3,500.00 $500.00 $5,500.00 $19050.00 $0.00 $10,550.00 Reimbursable $12000.00 $0.00 $0.00 $0.00 $0.00 $1,000.00 Not to exceed Total $28,254.00 $49000.00 $46,500.00 $8,308.00 $13,938.00 $101,000.00 00078a1Task-Time 092502.xis �yv ?!/f TC'�'M(Tl p STAFF REVIEW FORM AGENDA REQUEST X CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Council meeting of NUor's approval FROM: Sid NorLgash Engineerina Public Works Name Division_ Department ACTION REQUIRED: Approval of: Amendment #4 to the Engineering Contract with Hawkins -Wier Engineers, Inc. for Garland Ave. Water 6 Sewer Relocations project in the amount of $5,060.00 11 COST TO CITY: Garland Ave. - Water $5.050.00 sl88.666 & Sewer Relocations Cost of this Request Category/Project Budget Category/Project Name 5400-5600-5808-00 S138.519 Water / Sewer Improvements Account Number Funds Used To Date Program Name 00018-10 $50,147 Sales Tax Project Number Remaining Balance Fund 8 T W: X Budgeted Item Budget Adjustment Attached ......,.- r ,..o Administrative Services Director C�O�N j/CiRACT/G 1T/LEASE REVIEW: ?��� GRANTING AGENCY: 7//C �� ✓:�- �V_mo Nor u<Qotll Agc Man er Dat ADA Coordinator Date ` 3 k3 C't Ay t piney Date Internal A itor Date �r"j� (aS 3 h 103 Purchasina Officer Date STAFF RECOMMENDATION: Approval of Amendment #4. g.� vo- 2'/-03 D' ision Head Date 3� I1-03 Depar ent Dire�/t-Q Date AdArnti _ra rve Services Director Date % .. 3 i3 Mayor bate Cross Reference New Item: Yes_ No X Prev Ord/Res #: 73-00 prig contract Date: 6-6-2000 Orig Contract #764 e Staff Review Form Description/ Garland Ave. W&S Relocations Meeting Date N/A Project Name Change Order #4.. r Comments: Reference. Comments: Budget Director Accounting Manager City Attorney Purchasing Officer ADA Coordinator Internal Auditor FAYETTEVILE THE CITY OF FAYETTEVRIE, ARKANSAS DEPARTMENTAL CORRESPONDENCE To: Dan Coody, Mayor Thru: Hugh Earnest, CAO Tim Conklin, Interim Director CP&E Jim Beavers, City Engineer From: Sid Norbash, Staff Engineer 00( Date: February 10, 2003 Re: Garland Ave. Water & Sewer Relocations Amendment #4 to the Engineering Contract With Hawkins -Weir Engineers, Inc. Background: The above referenced project is a Capital Improvement Project in progress, which is scheduled for construction in 2002. The purpose of this project is to relocate water and sewer mains in order to accommodate the improvements scheduled for Garland Ave. (Maple to North St.) by the Highway Department. Change of Scope: Leverett School's sewer connection runs at the southeasterly direction crossing Garland Ave.'and connects to the sewer main at a point east of the intersection of Garland and Cleveland. Due to the fact that this clay sewer service line is very old and broken in several places construction of a new service line is necessary. If this line is replaced at the same location the estimated cost would be $54,665.00. Main reason for this high cost is the number of the requirements that A.H.T.D. enforces. To avoid this high cost Fayetteville School's Staff and City Staff and Hawkins Engineers evaluated alternative locations for the new sewer line. The chosen alternative route will have an estimated cost of $32,710. Fayetteville Schools has agreed to contribute $16,355 (50%) of this cost and grant the necessary easement to accommodate the new line at no cost to the City. 0 0 Hawkins -Weir Engineers, Inc. Has agreed to design and manage the construction of this sewer main and appurtenances for a total fee of $5,060. For details please see attached Contract Amendment #4. Recommendations: The Staff recommend approval of the Amendment #4 to the existing contract with Hawkins -Weir Engineers, in the amount not to exceed $5,060. Funding: From the contingency funds. The Council has approved project contingencies as follows: *Project Contingency per Resolution 13-01 $5,050.00 *Project Contingency per Resolution 93-01 $6,236.00 *Project Contingency per Resolution 115-02 $108,952.00 Total approved contingency amount $120,238.00 Total used to date 70,091.00 Balance of contingency $ 50,147.00 * please see attached documents SN/sn Attachments: Copy of the Amendment #4 Copy of the Res. 13-01 Copy of Resolution 93-01 Copy of Resolution 115-02 a �SOI<J1'iON�Y�so��3=Alper Copy MICROFILMED A RESOLUTION APPROVING AMENDMENT NO. 1 TO THE ENGINEERING CONTRACT WITH HAWKINS-WEIR ENGINEERING, INC., FOR GARLAND AVENUE WATER AND SEWER RELOCATIONPROJECT TO INCLUDE THE ADDITION OF DOUBLE SPRINGS ROAD PROJECT, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council hereby approves Amendment No. 1 to the engineering contract with Hawkins -Weir Engineering, Inc., for Garland Avenue water and sewer relocation project to include the addition of Double Springs Road Project; and authorizes the Mayor and City Clerk to execute said agreement. A copy of the agreement is attached hereto marked Exhibit "A" and made a part hereof. APPROVED this 6th day of February . 2001. APPROVED: OAOetz= Charles D. Coody, I� X AGENDA REQUEST x_ CONTRACT REVIEW GRANT REVIEW For the Fayetteville Ci FROM: Sid Norbash Name 0 - STAFF REVIEW FORM Council meeting of ACTION REQUIRED: Approval or the rune; Double .Springs Rd. Project) to the Engineers, Inc. For Garland Ave. Relocations Project. ,. 0 iment #1 (which also includes addition of engineering contract with Hawkins -Weir (Maple to North St.)- Water 6 Seger COST TO CITY: $137,600 (98036) Garland Ave. - Water 5$_O.500�+ s3�05ti4Coat-: •a^^••► $540.000 (00018) RelocatiOns Cost of this Request Category/Project Budget Category/Project Name 4470-9470-5808.00 $ 2.540 (98036) 4470 -9470 -5808 -DO $28o254 (00018) Account Number Funds Used To Date 98036-10 owl Creek $134,960 (98036) 00018-10 Garland Ave. $511r746 (00018) Project Number Remaining Balance � x_ Budgeted Item EM u• . u-@ Program Name Budget Adjustment Attached VIEW: GRANTING AGENCY: �I ADA Coordinator Date � Date Internal uditor Date : App of the amendment 0140,401 Date Cross Reference- 0(-�6-a! New Item: Yes_ No.$. D to I Prev Ord/Res #: 73-00 :tor a 1 F_F-2000 Orig Contract Date: Orig Contract # 764 Date RESOLUTION NO. 93'01 A RESOLUTION AWARDING A CONSTRUCTION CONTRACT TO GRAY CONSTRUCTION, INC. IN THE AMOUNT OF FORTY- ONE THOUSAND FIVE HUNDRED SEVENTY-SEVEN DOLLARS AND NINETY-FIVE CENTS ($411577.95) . FOR SEWER RELOCATION IN CONJUNCTION WITH THE DOUBLE SPRINGS BRIDGE OVER OWL CREEK, AND APPROVING A FIFTEEN PERCENT (15%) OF SDC THOUSAND TWO HUNDRED TTIIRT'Y-SDC DOLLARS BE rr RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVMLE, ARKANSAS: fiction, i. That the City Council hereby Awards a construction contract to Gray Construction, Inc. in the amount of Forty -One Thousand Five Hundred Seventy -Seven Dollars and Ninety -Five Cents ($41,577.95) for sewer relocation in conjunction with the Double Springs Bridge over Owl: Creek, and approving a fifteen percent (15%) project contingency of Six Thousand Two Hundred Thirty -Six Dollars ($6,236.00). 671 Section 2. That the City_. Council hereby Approves a fifteen percent (15%) ect contingency of Six - Thousand Two Hundred Thirty -Six Dollars prof ($6,236.00): 52g�o.,13. That the City Council hereby Authorizes the Mayor to sign such a contract with Gray Construction, Inc. PASSED AND APPROVED this 3rd day of July, 2001. ATTEST: By: ATHER ODRUFF, Ci Clerk APPROVED: By: CGi �a9 DAN COODY, Mayolu RESOLUTION NO. 115-02 r• A RESOLUTION AWARDING A CONSTRUCTION CONTRACT __TO BASIC CONSTRUCTION CO., INC. IN THE AMOUNT OF EIGHT HUNDRED TWENTY-FIVE THOUSAND NINE HUNDRED FORTY-SEVEN DOLLARS ($825,947.00) FOR THE. GARLAND' AVENUE WATER/SEWER RELOCATION PROJECT; APPROVAL OF A 15.2% IN THE AMOUNT OF ONE HUNDRED EIGHT THOUSAND NINE HUNDRED FIFTY-TWO DOLLARS % �, AND A BUDGET ADJUSTMENT IN THE AMOUNT OF FOUR HUNDRED SEVENTY-FOUR THOUSAND SEVEN HUNDRED FIFTY-TWO DOLLARS ($474,752.00) FOR SAME. MED BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Favetteville, Arkansas, hereby awards a construction contract to Basic Construction Co., Inc. in the amount of Eight Hundred Twenty -Five Thousand Nine Hundred Forty -Seven Dollars ($825,947.00) for the Garland Avenue Water/Sewer Relocation Project. Section 2. That. the City Council of the City of Fayetteville, Arkansas, hereby approves a 15.2% Project Contingency in the amount of One Hundred Eight Thousand Nine Hundred Fifty -Two Dollars ($108,952.00). Section 3. That the City Council of the City of Fayetteville, Arkansas, hereby approves a Budget Adjustment in the amount of Four Hundred Seventy - Four Thousand Seven Hundred Fifty -Two Dollars ($474,752.00) for same. PASSED and APPROVED this 16th day of July, 2002. fFrftf City Clerk APPROVED: By: DAN COODY, Mayo n ENGINEERS CONSULTANTS E HAWKINS-WEIR Mr. Sid Norbash Engineering Department City of Fayetteville 113 West Mountain Fayetteville, Arkansas 72701 0 ENGINEERS, INC. December 12, 2002 Re: Garland Avenue Utility Relocation Leverett School Sanitary Sewer Service HWEI Job No. 00078D Dear Sid: DEC 16 2002 l Please consider this as our proposal to provide our professional services on the design and construction of the sanitary sewer service for the Leverett School. We propose to offer the following services: TASK A 1) Prepare plans and specifications for 8" sanitary sewer outfall from Garland Avenue west to the existing sewer line and a 6" service line parallel to Garland to serve the school. 2) Prepare a legal description for the sewer line across the school property. 3) Submit plans to the Health Department for approval. Our fee for Task A will be based on our existing contract hourly rate and will not exceed $2,500 plus a fixed fee of $250. TASK B 1) Provide contract administration and inspection including coordination with the Contractor, inspection (3 days @ 8 hours/day) and assistance in processing pay estimate. 2) Final inspection and sewer line construction closeout. \00078D\SN 121202RH.doe P.O. BOX 648 • VAN BUREN, ARKANSAS 72957-0648 • FAX: (479) 474-8531 • PHONE (479) 474-1227 • www.hawkins-weir.com �Y Mr. Sid Norbash December 12, 2002 HWEI Job No. 00078D Page 2 Our fee for Task B will be based on our existing contract hourly rate and will not exceed $2,100 plus a fixed fee of $210. Please advise if Task A or Task A and Task B are acceptable to you. If you have any questions, please advise. Very truly yours, HAWKINS-WEIR ENGINEERS, INC. ,&,L. Ronald R. Hawkins, P.E., R.L.S. RRH/jeh Approved By: ---------- �YY�__�L_ PP Dan Coody, Mayor \00078D\SN 121202RH.doc TASK GARLAND AVENUE UTILITY RELOCATION LEVERETT SCHOOL SANITARY SEWER SERVICE FAYETTEVILLE, ARKANSAS HWEI JOB NO. 00078A TOTAL HOURS 10 a 12 24 \00078MTask.XLS ENGINEER TECHNICIAN FIELD INSPECTOR CLERICAL TASK IV CREW I Prepare plans & specifications 88 8 2 2 Inspection & Contract Administration 4 4 24 TOTAL HOURS 10 a 12 24 \00078MTask.XLS FAYETTEVILLE • .THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE To: Sid Norbash Engineering Division From: Clarice Buffalohead-Pearmanm City Clerk Division Date: 3/20/2003 Re: Hawkins -Wier Engineering, Inc. Attached please find two executed copies of Amendment No. 4 with Hawkins -Wier Engineering, Inc. in the amount of $5,060.00. The agreement will be microfilmed and filed in the city clerk's office. If anything else is needed please let the city clerk's office know. /cbp cc: Nancy Smith, Internal Auditor FAYETTEVILE THE CITY OF FAYETTEVIEEE, ARKANSAS DEPARTMENTAL CORRESPONDENCE -MI To: Sid Norbash, Engineering From: Heather Woodruff, City Clerk Date: February 27, 2002 Attached is a copy of the completed staff review form and signed amendments to the contract with Hawkins -Weir regarding the relocations on Garland Ave. I am also returning two originals to you. One original will be microfilmed and filed with the City Clerk. cc: Nancy Smith, Internal Audit 015 04 City of Fayetteville aintenance/Inquiry Document It Action Reference Date Ref. Taken Brief Description ENG 2/24/2002 CHNGO HAWKINS-WEIR/ GARLAND AVE/ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Keywords ..............: ENGINEERING HAWKINS-WEIR CHANGE ORDER N0, 2 RES, 73-00 SCOPE OF SERVICES WATER AND SEWER RELOCATIONS File Reference #......: CC OFC/02 3/19/2002 8:03:19 Security Class........: Retention Type: Expiration Date..:....: **** Active* Date for cont/Referred: Name Referred to......: Press Cmd 6 to Update Cmdl-Return Cmd2-Check Out Cmd8-Retention Cmd3-End Press 'ENTER' to Continue Cmd5-Abstract Yes No (c) 1986-1992 Munimetrix Systems Corp. RESOLUTION NO. 73 06 A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN AGREEMENT FOR ENGINEERING SERVICES WITH HAWKINS-WEIR ENGINEERS, INC., IN THE AMOUNT OF $28,253.37, FOR THE DESIGN OF WATER AND SANITARY SEWER RELOCATIONS AND SYSTEM IMPROVEMENTS IN PREPARATION FOR THE WIDENING OF GARLAND STREET. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council hereby authorizes the Mayor and City Clerk to execute an agreement for engineering services with Hawkins -Weir Engineers, Inc., in the amount of $28,253.37, for the design of water and sanitary sewer relocations and system improvement in preparation for the widening of Garland Street. A copy of the agreement is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 6° day of June 2000. ATTEST: By: Heather Woodruff, City Cler1 APPROVED: By: Fred Hanna, Mayor