HomeMy WebLinkAbout26-00 RESOLUTION• RESOLUTION NO. 26-00 Mi ICR OMTLMED A RESOLUTION APPROVING TASK ORDER NO. 1 TO THE AGREEMENT WITH McCLELLAND CONSULTING ENGINEERS, INC. IN AN AMOUNT NOT TO EXCEED $71,283 WHICH WII L COVER THE SCOPE OF THE DESIGN AND OVERSEE THE CONSTRUCTION OF THE ACCESS DRIVE ON THE EAST SIDE OF THE AIRPORT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council hereby approves Task Order No. 1 to the agreement with McClelland Consulting Engineers, Inc. in an amount not to exceed $71,283 which will cover the scope of the design and oversee the construction of the access drive on the east side of the airport. A copy of the task order is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 7th day of March , 2000. ATTEST By:pa, G( %rte f ' Heather Woodruff, City Cl APPROVED. By: red Hanna, Mayor • NAME OF FILE: lies. ,%-cq CROSS REFERENCE: • »s,< oR j /4. / it se/Ex/A/J4 C'oz'see/ /ZN EAST sz4F" o,& >yb Ark Pail C I Ani &A5 7-54e .e.2z ✓E Date Contents of File Initials 14700 45. z -106 6-221z-grT WC SK ()ask 40. 1 3 -D7 -Do 6703 &Uzco koR)Y 2 -1S -up % 1S40 72' AAye rra (/II.LC try Cembocroc fr,Pdm uDA2c Me,Q&Ezac /HRx%A/o,E AIR/JAM 3-15 0o V0✓:7/; b 7 1 E itaie ae2tc,e Aeb-ni 2 C onma6,c HaA7 • • EXHIBIT A . Thule OR TASK ORDER NO. 1 EXTENSION OF LANCASTER DRIVE STATE OF ARKANSAS COUNTY OF WASHINGTON This Task Order is written pursuant to the basic agreement entitled CITY OF FAYETTEVILLE, AGREEMENT FOR ENGINEERING SERVICES, of the same date entered hereon. The referenced basic agreement pertains to proposed improvements to Drake Field, Fayetteville's Municipal Airport. This Task Order entered into and executed this day of 2000, by and between the City of Fayetteville (OWNER) and McClelland Consulting Engineers (ENGINEER) sets forth project description, project schedule, and engineering fees related to the extension of Lancaster Drive, Drake Field. SECTION 1 - PROJECT DESCRIPTION Lancaster Drive is to be extended approximately 2,600 feet in the eastern and southern directions to permit ground vehicle access to the east -side general aviation facilities. As such, this project is intended to function solely as a roadway to be used by airport/ aviation patrons and is not to be considered a "general -use city street". Therefore, it is not required to strictly conform to City Street Standards in every detail. However, its design is to follow, generally, the same sound engineering principles upon which the City's Street Standards have been based. J:199199161LLo#1.2-15OOREV.wpd:f m 1 rn 1x 53 • A. The project is to include: 1. Approximately 2,600 linear feet of 2 -lane asphalt roadway, 26 feet wide. 2. Fence relocations as required. 3. Roadway lighting similar to that on the existing paved portions of Lancaster Drive; however, light poles shall be spaced farther apart. 4. Pond drainage and fill-in. 5. Connecting entrance drive to the east -side general aviation ramp. 6. Storm drainage improvements as required to accommodate the described roadway improvements. 7. Paint stuping for the roadway. 8. Topsoiling/reseeding areas disturbed during construction B. Specifically excluded from the project scope: 1. Curb and gutter (side ditches will accommodate storm drainage parallel to the roadway). 2. Storm Water Pollution Prevention Plan (less than a 5 -acre area is to be disturbed). 3. Large Scale Development Plan (no building construction is proposed at this time). 4. Sidewalk. 5. Formal wetlands determination. 6. Easement preparation (all work is anticipated to take place on Drake Field property). J9.991991861m#1-2-15-0OREV.wpO:lm 2 • • SECTION II — PROJECT SCHEDULE From the time the OWNER issues the Notice To Proceed to the ENGINEER, the project will be completed as follows: TASK Surveying Preliminary Design (35%) Geotechnical Study Design Development (65%) Final Design (95%) Submittal to FAA/City (100%) TIME AFTER N.T.P. 7 calendar days 16 calendar days 28 calendar days 45 calendar days 65 calendar days 75 calendar days SECTION III — SCOPE OF SERVICES The ENGINEER shall provide those services listed in the basic agreement which are applicable to this specific Task Order. SECTION IV — FEES AND PAYMENTS A. Title I Services (Engineering Planning and Design Services Preceding Construction). The ENGINEER shall provide, as hereafter enumerated individually, surveying and design, geotechnical investigation, bidding, and application for funding services for a total not -to -exceed fee of $40,329, including a total fixed payment of $4,815. 1. Surveying and Design Phase Services: For, and in consideration of, the services to be rendered by the ENGINEER, the OWNER shall pay the ENGINEER on the basis of actual salary costs for J:199199184VdH-2-15-00REV.wpd:jm 3 • work -time directly connected with work chargeable to the project, plus payroll additives and general overhead costs of 178% of direct labor costs, plus direct reimbursable expenses associated with the project, plus a fixed payment which are payable as follows: • a) Surveying and Design phase services costs not to exceed: $32,075 b) Fixed payment for Surveying and Design phase services: $ 4,599 c) Engineering contract amount for Surveying and Design phase services not to exceed: $36,674 The basis of this upper limit and justification for the fee is contained in Appendix "A" attached hereto. Adjustment of the upper limit may be made should the ENGINEER establish and the OWNER agree that there has been or is to be a significant change in scope, complexity or character of the services to be performed; or if the OWNER decides to shorten the duration of work from the time period specified in the Agreement for completion of work and such modification warrants such adjustment. Appendix "B" covers the classification of personnel and the salary rate for all personnel anticipated to be assigned to this project by the ENGINEER. Final payment for the Surveying and Design phase services shall be made upon the OWNER's approval and acceptance with the satisfactory completion of the Surveying and Design phase services. J:199199164Vo#1-2-1 S-0OREV.wpd:lm 4 • • 2. Geotechnical Investigation Phase Services: . For Geotechnical Investigation phase services associated with design, the OWNER shall pay the ENGINEER on the basis of hourly rates and unit prices set forth in Appendix "C" a fee not to exceed $2,112. The basis of this upper limit and justification for the fee is contained in Appendices "A" and "D", attached hereto. 3. Bidding Phase Services: For Bidding phase services rendered by the ENGINEER, the OWNER shall pay the ENGINEER on the basis of salary costs for work -time directly connected with the project, plus payroll additives and general overhead costs of 178% of direct labor costs (plus direct reimbursable expenses associated with the project), plus a fixed payment, which are as follows: a) Bidding phase services costs not to exceed: b) Fixed payment for Bidding phase services: c) Engineering contract amount for Bidding phase services not to exceed: $ 917 $ 130 $1,047 The basis of this upper limit and justification for the fee is contained in Appendix "A" attached hereto. The fee has been based upon bidding the project one time under a single contract section. Adjustment of the upper limit may be made should the ENGINEER establish and the OWNER agree that there has been or is to be a significant change in the services to be performed by the ENGINEER and such modification warrants such adjustment. JAII9991841rop1-2-1800REV.wpd:jm 5 • • Appendix "B" covers the classification of personnel and the salary rate for all personnel anticipated to be assigned to this project by the ENGINEER. Final payment for Bidding phase services shall be made upon the OWNER's approval and acceptance with the satisfactory completion of the Bidding phase of the project. 4. Funding Application Phase Services: For Funding Application phase services, the OWNER shall pay the ENGINEER on the basis of salary costs for work -time directly connected with the project, plus payroll additives and general overhead costs of 178% of direct labor costs (plus direct reimbursable expenses associated with the project), plus a fixed payment which are as follows: a. Funding Application phase services costs not to exceed: b. Fixed payment for Funding Application phase services: c. Engineering Contract amount for Funding Application phase services not to exceed: $433 $ 63 $496 The basis of this upper limit and justification for the fee is contained in Appendix "A" attached hereto. The proposed fee includes the filing of funding applications with both the F.A.A. and the State Aeronautics Board. Adjustment of the upper limit may be made should the ENGINEER establish and the OWNER agree that there has been or is to be a significant change in scope, complexity or character of the services to be performed and such modification warrants such adjustment. JA99199164 1-2-15-0OREV.wpd:jm 6 • • Appendix "B" covers the classification of personnel and the salary rate for all personnel anticipated to be assigned to this project by the ENGINEER. Final payment for Funding Application phase services shall be made upon the OWNER's approval and acceptance of the Funding Application phase documents. B. Title II Services (Construction Phase Services): The ENGINEER shall provide, as hereafter enumerated individually, construction phase services for a total not -to -exceed cost of $30,954, including a total fixed payment of $3,634. 1. Construction Administration and Inspection Phase Services: For Construction Administration and Inspection phase services rendered by the ENGINEER, the OWNER shall pay the ENGINEER on the basis of salary costs for work -time directly connected with the project, plus payroll additives and general overhead costs of 178% of direct labor costs (plus direct reimbursable expenses associated with the project), plus a fixed payment which are as follows: a) Construction Administration and Inspection phase services costs not to exceed: $23,674 b) Fixed payment for Construction Administration and Inspection phase services: $ 3,456 J:19919916412o#1.2.15-0OREV.wpd:jm 7 • • c) Engineering contract amount for Construction Administration and Inspection phase services not to exceed: $27,130 The basis of this upper limit and justification for the fee is contained in Appendix "A" attached hereto (the Construction Inspection portion of the fee has been based upon providing an average of 8 hrs/day of resident inspection during an assumed construction period of 90 calendar days). Adjustment of the upper limit of the ENGINEER's fee may be made should the ENGINEER establish and the OWNER agree that there has been or is to be a significant change in effort, scope, complexity or character of the services to be performed and such modification warrants such adjustment. Appendix "B" covers the classification of personnel and the salary rate for all personnel anticipated to be assigned to this project by the ENGINEER Final payment for Construction Administration and Inspection phase services shall be made upon the OWNER's approval and acceptance with the satisfactory completion of the Construction phase of the project. 2 Construction Staking Services: For Construction Staking services, the ENGINEER shall establish roadway centerline rough grade staking with offset staking on one side at 100 -ft. stations along tangents and 50 -ft. stations along curves, and perform drainage structures staking. This construction staking is to be performed by J:129199164\NA1-2-1 SODREV.wpd:lm 8 • • the ENGINEER one time only, with additional staking to be the responsibility of the Contractor. For this work, the OWNER shall pay the ENGINEER on the basis of actual salary cost for work -time directly connected with construction staking, plus payroll additives and general overhead costs of 178% of direct labor costs, plus direct reimbursable expenses, plus a fixed payment payable as follows: a) Construction Staking costs not to exceed: $1,042 b) Fixed payment for Construction Staking: $154 c) Engineering contract amount for Construction Staking services not to exceed: $1,196 The basis of this upper limit and justification for the fee is contained in Appendix "A" attached. Adjustment of the upper limit of the ENGINEER's fee may be made should the ENGINEER establish and the OWNER agree that there has been or is to be a significant change in effort, scope, complexity or character of the services to be performed and such modification warrants such adjustment. Appendix "B" covers the classification of personnel and the salary rate for all personnel anticipated to be assigned to this project by the ENGINEER. J:\99%99164'c#1-2-15.00REV.wpd:Jm 9 • i Final payment for Construction Staking service shall be made upon the OWNER's approval and acceptance of the satisfactory completion of the Construction Staking phase of the project. 3. Construction Materials Testing Phase Services: For the Construction Materials Testing phase services associated with construction of the project, the OWNER shall pay the ENGINEER on the basis of hourly rates and unit prices set forth in Appendix "E" a fee not to exceed $2,628. The basis of this upper limit and justification for the fee is contained in Appendices "A" and "F", attached hereto. SECTION V — BASIC AGREEMENT IN EFFECT Except as amended specifically herein, the basic AGREEMENT FOR ENGINEERING SERVICES shall remain in full force as originally approved and executed. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be duly executed as of the date and year first herein written. FOR THE CITY OF FAYETTEVILLE: By: Date: Mayor /ate J1991991041tc#1-2-15-0OREV.wpd:jm Attest:// zi��� 10 • • FOR McCLELLAND CONSULTING ENGINEERS, INC.: 1 Date: President 2/I5/Qo J:W9199164Va#1-2-15-00REV.wpd:lm Attest: (Lea laas 11 z 0 z Z W WG� G O 0 W IX l J { U 0 y < 0 -0LL X Y y' al O LfJcsWm W Z LL WW E w t -a V W W 0 1- U W 0 O 0. a • • o :WI U EXPENSE 6 0 0 0 0 0 f00 w 0 ' SI 0 Ol w 0 W' N pj m w 1 a O H o 0 V1 `�0 e O w W o O N N Y1 a y .. « DIRECT LABOR COST 511,029 OVERHEAD a 1.78 $19,632 DIRECT EXPENSES $1,414 FIXED PAYMENT $4,699 NOT -TO -EXCEED $36,674 rd' 1N SUBTOTAL NNNrNMpgOfl N N N N N N190V1NNWN N M N N 4,404 5479 W. $64 1085 NNA 40.4141 891.5 091.6 NNN N __ N ((pp M VIrrflS N 4 44 oNo M MI $37 04 0 ION wl w, INSPECTOR 0 Y W TYPIST ar N, 0 .- 23 DES. DEVEL.: LIGHTING 1 1 24 EROSION CONTROL FACTORS 1 2 4 25 OUTLINE SPECIFICATIONS 2 2 28 UPDATE COST ESTIMATE 1 6 4 27 IN-HOUSE REVIEWS 2 8 2 28 REVIEW MEETING WITH OWNER 2 2 1 29 DET. DES.: PAVEMENT SECTION 8 1 1 30 DET. DES.: PLAN & PROFILES 4 0.5 31 DET. DES.: CROSS-SECTIONS 8 32 DET. DES.: DETAILS 8 33 DET. DES.: DRAINAGE STRUCTURE 8 34 DET. DES.: FENCES 4 35 DET. DES.: EROSION CONTROL 4 38 DET. DES.: LIGHTING 1 37 SPECIFICATIONS 24 40 38 DRAWINGS 12 12 50 50 39 IN-HOUSE REVIEWS 8 6 2 1 40 DETAILED COST ESTIMATE 1 4 2 41 REVIEW MEETING WITH OWNER 2 2 1 42 REVISIONS TO PLANS & SPECS 1 6 2 4 8 2 43 RE-EVALUATE COSTS 025 2 0.5 44 SUBMITTALS TO F.AA. 1 0.5 0.5 45 FINAL REVISIONS TO P B S 0.5 2 0.5 1 1 0.5 Subtotals 30.75 230 27 25 102 97 20 24 63 o K 0 CREW 24 U W 0 Z 11.I reO f.1 1-N r U -ice 7 qm N Oo o U OPER.3 a N " a 0 O 0 a OPER.2 00 N 12 N0O O 9 OPER. 1 26 0.5 1 00 00 U ENGINEERING TECHNICIAN $18.03 1 a r PROJECT [ MGRJENGR. 523.34 0-1-01r 0.5 0 O N a N a N O Q e a m 0 1 6. DIRECTOR 540.86 1 -NON 0.5 0.5 N Yy TASK DESCRIPTION IGN 1 ISCOPING MEETING 2CONTRACT NEGOTIATIONS 3 (PREPARE CONTRACT FORM 4SCHEDULING & BUDGETING 5 IDENTIFY PROJ. COMPONENTS e DEVELOP DESIGN CRITERIA 7 TRAFFIC PROJECTION B ICOORD. WITH UTILITY MARKERS ZZ 0 N m 10 PRELIMINARY ROUTING 11 PRELIMINARY PROFILING 1 13 R.O.W. IMPLICATIONS 14 PRELIMINARY COST ESTIMATE 15 REVIEW MEETING WITH OWNER 16 IDES. DEVEL.: COVER 17 IDES. DEVEL.: TYPICAL SECTION 18 IDES. DEVEL.: PLAN & PROFILES 19 IDES. DEVEL.: CROSS-SECTIONS 20 IDES. DEVEL.: DETAIL SHEETS 21DES. DEVEL.: DRAINAGE DESIGN 22 IDES. DEVEL.: FENCE RELOCATES 12 PRELIMINARY DRAINAGE STU N W 0 0 o 2 2 K tl' LINE • f O EXPENSE 105% gCO ly m N ym 11,935 I DIRECT LABOR COST 155 OVERHEAD Ft 1.78 $99 DIRECT EXPENSES $1,935 FIXED PAYMENT $23 NOT -TO -EXCEED $2,112 IRECT ABOR m ,_mm N u N a! I 470 470 INSPECTOR I n fl CO11 m CLERK TYPIST 0 O )Il SURVEY CREW 0 0 N N N LICENSED SURVEYOR to0 N r.J 0 0 CADD OPER. 3 :Iii N e CADD OPER. 2 N N q I 55 N r nU 0QI n UO $16.25 mt.Ir 0gZ CONSTR. ADMIN. AND INSPECTION CONSTR. ADMINISTRATION CONSTR. INSPECTION Subtotals WVo wE z0 v44 z W W� co r N PR EC MGRJENGR. p gi P DIRECTOR m I0- 30 IGEOTECH. INVESTIGATION TASK DESCRI W z el S N N 14N ' Q 4.0 41 NNN 4. O M N N N 8 my 2 9 W W 6fX Y W U y ▪ UOLriejQ 00yyX�1 F 0Iz m 0 z 0 0 m O ' Irma N N N N N ILO N N N 0 FUNDING APPLICATIONS • m N M N Oh r 40 :if ! ml CO N mn 4- 44 N N N 0 N IN MT CONSTRUCTION STAKING ID Q CO N irm Ir 44 m N NN N N N N m M • N CONSTRUCTION MILS TESTING gCO ly m N ym N 4^ N' IR COST 58,288 1.78 514,753 NSFS 5632 m ,_mm N N m N N I 470 470 CO11 m N N 0 0 0 N N I 55 N r mt.Ir CONSTR. ADMIN. AND INSPECTION CONSTR. ADMINISTRATION CONSTR. INSPECTION Subtotals • r N m N M N Oh r 40 :if ! ml CO N mn 4- 44 N N N 0 N IN MT CONSTRUCTION STAKING ID Q CO N irm Ir 44 m N NN N N N N m M • N CONSTRUCTION MILS TESTING • • APPENDIX "B" CITY OF FAYETTEVILLE DRAKE FIELD, TASK ORDER NO. 1 SALARY RANGES LOWER UPPER END END Principal Engineer $34.00 $45.00 Project Manager 22.00 35.00 Project Engineer 19.00 25.00 Design Engineer 13.50 19.00 Project Surveyor 13.00 22.00 Surveyor 10.00 15.00 Survey Crew (2 men) 18.00 22.00 Survey Crew (3 men) 25.00 30.00 CADD Technician 9.00 13.00 Clerical 7.00 11.00 Senior Engr Tech. 16.50 19.50 Engineering Tech. 12.50 20.00 CADD Operator 1 15.00 20.00 CADD Operator 2 10.00 15.00 CADD Operator 3 6.50 10.00 Inspector 12.00 19.50 FY96166:SALSKDjm ' • • APPENDIX C GEOTECHNICAL INVESTIGATION FEE SCHEDULE CATEGORY HOURLY RATE Mobilization of $1.40/mile ( each way )" ( from Fayetteville, Ark Soil Drilling including Sampling Rock Drilling (Rotary Bit)' Rock Coring (Diamond Bit) ••• Boring Setup Charge Standby Time (Rig and Crew On -Site), if required Layout of Boring Crew Travel Time Per Diem (per night) Atterberg Limits Moisture Content Unit Weight Test (Soil Sample) Unconfined Compression Test Gradation Tests Dry Sieve Wet Sieve Califomia Bearing Ratio (CBR) with Std Proctor with Mod Proctor In-situ Permeability In-situ Permeability (Flexwall) Remolded Sample Triaxial Test (Single Stage) Triaxial Test (Multi -Stage) Remolded Sample Draftsman Senior Draftsman Clerical Design Engineer Project Engineer (Soils Engr.) Project Manager (Senior. Soils Engr.) Principal Engineer Senior Engineering Technician Engineering Technician Soils Technician Two Flagmen Mileage Backhoe Rental (4 hour minimum ) Dozer Rental (4 hour minimum ) S 75.00 minimum 10.00 per foot 12.00 per foot 30.00 per foot 25.00 per each 80.00 per hour 60.00 per hour 60.00 per hour 60.00 per man 45.00 each 8.00 each 8.00 each 40.00 each 6.00 each 25.00 each 250.00 each 275.00 each 125.00 each 200.00 each 50.00 each 120.00 each 150.00 each 50.00 each 40.00 per hour 55.00 per hour 31.00 per hour 55.00 per hour 65.00 per hour 95.00 per hour 100.00 per hour 55.00 per hour 40.00 per hour 30.00 per hour 50.00 per hour 0 .32 per mile 50.00 per hour 65.00 per hour Rock Bits 275.00 each Diamond Bits 460.00 each The Client is responsible for providing access to the site. The Client is responsible for all costs for site mobilization through unstable soil when a dozer is required to move the drill rig around the site. The Client is responsible for all costs involving clearing and access path to each boring location. The Client is responsible for drill bit costs while drilling into and/or through a chert, a very hard limestone formation, or other very hard formation, whenever new or slightly used drill bits are worn out during the drill operations. 1‘Servenserven991991 W\GEOTECMRATE S.wpa:jm • • APPENDIX "D" GEOTECHNICAL INVESTIGATION SCOPE AND FEE SCHEDULE DRAKE FIELD, TASK ORDER NO. 1, LANCASTER DRIVE FAYETTEVILLE, ARKANSAS ITEM NO. ITEM DESCRIPTION QUANTITY UNITS UNIT PRICE EXTENDED 1 MOBILIZATION 1 LS 575.00 575.00 2 BACKHOE RENTAL (CBR SAMPLING) 4 HR 550.00 5200.00 3 SOILS TECHNICIAN 4 HR $30.00 S120.00 4 BORING SETUP CHARGES 4 EA 525.00 $100.00 5 BORING LAYOUT 1 HR $60.00 $60.00 6 SOIL DRILLING AND SAMPLING 16 LF 510.00 $160.00 7 MOISTURE TESTS 4 EA $8.00 $32.00 8 ATTERBERG LIMITS TESTS 4 EA $45.00 5180.00 9 GRADATIONS (5 SIEVE) 4 EA $30.00 5120.00 10 DRY UNIT WEIGHT TESTS 4 EA $8.00 $32.00 11 CALIFORNIA BEARING RATIO TESTS 2 EA 5275.00 $550.00 12 GEOTECHNICAL REPORT, ENGINEER 2 HR 595.00 5190.00 13 BORING PLOT PLAN & LOG, CADD OPER. 2 HR 540.00 $80.00 14 REPORT, CLERICAL 1 HR 531.00 $31.00 TOTAL $1,930.00 • • APPENDIX E CONSTRUCTION MATERIALS LABORATORY FEE SCHEDULE GENERAL. Laboratory Feld Technician AHTD-Qualified Technician' Engineering Technician Senior Engineering Technician Lab Supervisor Consultation: Lab Supervisor Field Engineer Project Engineer Project Manager Principal Engineer Lab Report Preparation SOILS: AHTD-Qualified Feld Technician Soils Feld Technician (1 -hour minimum) In -Place Compaction Test -Nuclear Gauge ASTM D 2922 Sample Pickup Liquid Limit, Plastic Limit, Plasticity Index (3 point) ASTM D 4318 Sieve Analysis -Washed No 200 (Wet) ASTM D 1140 Sieve Analysis -Dry ASTM D 422 Hydrometer Analysis ASTM D 422 Spec Gravity ASTM D 854 Soils Classification, Unified or AASHTO ASTM D 2487 or AASHTO M 145 Laboratory Maximum Compaction Test ASTM D 698 or AASHTO T 99 Laboratory Maximum Compaction Test ASTM D 1557 or AASHTO T 180 Potential Volume Change -Swell Pressure California Bearing Ratio -CBR ASTM D 1883 (3 point) (Proctor curve additional) Shrinkage ASTM D 427 Soil Bearing Capacity (Engineering Tech., 2 -hour minimum) Non -ASTM Procedures Available On Request CONCRETE: Concrete Mix Design Review Concrete Mix Design (Lab Supervisor) Confirm Concrete Mix Design Concrete Field Technician' (1 -hour minimum): [For any of the following 6 items] • Unit Weight and Yield of Freshly Mixed Concrete ASTM C 138 • Concrete Cylinder or Beam Molding ASTM C 31 • Concrete Cylinder or Beam Pickup • Concrete Slump Test ASTM C 143 • Concrete Air Content Test ASTM C 231 or C 173 • Cement Mortar or Group Sampling AHTD-Qualified Concrete Technician: (For any of the foregoing 6 items:] Compressive Strength of Concrete Test Cylinders ASTM C 39 (pad cap) Compressive Strength of Concrete Test Cylinders ASTM C 39 (sulfur capped) Spare Cylinders Specimens Processed but not Tested Schmidt Hammer Testing (Engineering Tech, 2 -hour minimum) ACI Grade I Concrete Field Testing Technician a eniensarver, us+ e.wnsTtsTs.ra:rn $ 30.00 per hour 36.00 per hour 40.00 per hour 55.00 per hour 45.00 per hour 45.00 per hour 50.00 per hour 72.00 per hour 95.00 per hour 100.00 per hour 30.00 per hour 36.00 per hour 30.00 per hour 45.00 each 35.00 per sieve 7.00 per sieve 65.00 each 40.00 each 100.00 each 120.00 each 135.00 each 100.00 each 150.00 each 50.00 each 40.00 per hour Price on Request 45.00 per hour Price on Request 30.00 per hour 36.00 per hour 8.00 each 12.00 each 8.00 each 40.00 per hour Page 1 of 2 • • • • APPENDIX E CONSTRUCTION MATERIALS LABORATORY FEE SCHEDULE CONCRETE (Continued):. Flexural Strength of Concrete Beams ASTM C 78 or C 293 Spare Beam Specimens Processed but not Tested Compressive Strength of Grout Cubes Compressive Strength of Cement Mortar Cubes Concrete Coring (3" or 4"): Core Machine & Lab Technician Additional Lab Technician, as required Compressive Strength of Concrete Cores (3" or 4") Other Core Sizes Aggregate Sieve Analysis: Dry Sieve ASTM C 136 Wet Sieve ASTM C 117 Fineness Modules Decantation Deleterious Materials Specific Gravity and Absorption of Aggregate ASTM C 127 & C 128 Dry Rodded Unit Weight of Aggregate ASTM C 29 Sodium or Magnesium Sulfate Soundness (5 cycles) ASTM C 88 Additional Cycles ASPHALT: Asphalt Mix Design Review Asphalt Mix Design (Lab Supervisor) Asphalt Field Technician In -Place Compaction Test -Nuclear Gauge (Lab Technician) Sample Pickup Marshall Test including Stability, Flow, Laboratory Density, Percent Air Voids, Percent Voids in Mineral Aggregate (3 specimens per test) Extraction including percent Bitumen and Aggregate Gradation Laboratory Density of Cored Plugs including Depth Measurement Asphalt Coring (3" or 4"): Core Machine & Lab Technician Additional Lab Technician, if required Sample Pickup FIREPROOFING: Unit Weight, Bonding Strength, Thickness and Sampling (actual time required for Lab Technicians) Report Preparation (Lab Supervisor) STRUCTURAL STEEL: Bolt Torque Testing: Lab Technician(s) Field Engineer Pneumatic Torque Wrench Calibration (twice per day) Visual Weld Inspection Field Engineer S. Ivoro.roe NNaa1S4 W TSSTESTS...prJt Services not Listed are Available on Request 20.00 each 20.00 each 15.00 each 10.00 each 60.00 per hour 30.00 per hour 30.00 each Price on Request 7.00 each 35.00 each 15.00 each 20.00 each 45.00 each 75.00 each 50.00 each 250.00 each 40.00 each Price on Request 45.00 per hour 30.00 per hour 30.00 per hour 175.00 each 125.00 each 20.00 each 60.00 per hour 30 00 per hour 30.00 per hour/Tech. 45.00 per hour 30.00 per hour 50.00 per hour 50 00 each 50.00 per hour Page 2 of 2