HomeMy WebLinkAbout172-00 RESOLUTIONRESOLUTION NO. 172-00
MICROFILMED
A RESOLUTION APPROVING AMENDMENT NO. 6 TO THE
OMI CONTRACT FOR THE OPERATION AND MANAGEMENT
SERVICES OF THE FAYETTEVILLE WASTEWATER
TREATMENT PLANT IN THE AMOUNT OF $3,715,901.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS •
Section 1. That the City Council hereby approves Amendment No. 6 to the OMI
contract for the operation and management services of the Fayetteville Wastewater Treatment Plant
in the amount of $3,715,901. A copy of the agreement amendment is attached hereto marked Exhibit
"A" and made a part hereof.
PASSED AND APPROVED this 19th day of December , 2000.
APPROVE
By:
ATTEST:
By: #ig
UC/ i�Cer Woodruff, City rk
Fred Hanna, Mayor
NAME OF FILE:
•
esdeoddi /7/1--
CROSS
7 --
CROSS REFERENCE:
Date
Contents of File
Initials
a/9-ai.44a7
'6. /7% -DD
.X „ /14&
za e
4i(ci,:ice? rte
goat
iii S4- /./.-91.0a�
44z d
..lege./."b.
zecyzy,"0
/.lam
0/-G3 Dl
l// ro .IAt4mr, Cit Gl fr_.i.
/-
•
• EX
EXHIBIT A 9 N"
AMENDMENT NO. 6
TO THE
AGREEMENT FOR OPERATIONS,
MAINTENANCE, AND MANAGEMENT SERVICES
FOR THE CITY OF FAYETTEVII J F, ARKANSAS
WASTEWATER TREATMENT PLANT
THIS AMENDMENT, entered into this /9 day of `/aCt)n4, 2000, by and between the
City of Fayetteville, Arkansas (hereinafter "Owner"), whose address for any formal notice is 113 W.
Mountain St, Fayetteville, Arkansas 72701 and Operations Management International, Inc.,
(hereinafter "OMI") with offices at 6060 S. Willow Drive, Suite 200, Greenwood Village, Colorado
80111-5142 is made and entered into for purposes of amending certain provisions of the "Agreement
for Operations, Maintenance, and Management Services for the City of Fayetteville's Wastewater
Treatment Plant," dated August 16, 1994 (the "Agreement") to prevent the facilities covered by the
Agreement from being deemed to be used in the trade or business of OMI pursuant to Section 141 (b)
of the Internal Revenue Code of 1986, as amended.
This is Amendment No. 6 to the Agreement dated the 16th day of August, 1994, between Owner and
OMI.
NOW THEREFORE, Owner and OMI agree to amend the Agreement as follows:
Article 4.1 is hereby deleted in its entirety and replaced with the following Article 4.1:
4.1 For services rendered during the seventh year of this agreement owner shall pay to
OMI the actual cost of services performed plus a management fee of Ninety One
Thousand One Hundred and Twenty Eight Dollars ($91,128). Said fee and estimated
cost (base fee) shall be paid in twelve (12) equal monthly installments. The
management fee for subsequent years will be determined proportional to the increase
in estimated cost.
2. Article 4.3 is hereby deleted in its entirety and replaced with the following Article 4.3:
4.3 OMI estimates that cost for services for calendar year 2001 shall be Three Million
Seven Hundred Fifteen Thousand, Nine Hundred and One Dollars ($3,715,901)
annually. Details of said cost are shown in Appendix J. The base fee shall be
negotiated each year in September, beginning in 2001 for calendar year 2002. Should
Owners and OMI fail to agree, the base fee will be determined by the application of
the base fee adjustment formula shown in Appendix F. Should the actual
expenditures exceed estimated expenditures by more than Twenty Thousand Dollars
($20,000), in any year of this agreement, specific approval will be obtained from the
owner.
rn
i
4
•
3. Appendix J is hereby deleted in its entirety and replaced with the attached Appendix J.
4. Appendix K is hereby deleted in its entirety and replaced with the attached Appendix K.
All other terms and conditions remain in effect in accordance with the Agreement referenced in this
Amendment.
Both parties indicate their approval of this Amendment to the Agreement by their signatures below
as of the date shown above.
Authorized Signature: Authorized Signature:
BernarfA. Miller
Title: Chief Operating Officer
me/Sit--
Fred Hanna, Jr.
Title: Mayor
OPERATIONS MANAGEMENT CITY OF FAYETTEVILLE
INTERNATIONAL, INC.
Date: - _ Date:
•
•
Appendix J
COST DETAIL
•
The proposed annual estimated costs for 2001 were calculated as follows:
Direct labor and benefits
Labor overhead @ 35%
Electricity
Electric overhead @ 5%
All other direct costs
Other direct costs overhead 10%
Sub -Total
Fixed Fee
Total Operating Budget
SCADA Upgrade - Phase 1
Total 2000 Budget
Projected
2000
$1,385,000
$ 484,750
$ 670,000
$ 33,500
$ 775,000
$ 77,500
$3,425,750
$ 88,854
$3,514,604
Budgeted
2000
$1,381,183
$ 483,414
$ 715,000
$ 37,750
$ 737,909
$ 73,791
$3,427,047
$ 88,854
$3,515,901
Proposed
2001
$1,434,176
$ 501,962
$ 700,000
$ 35,000
$ 766,941
$ 76,694
$3,514,773
$ 91,128
$3,605,901
$ 156,546 (Phase IDS 200,000 (Phase III) $ 110,000
$3,671,150
$3,715,901
$3,715,901
The following are some of the major reasons for cost circumstances:
1. Projected decrease in electrical usage and demand due to the expectation that part-time
utilization of the second aeration basin will be limited.
2. Continued increase in the cost of providing skilled professional labor in Northwest Arkansas'
highly competitive job market.
3. Expense associated with maintenance of UV disinfection system after warranty period
expires
i
Appendix K
SCADA UPGRADE - PHASE 3 - SCOPE OF WORK
The following SCADA upgrade tasks will be performed by OMI during the calendar year 2001.
1. Installation of SCADA monitoring equipment (purchased and constructed in 2000) at
15 remote valve sites in the water distribution system, specific sites to be determined
by the City, to be compatible with the OMI -developed SCADA system. Note that this
item specifically excludes responsibility for providing the actual sensing or control
devices, any road boring or road cutting required for access, installation of electrical
service, or purchase/installation of mechanical equipment at these locations.
2. Upgrade of all original (1991 model) Motorola radios at previously existing SCADA
installations, to radios completely compatible with new system. (Parts are no longer
available for the old Motorola units)
3. Purchase and installation of a second repeater, antenna, and transmission line at the
Mt. Robinson tower site, to enable true redundancy for the repeater system at this
location. (This step will be taken with the assumption that the City will continue to
maintain the Mt. Robinson tower site as the repeater location for the entire SCADA
_ _ __ _installation, even after any general radio system upgrades that may occur)
CITY of FAYETTEVILLE
DEPARTMENTAL CORRESPONDENCE DATE: November 27, 2000
To: Fayetteville City Council
From: Don Bunn, Ass't Public Works Director
Thru: Charles Venable, Public Works Director
Fred Hanna, Mayor
Subject: Amendment No. 6, OMI Contract
Wastewater Treatment Plant Services
Attached for your review and approval is a proposed Amendment No. 6 to the existing OMI
contract for operations and management services at the Noland Wastewater Treatment Plant.
The amendment covers the estimated cost of providing operation and management of the
wastewater treatment plant (including sewage pump stations and SCADA maintenance) and
Phase III of the upgrade to our SCADA system.
Attached is a copy of the proposed Amendment No. 6. The purpose of the amendment is to set
the estimated cost of services and the fixed fee for 2000. The cost for this year breaks down
as follows:
Item
Budgeted Amount Requested Amount
Operations/Management Estimated Cost
Fixed Fee
Total, Operations and Management
$ 3,605,901.00
$ 3,514,773.00
91,128.00
3,605,901.00
SCADA Upgrade 150,000.00
110 000.00
TOTALS $ 3,755,901.00 $ 3,715,901.00
The increase in the operations and management estimated cost from 2000 to 2001 is 2.56
percent. Some of the factors involved in the cost of operations for 2001 are:
1. Projected demand in power costs is due to the expectation that part time use of the
second aeration basin will be limited in 2001.
2. Increased maintenance on the UV Disinfection system as the warranty period
expires.
3. Competition for skilled professional labor in the Northwest Arkansas area.
4. Continued replacement and upgrade of our SCADA System.
• •
The SCADA upgrade is a continuation of the program started in 1999. The $110,000.00 given
in the Amendment for that purpose will come from the capital portion of the 2001 Water and
Sewer Budget.
It is the recommendation of the Staff that the Council approve the proposed Amendment No.
6.
•
AGENDA REQUEST FORM
Council Meeting of December 19, 2000
FROM Don Bunn Public Works Admin Public Works
Name
Division Department
ACTION REOUIRED Approval of Amendment No.6 to the OMI Contract for
operation and management services, Fayetteville Wastewater Treatment Plant
at a total cost of $3,715,901.00, inclusive of a management fee of $91,128
and the Phase III of the SCADA upgrade cost of $110,000.00.
COST TO CITY
110,000.00
$ 3 605,601.00
Cost of this Request
150,000.00
$ 3,605,901.00
Category/Project Budget
5400 5100 5328 00 (OPERATIONS)
5400 5700 5315 00 (SCADA) -0-
Account Number
99031-1 (SCADA)
Project Number
BUDGET/CONTRACT REVIEW
udget Coordinator
Ai.
Accou
M./ .
Ai
City AttoLest ey,
Water/Sewer Imp'ts
Wastewater Treatment
Category/Project Name
Funds Used to Date Program Name
l50, 000.00
$ 3,605,901.00
Funds Remaining
XX Budgeted Item
Date
//-?R r/0
Water and Sewer
Fund Category
Budget Adj. Attached
Admin Services Director Date
Date ADA Coordinator
ft-2ra/
Date Internal Auditor
11-2-00
Purchasing Officer
Date
Date
kin—
Dat
STAFF RECOMMENDATION It is the recommendation of the Staff that the Council
approve Amendment No. 6 to the OMI Contract for operation of the Wastewater
Treatment Plant for 2001, at a cost of $3,715,901.00, inclusive of a
mana^S-nt fee of $91,128.00 and the SCADA upgrade cost of $110,000.00.
Mayor
Date
Cross Reference
New Item: Yes No
Prev Ord/Res #
Orig. Contract
Orig. Contract
94-94
Date 8-16-94
ro,
1 •
COMMENT SHEET
Project: Amendment No. 6, OMI Operations and Management Agreement
Engineer/Contractor: Operations Management International (OMI)
Notes to Reviewers: None
FAYETTEVOLLE
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENTAL CORRESPONDENCE
To: Don Bunn, Assistant Public Works Director
From: Heather Woodruff, City Clerk
Date: January 3, 2001
Attached is a copy of the resolution approving Amendment No. 6. To the OMI Contract for
operation and management services for the wastewater treatment plant. I am also returning two
originals for you to distribute. The original will be microfilmed and filed with the City Clerk.
cc: Nancy Smith, Internal Audit
14
•
RESOLUTION NO. 172-00
A RESOLUTION APPROVING AMENDMENT NO. 6 TO THE
OMI CONTRACT FOR THE,OPERATION AND MANAGEMENT
SERVICES OF THE aFAYETTEVILLE' WASTEWATER
TREATMENT PLANT IN THE AMOUNT OF $3,715,901.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1. That the City Council hereby approves Amendment No. 6 to the OMI
contract for the operation and management services of the Fayetteville Wastewater Treatment Plant
in the amount of$3,715,901. A copy ofthe agreement amendment is attached hereto marked Exhibit
"A" and made a part hereof.
PASSED AND APPROVED this 19th day of December 2000.
APPROVE , /—
By. lJ��i
Fred Hanna, Mayor
ATTEST:
By:
4Asrteather Woodruff, City rk
r..