HomeMy WebLinkAbout166-00 RESOLUTIONRESOLUTION NO. 166-00 o MICROFILMED A RESOLUTION AWARDING BID NO. 00-46 CONSTRUCTION BID FOR SANITARY SEWER REHABILITATION, ILLINOIS BASIN 16 AND WHITE RIVER MINISYSTEM 9A PROJECT TO HELLER COMPANY IN THE AMOUNT OF $501,400 AND APPROVING A 10% CONTINGENCY IN THE AMOUNT $50,140. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS* Section 1. That the City Council hereby awards Bid No. 00-46 construction bid for Sanitary Sewer Rehabilitation, Illinois Basin 16 and White River Minisystem 9A Project to Heller Company in the amount of $501,400, and approving a 10% contingency in the amount $50,140; and authorizes the Mayor and City Clerk to execute a contract for said amount. A copy of the contract is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 19th day of December , 2000. APPROVED• By: ATTEST: Byl • 6%A' I Heather Woodruff, City ed Hanna, Mayor NAME OF FILE. CROSS REFERENCE: Resolution No. 166-00 12/19/00 Resolution No. 166-00 Exhibit "A" (Contract Agreement)» 11/29/00 Memo to Fayetteville Mayor & City Council thru Charlie Venable & Don Bunn from David Jurgens, Water & Sewer Maint. 11/29/00 Copy of Purchase Requisition 12/19/00 Staff Review Form 01/02/01 Memo to David Jurgens, Water & Sewer Maintenance, from Heather Woodruff, City Clerk 01/16/01 Insurance Binder 05/09/01 Change Order No. 1 with Heller Company, Inc. (construction contract) for Sanitary Sewer Rehabilitation (pipe bursting), Illinois Basin 16 & White River Minisystem 9A. NOTES: 1 1 11 1 1 1 1 1 1 1 1 1 1 ixd • CITY OF FAYETTEVILLE, ARKANSAS AGREEMENT SANITARY SEWER MAIN REPLACEMENT AND REHABILITATION ILLINOIS RIVER WATERSHED BASINS 6, 9, 12, AND 16 THIS AGREEMENT, made this day of and between the City of Fayetteville, Arkansas, co or tion her inafter called the Owner, and /Acb hereinafter called WITNESSETH: PO/ ,(44-) , by a municipal • the Contractor. WHEREAS, the Owner has heretofore solicited Bids for all the work and improvements for the doing of all things included within the hereinafter specified Sanitary Sewer Main Replacement and Rehabilitation Illinois River Watershed, for Basins 6-9, 12, and 16 WHEREAS, the Owner did on the that the Contractor was the lowest for the hereinafter specified work Contract for said work. day of , 2000 find responsive, responsible Bidder and did award the Contractor a NOW, THEREFORE, for and in consideration of their mutual promises, covenants, undertaking and agreements, the parties hereto do hereby agree as follows: ARTICLE I - WORK TO BE DONE BY CONTRACTOR The Contractor agrees, at his own cost and expense, to do all the work and to furnish all the labor, materials, equipment and other property necessary to do, construct, install and complete all the works and improvements included in Sanitary Sewer Main Replacement and Rehabilitation Illinois River Watershed, for Basins 6, 9, 12, and 16. All in full accordance with and in compliance with and as required by the hereinafter specified Contract Documents and any addenda for said work, and to do, at his own cost and expense, all other things required of the Contractor by said Contract Documents for said work. ARTICLE II - CONTRACT DOCUMENTS The Contract Documents are defined in the General Conditions. 1 Agreement City of Fayetteville Sewer System Improvements Ex/ coy, AOE 410 ARTICLE III - CONTRACT AMOUNT The Contractor agrees to receive and accept the attached contract unit prices and/or lump sum prices as full compensation for furnishing all materials and equipment for doing all the work contemplated and embraced in this Agreement; also for all loss or damage arising out of the nature of the work aforesaid, or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the Owner, and for all risks of every description connected with the work; also for well and faithfully completing the work, and the whole thereof, in the manner and according to and in compliance with the Contract Documents and the requirements of the Engineer under them, also for any and all things required by the Contract Documents. II ARTICLE IV - LIOUIDATED DAMAGES OR ACTUAL DAMAGES AND FXCRS� ENGINEERING COSTS 1 The Contractor shall, and agrees to, pay to excess engineering as described in the General Conditions. The Contractor shall, and agrees to, pay for liquidated damages I or actual damages if the Contractor fails to complete the project within the specified time in accordance with the General Conditions. 1 1 The Contractor shall, and agrees to, furnish and deliver to the ARTICLE V - STARTING AND COMPLETION The Contractor agrees to commence work under this Agreement within ten calendar days of receipt of written Notice to Proceed and to complete all work included in this Contract to the point of substantial completion no later than 150/180, Unit 1/Unit 2 respectively, calendar days from Notice to Proceed. The contractor further agrees to complete all work to the point of final acceptance by the Owner no later than 180/220, Unit 1/Unit 2 respectively, calendar days from Notice to Proceed. 1 Owner, the Performance Bond, the Contractor's Labor and Material Bond, the Maintenance Bond and the insurance certificates and policies of insurance required of him by provisions of the Contract Documents, and to do, prior to starting work, all other 1 things which are required of him by the Contract Documents as a prerequisite of starting work. 1 1 Agreement 2 City of Fayetteville Sewer System Improvements • • ARTICLE VI - PAYMENTS TO CONTRACTOR The Owner agrees with said Contractor to employ, and does hereby employ, the said Contractor to provide the materials and do all the work, and do all other things hereinabove contained or referred to, for the prices aforesaid, and hereby contracts to pay the same at the time, in the manner and upon the conditions set forth or referred to in the Contract Documents; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the convenants herein contained. There shall be no measurement or separate payment for any items not listed and all costs pertaining thereto shall be included in the Contract unit prices for other items listed. IN WITNESS WHEREOF, the parties hereto have caused this Instrument to be executed in three original counterparts the day and year first above written. (SEAL) l//� 2c/if/A, 4, (Contractor) Attest: "/ By Name Title 04;A Wgieie (please type) Name 4/4» /4/416 (please type) Title 5y//%/T (SEAL) CITY OF FAYETTEVILLE, AR Attest: 4 %Ci BY Name fillefrn4 layrzvoe.11aY9.ejff= Name A -,2F0 fioldc r/4t (please type) (please type) Title rii-y uta(% Title /yJ,iniar. 3 Agreement City of Fayetteville Sewer System Improvements DEC -06-2000 16:01 UGI-Ny-Gtl110 110=1b RJN GROUP INC. • .SIN UAW lr1t.. • CITY Or VAYIITEVILLE, ARKANSAS AGRESNENT SssITARX sem NAM REPLACEMENT AND REHABILITATION 1LLIMonS RIVER WATERSHED WINE 6, 9, 12, AND 16 9724372707 P.06 Yf1454lMf Y. PJb THIS AOREE1l1, made this day of, by and between the City of Payettwsl �.Arkansaaa muaieap""ai co tion, hereinafter called the Owner, and 01,42)Z. hereinafter celled the Cannitatiat, wIIRESSETH, MEMMtAB, the Owner bas heretofore solicited Aids for all the work and imoccmiesnts for the doing of all things included within the hereinafter !pacified Sanitary Sewer Bain Replacement and Rehabilitation Illinois River watershed, for Basins 6-9, 12, and 16. WHEREAS, the owner did on the that the Contractor was the lowest tor the hereinafter specified work contract for said work. NOW, TEAREeORE, for and in consideration of their mutual prosiseee covenants, undertaking and agreements, the parties hereto do hereby agree as follows: The Contractor agrees, at his own Copt and expense, to do all the work and to furnish all the labor, materials, equipment and other property necesearyr to do, construct, install and complete all the works dad i provement■ included is Sanitary Sewer Wain Replacereat and Rehabilitation Illinois River watershed. for Basins 4, 9, 12, and 16. All is full accordance with and in compliance with and as requiredby the hereinafter specified Contract Documents and say addenda for said work, and to . at hie own cost and expense, all other things required i Contractor by said Contract Documents for said work. Ai .z Ts The Contract Documents are defined in the General Conditions. day of , 2000 find responsive, responsible Bidder sad did award the Contractor u 1 Agreement City of Payetteviile Sewer System Improvement, DEC -06-2000 16:01 RJN GROUP INC. OE'C-06-2669 10:17 illyn wave..ra. • 9724372707 P.07 • The Contractor agrees to receive and accept the attached contract unit prices and/or lump ems prices as full compensation for furnishing all materials and equipment for doing all the work contemplated and ssbreced in tbie Agreements also for all loss or damage arising out of the nature of the work aforesaid, or from the action et the elements, or from any unforeseen diffiealtiee or obstructioaa which may arise or be encountered in the prosecution of the work until its acceptance by the Owner, and for all risks of every description connected with the work; also for well and faithfully completing the work, and the whole thereof, is the manner and according to and in compliance with the Contract Documents and the requirements of the engineer under them, also for any and ail things required by the Contract Documents. The Contractor shall, and agrees to, pay to ":teas engineering as described in the General Conditions. The Contractor shall, and agrees to, pay for iigwidatsd damages or actual damages if the Contractor fa115 to complete the project within the specified time in accordance with the General Conditions. The Contractor agrees to commence work under this Agreement within ten calendar days of receipt of written Notice to prOcesd and to complete all work of substantial ccc lets nolllaaterithan s15Cont0r0, Ut nit 1U 3At respectively, calendar days from NoticeatPrth+ o OCee The of contractor further agrees complete final acceptance by the Owner no 1st. er than 180/220, Unit 1/unit 2 respectively, calendar days from Notioe to proceed. The Contractor shall, and agrees to, tarnish and deliver to the Owner. the Performance Bond. the Contractorio Labor and Material Bend, the Maintenance Band and the insurance certificates policies of insurance required of ihimor tbyo a�i work,allthe other Contract Documents, and to nog pr things which are required Of him by the Contract Documents ae a prerequisite of starting work. artirrtfayatureille Parer System recro"men to 2 DEC -06-2000 16:02 RJN GROUP INC. • ..e,. • 9724372707 P.OB 64W'G`V I . . VI Aft=d1wILLsaAMBREILISLOSEMa=11 The Owner agrees with acid Contractor to egploy, and does hereby employ, the said Contractor to provide the materials and dw all the work, and do all other things herainaheve oontaiaed or referred to, for the prices aforesaid, and hereby contracts to pay the same at the time, in the manner and upon the conditions set forth or referred to in the Contract Documents; and the acid parties for themselves, their beim, elaafttere, administrators, successors and assigns, do hereby agree to the full performance of the aonvenenta herein contained. There shall be no measnira nt or separate payment for any items not listed and all costs pertaining thereto shall be included in the Contract unit prfieee for other items listed. TS MUSS WHEREOF, the parties hereto have caused this inetrllaant to be executed in three original counterparts the day and year first above written. (SEAL) spik mince (Contractor) Attest: 0/'5. 0/.lits Now Title ray, (pease types (please type) (SEAL) CXW OT rsarrsvILLt4, Ail Mama i y..,. 14.13 a. Title rr•enidenr Attest: my Name (please typo) (please type) Title Name Title 3 City 01 laysttee illt s Sewer System Its IN - DEC -06-2000 16:02 DEL -as -40W La>AV Name of Bidder Business Address Date RJN GROUP INC. CITY OP PAYBTISNILLE, AR WIT 1 SID • SANITARY SEM nu. *per AND f8BAAILITATION ILLINOIS RIVER WATERSHED BASINS 6, 9, 12, AND 16 Eel] er ci pasty Inn 11_0. Ionian Mot ;.Wins At 11901 �1-17-ee To: The city of Fayetteville. AR 9724372707 P.09 The undersigned, as Bidder, °selares that the only person or parties interested is this Bid as principals ars those named herein, that this Sid u made without collusion with any person, firm or corporation; that hs has carefully examined the location of the proposed work, the propose:Limes of Agreement and Bonde, and the Cohered Drawings and Specifications for the above designated work, all other documents referred to or mentioned the Contract Documents. the Contract Drawings and Specifications, including Addenda Noe...L..—, and issued thereto, and he proposes and agrees if this bid is accepted that he will contract with the City of Fayetteville, AR. in thi force of the copy of the Agreement included in these Contract Documents, to provide all necessary machinery, tools, apparatus, and other means of construction, including utility and transportation services necessary to do all the work and furnish all materials and equipment specified or referred to in the Contract Documents, in the manner and time therein prescribed and according to the requirements of the City of Peyetteville. AR as therein set forth to furnish the Contractors Bonds and Insurance, and to do all other thus required of the contractor by the =tract Documents, and that he will take in full payment therefor the sums set forth in the renewing Bid Schedule. I. 810-1101202 Bidder agrees to perform all the work described in the contract Document for the following unit prices. Notes Bids obeli include seise tax and all other applicable taxes. 1 quits . 1 Cit - Addendumy of Fayetteville ille Sanitary Sewer Improvements DEC -06-2000 16:03 iEC`96-2UNI6 1e=1`f PAY APPROXIMATE ITEM pmu%TTT7 Al 34 1F A2 A3 A4 RJN GROUP INC. nVKuu 1 .. OPEN COT CONSTRUCTION (Per Section D2.13) • 9724372707 P.10 >•G-4 G V r.V7 D$SCRIPTZOB OP ITEMS KZTR UNIT BID PRICES BRITTEN IN WIRD& PRICE $w PVC Sewer Pipe O' -S' Deep By Open Cut AMOUNT BID Cora. Dollar a 1fe Cent per LY 6_122-22 $ 3-400 At 26 Ls S" PVC Sever Pipe 6'"iG' Deep By Open Cut pas UnwArod slot Dollars 6 She Coats per LE 9 ' ! o0 $ 2.Boa_00 29 LF 6" FS Slipliniag, All Depths ono"ndred 74froon Dollars & No Cents per LIE $ 125-00 $1.335.00 3,179 LP 8" SOPS Sewar Pipe, A11 Depths. by Pipe Bursting HABLValiamoollare fr ,r;, Cents per LE $..._12-29, 6 1E2 231_0Q 2 Uait 1 Bid - addendum No. 1 City of Fayetteville Sanitary Sewer Imps+Ovsments DEC -06-2000 16:03 ytl-vireaW mu - 47 RJN GROUP INC. • 9724372707 P.11 PAY APPROXIMATE DESCRIPTION OP ITEMS IIDTX UNIT mow: i,Tlag ouvraTT AtD .PSLCRs nano/ ria WtAZ1R plates xi2p A5 40 LF 8• MPS Sewer Pipe, 6'-l0' Deep, Sy Open Cut pap. wnnArr,A 332B -ms....... Dollars & ini- __ Cents per LE A8 A7 A8 4_119..9a $-S Saaa 306 l,! 12" IP! Sewn Pips, All Depths, by Pipe Bureti*g e a„ndr.d Dollars i No Cents per LE O.sao_on $ 30.600_00 109 LT 16"� l Encasement. A11 Depths,Cut By Two Wnndrsd Dollars 6 taemmorm seats per LE 0-.224.1.111 $ 20,000.00 16 SA COmstruet 48" Standard Manhole, 0'-6' Deep „Ars& ,Dollars i lig„.., Cents per EA s a.a00 ee tg k 2 0°.°a 3 unit 1 Sid - Addendum No, 1 City of Fayetteville Sanitary Santer Improvements ;ylct P.10 TOTAL P.11 DEC -06-2000 16:09 RJN GROUP INC. DEC -86-20a0 1E121 •RJM IROIiP 1NC. PAY A9 APPROXIMATE 18 VP Ai0 IPA A11 Al2 DESCRIPTION OP ITEMS MITE n to. yo.,, .J" w T:a;- 9724372707 P.01 • 97243'Tr?U7 P.01 NIT PRICE AMOUNT Construct 41" Standard MeahOle, Extra Depth Over 6' Deep 'Phzee Th nArad Dollars 8 Cents per YE 8_, 1P1.IQ 0-1.,122-A2 Construct 48" Drop Manhole, 00-6, Deep ae_r ?t diedmd etakt NEadadwi— Dollars i Ceuta per BA •.roe ea $.1-12.2-22 2 VP Contract 48" Drap Manhole, Extra Depth Over 61 Deep Ma Thn .nand Dollars a ND-- cents per BE $11.1 21-110 g 24.090-00 1 NA Abandons Existing Manhole rims W..earad Dollais 4 Ne Cents per $A 5--1124.0 100.10 A13 28 SA 4" Service Connection For Pipe Bursting Construction CENLIIE Bundisd Dollars 4 No Cents per Be. 3-14.1221.22 $12_2e2_20 4 Unit 1 Sid - Addendum Po_ t City of Yayettevilie Sanitary Serer Iaprovemtfta DEC -06-2000 16:10 UC%.—ub—e000 Wadi PAY 4r A14 APPROXIMATE .;ir YVYY RJN GROUP INC. DESCRIPTION OF ITEMS NITS 11 1- _lei• 4: Ass 238 LF • 9724372707 P.02 7114S4CM! Y.Ue 11117? AMOUNT FR= BID 4• Service Connection For Pipe Bursting Construction Illaymmmwmm, Dollars t MO cents per LE $ sQJQ g11.s60.00 2 IA s• Service Connection Por Pipe bursting Construction ,Ivo Thousand - Dollars 6 Cents per BA 4_.2 0SPJQ. $6.666.06 Alb S LF i" Service Line Extension Por Pipe bursting Construction 9evmty Dollars i Cents per LI $ 70 6Q $ 356.0Q A17 28 8A Service Cleanout pour SvndreS Dollars & Cents per BA $.14A-40 = 114206.66 A18 19 LP Curb i Cutter Repair pvllar F .�.. _ Cents per LY S a6 6n $ Ian AQ 5 Unit 1 Sid - Addendum No. 1 City of Fayetteville Sanitary Sewer improvements DEC -06-2000 16:10 RJN GROUP INC. •..Jr, v..N.- 11.•„ • 9724372707 P.03 7rem4fcrbr r,yJ PAY APPROXIPIATa DESCRIPTION OF ITEMS WITR UNIT ADMIT MIS Q071RPTP4 HID ant= Amy SH QUI p2 BID Also ass is Asphalt Street Repair sisLX Dollir6 A RRT Cents per LP 6-1W g-a_zao_ao A20 7 SA Clay Dams Your wcbdr i Dollars & Nn Cents per ER CALM= $.2..A0,0^01 A21 126 LP Trench Safety oav Dollars 1p,, --,w, Cents per LE 5-1.•21 $ 126 130 A22 I LS Tree Protection gear Thousand. Dollars & Ceatc per La a,.a.aoo.ao 0 A23 100 LP Remove Obstructions, A11 Depths 44000 no patty Dollat6 & An Cents per IS 04_5242 s 5 . 41go _ o0 6 Unit 1 Bid at -FayettNo. Sanitary Sewer Wrongs -eats DEC -06-2000 16:10 RJN GROUP INC. DEC-g6-2eW0 1W44 � • "" f ` • 9724372707 P.04 PAY APPR03C4ATS DSSCRSPTIOX OF IMO NITS UNIT AMOUNT A24 10 SA Sanitary Sewer Markers pee minted Ttminu - Eollass i Cents per ph $ 17D.DD St_20D_DD A25 1 LS Surface video Dooumeatatiaa Dolian i LA _ tentS per &g $ s DDD UI i a.DDD_DD A26 200 L! Sag Renewal. All Sires and Depths 2eanta„.... Dollars a go Lento per LE 8-__10-22 A27 50 Lir Heavy Root Cutting in Sever Pipe figs __-- Dollars & Cants per LE $----5.22 g250 00 CONSTRUCTION OP SANITARY SINUS (Ihh NRITINGI 7 Unit 1 Sid - Addendum No. 1 City of Fayetteville Sanitary Sewer Improvements DEC -06-2000 16:11 illia'1.- b-twu ib -C.7 wn war4P . RJN GROUP INC. 9724372707 P 05 • Y7[4S(e&, F.35 It is understood and agreed by the undersigned that the Owner reserves the unrestricted privilege to reject any or all the foregoing unit prices in this paragraph which it soy consider excessive or unseasonable, or to accept any or all vi them as unit prices applicable in the event addicione to or deduction from the work to be performed on this project ars ordered by the Owner. Rejection at any time of such bait Prices for Contraction changes shall net otherwise affect tae balance of the Did or Construction Contract. The selection of the lowest bid shall be based on the total amount bid. II. Easoinniza It is expressly understood and agreed that the preceding total . Sid is the basis for establishing the amount of the Bid security on this Sid for Sanitary hewer $lata Replec®ssnt and Rehabilitation, Illinois liver attested, Basins 6, 9 12, and 16 for the City of Fayetteville, AI, and that this total Bid is not to be construed to be a Lump Sum Bid. It is further understood that quantities in the bidding =beanie for unit price item. are approximate only, and that payment of a Contract wilt be mads only on the actual guantitiee of wore completed is place, measured as the basis defined in the General Cenditions, SpeCifications, or other Contract Documents, There shall be no xreasuresent or separate payment for any items not listed and all costs pertaining thereto shall be included in the unit prices for other item listed in the Proposal. The undersigned bac carefully checked the above bidding schedule against the Contract Drawings, Specifications, and other Contract Document' ent' before preparing this Bid and accepts the said quantities to be substantially correct, both as to classification and amount, and as correctly listing the complete work to be done in accordance with the Contract Drawings, Specification*, and other Contract Documents, if this Bid is accepted and the uodersiened shall tail to eantract as aforesaid and to give the Arkansas Statutory performance and vayment Bond, and Maintenance Bona required by the Conditions of Contract or by lee, and to provide all insurance as required by the Ccntract Decants within tea (10) days after the date of the notice of award of the Contract. the hisOwnerC may, at, aid thereupon this prop sates acceptance has � his Contract, and the thereof shall be null and void, and the forfeiture of such security accompanying this proposal shall operate and the same Shall be the property of the Owner as liquidated damages. 8 Unit 1 City - Addendum oft No, Sanitary Sewer !Statements DEC -06-2000 16:11 RJN GROUP INC. •. • 9724372707 P.06 The undersigned sorlmsto substnatial completion nay complete ao laterwoik �thaenn this Bid to the point i!O calendar days from Notice to Proceed. The undersigned further agrees to fully Complete ill work Covered r later this Bid to the paint of final acceptance by 100 calendar days from aottcs to Proceed. If tie undersigned fails to complete the work within tbs contract time, or extension of time granted by the Owner for unavoidable delays, then the undersignedlnShall dpay tto� Ownestipulatedininsted the contrraacts torDo Documents. calendar day beyond By submiasioa of this Bid, the undersigned certifies, end in the case of a joist bid, eech party thereto certifies as to his own organisation, that in connection with the proposal: A. The prices in the proposal have been arrived at independently. without consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prieee with any other bidder or with any competitor; e. unless otherwise required by law, the prices which have been Quoted in the bid have not kaowiuglY been disclosed by the Bidder prior to opening. directly or indirectly to any other Bidder or to any competitor; and. C. No attempt has been madeor rwill firm tomade submitby not sUbmitthe Bidder toinda bit 1a any h othep person restricting competition. bid for the purpose tle D. withi � organisatioonitoorr tthe decision as to tzation t�iices being bid and shall also certify that be bee not contrary t participated, Paragrapbs A tfrougn aSbfl. participate any action g. Se is not the person in the Bidder's for teoision as to res iblt within that organ! thepricesbeing bid but that hem tor � roriivedot in as agent for atempsesperrs ons have not participated, sad will certifying participate, not through ,.bOtt, iaad as their agent shall so certify; end shall also certify test be has not participated, and will not pettte in any action contrary to Paragraphs A through `have 9 Unit 1 Bid - Addendum No. 1 CSty of Fayetteville sanitary Bawer Improvements DEC -06-2000 16:12 DEZ-teraso a10: `a ..,.. 'r' — RJN GROUP INC. • 9724372707 P.07 8t. 87i2..fiMMAIX Accosipenying this Dia is a in the amount of boilers. ($ ) Note: The total amount of Bid security shall be based on the `notal Bid of this Contract. IV. RIZMICILSISNat A. M..1SZidaii Br(SEAL) riAdividwl's MEMO) doing business as Business address: Phone No.: B. lislastateNIN By (Firm iiameT (UAL) • Wand Partner) Business address: Phone No.: 10 Omit 1 City of FayetteviAddendum lle Sanitary Serer Iuprovemeats �.'avj -vas sanitary sanitary Serer improvements DEC -06-2000 16:12 DEC -FA -Zara 112•4:1 RJN GROUP INC. OFWW 81.1..r• C. tfluasaxatioa By swommallimmwommmmwmmw littler Co.. _Inc. (Corporation !Came) A nSAA. (State of Incorporation) Dr 9724372707 P.08 • T � •o l l r r (Fame of Person Authorised to Sign) President (Title) (Corporate Seal) J/�C J44204/ 4ss', Attest (Secretary) Business address:_ fi i tratY /2842 Phone No .15-10/- 4 1.3 &Q,e,u P. a BY (Fame) By (Address) (Same) (Address) inchoint venturer must sign, The manner of signing for each indivi . partnerehip and corporation that is s party to the joint venture should be in the Planner indicated above). g,*e sd and sworn to Wore OM this " IRLEY BORN 1 .� a 0 0 • 6�AtE NC1ARY PUBLIC i 140 COUNW 1 11 unit 1 Bid - Addendum No. L City Of Fayetteville Sanitary Sewer Improvements DEC -06-2000 16:12 RJN GROUP INC. alt'.' oo—eouo LV. CO — ..J.. V.V1.F ..14. • 9724372707 P.09 010,043i•v• r.09 Paragraph O.s continued shall permit examination of accounts, bills. end vouchers relating iv the cost -of -work when requested by the Engineer. 5. Partial Waiver of Liens Partial waiver or liens shall accompany tach payment request to cover the full amount vt the previous payment request. The Contractor shall Meer* from each and every subcontractor and suppliers of material or labor partial waiver of lien to release the Owner of any claim to a mechanics lien, which they or any of them may have under the mechanics lien laws of the State in which the project is located. Any payments made by the Owner without requiring strict compliance to the terms of this paragraph shall not be Construed as a waiver by the owner at the right to iasiat upon strict c0pgflieacs with the terms at uda approach as a condition of later payments. 6. Contractor's Warranty of Title Contractor warrant" and guarantees that title to all work. materials end equipment covered by any Application for Payment, whether incorporated in the project or not, will pass to Owner no later then the time of payment free and clear of all Liens. 7. Review of Progress Payment Requests a. gaginsar will, within fifteen (15) days after receipt of each payment request. either indicate in exiting a recommendation of payment and present the request to Owner, or return the paywsnt request to Contractor indicating in writing engineer's rnaacos fee refuting to recommend payment. In the latter case. Contractor may male the necessary corrections end resubmit the request. Thirty (30) days after presentation of the application for Payment with angiaaer's recommendation, the amount recommealed O.7. i bwilll (subject ect to the previsions of paragraph when due will be paid by Owner tOrilireeter. at M. 71 Genersi conditions City of sayetteviile Sanitary Sewer Improvements