HomeMy WebLinkAbout156-00 RESOLUTIONRESOLUTION NO. 156-00
•
MICROFILMED
A RESOLUTION APPROVING BASIC CONSTRUCTION CO.,
INC., CHANGE ORDER NO. 5 IN THE AMOUNT OF
$251,132.02; AUTHORIZING THE COMBINATION OF PHASE
I AND PHASE II OF HWY 265 WIDENING (HWY 45 AND HWY
16) WATER AND SEWER RELOCATION CONTINGENCY
AMOUNTS FOR THE TOTAL PROJECT CONTINGENCY IN
THE AMOUNT OF $340,796; AND APPROVAL OF A BUDGET
ADJUSTMENT.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS •
Section 1. That the City Council hereby approves Basic Construction Co., Inc , Change
Order No. 5 in the amount of $251,132.02 A copy of the change order is attached hereto marked
Exhibit "A" and made a part hereof.
Section 2. The City Council hereby authorizes the combination of Phase I and Phase II
Hwy 265 Widening (Hwy 45 and Hwy 16) Water and Sewer Relocation contingency amounts for
the total project contingency amount of $340,796.
Section 3. That City Council hereby approves a budget adjustment in the amount of
$120,000 by increasing Water Line Improvements, Acct. No. 5400 5600 5808 00, Project No. 97043
20 decreasing Use of Fund Balance, Acct. No. 5400 0940 4999 99. A copy of the budget
adjustment is attached hereto marked "Exhibit B" and made a part hereof.
P*SSER AND APPROVED this7`h day of November , 2000.
AY E`rF` APPROVED
By: 414,u�
F ed Hanna, Mayor
ATTEST:
By:�7 A, ✓%
Heatherea��
oodruff, City
NAME OF FILE:
CROSS REFERENCE:
as
/3d-00
Date
Contents of File
Initials
11-7-0o
Z/..« A. /,_ -&i
/4-34-o0
J 4 6a dA
7� 9� .A'i
_17/,7.10
Se,n, �O,ye� An .
�
D/ 0,[0/%e/ r,/�i,/�
/e 3/00
41622 28‘i (
,azAat
g-4-00
/./ A.D0v�
211.422.222,
2ideGd1_dw
k L/%r
/aid
//ti,
/J,dnor
/J
/7- 7- Do
aco_ar ,021
a,
/1-/3-0o
41
Y/n, G a
e. c. K 2
e A. _/--00
,1 /7
• • EXHIBIT A
CHANGE ORDER
OWNER: CITY OF FAYETTEVILLE
PROJECT NAME: HIGHWAY 265 WATER AND
SEWER RELOCATIONS, PHASE 2
Sheet 1 of 2
Change Order 5
LOCATION: FAYETTEVILLE, ARKANSAS Project No. 18-148500
CONTRACTOR: BASIC CONSTRUCTION CO„ INC. Date: October 30, 2000
I. DESCRIPTION OF CHANGES INVOLVED
The following changes are made to the Contract Documents:
A) It is necessary to add 491 feet of 24" ductile iron pipe to the W-7 water main
north of station 71+70 and to make connections to various points on the existing main. Since
the line will be immediately adjacent to the new edge of proposed Route 265 pavement, the
Arkansas Highway department requires that the line be covered with slurry mix concrete
backfill. In addition to the 491 feet of additional 24" line, some smaller pipe and several
connections must be made and a portion of the existing sanitary sewer will be rerouted. The unit
prices for the work are reflected on the attachment appended to this change order and reflect
contract units added or adjusted to meet the conditions shown on the plans for the line
relocation.
ADJUSTED CONTRACT PRICE
II CHANGE ORDER CONDITIONS
1) An addition to the contract amount is made in the amount of TWO HUNDRED
FIFTY-ONE THOUSAND ONE HUNDRED THIRTY TWO AND 2/100 ($251,132.02)
DOLLARS for the labor and material referred to above.
2) The adjusted contract price is therefore the sum of TWO MILLION FOUR
HUNDRED FOUR THOUSAND NINE HUNDRED NINETY EIGHT AND TWO/100
($2,404,998.02) DOLLARS.
5) This Change Order unless otherwise provided herein does not relieve the Contractor
from strict compliance with all provisions of the Original Contract and where unit items are set
forth herein, they shall, unless otherwise stated or shown on the plans, be deemed to be as
described and contained within the Original Contract. All of the provisions of the Original
Contract with respect to guarantees shall apply to this work as well. Should any other unit item
be required which is not shown here, the provisions of the Original Contract, including the
provisions for compensation shall apply..
t Xi
egg.
V 11S1HX2
•
•
III ADJUSTMENTS IN CONTRACT TIME
1) The completion date for the contract is revised to November 30, 2000 for total
completion.
IV ADJUSTMENTS IN AMOUNT OF CONTRACT
1) Amount of Original Contract
2) Net Addition due to all previous Change Orders
3) Amount of Contract not including this Change Order
4) Addition to Contract due to this Change Order
5) Amount of Contract including this Change Order
RECOMMENDED FOR ACCEPTANCEE�C
(For RJN Group, Inc.)
ACCEPTED: CONTRACTOR:
By
$2.107.961 00
$ 45 905.00
$ 2.153 866.00
$ 251.132,02
$2.404.998.02
re of Authorized Representative
OWNER: CITY OF FA MLLE, tRKANAL.
By
WV
Signat e of Authorized Representative
Date
to
Date
ATTACHMENT TO CHANGE ORDER 5
ITEM NO. QUANTITY UNITS DESCRIPTION UNIT PRICE TOTAL AMOUNT
24" DI PIPE 87 42717
FIELD LK GSKT 400 10000
DEPTH OV 5' LS 16000
12" DI PIPE 56 560
8" DI PIPE 65 7150
2" CONNECT 800 1600
2" PIPE 20 400
1" CONN /6" 600 600
1" PIPE 18 360
CUT/PLG 12" 1750 1750
18"CMP 30 300
16" SPLT CASE 80 6000
DI FITTINGS 6000 27000
8" GATE VLVE 750 750
TRCH SFTY 7500 7500
FIRE HYDRNT 2400 4800
R & R 6" PCC 40 13400
4" SDWLK 40 1120
R & R CHNL LS 10000
EROSION CNTL 2000 2000
8 X 8 TPNG SLV 2200 2200
TIE 24" WTR LN 6000 6000
SLVG HYDRNT 200 200
ROCK EX LS 12000
NEW MTR BX 500 500
TRAFFIC CNTR LS 5000
CL7AGGRBF 16 640
SLURRY BF 60 24000
HLSD BF 8 1600
8" PVC 60 2100
CN 8"PVC/MH 750 750
4' SAN MH 170 1530
4" PVC SERV 50 1500
CN 4" PVC/MH 750 750
CT/PLG 8" SWR 200 200
GRASS SOD 3 270
GR SEED/MLC 1.5 735
TOPSOIL 9 585
1" CONN/8"LN 750 1500
24" BTRFL VLV 5500 5500
R & R 2"VL ADP 350 350
RAISE EX MH 2' 500 500
8" TIE IN 2000 2000
8" CUT & PLUG 1500 1500
CURB & GUTTR 20 6000
ADD FIRE HYD 5000 5000
236917
LS 11845.85
LS 2369.17
251132.02
1 491 LF
2 25 EACH
3 1 LS
4 10 LF
5 110 LF
6 2 EACH
7 20 LF
8 1 EACH
9 20 LF
10 1 EACH
11 10 LF
12 75 LF
13 4.5 TON
14 1 EACH
15 1 LS
16 2 EACH
17 335 SY
18 28 SY
19 1 LS
20 1 LS
21 1 EACH
22 1 EACH
24 1 EACH
25 1 LS
26 1 EACH
27 1 LS
28 40 TON
29 400 CY
30 200 CY
31 35 LF
32 1 EACH
33 9 VF
34 30 LF
35 1 EACH
36 1 EACH
37 90 SY
38 490 SY
39 65 CY
40 2 EACH
41 1 EACH
42 1 EACH
43 1 EACH
44 1 EACH
45 1 EACH
46 300 LF
47 1 EACH
TOTAL
ADD 1 LS MOBILIZATION
ADD 1 LS BOND
TOTALS THIS CHANGE ORDER
FAYETTEVtLE
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENTAL CORRESPONDENCE
To: Fayetteville City Council /
Thru: Fred Hanna, Mayor 4,_ /
Charles Venable, Public Works Director �jti(J
Jim Beavers, City Engineer 43
From: Sid Norbash, Staff Engineer )44-011
Date: October 30, 2000
Re:
Highway 265 (Hwy 45 to Hwy 16) Widening / Water & Sewer
Relocations - Construction Contract with Basic Construction Co., Inc.
Change Order #5
The above referenced project has been under construction since February of 2000,
and good progress has been made, and at this time the project is approximately
90% complete.
Per request of the Staff, an additional 491 feet of 24 inch water main is being
proposed to be added to the construction contract with Basic Construction Co.,
Inc. This change will ease the access to the main in case of emergency.
The Staff requests that the Council approve the following:
(a) Change Order #5 to the construction Contract with Basic Construction Co..
Inc. in the amount of $251,132.02.
(b) The related budget adjustment, in the amount of $120,000.
(c) Approval of combining all of the Phase I and Phase II Contingency amounts for
the total project contingency.
The Council has approved $130,000 contingency for the Phase I, and $210,796 for
the Phase II portion, for a total of $340,796. To date $100,305 of the
contingency has been used, leaving a balance of $240,491. The Staff is proposing
to use $131,132 of the balance of contingency amount, and is requesting a budget
adjustment in the amount of $120,000 additional funds for this project. This will
leave an amount of $109,359 for the total project contingency.
SN/sn
Attachments: Vicinity Map
Copy of the change order #5
Budget Adjustment
GOLDENROD ST
0
PETUNIA CT
S
proposed* b
,add iti on
BOARDWALK
1.2651
Il .8
•
10/31/00 TUE 09:19 FAX 501 751 7650
10/30 2000 15.59 501575831CIN FAY 1ST FLOOR
r .,� ev nun LGrD♦ rn TH465140N i TNOr1PSOM 9t9'950 S
CHANGE ORDER
OWNER: CITY OF FAYETTEVILLE Shat 1 oft
PROJECT NAME: HIGHWAY 265 WATER AND Change Order 5
SEWER RELOCATIONS, PHASE 2
LOCATION: FAYETTEVII.LE, ARKANSAS Project No. 18-148500
CONTRACTOR: BASIC CONSTRUCTION CO„ INC. Dur October 30, 2000
L Rocr�ttry rroN OP ®w*rr c INVOLVED
The following changes are made to the Contract Documents:
A) ft is neeesaty to add 491 feet of 24" ductile iron pipe to the W-7 water man
north of station 71+70 and to make connections to various points on the existing main. S'aace
the line will be immediately adjacent to the new edge of proposed Route 265 paematt, the
Arkansas Highway department requires that the Lae be covered with slurry mac concrete
backlit In addition to the 491 fat of additional 24" fine, some =Ilia pipe and meant
connections trust be made and a portion of the existing aatrtsry sewer all be rerouted. The unit
prices for the worst are reflected on the enactment appended to this change order and mesa
contract mita added or adjusted to meet the oondklons shown on the plans for the line
relocation
ADJUSTED corntscr PRIM
II
1) An sddnion to the contract amount is made n the amount of TWO HUNDRED
FDTT-ONE THOUSAND ONE HUNDRED THIRTY TWO APB) 21100 ($251,132.02)
DOLLARS fbr the labor and material referred to above..
2) The adjusted contract pricy is thaefbre the son of TWO bIILLION FOUR
HUNDRED FOUR THOUSAND NINE HUNDRED NINETY EIGHT AND TWO/100
(52,404,998.02) DOLLARS.
5) Tots Change Order unless other vise provided herein does not relieve the Contractor
from stria compliance with all provisions of the Original Contract and where unit items are sa
forth herein, they shall, Was otherwise stated or shown on the pians, be deemed to be es
described and contained within the Original Contract. All of the provisions of the Original
Contract with respect to guarantees shall apply to this work u wet. Should any other unit item
be required which is not shown here, the provisions of the Original Contract, includiirr$ the
provisions for compensation shalt apply..
11002
PAGE 02
P,04
10/31/00 TUE 09:20 FAX 501 751 7650 a003
U/30/2000 15:59 50157583. CITY FAY 1ST FLS PAGE 03
OCT -30-00 MON 10:08 AM APSON i THOMPSON 918 987' P_04
ATTACHMENT TO CHANGE ORDER 5
ITEM NO. QUANTITY UNITS DESCRIPTION UNIT PRICE TOTAL AMOUNT
1 491 12 24" 01 PIPE 87 42717
2 25 EACH FIELD LK GSKT 400 10000
3 1 LS DEPTH OV 5' LS 18000
4 10 LF 12' DI PIPE 56 580
5 110 LF 8" Of PIPE 85 7150
6 2 EACH 2" CONNECT 800 1600
7 20 LF 2' PIPE 20 400
6 1 EACH 1' CONN /8' 600 600
9 20 LF 1° PIPE 18 360
10 1 EACH CUT/PLO1T 1750 1750
11 10 LF 18"CMP 30 300
12 75 LF 16' SPLT CASE 80 6000
13 4,5 TON DI FITTINGS 6000 27000
14 1 EACH 8' GATE VLVE 750 760
15 1 LS TRCH &FTY 7500 7500
16 2 EACH FIRE HYDRNT 2400 4800
17 335 SY R & R A' PCC 40 13400
18 26 SY 4" SDWLK 40 1120
19 1 LS R & R CHNL LS 10000
20 1 LS EROSION CNTL 2000 2000
21 1 EACH 8 X 8 TPNG SLV 2200 2200
22 1 EACH TIE 24' NRR LN 6000 6000
24 1 EACH SLVG HYORNT 200 200
25 1 LS ROCK EX LS 12000
28 1 EACH NEW MTR BX 500 500
27 1 LS TRAFFIC CNTR LS 5000
28 40 TON CL 7 AGGR BF 16 640
29 400 CY SLVRRY BF 80 24000
30 200 CY F4.SD BF 8 1600
31 35 LF 8" PVC 80 2100
32 1 EACH CN 8"PVC/MH 750 750
33 9 VF 4' SAN MH 170 1530
34 30 LF 4" PVC SERV 50 1500
35 1 EACH CN 4" PVC/MH 750 750
38 1 EACH CT/PLG 8' SWR 200 200
37 90 SY GRASS SOD 3 270
38 490 SY GR SEEDIMLC 1.5 735
39 85 CY TOPSOIL 9 585
40 2 EACH V CONNI8"LN 760 1500
41 1 EACH 24" BTRFL VW 5500 5500
42 1 EACH R 8 R 2"VL ADP 350 350
43 1 EACH RAISE EX MH 2' 500 500
44 1 EACH 8'TIE IN 2000 2000
46 1 EACH 8" CUT 8 PLUG 1500 1500
46 300 LF CURB 8 GUTTR 20 6000
47 1 EACH ADD FIRE HYD 5000 5000
TOTAL 236917
ADD 1 LS MOBILIZATION LS 11845.85
ADD 1 LS BOND L3 2369.17
TOTALS 1141S CHANGE ORDER 251132.02
10/31/00 TUE 09:20 FAX 501 751 7650
10/30/2000 15:59 58157501,7 CITY FAY 1ST FL
us.! ae-ntl nun I4;3 rn PSUN i TMQn VSON 9100 675
I1I A121USIMANTS HJM?*1 is Ar'r a
1) The completion date for the contract is revised to November 30, 2000 for total
completion.
IV ADJUSTMENTS IN AMOUNT OF COnACr
1) Amount of Original Contract $3 107 961 00
2) Net Addition due to a8 previous Change Orden S 45905 00
3) Amount of Contract not including this Change Order S 2,153.666 OQ
4) Addition to Contract due to this Change Order S 25 1,132.02
5) Amount ofCont ract including this Change Order $2.404,998.02
RECOMMENDED FOR ACCEPTANCE:
(For RN (croup, Inc.)
Date
Representative Date
l/L�d
of Authorized Representative Date
J 004
PAGE 04
P . 05
• i
RESOLUTION NO 119-99
A RESOLUTION AWARDING BID NO. 99-72 IN THE AMOUNT
OF $1,301,170, PLUS A PROJECT CONTINGENCY IN THE
AMOUNT OF $130,000 TO BASIC CONSTRUCTION
COMPANY, FOR WIDENING HIGHWAY 265, WATER &
SEWER RELOCATIONS; AND APPROVAL OF A BUDGET
ADJUSTMENT.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1 That the City Council hereby awards Bid No. 99-72 in the amount of
$1,301,170, plus a project contingency in the amount of $130,000 to Basic Construction Company,
for widening of Highway 265, water & sewer relocations; and authorizes the Mayor and City Clerk
to execute a contract for said amount. A copy of the contract is attached hereto marked Exhibit "A"
and made a part hereof.
Section'? The City Council hereby approves a budget adjustment m the amount of
$92,511 mcreasmg Water Line Improvements, Acct. 5400 5600 5808 00 Project No. 99072 20 by
decreasing Water Line Improvements, Acct. No. 5400 5600 5808 00, Project 97021 20. A copy of
the budget adjustment is attached hereto marked Exhibit B and made a part hereof.
PASSED AND APPROVED this 2L` day of September , 1999.
APPROVE
By. �y/s'vrK�
red Hanna, Mayor
ATTEST:
�, x mer o. druff, City Clerk
•
1..
•
•
RESOLUTION NO. 16-00
•
A RESOLUTION AWARDING BID NO. 2000-11, IN THE
AMOUNT OF $2,107,961, TO BASIC CONSTRUCTION
COMPANY, INC., FOR PHASE II, HIGHWAY 265 WATER AND
SANITARY SEWER RELOCATIONS; APPROVING A 10%
CONTRACT CONTINGENCY IN THE AMOUNT OF $210,796.10;
AND APPROVAL OF A BUDGET ADJUSTMENT.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1. That the City Council hereby awards Bid No. 2000-11, in the amount of
$2,107,961, to Basic Construction Company, Inc., for Phase II, Highway 265 water and sanitary
sewer relocations, and authorizes the Mayor and City Clerk to execute a contract for said amount.
A copy of the is attached hereto marked Exhibit "A" and made a part hereof.
Section 2. The City Council hereby approves a 10% contract contingency in the amount
of $210,796.10.
Section 3. The City Council hereby approves a budget adjustment in the amount of
$1,117,786 increasing Water Line Improvements, Acct. No. 5400 5600 5808 00, Project No. 97043
20, in the amount of $470,786 and Building Cost, Acct. No 5400 5600 5804 00, Project No. 98076
20 by decreasing Use of Fund Balance, Acct. No. 5400 0940 4999 99. A copy of the budget
adjustment is attached hereto marked Exhibit "B" and made a part hereof.
ASSED AND APPROVED this1"` day of February , 2000.
•
„i It
tf..m
9_
ATTR
Bv:
eather Woodruff, City Cler
City of Fayetteville, Arkansas
Budget Adjustment Form
EXHIBIT B
Budget Year
2000
Department: Public Works
Division: Water & Sewer
Program: Capital Water Mains
Date Requested
October 31, 2000
Adjustment #
Project or Item Requested:
Additional funding is requested for the Highway 265 Water &
Sewer Relocation project.
Project or Item Deleted:
None. Use of fund balance is proposed for this adjustment.
Justification of this Increase:
The Highway 265 Water & Sewer Relocation project budget
needs to be increased to fund a change order that adds 491
lineal feet of 24" waterline. This change is needed due to site
conditions.
Justification of this Decrease:
Sufficient cash & investments exist to fund this request and
comply with City policy.
Increase Expense (Decrease Revenue)
Account Name Amount
Water Line Improvements
Account Number
120,000 5400 5600
5808 00
Decrease Expense (Increase Revenue)
Account Name Amount
Use of Haid Balance
Account Number
120,000 5400 0940
4999 99
Project Number
97043 20
Project Number
Approval Signatures
^3/— 00
Re. uested By Date
or
artment Director
/o-1(-oa
Date
aLIJ�� _/Q --it—toe
Admin. Se ces Direct
"
11721,---"
Mayor
Mayor ! �
Date
Date
/1 ate
Blue Copy: Budget & Research / Yellow Copy: Requester
Type:
Budget Office Use Only
A B C E
Date of Approval
Posted to General Ledger
Posted to Project Accounting
Entered in Category Log
H:IBUDGETIPROJECTSIBud AdjIBA_2000111WY265W2.WK4
• AGREEMENT
•
This AGREEMENT, executed this (o day of AZOTA, 2000 by and between the City of
Fayetteville, Arkansas, hereinafter referred to as the "City", and Summersby Subdivision Property
Owners Association, an Arkansas nonprofit corporation, hereinafter referred to as the "Association".
WHEREAS, The developers of Summersby Subdivision to the City of Fayetteville, Arkansas
have requested the City of Fayetteville to approve the use of a non-standard architecturally aesthetic
streetlight, within and around the perimeter of said development in lieu of the standard "SWEPCO" or
"OZARKS" aluminum streetlight; and,
WHEREAS, the City of Fayetteville has approved said request provided all costs for the
installation and maintenance of the non-standard streetlighting shall be borne by the Association.
NOW, THEREFORE, the City and the Association hereby agree as follows:
1. The Association shall pay all installation and maintenance costs of the non-standard
streetlights within the development as located on the final plat and approved by the City.
2. The City will pay the actual metered or utility estimated electrical usage charge for those
streetlights placed according to current City policy and approved in the Plat Review process.
3. This agreement is recorded and becomes a permanent part of the Protective Covenants of
Brookhaven Subdivision as filed at the Washington County Courthouse.
4. The term of this Agreement shall be for an indefinite period from the execution date
hereof, provided the City continues to require streetlights on public rights -of -ways.
5. The parties stipulate and agree that should the City at any time do away with or modify
its policy of requiring ordinary electric utility streetlights on public rights -of -ways this agreement be
subject to termination or cancellation in conformity with such new policy.
CITY OF FAYETTTEVILLE, ARKANSAS
By: /2 ///�� ante
ATTEST
By: r S/tet/�
i d
City Clerk ��
J
ATTEST
By: 6 1
Secretary
Mayor
SUMMERSBY PROPERTY OWNERS ASSOCIATION
AN ARKANSAS NONPRO y T CORPORATION
By:
President
STAFF REVIEW FORM
AGENDA REQUEST
X CONTRACT REVIEW
GRANT REVIEW
•
For the Fayetteville City Council meeting of November 7, 20000
FROM:
Sid Norbash }L,✓ Engineering Public Works
Name Division Department
ACTION REQUIRED: (a)Approval of the Change Order #5 to the Construction
Contract with Basic Construction Co., Inc. for Hwy 265 Widening (Hwy 45 to
Hwy 16) - Water & Sewer Relocations Phase II. (b)Approval of the related
Budget Adjustment. (c)Approval of combining all of the Phase I and Phase II
Contingency amounts for the total project contingency.
COST TO CITY:
$251,132.02
Cost of this Request
5400-5600-5808-00
Account Number
99 20 (extra work)
97043-20
Project Number
$3,028,543
Category/Project Budget
$.2,618,49,4,
Funds Used To Date
$ 240.,4-91:00
Remaining Balance
Hwy 265 Water & Sewer Reloc.
Category/Project Name
Water & Sewer
Program Name
Water & Sewer
Fund
BUDGET REVIEW:
X
BudgeE Coordinator
Budgeted Item
X
Budget Adjustment Attached
Administrative Services Director
CONTRACT/GRANT/LEASE REVIEW:
Account
Ci)y ttorne.
Purchasing Officer
GRANTING AGENCY:
ADA Coordinator
/G
Date Internal
10/316
Date
ditor
Date
Date
STAFF RECOMMENDATION: Approval of the
fo/31/00
Date
atalyem
Director Date
ces Director
Mayor
/o//$d
Date
Change
Order #5.
Cross Reference
New Item: Yes No X
Contract #: 755
Resolution # 16-00
Orig Contract Date: 2-1-00
STA
oR
FAYETTEVPLLE
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENTAL CORRESPONDENCE
•
To: Sid Norbash, Engineering Division
From: Heather Woodruff, City Clerk
Date: November 13, 2000
Attached is a copy of Resolution No. 156-00 approving Basic Construction Co., Inc., Change
Order No. 5 authorizing the combination of Phase I and Phase II of Hwy 265 Widening (Hwy
265 and Hwy 16) water and sewer relocation. The original will be microfilmed and filed with the
City Clerk. The budget adjustment has been forwarded to Steve Davis.
cc: Nancy Smith
Steve Davis
Marilyn Cramer
•
1
.ipyr1U, V
_D V la
•
. . :.
RESOLUTION NO. 156-00
A RESOLUTION APPROVING BASIC CONSTRUCTION CO.,
INC., CHANGE ORDER NO. 5 IN THE AMOUNT OF
$251,132.02; AUTHORIZING THE COMBINATION OF PHASE
I AND PHASE II OF HWY 265 WIDENING (HWY 45 AND HWY
16) WATER AND SEWER RELOCATION CONTINGENCY
AMOUNTS FOR THE TOTAL PROJECT CONTINGENCY IN
THE AMOUNT OF $340,796; AND APPROVAL OF A BUDGET
ADJUSTMENT.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1. That the City Council hereby approves Basic Construction Co., Inc., Change
Order No. 5 in the amount of $251,132.02. A copy of the change order is attached hereto marked
Exhibit "A" and made a part hereof.
Section 2. The City Council hereby authorizes the combination of Phase I and Phase 11
Hwy 265 Widening (Hwy 45 and Hwy 16) Water and Sewer Relocation contingency amounts for
the total prQlect contingency amount of $340,796.
Section 3. That City Council hereby approves a budget adjustment in the amount of
$120,000 by increasing Water Line Improvements, Acct. No. 5400 5600 5808 00, Project No. 97043
20 decreasing Use of Fund Balance, Acct. No. 5400 0940 4999 99. A copy of the budget
adjustment is attached hereto marked "Exhibit B" and made a part hereof.
SKK AND APPROVED this7'" day of November , 2000.