HomeMy WebLinkAbout100-00 RESOLUTION• •
RESOLUTION NO.100-00
MICROFILMED
A RESOLUTION APPROVING A LETTER AGREEMENT WITH
MILHOLLAND COMPANY, ENGINEERING AND SURVEYING,
IN AN AMOUNT NOT TO EXCEED $5,000, FOR ENGINEERING
DESIGN, CONSTRUCTION STAKING, CONSTRUCTION
MANAGEMENT, AND AS BUILT DRAWINGS FOR THE
SHILOH DRIVE RECONSTRUCTION AT THE INTERSECTION
OF SHILOH AND NORTHWOOD; AND AUTHORIZING THE
MAYOR AND CITY CLERK TO EXECUTE SAID AGREEMENT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1. That the City Council hereby approves a letter agreement with Milholland
Company, in an amount not to exceed $5,000, for engineering design, construction staking,
construction management, and as built drawings for the Shiloh Drive reconstruction at the
intersection of Shiloh Drive and Northwood Avenue; and authorizes the Mayor and City Clerk to
execute said agreement. A copy of the letter agreement is attached hereto marked Exhibit "A" and
made a part hereof.
N1Gii
ED AND APPROVED this 18th day of July , 2000.
ATTEST: l
By: . 1a/r Cf
Heather Woodruff, City Clfrk
APPROV7�
By:
Fed Hanna, Mayor
NAME OF FILE:
0
•
71. .1% /OD- Do
CROSS REFERENCE:
Date
Contents of File
Initials
rgg7)0
e
n/DD- * D
£Xi/TSI r A ft ( .
tgal)
/
i g -on
�� ctA4 / ..',
,.eo %-11/7/. L S. Y
th _lik,9771
-y,
o151 -0D
/
al.,1, si
)
.a"
id
aul
v
d7.i
,Icai�/
,g
-661
'78-DD
aIL N
71900
/��..
Yt L
�d
���
FAYETTEVILLE
THE CITY OF FAYETTEVILLE, ARKANSAS
EXHIBIT A
June 15, 2000
Mr. Mel Milholland, P.E.
Milholland Company, Engineering and Surveying
205 West Center Street
Fayetteville, Arkansas 72701
Re: The proposed design and reconstruction of approximately 240 if of Shiloh Drive from
the existing AHTD right-of-way east to the new Shiloh Drive extension at the CMN
property line, including the radius and intersection of Northwood Avenue per the plan by
Milholland Engineering (sheet E-526, sheet 17, received 06/13/00).
Dear Sir,
This letter shall serve as the formal agreement to be presented to the City Council for
consideration for the City of Fayetteville to:
Approve a bid waiver/letter contract with Milholland Company for engineering design,
construction staking, construction management and as -built drawings in the not -to exceed
amount of $5,000.00 for the above described street reconstruction.
If the proposed design and reconstruction of approximately 240 If of Shiloh Drive from the
existing AHTD right-of-way east to the new Shiloh Drive extension at the CMN property line,
including the radius and intersection of Northwood Avenue per the plan by Milholland
Engineering (sheet E-526, sheet 17, received 06/13/00) is approved by the City Council, the City
agrees to pay the actual and verified engineering costs associated with this specific reconstruction
and as further described in the attached letter received from Milholland Engineering on June 15,
2000.
Milholland Company will provide design services, construction staking, construction inspection
and as -built drawings. Material/construction testing will be paid by the owner. A separate
formal agreement with McClinton -Anchor will be presented to the City Council for
consideration for the reconstruction of the above described segment of Shiloh Drive. If the
proposed reconstruction of Shiloh Drive as described above is approved by the City Council such
reconstruction should be completed no later than the completion of the adjacent Shiloh Drive
extension at the CMN II development west property line.
113 WEST MOUNTAIN 72701 501 521-7700
FAX 501 575-8257
Page 1 of 2
/IaQEE
Please note: This is a request for approval of a bid waiver/letter contract only. The Mayor and/or
City Council will not normally consider a proposed contract for approval without a formal
agreement signed in advance by the contracting parties. Do not proceed with any work for these
proposed improvements unless/until the proposed contract is approved by the City Council and a
copy signed by the Mayor is furnished to you.
If you agree with these provisions please sign the four original letters in the space provided and
return all four to me. I will proceed to schedule this on the next available City Council Agenda
(July 3 or July 17, 2000). Should you need any additional information please call me at 575-
8208.
Thank you� �'�
alkditd
im Beavers, P E
City Engineer
Approved City of Fayetteville
Fred Hanna, Mayor
date
61/001,0
vin Milholland, P.E. date
Milholland Company
Page 2 of 2
FAYETTEVILE
THE CITY Of FAYETTEVILLE, ARKANSAS
DEPARTMENTAL CORRESPONDENCE
•
To: Fred Hanna, Mayor
Thru: Charles Venable, Public Works Director
Contract Review
From. Jim Beavers, City Engineer
Date: June 15, 2000
Re: Council Meeting July 3, 2000
Proposed improvements to Shiloh Drive between CMN and the AHTD right-of-way.
Proposed engineering contract with Milholland Company
The section of Shiloh Drive between the AHTD right-of-way and the CMN property near
Northwood Avenue (approximately 240 1» is failing and needs to be replaced prior to the new
section of Shiloh Drive on the CMN property being completed and opened to the public. The
Traffic Engineer for the development, Peters and Associates, estimates the ultimate future traffic
on this section to be approximately 10,000 vehicles per day.
McClinton -Anchor is the contractor for CMN constructing the Shiloh Drive extension, Steel
Boulevard, Mall Avenue and Van Asche. Staff recommends a bid waiver and contracting the
replacement of Shiloh Drive between the AHTD right-of-way and the CMN property near
Northwood Avenue (approximately 240 l» with McClinton -Anchor. The basis for
recommendation of the bid waiver is that the reconstruction is on a segment of street
immediately adjacent to the new Shiloh construction and the additional time and costs of bidding
the project, including mobilization and earthwork makes a separate design and bid process
impractical and unfeasible.
For similar reasons to save time and money, Staff has selected Milholland Company to provide
the engineering services for this street reconstruction Milholland Company will provide the
design, construction staking, construction management and as -built drawings for the not -to
exceed amount of $5000.00 for the above described street reconstruction;
Staff has reviewed the plan drawing by Milholland and the proposed costs from McClinton -
Anchor and believe them to be fair and reasonable.
Page 1 of 2
•
Staff specifically requests approval of two agenda items to include:
Agenda item 1, McClinton- Anchor:
1. Approval of a bid waiver with McClinton -Anchor, the contractor at CMN, to allow the
reconstruction of approximately 240 If of Shiloh Drive from the existing AHTD right-of-way
east to the new Shiloh Drive extension at the CMN property line, including the radius and
intersection of Northwood Avenue per the plan by Milholland Engineering (drawing E-526,
sheet 17);
2. Approval of a construction contract with McClinton -Anchor in the estimated amount of
$43,300.00 for the above described street reconstruction;
3. Approval of a 15% project contingency of $6,495.00 for material/construction testing and
variations in final quantities.
Agenda item 2, Milholland Company (Engineering):
1. Approval of a letter contract with Milholland Company for engineering design, construction
staking, construction management and as -built drawings in the not -to exceed amount of
$5000.00 for the above described street reconstruction;
Enclosures for Agenda Item two:
1. Letter proposal from Milholland Company dated June 15, 2000
2. Proposed letter contract with Milholland Company
Page 2 of 2
•
and C,ompanr,
engineering PiSurveging
Melvin L. Milholland, PE, PLS
RiECEOVE
JUN 1 5 2000
REGISTRATIONS:
PE: AR, OK, MO
PLS: AR, OK
PROPOSAL
DATE: JUNE 15, 2000
PROJECT: SHILOH RECONSTRUCTION
LOCATION: INTERSECT SHILOH & NORTHWOOD
RE. ENGINEERING FEES
Dear Mr. Beavers:
Milholland Company proposes to perform all Engineering Services for the construction of said
project for a Maximum -Not -To -Exceed Figure of $5,000.
Compensation for said services shall be invoiced monthly, based on an hourly rate per attached
EXHIBIT "A" with said Maximum -Not -To -Exceed amount of $5,000.00
The opportunity to be of assistance is appreciated!
Sincerely,
Melvin L. Milholland, PE
205 West Center Street; Fayetteville, Arkansas 72701; Phone: (501) 443-4724; Fax: (501) 443-4707; E-mail: EngrMCOPaol.com
C'oP:
0
PRo&e
•
Milt/lad /itt /land (,ompan y
engineering en' Surveying
Melvin L. Milholland, Owner
•
REGISTRATIONS:
PE: AR, OK, MO
PLS• AR, OK
HOURLY RATE PER CLASSIFICATION
EXHIBIT "A"
Survey Crew 3 men @ $110.00 per hour
Survey Crew 2 men @ $86.00 per hour
Professional Land Surveyor $70.00 per hour
AutoCAD/Drafting
Professional Engineer
Engineer's Aide
Inspector
Office Computations
Research and Compiling Data
Secretary
Printing: 8-1/2" X 11":
Blueprints (any size)
Mylar (any size)
Mileage
Out -of -Pocket Expenses (Long-distance phone calls, etc.)
All fees for Review by Governmental Agencies ... Paid by Owner, upon demand
$50.00 per hour
$95.00 per hour
$65.00 per hour
$50.00 per hour
$45.00 per hour
$42.50 per hour
$30.00 per hour
$00.25 per sheet
$03.50 per sheet
$15.00 per sheet
$00.30 per mile
Actual Cost
205 West Center Street; Fayetteville, Arkansas 72101; Phone: (501) 443-4724; Fax: (501) 443-4707; E-mail: EngrMCO@)aol.com
•
MAD/and (�ompanrd
engineering &surveying
Melvin L. Milholland, PE, PLS
RECEOVE
D
JUN 1 5 2000
.J'
•
REGISTRATIONS:
PE: AR, OK, MO
PLS: AR, OK
PROPOSAL
DATE: JUNE 15, 2000
PROJECT: SHILOH RECONSTRUCTION
LOCATION: INTERSECT SHILOH & NORTHWOOD
RE• ENGINEERING FEES
Dear Mr. Beavers:
Milholland Company proposes to perform all Engineering Services for the construction of said
project for a Maximum -Not -To -Exceed Figure of $5,000.
Compensation for said services shall be invoiced monthly, based on an hourly rate per attached
EXHIBIT "A" with said Maximum -Not -To -Exceed amount of $5,000.00
The opportunity to be of assistance is appreciated!
Sincerely,
Melvin L. Milholland, PE
205 West Center Street; Fayetteville, Arkansas 72701; Phone: (501) 443-4724; Fax: (501) 443-4707; E-mail: EngrMCOPaol.com
•
Mt/holland t mpan4f
engineering et Surveying
Melvin L. Milholland, Owner
•
REGISTRATIONS:
PE: AR, OK, MO
PLS• AR, OK
HOURLY RATE PER CLASSIFICATION
EXHIBIT "A"
Survey Crew 3 men @ $110.00 per hour
Survey Crew 2 men @ $86.00 per hour
Professional Land Surveyor $70.00 per hour
AutoCAD/Drafting $50.00 per hour
Professional Engineer $95.00 per hour
Engineer's Aide $65.00 per hour
Inspector $50.00 per hour
Office Computations $45.00 per hour
Research and Compiling Data $42.50 per hour
Secretary $30.00 per hour
Printing: 8-1/2" X 11": $00.25 per sheet
Blueprints (any size) $03.50 per sheet
Mylar (any size) $15.00 per sheet
Mileage $00.30 per mile
Out -of -Pocket Expenses (Long-distance phone calls, etc.) Actual Cost
All fees for Review by Governmental Agencies ... Paid by Owner, upon demand
205 West Center Street; Fayetteville, Arkansas 72701; Phone: (501) 443-4724; Fax: (501) 443-4707; E-mail: EngrMCO(@aol.com
• •
STAFF REVIEW FORM
X AGENDA REQUEST
X CONTRACT REVIEW
GRANT REVIEW
For the Fayetteville City Council meeting of July 3, 2000
FROM:
Jim Beavers Engineering Public Works
Name
Division Department
ACTION REQUIRED:
S7 fr
Ui
1. Approval of a letter contract with Milholland Company for engineering fioR1y
design, construction staking, construction management and as -built drawings
in the not -to exceed amount of $5,000.00 for the reconstruction of
approximately 240 if of Shiloh Drive from the existing AHTD right-of-way
east to the CMN property line and the intersection with Northwood Avenue.
COST TO CITY:
$5000.00
Street/ROW/Intersection
$276,247 Cost shares
cost of this Request Project Budget
4470-9470-5809.00 $167,629
Account Number Funds Used To Date
98033-20
Project Number
* Prior to this request
$108,618 *
Remaining Balance
and prior to the
Project Name
Street Improvements
Program Name
Sales Tax
Fund
accompanying $49,795 construction
BUDGET REVIEW:
X Budgeted
Q1
Budget Adjustment Attached
get Coordinator
CONTRACT/GRANT/LEASE REVIEW:
(411.4 Qi itru
Accoun
CityAtptorrn
��
fR
Services Director
GRANTING AGENCY:
Date AD Coordinator
70.00
Date In
G -ao-oo
Purchasing Officer Date
rnal Auditor
STAFF RECOMMENDATION: Approval
Date
(a L-00
Date
• •
Department Director
ative er es Director
AzollAfriew—
Mayor
6/ o0
Da e
G -Z/-Ca
Date
Cross Reference
New Item: Yes
Prev Ord/Res #
Orig Contract Date:
Contract number
STAFF REVIEW FORM Page 2
Description Shiloh Dnve reconstruction Meeting Date July 1 2000
Comments: Reference Comments:
Budget Coordinator
Accounting Manager
City Attorney
Purchasing Officer
ADA Coordinator
Internal Auditor
FAYETTEVILLE
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENTAL CORRESPONDENCE
•
To: Jim Beavers, Engineeering
From: Heather Woodruff, City Clerk
Date: July 19, 2000
Attached is a copy of the resolution approving an agreement with Milholland for engineering and
surveying services for the reconstruction of a portion of Shiloh Drive. I am also returning three
originals for you to distribute. The original will be microfilmed and filed with the City Clerk.
Your purchase requisition has been forwarded to the Intemal Auditor.
cc: Nancy Smith, Internal Auditor
•
• •
RESOLUTION NO. 100-0Q
•
A RESOLUTION APPROVING A LETTER AGREEMENT WITH
MILHOLLAND COMPANY, ENGINEERING AND SURVEYING,
IN AN AMOUNT NOT TO EXCEED $5,000, FOR ENGINEERING
DESIGN, CONSTRUCTION STAKING, CONSTRUCTION
MANAGEMENT, AND AS BUILT DRAWINGS FOR THE
SHILOH DRIVE RECONSTRUCTION AT THE INTERSECTION
OF SHILOH AND NORTHWOOD; AND AUTHORIZING THE
MAYOR AND CITY CLERK TO EXECUTE SAID AGREEMENT.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section . That the City Council hereby approves a letter agreement with Milholland
Company, in an amount not to exceed $5,000, for engineering design, construction staking,
construction management, and as built drawings for the Shiloh Drive reconstruction at the
intersection of Shiloh Drive and Northwood Avenue; and authorizes the Mayor and City Clerk to
execute said agreement. A copy of the letter agreement is attached hereto marked Exhibit "A" and
made a part hereof.
,M 1.t./
ED AND APPROVED this18° day of July , 2000.
t
ATTEST:
By:� a 4/4vi/.t�
Heather Woodruff, City C rk
APPROVED.
�
By:
F Hanna, Mayor
S..