HomeMy WebLinkAbout08-00 RESOLUTIONt
011 • at
RESOLUTION NO 8-00
MICROFILMED
A RESOLUTION APPROVING AMENDMENT NO. 5 TO THE
OMI AGREEMENT FOR THE OPERATIONS, MAINTENANCE
AND MANAGEMENT SERVICES OF THE CITY OF
FAYETTEVILLE WASTEWATER TREATMENT PLANT AT A
TOTAL COST OF $3,715,901, INCLUSIVE OF A
MANAGEMENT FEE OF $88,854.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1. That the City Council hereby approve Amendment No. 5 to the OMI
Agreement for Operations, Maintenance and Management Services of the Fayetteville Wastewater
Treatment Plant at a total cost of $3,715,901, inclusive of a management fee of $88,854; and
authorizes the Mayor and City Clerk to execute said agreement amendment. A copy of the
amendment is attached hereto marked Exhibit A and made a part hereof.
PASSED AND APPROVED this 18`" day of January , 2000.
APPROVED,
By. //////�
Fred Hanna, Mayor
ATTEST:
By:4..%zrrdY
l "Heather Woodruff, City C e
NAME OF FILE:
CROSS REFERENCE:
Date
Contents of File
NX -Do
oi:
igek
iazizzadi
(14 a.��u�c .
d � ez'4/2 Kizzad...dna
l�2/00
Se
•
, &s, g-oo
• • • •
AMENDMENT NO. 5
TO THE
AGREEMENT FOR OPERATIONS,
MAINTENANCE, AND MANAGEMENT SERVICES
FOR THE CITY OF FAYETTEVILLE, ARKANSAS
WASTEWATER TREATMENT PLANT
THIS AMENDMENT, entered into this) d day of fe eu4', 2000, by and between the
City of Fayetteville, Arkansas (hereinafter "Owner"), whose address for any formal notice is 113 W.
Mountain St, Fayetteville, Arkansas 72701 and Operations Management International, Inc.,
(hereinafter "OMI") with offices at 6060 South Willow Drive, Suite 200, Greenwood Village,
Colorado 80111-5142 is made and entered into for purposes of amending certain provisions of the
"Agreement for Operations, Maintenance, and Management Services for the City of Fayetteville's
Wastewater Treatment Plant," dated August 16, 1994 (the "Agreement") to prevent the facilities
covered by the Agreement from being deemed to be used in the trade or business of OMI pursuant to
Section 141 (b) of the Internal Revenue Code of 1986, as amended.
This is Amendment No. 5 to the Agreement dated the 16th day of August, 1994, between Owner and
OMI.
NOW THEREFORE, Owner and OMI agree to amend the Agreement as follows:
1. Article 4.1 is hereby deleted in its entirety and replaced with the following Article 4.1:
4.1 For services rendered during the sixth year of this agreement owner shall pay to OMI
the actual cost of services per formed plus a management fee of Eighty Eight
Thousand Eight Hundred and Fifty Four Dollars ($88,854). Said fee and estimated
cost (base fee) shall be paid in twelve (12) equal monthly installments. The
management fee for subsequent years will be determined proportional to the increase
in estimated cost.
2. Article 4.3 is hereby deleted in its entirety and replaced with the following Article 4.3:
4.3 OMI estimates that cost for services for calendar year 2000 shall be Three Million
Seven Hundred Fifteen Thousand, Nine Hundred and One Dollars ($3,715,901)
annually. Details of said cost are shown in Appendix J. The base fee shall be
negotiated each year in September, beginning in 2000 for calendar year 2001. Should
Owners and OMI fail to agree, the base fee will be determined by the application of
the base fee adjustment formula shown in Appendix F. Should the actual
expenditures exceed estimated expenditures by more than Twenty Thousand Dollars
($20,000), in any year of this agreement, specific approval will be obtained from the
owner.
„0 MI DNVMIUSERIIATAWmdT,c ling WPDauUyttmcMPFlptllet911e Ami$ doc
-1- 2/2/00
N •0
3. Appendix B is hereby deleted in its entirety and replaced with the attached Appendix B
4. Appendix J is hereby deleted in its entirety and replaced with the attached Appendix J.
5. Appendix K is hereby deleted in its entirety and replaced with the attached Appendix K.
All other terms and conditions remain in effect in accordance with the Agreement referenced in this
Amendment.
Both parties indicate their approval of this Amendment to the Agreement by their signatures below
as of the date shown above.
Authorized Signature:
CC72
Bernar47(. Miller
Title: Chief Operating Officer
OPERATIONS MANAGEMENT
INTERNATIONAL, INC.
Authorized Signature.
Fred Hanna, Jr.
Title: Mayor
CITY OF FAYETTEVILLE
Date: 2 rag 09" Date: 9 F6@ aooc
\ OMI DNVM105ERDATA1WordPmasing%WPDms Agntnxni1REnyc1levlle Am,5.Jx
2/2/00
gE5,8-00
KES. S-00
1•
Appendix B
LOCATION OF PROJECT
B.1 OMI agrees to provide the services necessary for the management, operation and maintenance
of the following:
•
a) All equipment, vehicles, grounds, and facilities now existing within the present
property boundaries of or being used to operate the Owner's Wastewater Treatment
Plant located at:
1500 North Fox Hunter Road
Fayetteville, Arkansas
b) All equipment, grounds and facilities now existing within the present property
boundaries of pump stations described as follows:
WW1 978 East Zion Road
WW2 4938 Mission Boulevard
WW3 Salem Road North of Mt. Comfort Road
WW4 691 West Poplar
WW5 3896 North Gregg
WW6 3021 North Old Wire Road
WW7 2034 North Country Road # 877
WW8 729 West North Street
WW9 1336 North Porter
W W 10 716 Futrall Drive
WW11 4412 West 6th Street
WW12 398 North Double Springs Road
WWI3 878 South Stonebridge Road
W W 14 1820 South Armstrong
W W 15 203 East 29'h Circle
W W 16 3917 South McCollum Road
WW17 4394 South School
W W 18 202 North Sandy (Greenland)
WW19 933 South Mally Wagon Road
W W20 3212 North Highway 112
WW21 1687 South Happy Hollow Road
WW22 630 North Double Springs Road
WW23 Masters Addition Country Club
WW24 Willow West (Farmington)
WW25 4071 South Mcollum (Airport East)
WW26 74 South Kestrel (Sequoyah Preserve)
WW27 1031 River Meadows Drive (Stonebridge Meadows)
\\OMIDNVNOUSERDATMWordPromsiylW PDadUpttmcm4Vo,mwIIIc Amxa doe
2/2/00
WW28 1603 Plantation Avenue (Heritage Village)
4'ss. St 00
c) All equipment, vehicles, grounds and facilities now existing within the present
property boundaries of or being used to operate the Owner's Sludge Management Site
located east of the wastewater facility across the White River.
d) The potable water SCADA system at the following locations:
WI 215 West 24ih Street
W2 844 North Crossover Road
W3 4938 East Mission Boulevard
W4 1016 East Ash Street
W5 707 East Rogers Drive
W6 456 East Baxter Lane
W7 707 East Rogers Drive
W8 113 North Sang
W9 1170 East South Skyline
W10 1044 East Township Road
W11 Mt. Kessler
W12 Highway 45 Valve Station
W 13 Fire Tower Avenue (Goshen)
W14 Fire Tower Avenue (Goshen)
W15 Co. Road # 55 (Round Mountain)
W16 Co. Road # 4343 (Benson Mountain)
W17 Gulley Road Tank
W18 Gulley Road Station
1475 Cato Springs Road
110MIDNMTIISERDATMWwdPmc sIrWPD3m1Agmnma\FlFMtiiwllle A^O5EOC
-4-
Pump Station
Pump Station
Pump Station
Pump Station
Pump Station
Ground Storage Tank
Ground Storage Tank
Elevated Storage Tank
Elevated Storage Tank
Elevated Storage Tank
Ground Storage Tank
Pressure -reducing Valve
Ground Storage Tank
Pump Station
Ground Storage Tank
Ground Storage Tank
Elevated Storage Tank
Pump Station
Water & Sewer Ops Center
2/2/00
e•
Appendix J
COST DETAIL
a
The proposed annual estimated costs for 2000 were calculated as follows:
Direct labor and benefits
Labor overhead @ 35%
Electricity
Electric overhead @ 5%
All other direct costs
Other direct costs overhead 10%
Sub -Total
Fixed Fee
Total Operating Budget
SCADA Upgrade - Phase 1
Total 2000 Budget
Projected
1999
$1,305,829
$ 457,040
$ 618,712
$ 30,936
$ 787,878
$ 78,788
$3,279,183
$ 85,495
$3,364,678
$ 212,500
$3,577,178
The following are the major circumstances affecting cost:
Budgeted
1999
$1,329,586
$ 465,355
$ 600,000
$ 30,000
$ 793,233
$ 79,323
$3,297,497
$ 85,495
$3,382,992
$ 250,000
$3,632,992
4s, 8-oo
Proposed
2000
$1,381,183
$ 483,414
$ 715,000
$ 37,750
$ 737,909
$ 73,791
$3,427,047
$ 88,854
$3,515,901
(Phase 11) $ 200,000
$3,715,901
1. Projected increase in electrical usage and demand due to increased loading, the use of the new
ultra -violet disinfection system, and the requirement for part-time utilization of the second
aeration basin.
Continued increase in the cost of providing skilled professional labor in Northwest Arkansas'
highly competitive job market.
3. Expansion of sewer lift -station maintenance responsibilities to include six (6) additional
stations and SCADA at eight (8) additional potable water sites as noted in Appendix B.
\W MIDNVM\USERDATA\W ONNaxainR\WPDIIMAgI¢mmMA,woill< AmIS,Ux
-5- 2/2/00
Appendix K
SCADA UPGRADE - PHASE 2 - SCOPE OF WORK
The following SCADA upgrade tasks will be performed by OMI during the calendar year 2000.
/as &oo-
1. Upgrade of all existing ultrasonic level measurement devices with new units capable
of being calibrated without entering the wetwell area, as well as installing new devices
at the four additional sewer lift stations to receive SCADA control/monitoring during
this phase.
2. Purchase and installation of SCADA monitoring equipment at 15 remote valve sites in
the water distribution system, specific sites to be determined by the City, to be
compatible with the OMI -developed SCADA system. Note that this item specifically
excludes responsibility for providing the actual sensing or control devices at these
locations.
3. Purchase and installation of SCADA control/monitoring equipment at the four sewer
lift stations not previously so equipped, to be compatible with OMI -developed
SCADA system.
110NIDNVNIIDSERDATA1Word unah6AWPDatntkracmeninNyetievIllt AmM,yx
-6- 2/2/00
•
AGENDA REQUEST FORM
Council Meeting of January 18,2000 Mayor's Approval
FROM Don Bunn Public Works Admin Public Works
Name
Division Department
ACTION REQUIRED Approval of Amendment No. 5 to the OMI Contract for
operation and management services, Fayetteville Wastewater Treatment Plant
at a total cost of $3,715,901.00, inclusive of a management fee of
$88,854.00 and the SCADA upgrade cost of $200,000.00.
COST TO CITY
200,000.00
$ 3,515,901.00
Cost of this Request
5400 5100 5328 00
5400 5700 5315 00 (SCADA)
Account Number
300,000.00
$ 3,519,733.00
Category/Project Budget
(Operations
9903.-1 (SCADA)
Project Number
BUDGET/CONTRACT REVIEW
N4
Budget Coordinator
Accoun/ g' naaper
City. por
P�%7n
Purchasing Officer
STAFF RECOMMENDATION It i
approve Amendment No. 5 t
Treatment Plant for 2000,
mant fee of $8„ 854
Contract)
-0-
Funds Used to Date
$ 3 819 733.00
Funds Remaining
XX Budgeted Item
Water/Sewer Imp'ts
Wastewater Treatment
Category/Project Name
Program Name
Water and Sewer
Fund Category
Budget Add. Attached
Date Admin Services Director Date
/-7-00
Date ADA Coordinator Date
t 7-Oo
Date Internal Auditor Date
1-1-00
Date
s the recommendation of the Staff that the Council
o the OMI Contract for operation of the Wastewater
at a cost of $3,715,901.00, inclusive of a
.00 and the SCADA upgrade cost of $200,000.00.
rks Director
C/- 07-00
Date
/-7_00
Date
Date
/741
Date
Cross Reference
New Item: Yes No
Prev Ord/Res #
Orig. Contract
Orig. Contract
94-94
Date 8-16-94
• •
COMMENT SHEET
Project: Amendment No. 5, OMI Operations and Management Agreement
Contractor: Operations Management International (OMI)
Notes to Reviewers. None
FAYETTEVILI,E
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENTAL CORRESPONDENCE
•
January 5, 2000
To: Fayetteville City Council
From: Don Bunn, Assistant Public Works Director.�i�3�--------_
Thru: Charles Venable, Public Works Director
Fred Hanna, Mayor
Subject: Amendment No. 5
OMI Contract for Wastewater Plant Services
Attached for your review and approval is a proposed Amendment No. 5 to the existing OMI
contract for operations and management services at the Noland Wastewater Treatment
Plant. The amendment covers the estimated cost of providing operation and management
of the wastewater treatment plant (including sewage pump stations and SCADA
maintenance) and the upgrade of the SCADA system. The breakdown of the costs and a
comparison of budgeted amounts are:
Attached is a copy of the proposed Amendment No. 5. The purpose of the amendment is to
set the estimated cost of services and the fixed fee for 2000. The cost for this year breaks
down as follows:
Item
Budgeted Amount Requested Amount
Operations/Management Estimated Cost
Fixed Fee
Total, Operations and Management
SCADA Upgrade
TOTALS
$ 3,519,733.00
300,000.00
$ 3,819,733.00
$ 3,427,047.00
88,854.00
3,515,901.00
200,000.00
$ 3,715,901.00
The increase in the operations and management estimated cost from 1999 to 2000 is 3.98
percent.
• •
The reasons given for the increase are:
1. Projected increases in power costs associated with the new UV disinfection
system and possible use of the second aeration basin.
2. The addition of six (6) sewage pump stations during 1999.
3. Expansion of the SCADA system to six additional potable water sites.
4. Increased labor costs.
The SCADA upgrade is a continuation of the program started in 1999 to replace our
outdated SCADA system. The $200,000.00 given in the Amendment for that purpose will
come from the capital portion of the 2000 Water and Sewer Capital Budget.
The Water and Sewer Committee is scheduled to meet immediately following the Council
Agenda Meeting on January 11, 2000, and will have a recommendation for the Council on
this matter.
It is the recommendation of the Staff that the Council approve the proposed Amendment
No. 5.
• •
AGENDA REQUEST FORM
Council Meeting of January 18,2000 Mayor's Approval
FROM Don Bunn Public Works Admin Public Works
Name
Division Department
ACTION REQUIRED Approval of Amendment No. 5 to the OMI Contract for
operation and management services, Fayetteville Wastewater Treatment Plant
at a total cost of $3,715,901.00, inclusive of a management fee of
$88,854.00.
COST TO CITY
200,000.00
$ 3,515,901.00
Cost of this Request
Account Number
Project Number
BUDGET/CONTRACT REVIEW
300,000.00
$ 3,519,733.00
Category/Project Budget
-0-
Funds Used to Date
$ 3,819,733.00
Funds Remaining
XX Budgeted Item
Budget Coordinator Date
Accounting Manager Date
City Attorney Date
Purchasing Officer Date
STAFF RECOMMENDATION It is the
approve Amendment No. 5 to the
Treatment Plant for 2000, at a
ma :gement few of $88,854.00
Water/Sewer Imp'ts
Wastewater Treatment
Category/Project Name
Program Name
Water and Sewer
Fund Category
Budget Add. Attached
Admin Services Director Date
ADA Coordinator Date
Internal Auditor Date
recommendation of the Staff that the Council
OMI Contract for operation of the Wastewater
cost of $3,715,901.00, including a
Ass't Public Works Director Date
Department Director Date
Admin Services Director Date
Mayor Date
Cross Reference
New Item: Yes No
Prev Ord/Res #
Orig. Contract #
Orig. Contract Date
FAYETTEVR,LE
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENTAL CORRESPONDENCE
January 5, 2000
To: Fayetteville City Council
From: Don Bunn, Assistant Public Works Director,11
Subject: Amendment No. 5
OMI Contract for Wastewater Plant Services
Attached for your review and approval is proposed Amendment No. 5 to the existing OMI
contract for operations and management services at the Wastewater Treatment Plant.
The amendment calls for a total budget of $3,715,901.00 for 2000, and breaks down as
follows:
Operations and Management Services - $ 3,427,047.00
Fixed Fee 88,854.00
SCADA Upgrade- 200,000.00
Total $ 3,715,901.00
There will be a Water and Sewer Committee Meeting immediately following the Agenda
Session on Tuesday, January 11 to discuss the Amendment. The Committee's
recommendation will be brought to the Council at their regular meeting on January 18,
2000.
•
• •
AMENDMENT NO. 5
TO THE
AGREEMENT FOR OPERATIONS,
MAINTENANCE, AND MANAGEMENT SERVICES
FOR THE CITY OF FAYETTEVILLE, ARKANSAS
WASTEWATER TREATMENT PLANT
THIS AMENDMENT, entered into this day of , 2000, by and between the
City of Fayetteville, Arkansas (hereinafter "Owner'), whose address for any formal notice is 113 W.
Mountain St, Fayetteville, Arkansas 72701 and Operations Management International, Inc.,
(hereinafter "OMI") with offices at 5299 DTC Boulevard, Suite 1209, Englewood, Colorado 80111-
3333 is made and entered into for purposes of amending certain provisions of the "Agreement for
Operations, Maintenance, and Management Services for the City of Fayetteville's Wastewater
Treatment Plant," dated August 16, 1994 (the "Agreement") to prevent the facilities covered by the
Agreement from being deemed to be used in the trade or business of OMI pursuant to Section 141 (b)
of the Internal Revenue Code of 1986, as amended.
This is Amendment No. 5 to the Agreement dated the 16th day of August, 1994, between Owner and
OMI.
NOW THEREFORE, Owner and OMI agree to amend the Agreement as follows:
1. Article 4.1 is hereby deleted in its entirety and replaced with the following Article 4.1:
4.1 For services rendered during the sixth year of this agreement owner shall pay to OMI
the actual cost of services performed plus a management fee of Eighty Eight Thousand
Eight Hundred and Fifty Four Dollars ($88,854). Said fee and estimated cost (base
fee) shall be paid in twelve (12) equal monthly installments. The management fee for
subsequent years will be determined proportional to the increase in estimated cost.
2. Article 4.3 is hereby deleted in its entirety and replaced with the following Article 4.3:
4.3 OMI estimates that cost for services for calendar year 2000 shall be Three Million
Seven Hundred Fifteen Thousand, Nine Hundred and One Dollars ($3,715,901)
annually. Details of said cost are shown in Appendix J. The base fee shall be
negotiated each year in September, beginning in 2000 for calendar year 2001. Should
Owners and OMI fail to agree, the base fee will be determined by the application of
the base fee adjustment formula shown in Appendix F. Should the actual
expenditures exceed estimated expenditures by more than Twenty Thousand Dollars
($20,000), in any year of this agreement, specific approval will be obtained from the
owner.
•
•
• •
3. Appendix B is hereby deleted in its entirety and replaced with the attached Appendix B.
4. Appendix J is hereby deleted in its entirety and replaced with the attached Appendix J.
5. Appendix K is hereby deleted in its entirety and replaced with the attached Appendix K.
All other terms and conditions remain in effect in accordance with the Agreement referenced in this
Amendment.
Both parties indicate their approval of this Amendment to the Agreement by their signatures below as
of the date shown above.
Authorized Signature: Authorized Signature:
Bernard A. Miller
Title: Chief Operating Officer
Fred Hanna, Jr.
Title: Mayor
OPERATIONS MANAGEMENT CITY OF FAYETTEVILLE
INTERNATIONAL INC.
Date: Date:
•
•
Appendix J
COST DETAIL
•
The proposed annual estimated costs for 2000 were calculated as follows:
Direct labor and benefits
Labor overhead @ 35%
Electricity
Electric overhead @ 5%
All other direct costs
Other direct costs overhead 10%
Sub -Total
Fixed Fee
Total Operating Budget
SCADA Upgrade - Phase 1
Total 2000 Budget
Projected
1999
$1,305,829
$ 457,040
$ 618,712
$ 30,936
$ 787,878
$ 78,788
$3,279,183
$ 85,495
$3,364,678
$ 212,500
$3,577,178 $3,632,992 $3,715,901
Budgeted
1999
$1,329,586
$ 465,355
$ 600,000
$ 30,000
$ 793,233
$ 79.323
$3,297,497
$. 85,495
$3,382,992
$ 250,000
Proposed
2000
$1,381,183
$ 483,414
$ 715,000
$ 37,750
$ 737,909
$ 73,791
$3,427,047
$ 88,854
$3,515,901
(Phase II) $ 200,000
The following are some of the major reasons for cost circumstances:
1. Projected increase in electrical usage and demand due to increased loading, the use of the new
ultra -violet disinfection system, and the requirement for part-time utilization of the second
aeration basin.
2. Continued increase in the cost of providing skilled professional labor in Northwest Arkansas'
highly competitive job market.
3. Expansion of sewer lift -station maintenance responsibilities to include six (6) additional
stations and SCADA at eight (8) additional potable water sites as noted in Appendix B.
•
•
Appendix K
SCADA UPGRADE - PHASE 2 - SCOPE OF WORK
The following SCADA upgrade tasks will be performed by OMI during the calendar year 2000.
1. Upgrade of all existing ultrasonic level measurement devices with new units capable
of being calibrated without entering the wetwell area, as well as installing new devices
at the four additional sewer lift stations to receive SCADA control/monitoring during
this phase.
2. Purchase and installation of SCADA monitor ng equipment at 15 remote valve sites in
the water distribution system, specific sites to be determined by the City, to be
compatible with the OMI -developed SCADA system. Note that this item specifically
excludes responsibility for providing the actual sensing or control devices at these
locations.
3. Purchase and installation of SCADA control/monitoring equipment at the four sewer
lift stations not previously so equipped, to be compatible with OMI -developed
SCADA system.
Appendix B
LOCATION OF PROJECT
B.1 OMI agrees to provide the services necessary for the management, operation and maintenance
of the following:
a) All equipment, vehicles, grounds, and facilitids now existing within the present
property boundaries of or being used to operate the Owner's Wastewater Treatment
Plant located at:
1500 North Fox Hunter Road
Fayetteville, Arkansas
b) All equipment, grounds and facilities now existing within the present property
boundaries of pump stations described as follows:
WW1 978 East Zion Road
WW2 4938 Mission Boulevard
WW3 Salem Road North of Mt. Comfort Road
WW4 691 West Poplar
WW5 3896 North Gregg
WW6 3021 North Old Wire Road
WW7 2034 North Country Road # 877
WW8 729 West North Street
WW9 1336 North Porter
W W IO 716 Futrall Drive
WW11 4412 West 6a' Street
WW12 398 North Double Springs Road
WW13 878 South Stonebridge Road
W W 14 1820 South Armstrong
WW 15 203 East 29`" Circle
WW16 3917 South McCollum Road
WW 17 4394 South School
WW 18 202 North Sandy (Greenland)
WW19 933 South Mally Wagon Road
WW20 3212 North Highway 112
WW21 1687 South Happy Hollow Ro d
WW22 630 North Double Springs Road
WW23 Masters Addition Country Club
WW24 Willow West (Farmington)
WW25 4071 South Mcollum (Airport East)
WW26 74 South Kestrel (Sequoyah Preserve)
WW27 1031 River Meadows Drive (Stonebridge Meadows)
•
•
WW28 1603 Plantation Avenue (Heritage Village)
c) All equipment, vehicles, grounds and facilities now existing within the present
property boundaries of or being used to operate the Owner's Sludge Management Site
located east of the wastewater facility across the White River.
d) The potable water SCADA system at the following locations:
W I 215 West 24th Street
W2 844 North Crossover Road
W3 4938 East Mission Boulevard
W4 1016 East Ash Street
W5 707 East Rogers Drive
W6 456 East Baxter Lane
W7 707 East Rogers Drive
W8 113 North Sang
W9 1170 East South Skyline
W10 1044 East Township Road
W11 Mt. Kessler
W12 Highway 45 Valve Station
W13 Fire Tower Avenue (Goshen)
W14 Fire Tower Avenue (Goshen)
W15 Co. Road # 55 (Round Mount in)
W16 Co. Road # 4343 (Benson Mountain)
W17 Gulley Road Tank
W18 Gulley Road Station
1475 Cato Springs Road
Pump Station
Pump Station
Pump Station
Pump Station
Pump Station
Ground Storage Tank
Ground Storage Tank
Elevated Storage Tank
Elevated Storage Tank
Elevated Storage Tank
Ground Storage Tank
Pressure -reducing Valve
Ground Storage Tank
Pump Station
Ground Storage Tank
Ground Storage Tank
Elevated Storage Tank
Pump Station
Water & Sewer Ops Center