HomeMy WebLinkAbout142-99 RESOLUTION• • • • RESOLUTION NO 142-99 - A RESOLUTION APPROVING THE 2000-2004 CAPITAL IMPROVEMENTS PROGRAM PLANNING DOCUMENT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council hereby approves the 2000-2004 Capital Improvements Program planning document. A copy of the CUP program is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 2nd day of November , 1999. APPRO By. �//VED// v��1 Fr d Hanna, Mayor ATTEST By. dt Heather Woodruff, erk City FAYETIEVII,LE • a'v/keo. 14'z -q9 THE CITY OF FAYETTEVILLE, ARKANSAS MICROFILMED DEPARTMENTAL CORRESPONDENCE TO: All Department Directors & Division Heads THRU: John Maguire, Administrative Services Director FROM: Budget & Researchd DATE. November 12, 1999 SUBJECT: 2000-2004 Capital Improvements Program Attached, please find a copy of the 2000-2004 Capital Improvements Program (CIP) document. The projects listed for 2000 will be submitted to the City Council as part of the Proposed 2000 Budget. Thank you for all your help in completing the CIP. If you have any questions concerning the document, please feel free to contact either Steve Davis (ext. 296) or Kevin Springer (ext. 226). STAFF REVIEW FORM X AGENDA REQUEST CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Council meeting of RECEIVED OCT 0 5 1999 CITY OF FAYETTEVILLE CITY CLERK'S OFFICE October 19, 1999 FROM: Steve Davis Name Budget & Research Division Administrative Services Department ACTION REQUIRED: Council approval of the 2000-2004 Capital Improvements Program. This is a planning document - any funding required will be submitted with the 2000 operating budget. COST TO CITY: $ see attachment Cost of this Request Account Number Project Number Category/Project Budget Funds Used To Date Remaining Balance Category/Project Name Program Name Fund BUDGET REVIEW: Budget Ntanager N/A Budgeted tem Budget Adjustment Attached y'), Administrative Services Director CONTRACT/GRANT/LEASE REVIEW: Acco �� in Ma/a•= City Attorne Purchasing Officer GRANTI /0-4'-/9 Date I. ernal Auditor /0-y-95 Date 10-4 •t1 Date CY: ADA Coordinator Date Date STAFF RECOMMENDATION: Staff recommends Improvements Program Division Head Admin -ervices Director Date Date 20(1111 13) e Date approval of the 2000-2004 Capital Cross Reference New Item: Yes No Prev Ord/Res #: Orig Contract Date: • FAYETTEVILLE THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE TO: THRU: FROM: DATE. SUBJECT: Fayetteville City Council Fred Hanna, Mayor Kevin Crosson, Administrative Services Director Budget & Resear i```"`'''' ��I��I "'''' October 1, 1999 2000-2004 Capital Improvements Program The 2000-2004 Capital Improvements Program (CIP) is submitted for City Council adoption. The CIP contains approximately $191 8 million in planned capital improvements over the next five years. The CIP is the planning tool that provides guidance in making infrastructure and capital improvements. The 2000-2004 CIP contains planned expenditures in the following areas: Wastewater Plant Expansion & Improvements $ 106 3 million Water & Sewer Improvements 25.6 million Street Improvements 19.0 million Vehicles & Equipment Replacements / Expansions 8 6 million Parks & Recreation Improvements 6 8 million Off -Street Parking Improvements 6 6 million Airport Improvements 3 5 million Bridge & Drainage Improvements 3 0 million Fire Safety Improvements 2 1 million Community Development Improvements 1 8 million Sidewalk Improvements 1 7 million Police Safety Improvements 1 4 million Solid Waste Improvements 0 8 million Other Capital Improvements 4 6 million The projected cost of constructing a new wastewater treatment plant and making improvements to the City s current wastewater collection system and the Paul Noland Wastewater Treatment Plant is incorporated in this capital improvement program at an estimated cost of $106.3 million. The process for completing the annual update of the City's Five -Year Capital Improvements Program began in June with the preparation of projected funding available and a packet distributed to in-house staff to be used in the submission of capital projects. Since that time, numerous staff r • • • meetings have been held concerning the proposed CIP to assist in fine tuning it. In addition, City Council committee meetings, Airport Board meetings, and Parks & Recreation Advisory Board meetings have been held to obtain comments on the proposed improvements. By adopting the CIP, the City Council is providing direction on what is considered the prioritized capital replacement and expansion needs of the City during the next five-year period. As a planning tool, the CIP may be updated and/or revised on an annual basis to reflect changing priorities, to renew existing priorities, and to revise cost estimates. The funding requests for the projects planned for 2000 will be incorporated in the 2000 budget to be submitted for City Council review and approval in November. Thank you for consideration of this request and should you have any questions, please feel free to contact either Kevin Crosson at 575-8330 or Steve Davis at 575-8296. FAYETTEVILLE THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE To: Steve Davis, Budget and Research From: Heather Woodruff, City Clerk Date: November 8, 1999 Attached is a copy of the resolution approving the 2000-2004 CIP for your records. The original will be microfilmed and filed with the City Clerk. City Clerk's Office - File Copy City of Fayetteville, Arkansas Proposed Five Year Capital Improvements Program 2000 - 2004 VaS MICROFILMED CITY OF FAYETTEVILLE 2000 - 2004 Capital Improvements Program Compiled by: Kevin Crosson, Administrative Services Director Stephen Davis Budget Manager Kevin Springer, Financial Analyst Barbara Fell, Research Analyst CITY OF FAYETTEVILLE, ARKANSAS 2000-2004 CAPITAL IMPROVEMENTS PROGRAM TABLE OF CONTENTS INTRODUCTION/SUMMARY PAGE(S) Letter of Transmittal I -VI Program Directional Information VII -X CIP Project Cost Table XI Summary of Project Requests 1-3 Comprehensive Detail 4-7 AIRPORT FUND PROJECTS Airport Improvements: Priority Rankings 8 Project Details 9-17 PARKS DEVELOPMENT FUND PROJECTS Parks & Recreation Improvements. Priority Rankings 18 Project Details 19-35 SALES TAX CAPITAL IMPROVEMENTS FUND PROJECTS Fire Safety Improvements: Priority Rankings 36 Project Details 37-42 Police Safety Improvements: Priority Rankings 43 Project Details 44-54 Library Material Purchases & Improvements: Priority Rankings 55 Project Details 56-57 Parks & Recreation Improvements: Priority Rankings 58 Project Details 59-73 Bridge and Drainage Improvements: Priority Rankings 74 Project Details 75-79 • • • • PAGE(S) In -House Street & Sidewalk Improvements. Priority Rankings 80 Project Details 81-82 Street Improvements: Priority Rankings 83 Project Details 84-101 Transportation Improvements: Priority Rankings 102 Project Details 103-104 Water & Sewer Improvements: Priority Rankings 105 Project Details 106-112 Other Capital Improvements: Priority Rankings 113 Project Details 114-131 SHOP FUND PROJECTS Vehicles & Equipment: Priority Rankings 132 Project Details 133-141 WATER & SEWER FUND PROJECTS Wastewater Treatment Improvements: Priority Rankings 142 Project Details 143-148 Water & Sewer Improvements: Priority Rankings 149 Project Details 150-164 Water & Sewer Services Improvements: Priority Rankings 165 Project Details 166-169 PAGE(S) OTHER FUND PROJECTS Bond Fund - Water & Sewer Improvements: Priority Rankings 170 Project Details 171-174 C.D.B.G. Fund - Community Development Improvements: Priority Rankings 175 Project Details 176-182 General Fund - Street Improvements. Priority Rankings 183 Project Details 184 Off -Street Parking Fund - Off -Street Parking Improvements: Priority Rankings 185 Project Details 186-189 Solid Waste Fund - Solid Waste Improvements: Priority Rankings 190 Project Details 191-199 UNFUNDED PROJECTS 200-206 LISTING OF ACRONYMS 207 PROJECT INDEX 208-211 • • • • • FAYETTEVILLE THE CITY OF FAYETTEVILLE, ARKANSAS October 12, 1999 Members of the City Council and Citizens of Fayetteville It is my pleasure to present the Proposed 2000-2004 Capital Improvements Program (CIP) for the City of Fayetteville. The City began this very important and successful annual CIP process in 1988 to provide a focused plan identifying the City's infrastructure and capital needs and identifying the funding to meet those needs. Below is a table that lists planned expenditures by project category for the 2000-2004 CIP and lists the actual funds expended for the past five years 1994-1998. It is significant to note that with all the challenges faced by the City over the past few years, we have fulfilled approximately $73 million in capital and infrastructure needs. The completed improvements and those currently planned for the next five years, will help meet the needs of our current and future citizens as more pressure is placed on the City's infrastructure and capital assets due to the growth of our City and the region. Project Category Proposed Actual 2000-2004 1994-1998 Water & Sewer Improvements Street & Transportation Improvements Vehicles & Equipment Replacement / Expansion Parks & Recreation Improvements Off -Street Parking Improvements Airport Improvements Bridge & Drainage Improvements Fire Safety Improvements Community Development Police Safety Improvements Library Book Purchases and Improvements Solid Waste Improvements Other Capital Improvements Wastewater Treatment Plant Improvements/Expansion $ 24,817,000 20, 740, 000 8,690,000 6,850,000 6,564,000 3,486,000 3,042,000 2,121, 000 2,015,000 1,395,000 852,000 756,000 3,741,000 107,105, 000 $ 24,814,000 14,288,000 9,497,000 2,870,000 100,000 7,936,000 1,540,000 1,198,000 1,268,000 1,11 1,000 468.000 2,837,000 3,292,000 1,999,000 Total $ 192,174,000 $ 113 WEST MOUNTAIN 72701 501-521-7700 FAX 501-575-8257 73,218,000 The 2000-2004 CIP includes $192 million in planned capital improvements over the next five years or approximately $37.4 million more in projects than the 1999-2003 CIP contained. Most of the project additions are due to increased funding for a new wastewater treatment plant and improvements to the City's wastewater collection system ($39.5 million). In addition, there is increased funding in Community Development Improvements ($1.0 million) and Bridge & Drainage Improvements ($0.5 million). Other significant project category changes include reduced funding for Water & Sewer Improvements ($2.7 million), Airport Improvements ($5.7 million), Parks & Recreation Improvements ($0.6 million), Fire Safety Improvements ($0.5 million), and Vehicles & Equipment Replacement/Expansion ($0.3 million). The projects in this CIP are funded on a pay-as-you-go basis except for the Wastewater Treatment Plant Expansion project, which is proposed to be funded by bonds supported by either water & sewer revenues or a special revenue. Finally, improvements adopted in this CIP for the Airport, Parks & Recreation, Water & Sewer, Street, and Bridge & Drainage improvements have been reviewed and recommended by the Airport Board, Parks & Recreation Advisory Board, and City Council Street and Water & Sewer Committees respectively. Status of Projects Budgeted for 1999 The City has approximately $54.6 million in capital projects budgeted for 1999. The current status of the major projects budgeted for 1999 are listed below: Street, Drainage, and Transportation Improvements $ 13.8 million • Dickson Street Enhancements ($2.5 Million). The engineering contract was awarded in 1998 and design is currently underway. The construction bid is expected during the spring of 2000. • Highway 16 West Highway Widening ($1.8 Million). The project is a cost share ("50/50") with the AHTD for the widening of Highway 16 West from Highway 71 to approximately Meadowlands Drive. The City's share is estimated at $1,823,106 as approved by the City Council on January 19, 1999. Construction continues by Mobley Contractors. • Poplar Street Improvements ($1.0 Million). The project has been advertised and bids were opened June 10, 1999. The low bidder is Sweetser Construction at $845,816. The construction contract and the engineering contract for construction management (Milholland) were approved by the City Council July 6, 1999. • In -House Pavement Improvements ($0.8 Million). Approximately 90,000 square yards of asphalt has been laid with the following work to be completed this season: East from South to dead end, South from Archibald Yell to College, Elizabeth from Rolling Hills to Oaks Manor, Stagecoach from Oakcliff to dead end, Oakcliff from Elizabeth to Old Missouri, Longview from Plainview to College, and Drake from Villa to College. II • • • • • • Sixth Street Extension To East Huntsville Road ($0.8 Million). Project design is 95% complete. Currently $112,829 has been spent on easement purchases. Some revisions are proposed due to Right -of -Way (ROW) acquisition commitments. The storm drainage outlet and final drainage require further review. The bid advertising date is changing to early 2000 to match funds availability. • Rupple Road Area Improvements ($0.8 Million). Bids for the project were opened August 11, 1999. The low bidder is McClinton -Anchor at $658,900. The contract was approved at the September 7, 1999 City Council meeting. Construction is planned to begin in mid-October. • Londonderry Drainage Improvements ($0.6 Million). Bids were opened May 3, 1999 and approved by the City Council on June 1, 1999. The low bidder was Mobley at $433,361. All easements have been acquired, including the negotiated, reduced easement for the Lewis property. The City has given the Notice to Proceed to Mobley. • Old Missouri Road / Zion Road Intersection ($0.6 Million). Project bids were opened February 11, 1999. The City Council awarded the contact to Tomlinson Asphalt on March 2, 1999 for $484,949. Construction of the street and drainage improvements are progressing. Construction is approximately 70% complete. • Sycamore Street - Leverett To Garland ($0.6 Million). Final plans for the intersection work have been approved. Bids were opened August 24, 1999. The low bidder is Sweetser Construction at $522,695. The construction contract and the engineering contract for construction management / inspection were approved at the September 7, 1999 City Council meeting. • Sidewalk Improvements ($0.5 Million). This is an on-going project repairing and adding sidewalks. Recent work includes 400 linear feet of sidewalk on South College from Archibald Yell to South Street and 200 linear feet of new sidewalk, one approach, and one access ramp at Meandering Way in the Boardwalk Subdivision. Current work includes removing and replacing sidewalk on Lafayette from Campbell to Highland. Water & Sewer Improvements $17.8 million • Highway 265 - Water & Sewer Relocations ($4.0 Million). The contract with RJN was approved by the City Council on March 2, 1999. The design time requirements have been discussed and the proposed date of construction completion for the southern 1/3 (Phase I) is December 20, 1999. The northern 2/3 (Phase II) is being designed and the bid opening will be in December, 1999 with completion planned for July, 2000. • Wastewater Treatment Plant Expansion ($3.6 Million). 316 acres of land has been purchased for the new wastewater treatment plant and is in the process of being annexed. • Sanitary Sewer Rehabilitation ($2.6 Million). The engineering and construction contracts for sanitary sewer system rehabilitation planned for 1999 have been awarded. III • Highway 45 East Pump Station & Elevated Tank ($1.2 Million). This project is divided into three sub -projects which consist of the elevated tank, the booster station, and the water line. The water line, tank, and booster stations are substantially complete. • Ultraviolet Disinfection System ($1.1 Million). The contract was awarded at the February 16, 1999 City Council meeting. The system was placed into service in August, 1999. • Wastewater Treatment Plant - Engineering ($1.0 Million). Engineering firms have been selected and the contracts are currently under negotiation, for award during the first quarter of 2000. • Wastewater Collection System - Engineering ($1.0 Million). Engineering fines have been selected and the contracts are currently under negotiation, for award during the first quarter of 2000. • Highway 16 West Water/Sewer Relocation ($0.7 Million). The bids were opened May 3, 1999 and approved by the City Council on May 4, 1999. The low bidder was Northwest Excavation (Nabholz) at $601,076. Construction began in mid-May, 1999 and should be completed in October, 1999. • Dickson Street - Water & Sewer Relocations ($0.5 Million). The project is for improvements to Dickson, East, and Block Streets. This is a cost share project with partial reimbursement from Federal funding. The water and sanitary sewer improvements are under construction. The design on the storm drainage has not been submitted. Other significant projects: • Town Center / Parking Garage ($8.3 Million). The construction contract for the Fayetteville Town Center was approved and awarded to Nabholz Construction Company at the August 3, 1999 City Council meeting. Notice to proceed has been given and construction is currently underway. • Building Improvements ($1.0 Million). The City Administration Building HVAC project is complete. Airworks is currently fine tuning some aspects of the system. • Fire Station #4 - Expansion ($0.6 Million). Heckathorn Construction was awarded the construction contract at the February 2, 1999 City Council meeting. Construction is underway with an estimated completion time of early November, 1999. • Fire Station #6 - Expansion ($0.6 Million). The project is complete and the assigned firefighters have taken residency. The grand opening for the station was held on October 4, 1999. IV s i • Significant Chances from the Prior Year Capital Improvements Program • i The significant changes to the 2000 projects included in the CIP are: Add Add Add Add Add Add Decrease Decrease Decrease Decrease Delete Delete Delete Delete Increase Increase Move Move Move Rebudget Highway 62 West - Water Line Replacement Pavement Maintenance & Rehabilitation Garland Avenue - Water & Sewer Relocations Ernest Lancaster Drive Extension Tennis/Basketball Surface Renovation Container Maintenance Building Water & Sewer Cost Sharing Project for Family Violence - Expansion Old Missouri Road Street Improvements Sanitary Sewer Rehabilitation Harold Street - Stubblefield to College Sludge Dewatering / Drying System T -Hangar Apron Area Resurfacing Terminal Area Improvements Ark. Research & Technology Park Improvements T -Hangar Unit Expansion Steele Property Street Improvements from 2003 Lake Sequoyah Bridge Improvements to 2002 Shiloh Drive Extension to potential list Sixth Street Improvements from 1999 $ 796,000 562,000 540,000 487,000 260,000 200,000 (125,000) (135,000) (150,000) (1,110,000) (348,000) (400,000) (964,000) (1,089,000) 1,070,000 300,000 300,000 (250,000) (736,000) 1,300,000 Unfunded Projects The unfunded projects list contains projects that have been identified as needed without an identified funding source. The value of the unfunded projects list has increased from $55.7 million in the 1999-2003 CIP to $72.2 million for the 2000-2004 CIP. The increase in unfunded projects is primarily attributed to the addition of the New Central Library Building project. Conclusion The CIP is a planning tool for infrastructure and other capital improvements which prioritizes projects and schedules them for completion as soon as practical. The City advocates a primarily pay- as-you-go policy. This policy requires difficult decisions to be made regarding the timing and scope of capital improvements. Some projects simply have to wait. The CIP is a five year plan that may be updated and / or revised on an annual basis to reflect changing priorities, to renew existing priorities, and to revise cost estimates. The funding requests for the projects planned for 2000 will be incorporated in the 2000 budget submitted for Council approval in November, 1999. Finally, let me express my sincere thanks to the members of City staff, the City Council, various committees, and the community for the significant effort and input that has helped to shape this document. Respectfully submitted, Fred B. Hanna Mayor VI • • • • • • CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM DIRECTIONAL INFORMATION Introduction The Capital Improvements Program (CIP) for the City of Fayetteville examines the infrastructure and capital needs of the City for the next five years. The CIP maybe reviewed and updated on an annual basis to reflect the changing needs of the community and changes in available monies for financing capital projects. The City's philosophy concerning the use of the CIP is that it should be considered as a financial planning tool that lists the City's capital improvement projects, places the projects in a priority order, and schedules the projects for funding and implementation. The CIP should be further considered as a major policy tool for the Mayor and City Council. Financing The City finances capital improvements on essentially a pay as you go basis utilizing revenue from the 1% City sales tax adopted in 1993, the 1% Parks Development (Hotel, Motel, Restaurant) sales tax adopted in 1996, and operating revenues from the Airport, Shop, Water & Sewer, and Solid Waste funds. Based on a resolution approved by the City Council, prior to the passage of the sales tax, a minimum of 75% of the sales tax revenues will be used to assist in funding capital projects. In addition, long-term debt is considered and utilized only when the City faces a project that is of such importance and sufficient financial magnitude as to warrant a bond issue. The CIP is not a financing document in and of itself. Rather, the CIP is utilized as a planning document that places projects in the annual budget whereby funds are appropriated for them by the City Council. Prior to actual initiation of project work, required contracts are presented to the Mayor or City Council, as appropriate, for final approval of expending funds. What Protects Are in the CIP Projects and their cumulative component areas totaling $10,000 or more should be included in the CIP. Projects costing less than $5,000 are not considered capital and are funded through program operating budgets. Projects that cost between $5,000- 10,000 are handled through the budget process. Attempts will be made to fund these capital items through operating funds. Projects in the CIP can include: • obligations for labor and materials and contractors involved in completing a project, • acquisition of land or structures, • engineering or architectural services, professional studies, or other administrative costs, • expenses for City vehicles and equipment, and • renovating or expanding City facilities, grounds, or equipment. VII Project Cost Determination All projects are first costed in current or 1999 dollars. Then a determination of the year the project is expected to start is made. Finally, determination of the projected cost of the improvement is made by referring to the "Project Cost Table" that provides the inflation multiplier to be used for the project in the anticipated year. Priority Selection of Projects The adopted CIP will rely on priorities defined by the Mayor, City Council, Community, and City staff. As always, cnteria such as government imposed mandates, usefulness to the community, and impact on operational expenses will be reviewed in establishing priorities. A priority ranking is assigned to each project by year and by funding source. Projects for which no funding is projected to be available will be placed on an "Unfunded Projects List", which will identify the cost of the project in 1999 dollars. This list identifies the project as being viable, but one for which no funding is presently available. Unfunded projects may be funded if actual revenue is above projected revenue, if costs on funded projects is below budget, or if another funding source is identified. The Parks and Recreation Advisory Board, Airport Board, City Council Street Committee, and City Council Water & Sewer Committee meetings have been held to obtain committee and public input and guidance regarding parks, streets, bridge and drainage improvements, and water and sewer improvements planned for the next five years. Impact on Operations Cost The majority of the projects planned in the CIP will have a minor impact on operational budgets. Most of the projects planned over the next five years replace high maintenance water lines, sewer lines and street segments. Performing reconstruction of these items will free up maintenance budgets to address areas that currently have a lesser priority. There are a few projects that will have a significant impact on operational budgets. The most significant of these projects are listed below: • Vehicles & Equipment: The vehicles and equipment planned for 2000 in the Shop Fund will cost user divisions approximately $141,000 annually. The user divisions are charged monthly replacement and maintenance charges. These charges help to escrow funds for replacement units when the vehicle has become obsolete or is no longer suited for service. • The In -House Pavement Improvements Project will reduce maintenance costs for each street that is overlaid. In addition, this project is projected to save the City more than $100,000 annually over contract pricing for the same work. • The TCA Cable Building Renovation Project will increase operational costs by $35,000 annually for additional utility and janitorial expenses. VIII • • • • • • Organization of the Capital Improvements Program Document The document is organized into three (3) primary sections as follows: Introduction/Summary This section contains the transmittal letter from the Mayor, a CIP overview, and several summary schedules which explain the resources and uses for the CIP. The most detailed schedule is the Comprehensive Detail, which lists the individual projects, their funding sources, and the year in which they are planned to be initiated. II. Project Details by Funding Source This section of the document is actually found in six separate tabs, which are broken into the primary sources for the projects. The six tabs are as follows: (1) Airport Fund, (2) Parks Development Fund, (3) Sales Tax Capital Improvements Fund, (4) Shop Fund, (5) Water & Sewer Fund, and (6) Other Funds. Each section includes a priority listing of projects by project type and by year The priority listing for each year will be denote with an asterisk (*) if the project is a continuing project from the prior year. In addition, a project detail is included for all projects. This detail will provide specific information about each project including: the project title, funding source(s), year(s) the project is scheduled, a project description and justification, project status, and the impact of the project on operations. A visual aid is included for the project if appropriate and available. lll Unfunded Projects This section of the document contains all of the projects which are outside of the five year plan. The CIP document compilation process involves a review of all projects and resources during each update. Every attempt is made to identify as many current and anticipated projects as possible. Resources available are then matched up with as many project requests as possible. Unfortunately, there continue to be significantly more project requests than resources available. This has resulted in an extensive Unfunded Projects List totaling almost $72.2 million. All projects on this list are considered to be viable projects for which no current funding exists. Capital Improvement Policy The CIP is approached as a valuable tool to be used in the development of responsible and progressive financial planning. The program is developed in accordance within the financial policies of the City. The policies and the CIP form the basis for making various annual capital budget decisions and support the City's continued commitment to sound, long range financial planning and direction. The City's official Capital Improvement Policy is as follows: IX