HomeMy WebLinkAbout91-98 RESOLUTION• • DOCUMENT 00500 CONTRACT • THIS AGREEMENT, made and entered into on the 7fti day of J c. l y 1998, by and between John P. Marinoni Construction Company. Inc. herein called the Contractor, and the City of Fayetteville, Arkansas, hereinafter called the Owner: WITNESSETH: That the Contractor, for the consideration hereinafter fully set out, hereby agrees with the Owner as follows: 1. That the Contractor shall furnish all the materials, and perform all of the work in manner and form as provided by the following enumerated Drawings, Specifications, and Documents, which are attached hereto and made a part hereof, as if fully contained herein and are entitled Fueling Facility Imnrovements Phase II Fuel Farm. Fayetteville Municipal Airport, dated April, 1998. a Advertisement for Bids Instructions to Bidders Bid and acceptance thereof Performance Bond SHEET INDEX Sheet No. 1 2 3 4 5 6 7 8 9 10 11 Payment Bond General Conditions Supplemental Conditions Specifications Drawings (See Sheet Index below) Description Cover Project Layout Plan Enlarged Site Plans Foundation and Pavement Details Piping Plan, Sections, and Details Tank Details Details Details Closure Plan for Existing Fuel Farm Electrical Site Plan and Details Electrical Control Plan 2. That the Owner hereby agrees to pay to the Contractor for the faithful performance of this Agreement, subject to additions and deductions as provided in the Specifications or Bid, in lawful money of the United States the amount of: Five -hundred seventeen thousand one -hundred thirty Dollars ($ 517.130 ), said amount being the sum of the base bid, less the proposed amount of Deductive Alternate Proposal No. 1. FY962146 00500- 1 r • • 3. The Work will be substantially completed within 150 days after the date when the Contract Time commences to run as provided in Notice to Proceed, and completed and ready for final payment in accordance with the General Conditions within 180 days after the date when the Contract Time commences to run. 4. Liquidated Damages: Owner and Contractor recognize that time is of the essence of this Agreement and the Owner will suffer financial loss if the Work is not completed within the times specified in above, plus any extensions thereof allowed in accordance with the General Conditions. They also recognize the delays, expense, and difficulties involved in proving the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty) Contractor shall pay Owner Five Hundred Dollars ($500.00) for each day that expires after the time specified in Paragraph 3 for Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the time specified in Paragraph 3 above for final payment or any proper extension thereof granted by Owner, Contractor shall pay Owner Five Hundred Dollars ($500.00) for each day that expires after the time specified in Paragraph 3 for completion and readiness for final payment. 5. That within 30 days of receipt of an approved payment request, the Owner shall make partial payments to the Contractor on the basis of a duly certified and approved estimate of work performed during the preceding calendar month by the Contractor, LESS the retainage provided in the General Conditions, which is to be withheld by the Owner until all work within a particular part has been performed strictly in accordance with this Agreement and until such work has been accepted by the Owner. 6. That upon submission by the Contractor of evidence satisfactory to the Owner that all payrolls, material bills, and other costs incurred by the Contractor in connection with the construction of the work have been paid in full, final payment on account of this Agreement shall be made within 60 days after the completion by the Contractor of all work covered by this Agreement and the acceptance of such work by the Owner. 7. It is further mutually agreed between the parties hereto that if, at any time after the execution of this Agreement and the Surety Bond hereto attached for its faithful performance and payment, the Owner shall deem the Surety or Sureties upon such bond to be unsatisfactory or if, for any reason such bond ceases to be adequate to cover the performance of the work, the Contractor shall, at his expense, within 5 days after the receipt of notice from the Owner, furnish an additional bond or bonds in such form and amount and with such Surety or Sureties as shall be satisfactory to the Owner In such event, no further payment to the Contractor shall be deemed to be due under this Agreement until such new or additional security for the faithful performance of the work shall be furnished in manner and form satisfactory to the Owner. 8. No additional work or extras shall be done unless the same shall be duly authorized by appropriate action by the Owner in writing. FY962I46 00500-2 - .. IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the day and date first above written, in three (3) counterparts, each of which shall, without proof or accounting for the other counterpart be deemed an original Contract. SEAL: WITNESSES: John P. Marinoni Construction Co.. Inc. CONTRACTOR ByVd/Q-��an"� Title CITY OF FAYETTEVILLE, ARKANSAS ATTEST: OWNER A/Izeirge Clerk Approved as to form: FY962I46 By Attorney for Owner An, Fred Hanna, Mayor 00500 - 3 • CHANGE ORDER No. 1 Date: 7- 7— 9"8 ENGINEER'S PROJECT NO. FY962146 • PROJECT: Fueling Facility Improvements - Phase II. Fayetteville Municioal Airport Fuel Farm CONTRACTOR: John P. Mannon' Construction Co.. Inc. Contract for $517.130.00 Contract Date: TO: John P. Marinoni Construction Co.. Inc. Contractor You are directed to make the changes noted below in the subject Contract: City of Fayetteville By: Owner Nature of the Changes: 1. Substitute a skid -mounted, factory -assembled fueling system for the built -in-place system shown in the Contract Documents; 2. Reduce the scope of electrical work by eliminating trenching duplication, using native soil backfill vs. Class 7 base (except under paved traffic areas), and narrowing the grounding circuit trench width; 3. Reduce the concrete slab work commensurate with item 1, above; and 4. Replace the catwalk structure with individual ladder/platform access systems for each fuel tank. Justification: In order to optimize the fueling operation and to decrease the initial cost of the project These changes result in the following adjustment of Contract Price and Contract Time. CONTRACT PRICE prior to this Change Order: Estimated Decrease Resulting from this Change Order: Estimated CONTRACT PRICE Including this Change Order: C:\W OR K06\9614610a1. $ 517.130 $ (29.300) $ 487.830 • Substantial Completion Time Prior to This Change Order: 150 Calendar Davg Final Completion Time Prior to This Change Order: 180 Calendar Days Net Time Change Resulting From This Change Order: a. Substantial Completion: No Chancie b. Final Completion: No Chanae Current Contract Completion Dates Including This Change Order: a. Substantial Completion: b. Final Completion: The Foregoing Changes Are Recommended: The Foregoing Changes Are Accepted: The Foregoing Changes Are Approved: 150 calendar dans 180 calendar days McCLELLAND C NSULTING ENGINEERS, INC. • Date: 1998 John P. Marinoni Construction Co.. Inc. By: (>/c.4.7/')2 7a + - / f Date: 1998 CITY OF FAYETTEVILLE By: Date: Sfn y 7 1998 City of Fayetteville, Arkansas Budget Adjustment Form Budget Year 1998 Department: General Government Division: Airport Program: Airport Capital Date Requested 06/25/98 Adjustment # Project or Item Requested: Additional funding is requested for the Fuel Farm Replacement Project on Drake Field. Project or Item Deleted: The funding proposed for this project is from project # 97048, Safety Area Maintenance & Drainage, project #97051, General Aviation Terminal Renovation and a portion of project # 98055, Baggage Belt Replacement. Justification of this Increase: The project is needed to comply with federal environmental - 'regulations that become effective in December 1998. Justification of this Decrease: The Fuel Farm Replacement Project is a higher priority than the other projects. Account Name Fixed Assets Account Name Buildings & Grounds Maintenan Building Costs Buildings & Grounds Maintenan Increase Expense (Decrease Revenue) Amount Account Number 272,313 5550 3960 5801 00 r .rw�gk..a r Project Number 97050 1 Decrease Expense (Increase Revenue) Amount 163,266 90,000 Account Number - 5550 3960 5550 3960 5550 3960 Approval Signatures Requested B udget Coordinator Department Director Date Date Date Admin. S is s Director Date 441414^c/ dg1/1 Mayor Date 5400 00 5804 00 Project Number 97048 r 1 97051 1 98055. 1 Date of Approval Posted to General Ledger Posted to Project Accounting Entered in Category Log 1Budget Office Use Only • wH1 E' Blue Copy.' Budget & Research / Yellow Copy: Requester C: IAPP198BUDIFUELFARM.WK4 • STAFF REVIEW FORM AGENDA REQUEST X CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Council meeting of N/A FROM: Dale Fredenck Name Airport General Gvntt. Division Department ACTION REQUIRED: The Airport requests approval of and the Mayor's signature for Contract Change Orders 2, 3, and 4 with John P. Marinoni Construction Co. for the Fuel Farm Replacement. Change Order #2 increases the contract by $221.00 to cover the cost of equipment to meter the irrigation service. Change Order #3 is an increase of $590.00 to provide additional protection to petroleum piping. Change Order #4 is a net decrease of 551.00 to the original contract. Change order #4 reflects a cost savings of $1,300.00 which resulted from using a lower-priced equipment design to maintain a constant operating temperature environment for a monitoring system. Part of this savings will be utilized to cover the cost of installing additional needed safety equipment. The net cost of all three of these change orders is $760.00. Resolution No. 91-98 passed and approved on July 7, 1998, provides for a contract contingency of $48,783.00 for this project, and an approved budget adjustment provides for the funding. COST TO CITY: $76 Doo Cost of this Request 5550-3960-5801.00 Account Number 97050 Project Number S 562.212.00 Category/Project Budget S 521974.00 Funds used to date S 40.238.00 Remaining Balance Fuel Farm Replacement Category/Project Name Fixcd Asset Program Name Airport Fund BU Budget Coordinator X Budgeted Item Administrative Services Director CONTRACT/ T/LEASE REVIEW: ,.bi/ 2— '49 2 a r1 ate s-91 Purchasing Officer Date Budget Adjustment Attached GRANTING AGENCY: YD ZC rdinator ,Lf o eL Irtthmal Auditor 468 Date -(4- r Date STAFF RECOMMENDATION: Staff recommends approval of three change orders. Division Head Date ervices Director Date n; �il•:a A Date Cross Reference New Item: YesNo Pre. Ord/Res#:'J n\ 1 Orig Cont. Date: • • • STAFF REVIEW FORM Page 2 Description: Meeting Date: N/A Change Order 2, 3, and 4 for John P. Marinoni Construction Co.Inc. Comments: Budget Coordinator Reference Comments: Accounting Manager Reference Comments: City Attorney Reference Comments: Purchasing Officer Reference Comments: ADA Coordinator Reference Comments: Internal Auditor Reference Comments: FAYETTEVILLE THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE TO: FRED HANNA, MAYOR FROM: DALE FREDERICK, AIRPORT MANAGE DATE: JANUARY 31,1999 SUBJECT: CHANGE ORDERS 2, 3, AND 4 for the Fuel Farm Replacement The Airport requests approval of and the Mayor's signature for Contract Change Orders 2, 3, and 4 with John P. Marinoni Construction Co. for the Fuel Farm Replacement. Change Order #2 increases the contract by $221.00 to cover the cost of equipment to meter the irrigation service. Change Order #3 is an increase of $590.00 to provide additional protection to petroleum piping. Change Order #4 is a net decrease of $51.00 to the original contract. Change Order #4 reflects a cost savings of $1,300.00 which resulted from using a lower-priced equipment design to maintain a constant operating temperature environment for a monitoring system. Part of this savings will be utilized to cover the cost of installing additional needed safety equipment. The net cost of all three of these change orders is $760.00. Resolution No. 91-98 passed and approved on July 7, 1998, provides for a contract contingency of $48,783.00 for this project, and an approved budget adjustment provides for the funding. DF/bjm Attachments: Contract Review Form Four originals of Change Order 2, 3, 4. • • CHANGE ORDER NO. 2 PROJECT: DRAKE FIELD FUEL FARM PROJECT NUMBER: FY962146 CONTRACT DATE; 7/7/98 DATE OF ISSUANCE: 10/06/98 EFFECTIVE ON DATE APPROVED BY OWNER OWNER CITY OF FAYETTEVILLE CONTRACTOR: MARINONI CONSTRUCTION Reason for Change: IRRIGATION SERVICE MUST BE METERED Change: 1. INSTALL METER SET/METER BOX ON IRRIGATION LINE CHANGE IN CONTRACT PRICE Original Price: $517,130.00 I CHANGE IN CONTRACT TIMES Original Contract Times Substantial Completion (days):150 Ready for final payment (days):180 Net Changes from previous Amendments or Changes: 429,300.00 Net Changes from previous Amendments or Changes: Substantial Completion (days):0 Ready for Final Payment (days):0 Net Increase for this Change: +$221.00 Net Increase (Decrease) for this Change: Substantial Completion (days): 0 Ready for final payment (days): 0 Revised Contract Price: $488,051.00 Revise Contract Times: Substantial Completion (days): 150 Ready for final payment (days): 180 Revised Completion Dates: Substantial Completion: 12/30/98 Ready for final payment: 1/29/99 RECOMMENDED: By: `kl/GL4GrI"e+-� McClelland Consulting Engineers, Inc. Engineer Date: 141/94 ACCEPTED: By: MARINONI CONSTRUCTION Contractor Date: is a ca• APPROVED: By: TY OF F • YETTEVILLE Owner CHANGE ORDER NO. 3 PROJECT: DRAKE FIELD FUEL FARM PROJECT NUMBER: FY962146 CONTRACT DATE: 7/7/98 DATE OF ISSUANCE: 10/06/98 EFFECTIVE ON DATE APPROVED BY OWNER OWNER: CITY OF FAYETTEVILLE CONTRACTOR: MARINONI CONSTRUCTION Reason for Change: PROTECTION OF PETROLEUM PIPING Change: 1. INSTALL TWO 4" BOLLARDS LOCATED AS SHOWN ON ATTACHED SHEET. CHANGE IN CONTRACT PRICE Original Price: $517,130.00 CHANGE IN CONTRACT TIMES Original Contract Times Substantial Completion (days):150 Ready for final payment (days):180 Net Changes from previous Amendments or Changes: -$29,079.00 Net Changes from previous Amendments or Changes: Substantial Completion (days):0 Ready for Final Payment (days):0 Net Increase for this Change: +$590.00 Net Increase (Decrease) for this Change: Substantial Completion (days): 0 Ready for final payment (days): 0 Revised Contract Price: $488,641.00 Revise Contract Times: Substantial Completion (days): 150 Ready for final payment (days): 180 Revised Completion Dates: Substantial Completion: 12/30/98 Ready for final payment: 1/29/99 RECOMMENDED: By: `61044 Cass McCle land Consulting Engineers, Inc. Engineer / Date: I !aI/9/ ACCEPTED: B MAR NI CONSTRUCTION Contractor Date: leas' 4Y APPROVED: By: Date: r- • • T.O.C. 1249.35 SAW CUT EXISTING ASPHALT T.O.W. T.O.C. 1249.25 1251.93 1249.7 w ce • GR T.O.C. C F\196)19(0 Le po v of Z BoLIAJJS CH/W(E °R ER flD. 3 •lo/6(9$ pis t • • • CHANGE ORDER NO. 4 PROJECT: DRAKE FIELD FUEL FARM PROJECT NUMBER: FY962146 CONTRACT DATE; 7/7/98 DATE OF ISSUANCE: 11/06/98 EFFECTIVE ON DATE APPROVED BY OWNER OWNER: CITY OF FAYETTEVILLE CONTRACTOR: MARINONI CONSTRUCTION Reason for Change: COST SAVINGS BY USE OF ALTERNATE EQUIPMENT AND INSTALLATION OF ADDITIONAL SAFETY FEATURE. Change: 1. Utilize "Hoffman" heated and ventilated enclosure in place of "cool cell" to maintain operating temperature of monitoring system. Contract decrease of $1300. 2. Install timer systems on avgas and jet fuel pumps to prevent damage to pumps from inadvertently being left on. Contract increase of $1,249. CHANGE IN CONTRACT PRICE Original Price: $517,130.00 CHANGE IN CONTRACT TIMES Original Contract Times Substantial Completion (days):150 Ready for final payment (days):180 Net Changes from previous Amendments or Changes: -$28,489.00 Net Changes from previous Amendments or Changes: Substantial Completion (days):0 Ready for Final Payment (days):0 Net Increase for this Change: -$51.00 Net Increase (Decrease) for this Change: Substantial Completion (days): 0 Ready for final payment (days): 0 Revised Contract Price: $488,590.00 Revise Contract Times: Substantial Completion (days): 150 Ready for final payment (days): 180 Revised Completion Dates: Substantial Completion: 12/30/98 Ready for final payment: 1/29/99 RECOMMENDED: By: McClelland Consulting Engineers, Inc. Engineer Date: I/4/` i ACCEPTED: By MARINONI CONSTRUCTION Contractor Date: l - e741. -9f APPROVED: By: Date: FAYETTEVILLE THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE To: Dale Frederick, Airport From: Heather Woodruff, City Clerk Date: February 24, 1999 Attached is a copy of the completed staff review form and change order number 2, 3, and 4 for the contract with Marinoni Construction for the Fuel Farm Rehabilitation project. I am also returning three original of each change order for you to distribute. The original will be microfilmed and filed with the City Clerk. cc. Internal Auditor File • • /YJB i2/4r/O' / • STAFF REVIEW FORM _ ___ AGENDA REQUEST XX CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Council meeting of N/A CNNAo set, pmcfa ft3 FROM: Dale Frederick Name Airport General Gvmt. Division Department ACTION REQUIRED: The Airport staff requests approval and Mayor's signature for: Change Order #5 and #6 to Contract #658 with John P. Marinoni Construction Co.. and Amendment #3 to Task Order #2 to Contract #531 with McClelland Consulting Engineers, Inc. All three of these charges are for the Fuel Farm Replacement Project. Change Order #5 and #6 increase Marinoni's contract by $5,925.00 to cover the cost of construction which provides additional clearance in the refueller basin. Amendment #3 to McClelland Consulting Engineers' contract would decrease future city payments made to their company by the amount of $5,925.00. COST TO CITY: $ -0- Cost of this Request 5550-3960-5801.00 Account Number 97050 Project Nmnber $ 562,212.00 Category/Project Budget $ 524.234,00 Funds used to date $ 37978.00 Remaining Balance Fixed Assets Category/Project Name Capital Program Name Airport Fund BUDGET REVIEW: Budget Coordinator Budgeted Item Administrative Services Director Budget Adjustment Attached CONTRACT/GRANT/LEASE REVIEW AA/WA/ ,5- IA 49 1X • ...b ` (tel Date City Attorney v Date Inti al Auditor GRANTING AGENCY. • a • C • rdina ;Jr WI 111 I Purchasing Officer Date 1J Date STAFF RECOMMENDATION: Staff recommends approval of Change Orders #5 and #6 and Amendment #3.. rvices Director Date Date 1 Date Cross Reference New Item: Yes No Prev. Ord/Rcs#: _3-97/91-98 Orig Cont. Date: 8-30-95/7-7-98 • • STAFF REVIEW FORM Page 2 Description. Meeting Date: N/A Change Order #5 and #6 for John P. Marinoni Construction Co. Inc. Amendment #3 to Task Order #2 for McClelland Engineers Comments: Budget Coordinator Reference Comments: Accounting Manager Reference Comments: City Attorney Reference Comments: Purchasing Officer Reference Comments: ADA Coordinator Reference Comments: Internal Auditor Reference Comments: FAYETTEVILLE THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE TO: FROM: DATE: SUBJECT: FRED HANNA, MAYOR DALE FREDERICK, AIRPORT MANAGER APRIL 28, 1999 CHANGE ORDER #5 AND #6 TO JOHN P. MARINONI CONSTRUCTION CONTRACT AND AMENDMENT #3 TO TASK ORDER #2 FOR MCCLELLAND CONSULTING ENGINEERS. The Airport staff requests approval and Mayor's signature for: Change Order #5 and #6 to Contract #658 with John P. Marinoni Construction Co., and Amendment #3 to Task Order #2 to Contract #531 with McClelland Consulting Engineers. All three of these requests pertain to the Fuel Farm Replacement Project. Change Order #5 and #6 increase Mannoni's contract by $5,925.00 to cover the cost of construction which provides additional clearance in the refueller basin. Amendment #3 to McClelland Consulting Engineer's contract would decrease the City's payments made to their company by the amount of $5,925.00. Because of required design modifications, McClelland has agreed to reimburse the City for the cost of the change orders requested by Marinoni Construction Company by crediting future payment requests for their remaining earned revenues for engineering services on this project up to the $5,925.00. DF/bjm Attachments: Contract Review Form Three Originals of Change Order 5 Three Originals of Change Order 6 Three Originals of Amendment #3 to Task Order #2 1 AMENDMENT #3 TO TASK ORDER NO. 2 AGREEMENT WITH McCLELLAND CONSULTING ENGINEERS. INC. This is an amendment to the Agreement for Engineering Services dated the 301h day of August, 1995, between the City of Fayetteville, Arkansas, and McClelland Consulting Engineers, Inc.. Additional costs have been incurred to modify the fuel loading ramp to accommodate the Fixed Base Operator's fueling trucks. The Engineer has agreed to reimburse the Owner (City of Fayetteville) for these additional construction costs in the following amounts: • Modification No. 1 • Modification No. 2 Total for this Amendment $ 1,513.00 $ 4.412.00 $ 5,925.00 The Contractor (Marinoni Construction Company) is to be paid for these modifications by the City under Change Orders No. 5 and No. 6. The City is then to be reimbursed by McClelland Engineers through a credit of $5,925.00 being applied to future billings for engineering services for this project. CITY OF FAYETTEVILLE M yor C:\data\96\962146#3-TO4-14: sr Date: j%/11- McCLELLAND CONSULTING ENGINEERS, INC. Company President C:\data\96\962146#3-TO4-14:sr Date: 4/TA fie FOR OFFICE USE ONLY Existing P.O. # Contract #