HomeMy WebLinkAbout31-98 RESOLUTIONRESOLUTION NO 31- 9 8 A RESOLUTION APPROVING A RECONCILIATION CHANGE ORDER NO. 3 FOR EDWARDS DESIGN & CONSTRUCTION IN THE AMOUNT OF $29,119 FOR FINAL PAYMENT; APPROVING AGREEMENT FOR ENGINEERING SERVICE AMENDMENT NO. 2, WHICH SHALL NOT EXCEED $27,417, WITH CEI ENGINEERING; AND APPROVAL OF A BUDGET ADJUSTMENT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS - Section 1. That the City Council hereby approves Reconciliation Change Order No. 3 for Edwards Design & Construction in the amount of $29,119 for final payment, approves Agreement for Engineering Service Amendment No. 2, which shall not exceed $27,417, with CEI Engineering; and authorizes the Mayor and City Clerk to execute the change order and agreement for said amounts. A copy of above documents are attached hereto marked Exhibit "A" and made a part hereof. Section 7 The City Council hereby approves a budget adjustment in the amount of $30,000 increasing Capital Water Mains, Acct. No. 5400 5600 5808 00, Project No. 95040 by decreasing Capital Water Mains, Acct. No. 5400 5600 5808 00, Project 95038. A copy of the budget adjustment is attached hereto and made a part hereof. 7, -----comp AND APPROVED this day of March , 1998. 1:: i, t • ATTEST: By: Heather Woodruff, City Clerk APPROVED - By: 4fA‘kfrtet4-----" Fred Hanna, Mayor • AGREEMENT FOR ENGINEERING SERVICES AMENDMENT NO. 2 This is an amendment to the Agreement for Engineering Services for Wedington Drive Water & Sewer Relocations executed on the J 7 J -A day of /114r64 , 1998 between the City of Fayetteville, Arkansas and CEI Engineering Associates, Inc.. Additional services were required due to extra expenses incurred by CEI Engineering Associates, Inc. as a result of the contractor going past the Contract Times to complete the construction. The charge for the additional services shall not exceed $32,000.00, and will include all surveying, construction contract administration, and inspection, except that the following credits will be given to the City of Fayetteville: • subtract $1,542.50 for time related to changes in Water Line B west of Sang Ave. • subtract $1,148.00 for expenses related to the relocation of a fire hydrant. • subtract $1,892.50 for time related to the addition of a storm sewer and junction box. Thus the net charge for additional services shall not exceed $27,417.00. CITY OF FAYEFIEVILLE: Mayor CEI Engineering Associates, Inc. n tc 3 caotk awl 44 //� fj Cil A' c, Title Date 3-/7— 98 Date 211679 [RECEIVED FFR 9 0119'98` EXHIBIT A CHANGE ORDER No. 3 PROJECT Nedington Dr. Utilities Rel ocation PROJECT NO. 30961.0 DATE OF ISSUANCE EFFECTIVE DATE OWNERy of Fayetteville OWNER'S Contract No. 96-41 CONTRACTOR Edwards Design & Constriirt1on ENGINEER ('ET engineering Asscriates, Inc You are directed to make the following changes in the Contract Documents. Description: Reconcile units installed to contract amounts Reason for Change Order: See Attached Attachments: (List documents supporting change) Description & Unit price details CHANGE IN CONTRACT PRICE: Original Contract Price $ 1,091,455.50 Net changes from previous Change Orders No._to No. 2 $ 107,821.46 Contract Price prior to this Change Order $ 1,199,276.96 Net Increase(decrease) of this Change Order $ +29,119.00 Contract Price with all approved Change Orders $ 1,228,395.96 RECOMMENDED. APPROVED - By: d .ta..tYt 7i •-t By. CHANGE IN CONTRACT TIMES: Original Contract Times Substantial Completion- 120 Ready for final payment: 150 days or ares Net change from previous Change Orders No. 1 _to No. 2 2 ay, Contract Times prior to this Change Order Substantial Completion: 172 Ready for final payment: 202 aye or darn Net Increase (decrease) of this Change Order 39 dap Contract times with all approved Change Orders Substantial Completion: Ready for final payment: 211 241 aye o<aus amiss ACCEPTED: e By: Engineer (Authorized Signature) Owner (Aoiharved Signature) Date: 2/51i Date: 3'17-9 Date: WEDINGTON DRIVE UTILITIES RELOCATION PROJECT Change Order Number 3 Reconciliation Change Order Description As with all unit price contracts, a change order must be issued at the end of the project to reconcile the quantities actually installed to those which were estimated at the start of the project. This change order provides that reconciliation, adjusting quantities in the contract to those installed based on actual measurements in the field. In addition, several changes/modifications to the project have been required, or the Contractor encountered changed conditions in several areas. The Contractor accumulated these during the course of the project, rather than submitting them item by item as the project progressed. Each of these changes or modifications have been reviewed with the Owner's engineering department, quantities and unit prices agreed to, and in some cases the amount adjusted downward. The Engineer has verified these items at the site. These items are as follows. • Install pressure reducing valves at two locations where old valves were found to be not serviceable. The problems were raised by the property owners, who claimed that the City's overall project caused the valves to fail This was not in the Contractor's original scope of work. • Tie in farm house to 24 -inch main. Due to no fault of Contractor, Owner requested that this house be connected out of sequence of the work, causing additional expense. • Remove and replace a water line at the east side of Sang that was in conflict with the AHTD work. This was caused by the extremely tight working space among all utilities, as well as by some changes in the AHTD design after this project was designed. • Expose and check, at Owner's request, several existing pressure reducing valves that were thought to be dad, but which were found to be satisfactory. • Remove 42 -inch diameter casing at Lewis Street to allow for installation of new casing. The drawings called for the new casing, but no one was aware of the existing, substandard casing that would have to be removed before the new one could be constructed. This was a changed condition. • Expenses and lost time related to encountering gas in trench next to a converted service station on Garland Avenue. Contractor completed certain clean-up items at the Owner's request, and had standby time, and maintenance, mobilization, and demobilization expenses. This was a changed condition. • Revise pipe location and add fittings to water line B west of Lonnie Drive, due to telephone company installations. This was due to the slow progress of the telephone company at executing their new work and removing their old. This was a changed condition. • Cut and cap a 21/4 -inch diameter line at Vista Street. This water line was not known to exist at the time of the design and was discovered during construction. The work was executed by the Contractor at the Owner's request. • Remove existing storm sewer, construct new storm sewer and modify existing drop inlet as required. This work was required due to an undocumented storm sewer at the corner of Hall Street and Wedington. This project conflicted with the storm sewer, which had to be removed and relocated, necessitating the modification of the drop inlet. The Owner requested the Contractor to execute this work. • Remove and reinstall a fire hydrant that proved to be in the way of proposed AHTD storm sewer construction. This was a changed condition to the Contractor. • Improve and maintain ditches in the area of an undocumented storm sewer cross drain The work was required to prevent flooding of two residences. • Cut and remove undocumented 24 -inch diameter casing pipe to allow installation of a water service tap. This was a changed condition. • Remove gravel drive at the corner of Eva Street and Wedington and replace with sod. This work was executed at the request of the Owner. In addition, this Change Order includes two claims that the Owner has against the Contractor. • $259.00, for damages caused at 2330 Wedington Drive, which the Contractor had agreed to pay but never did. The Owner paid these claims and is back -charging the Contractor in this Change Order. • $998.00, for damage caused by the Contractor to the traffic light controller at the southwest corner of Wedington and Garland. Changes in Contract Price See the attached table of all unit price items, together will all changes from the originally estimated quantities. Changes in Contract Times 1. The Contract Time is extended by 15 days to account for extra time related to rock excavation. 2. The Contract Time is extended by 5 days to account for delays for ditch work in the Vista Road area 3. The Contract Time is extended by 6 days to account for abnormal weather conditions. 4. The Contract Time is extended by 13 days to account for time required for various items included in this Change Order. 5. These changes in Contract Time leaves the project Substantially Complete 183 days after the revised contract completion date. Included in this Change Order is an assessment of Liquidated Damages for 183 days at $200.00 per day. Change in c0 D 0 E Q (D0 .n m I r IA $ 742.00 1 O 0 mv 0 to (0 m 0 to (0 1n 6 01 w 0 o vi 0 $ (300.00) $ 749.00 1 0 0 0 0 03 ((0 03 $ 2,750.00 $ 1,875.00 I7 $ (575.00)1 0 1 w 69 1 IA 1 w 1 w w 1 w 1 w (03 1 w 1 w 1 w O 0 6 10 CO 0 0 6 v w w 1 $ 230.00 1 I w 1 $ (300.00)1 $ 275.00 w 1 -1 $ 200,00 $ 400.00 $ 200.00 $ (200.00) 5 -5 $ 100.00 $ 1,000.00 $ 500.00 $ (500.00) New 1 c O (D 1n 6 n (0 C) M 19 $ 1,325.001 00 0 O• v (0 10 19 03 ID (0 r V 01 19 $ 6,987.451 0 6 CO r M 0 0 O (0 C) 03 $ 186,774.001 0 0 0 0 N_ N W 0 0 0 0 O r r N 0 0 0 0 0 0 W $ 2,875.00 $ 350.00 0 0 N r N 03 0 0 6 v 0 Cli M $ 5,200.00 0 0 0 0 N f9 0 0 0 0 0) tD 03 0 0 0 0 m V f9 0 0 0 0 A M r {9 0 0 0 0 m <II f9 $ 1,700.00 1 0 0 O 0 N of W $ 2,600.001 $ 33,600.00 $ 11,050.00 $ 6,120.00 0 0 O ID O O 19 I $ 3,730.00 $ 575.00 0 0 O 0 C. n:Q r 0 1 $ 2,475.00 0 0 C 0 0 03 Original Amount $ 321,840.00 $ 583.00 $ 0 0 O N Q fA 0 0 N (0 N 19 7,200.00 0 O O 03 f9 fn (0 19 0 0 O 0 O u, N O W W $ 68,000.001 $ 8,250.00 0 0 ^ c0 f9I $ 3,450.001 $ 350.00 $ 275.00 $ 0 0 V m m W 5,200.00 $ 2,100.00 $ 16,900.00 $ 4,900.00 $ 13,750.00 $ 4,600.00 0 0 6 0 n r IA 1 $ 4,200.00 $ 2,600.00 $ 33,600.00 0 0 O 0 O ' f9 0 O O m O w IA 1 $ 10,450.00 $ 3,500.00 1 $ 575.00 0 O O O O M 1 $ 2,200.00 0 0 6 0 m e9 Unit I in U d 0 O (Ni n. 19 69 0 0 C) N(0 fA 0 (0 0 10 N m 19 0 0 N r i9 0 0 m M 0 0 (D IA $ 3.50 1 $ 6,800.00 $ 2,750.00 1 $ 625.00 $ 575.00 $ 350.00 $ 275.00 $ 3,280.00 $ 2,600.00 $ 2,100.00 0 0 O 0 ) 7- IA 0 0 O V N 19 $ 13,750.00 $ 2,300.00 0 0 0 0 r M 0 0 0 0 r 0 0 0 0 CO, r fR 0 0. 0 0 r 19 0 0 0 N W 0 0 0 v to, 0 0 1n m lA 0 0 10 M 111 N. 10 63 1 $ 300.00 $ 275.00 1 $ 450.00 ocation, Fayetteville Conl Detail of Unit Price Items, Final Quantities, and Final Changes l Change in Quantity CO a C) 01 'Cr r O N 7 to 0 O 0 r ? 1n 0 (n p N r l r C) r ' 0 0 0 0 0 0 0 0 0 0 0 0 0 r r 0 (p C 0 7 7 0 Actual 1 C (0 J Of 4493.48 25 0 r 6449.95 1 465.83 10 L- 0 0 1 533641 0) 'P t0 r 0 r r (h N r r N r N r (0 N r N 221 Cl ^ 0 r (0 Q 0 0 0) 1n 0) N Reconciliation Change Order I Plan Quantity 0^ y Q 12801 6450 480 0 0 r 53150 0 r C1 C1 r 10 r r C) N r r N, N r C) N N 0 N N N ^ 0 r COL 0 O 0 (D CO N N 0 1- N C Dto LF LF E LF 1 LF 1 LL J LL J LL J m J EA < LLWl < W < W < W < IL < W < W < W < 14111 < L111 < W V3 < W < Ill < W < LLLL1l LL J LL J ILF q w < W Q LLJ a LLl a W a W < LLl Description 24 -inch DI Pipe 16 -inch DI Pipe 12 -inch Water Main I 8 -inch Water Main I 6 -inch Water Main 4 -inch Water Main 2 -inch Water Main Ductile Iron Fittings 24 -inch Butterfly Valve 12 -inch Butterfly Valve 8 -inch Gate Valve 6 -inch Gate Valve 4 -inch Gate Valve 2 -inch Gate Valve 3 -inch AirNacuum Valve 2 -inch AlrNacuum Valve 1 -inch AirNacuum Valve ,24x20 -inch Tap 24x8 -inch Tap 16x16 -inch Tap 6 N H L o co _ N 0. 01aF L C CO N 01 r L U '- 0% 16x6 -inch Tap c T S LL 124 -inch Steel Casing 16 -inch Steel Casing 142 -inch Split Steel Casing 13/4 -inch Water Service 11 -inch Water Service 1Single Meter Set 1Double Meter Set 1Cut & Cap 16 -inch 1Cut & Cap 12 -inch Cut & Cap 8 -inch E W O Z r N 10 Q N 0 A COm m O r N C) V (0 up n. n. no N r m 0 N r' N N N M N 24 N N N N r- N 03 N 29 0 C) Cl N (7 33 V M CI 0 o O O'0i ... 0 r M $ (725.00)1 o 0 O r 03 0 6 61 0 N W $ (4.725.00)1 $ 80.00 19 $ (130.00) $ (372.00)1 1 $ r M r 69 r 01 0 0 O N n Q 4111 0 o N CO NI 10 CO $ 2,060.001 1 49 '19 r1 M 49 1 M 1 '9 0 0 O CD 19 o 0 0 •N- ... 49 1i M 63 rn rn in N bi I 1 $ 400.00 O O O 0 (0 49 $ 675.00 1 0 O 0 N N 0) 69 0 r0 0 Cl 0 O r 4. 0 0 1 0 n 0) (0 19 0 0 0 (0 C) Ci 19 0 0 0 O Y l0 9-r 19 $ 5,495.001 0 0 m t0 (0 r 09 0 0 O ID n 19 $ 1,500.001 0 0 O 0 O r 69 $ 2,000.00 1 0 0 N V r 69 $ 11,822.00 $ 4,060.00 $ 1,750.00 $ 800.00 0 0 10 t` < 1.11 CO 0 0 0 N O r 19 1 $ 5,250.00 $ 7,000.00 r 69 0 N N (0 o 49 1 $ 1,500.00 $ 42,500.00 10 0 Ni 0 O R 0 19 $ 500.00 00 O 0 CO 09 $ 1,400.001 O O 0 03 r 10 19 0 0 CO 01 W O 0 0 t` r r 69 $ 3,280.00 $ 18,400.001 $ 5,625.00 0 O v O N 69 0 O 10 !` 19 $ 1,500.001 $ 1,000.00 $ 2,000.00 $ 7,000.00 00'000'9 $ $ 2,000.00 $ 1,750.00 00'009 $ $ 5,475.00 0 O '0 O r M 0 O 1n N to M $ 7,000.00 $ 200.00 $ 18,750.00 $ 1,500.00 $ 42,500.00 10 10 1n < 01' O M 0 0 O 0 69 0 0 N t` M $ 25.00 1 0 0 ^ fA 0 0 4 03 0 0 b r Hi 0 0 6 r f9 0 0 O (0 r 69 $ 125.00 1 $ 120.00 0 0 O (0 O el 0 0 N S. 1 o0.00t $ 0 0 O 0 69 0 0 O r M $ 20.00 $ 5.00 $ 250.00 $ 200.00 0 0 Y) t• 19 1$ 50.00 $ 750.00 0 0 O O 69 0 0 O N 69 1 $ 25.00 1 0 0 M M 0 0 O 0 N Q 69 1 r 0 -291 110 145.75 0 t' V) 0 O r • 0 0 0 0 474.5 291.1 N < 0 0 0 co O O q (0 0 0 O 03 t` N 0 CO R 780.75 10 (0 Q 0 (0 (0 0r ? 0— .O- 0 0 C) 0 0 N 1174.51 T r0 812 1- 71 O 1 731 r N N. 0 r 0 N N IT 0 0 (.j r 10 on 56 3701 0 00rV r 0 N 0 t` r r 3001 O N 7001 0 COC) 4001 N. Q Cr n 0<'0 16 N. 0 0 0 r W W J J J J J EA >> W W_( W LL LF LF LF LF W W W W W W W IL F LF � 36 Cut & Cap 6 -inch Cut & Cap 4 -inch & Smaller 12 -inch PVC Sewer 8 -inch PVC Sewer 0-6 ft 8 -inch PVC Sewer 6-8 ft 8 -inch PVC Sewer 8-10 ft 8 -inch PVC Sewer 10 ft + 4 -ft Manhole 4 -ft Manhole Extra Depth Drop Manhole Remove Manhole 4 -inch PVC Sewer Service 8x4 -inch Service Wye 30 -inch Casing Extension Ashpalt Cut/Repair Concrete Cut/Repair Gravel Drive Repair Connect Existing Sewer Services Connect to Existing Sewer Remove Water Meter Remove Valve Box Remove Fire Hydrant 1Reconnect Water Services Transition Couplings 1Concrete Encasement 1Clear & Grub 1Excavation Safety 371 CO C) CD co 40 I 411 ? 1 44 44 P 1 461 O 481 1 491 $0 10 10 0 r0 < N 5$ 11 56 t` 10 0 0 O) N 0 (O r 0 N (0 $ (2,236.50) $ 2,317.00 1 i•.4 IA W W $ (200.00) $ (200.00) $ (200.00)1 0 m N f9 0 6 IA M $ 750.00 1 0 O (O M IA $ 6,411.00 1 O O O 0 19 N h O 69 $ 459.60 $ (2,765.00)1 1 fA i iR 19 0 O IA $ (3,644.70)1 i• M !A V Q IA 0 O M IA (A 1 M 69 0 LO m N (O Cl"; (7 e di 0 O r r r Oj 11, $ 2,750.00 $ 2,300.00 $ 1,600.00 $ 400.00 1 69 1 IA $ 2,934.00 1 � W 0 O O O bf $ 750.00 1 ' 69 0 O O 0 4 0 O r 0 m H ' IA 0 N N V Ni 19 0 (O 0 0 r 69 0 0 h 0 T ,- E9 $ 3,500.00 1 $ 4,000.00 1 0 0 O 0 M IA 1 $ 95,250.30 0 0 tO 0) 0 0 0 O 0 W 1 $ 2,202.40 O 0 O h M $ 417.00 1 $ 750.00 CO O O 0 fA 0 O IO 01 00) OD M $ 41,895.00 1 $ 2,800.00 $ 2,750.00 $ 2,300.001 0 0 O O O r Vi 0 0 O O b 19 $ 200.00 $ 200.00 0 0 O O O 4, $ 50.00 1 $ 0 0 0. O W 49 0 0 0 0 (O r 49 0 0 0 0 0 M 0 0 0 0 Cr N M 0 0 0 0 O 0) (R 2,000.00 0 O O O f0 IA 0 O O O Nr 0 IA $ 3,500.00 $ 4,000.00 $ 5,000.00 0 0 O 0 69 $ 98,895.00 1 $ 1,946.00 $ ----- 100.00 $ 2,202.00 0 0 6 10 19 $ 417.00 1 $ 750.00 (0 [O V W 1 $ 8,926.46 $ 31.50 O N (') 4, $ 2,750.00 $ 2,300.00 O 0 O 0 (O r- 4 $ 200.00 O 0 O 0 19 O 0 O 69 $ 20.00 $ 5.001 O 0 6 10 19 $ 750.00 0 0 0 0 (0 r IA 0 0 0 0 0 19 0 0 0 (O 0 0 0 0 CO IA 0 0 0^ CO 69 0 0 M 0 0 h 0 I9 0 0 O 0 0 (9 $ 4,000.00 $ 5,000.00 O 0 6 0 M 0 0 Y r IA 0 0 O 0 I- 01 0 0 O 00 (9 0 0 Si r M 1 $ 417.00 $ 750.00 $ 3,461.46 r 1r N D v 0 0 0 r 2 20 r (O0 O O N- r 0 0 '0 o 00 7 5.441 (7 n 0 0 0 0 r 1 0 0 0 0 0 0 0 (CHANGE ORDER NO 1 1 1 No 01 14621 r r r N 0 0 146.7 0 N r 0 r 1 146.851 0 O Q O N 0) 0V 003 r r r 0 1 139 �- 0! N r r 0 t7 () r 0 O 0 r r r 0 N 0 N 1oc 0 N 0 r r 40 0 r N 0 0 `r r r r r 0 `- r 1 Lel r N r r r LF LBS W W W W W LF LF LF EA EA W W CO W to J SY LS LS LS U J W N J 1LS J 1Ls 12 -inch PVC Water Pipe Ductile Iron Fittings 1 12 -inch Valve 12x10 -inch Tap Fire Hydrant E 12 -inch Cut & Cap 6 -inch Cut & Cap Ashpalt Cut/Repair Concrete CuVRepair Gravel Drive Repair Remove Valve Box Remove Fire Hydrant Tie in 6 -inch Main 2 -inch Water Service Non -Reinforced Conc Pavement Reinforced Concrete Pavement (Asphalt Paving Curb & Gutter Remove/Replace 4 -ft Sidewalk Remove/Replace Tree Removal Traffic Control Trench Safety 1Rock Excavation 1Change Order No 1 Totals Change Order No 2 18 -inch PVC Sewer 1Sewer Service Wye— - Asphalt Paving 1Gurb & Gutter Remove/Replace Remove 6 -inch Sewer 1Tie to Manhole Lewis Street Time Change Order No 2 Totals t7 03 0 N 251 M CA 0)) 10 N N 0 N en (0 (0O ((O (O 67 00 0O 70 r r r 40 67 0 74 N 76 $ 1,109.85 $ 1,044.93 $ 15,812.32 N m O r 0 0 ' 6 r 0 01 N r ` 0 0 (r) 0 0) 0 0 (h CV N (%) el)1 CO O $ 1,148.00 1 v V ^ V) $ 225.00 1 v r0 N N 0 O (D $ (259.00)1 0 0 N O) I $ 27,164.71 1 1Total Original Plus All Change Orders _ 1 I 1 1 $ 1,228,395.96 1 $ 29,119.00 4, t9 M W M M M 49 M fH $ 1,109.85 $ 1,044.93 N $ 1,028.12 I 0 $ 14,732.901 0 $ 223.00 1 r 0 O 0 R 0 0 0 M 0 0 CO O0 r 0 0 0 h r N (0 0) Q VT 0 LO NCO en O V) 03 0' nr (0 CO :(7) mN Y) (0 04 0)r tli r 0> O r N N 0 ... N VA 43 (A W M bi (A (A (R 4) 63 (A 1 1 1 1 1 1 1 s 1 1 1 1 1 1 4i 19 (9 43 19 69 49 f9 W 4i 69 (A 49 69 4i S Change Order No 3 Items 1 1 1 I 1 6 $ 1,044.931 N O $ 14,732.90 O $ 223.00 $ 10,891.31 1 O ^ I $ 225.00 < I $ (200.00)' $ (259.00) 00 (0 to ^ O 0 O o N m N O N iD (0 LO V 0) t7 N 01 0) r N r 0) r N N 4) 19 M 4) 4) 49 a 19 49 r r r r r - r r m r - r r r .- r r r r 03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LS LS LS 1 LS LS } ILS LS J J J J CO JQJ 0 PR Valves C Sang Avenue Modifications PRV related work 42 -inch CMP Casing Removal consolidated with number 5 Petroleum Work at Garland Ave Telephone Related Extras Cut & Cap at Vista :Hall Street Storm Sewer Work Fire Hydrant Re -set Ditch work for changed conditions 124 -inch CMP Casing Removal 1Eva Street Drive and Sod Liquidated Damages Assessed Damages at 2330 Wedington 1 Damage to traffic controller Chane Order 3 Totals N 7 > CO W .- N 0)? 10 CO r 0) 003^ r- .10- 14 � r City -of Fayetteville, Arkansas Budget Adjustment Form Budget Year 1998 Department: Public Works Division: Water & Sewer Program: Capital Water Mains - Date Requested March 17, 1998 Adjustment # Project or Item Requested: Project or Item Deleted: None. A portion of Rolling Hills Water Line Replacement project funding is proposed for -trthis adjustment. Additional funding is requested for the Wedington Water & Sewer Relocation Project. • • Justification of this Increase: Added construction and engineering cost incurred while the project was in progress caused the total cost incurred to exceed the remaining budget. • Justification of this Decrease rTheproject is :in :phases.' """ Y 3 _41 scheduled to be accomplished ti IF:L' v: u•r'tt ,, , tit '7 - Account Name 4• "Capital Water 'Mains ,,....,.;,>. Expense (Decrease Revenue) 'Amount '5= ry7F Account Number j Decrease Expense (Increase Revenue) Amount u£:.. Account NumberY Capital Water Mains 30;000., 5400 5600 Via'::; Project Number .1' 5808 . 00 c .•;95038 'mr� ,.,.• ...K Approval Signatures Requested By Budget Coordinator Budget Office Use Only cg- 041a ' Date 26 nr ypc: =Date of Approval Department Director `Posted to General Ledger Mayr Posted to Project Accounting Entered in Category Log Blue Copy: Budget & Research / Yellow Copy: Requester