HomeMy WebLinkAbout23-98 RESOLUTION•
RESOLUTION NO 7 4- 9 8
A RESOLUTION APPROVING AMENDMENT NO. 3 TO THE
ENGINEERING AGREEMENT WITH DEVELOPMENT
CONSULTANTS, L.L.C., FOR AN ADDITIONAL AMOUNT OF
$3,819.24 FOR THE DESIGN OF THE MUD CREEK BRIDGE
REPLACEMENT.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1. That the City Council hereby approves Amendment No. 3 to the engineering
agreement with Development Consultants, L.L.C., for an additional amount of $3,819.24 for the
design of the Mud Creek bridge replacement; and authorizes the Mayor and City Clerk to execute
said contract amendment. A copy of the amendment for engineering services is attached hereto
marked Exhibit "A" and made a part hereof.
FP14SSlED.AND APPROVED this 17th day of February , 1998.
, re APPROVED:
y-,
6,41
•/ c,
1 ;
ATTEST:
jla We-4e
Heth, Deputy City Clerk
By.
By
Fred Hanna, Mayor
RECIEWED
FEB M "5
---.-
AMENDMENT TO
AGREEMENT FOR ENGINEERING SERVICES
MUDD CREEK BRIDGE
FAYETTEVILLE, ARKANSAS
THE AMENDMENT to the AGREEMENT FOR ENGINEERING SERVICES, is made
and entered into by and between the City of Fayetteville, Arkansas, hereinafter called
the "OWNER" and Development Consultants, L.L.C., hereinafter called the
"ENGINEER" a corporation existing under the laws of the State of Arkansas, with
principal offices at 1970 East Joyce Boulevard, Suite 1, Fayetteville, Arkansas 72703,
am -
WITNESSETH
WHEREAS, the OWNER and the ENGINEER entered into an Agreement for
Engineering Services for design services (Title I Services) at the Mudd Creek Bridge on
Gregg Street on November 4, 1954, and
WHEREAS it is the desire of the parties to amend said contract by including
additional services to the scope of modification of the contract to eflectothe additional expense the equir ditto perform said
additional
id
mod
additional items.
NOW, THEREFORE for ardin consideration of the terms, conditions, and
covenants hereinafter set forth, the parties hereto do mutually agree as follows:
Modify SECTION IV — SERVICES TO BE FURNISHED BY THE ENGINEER to
include the following additional item as a part of this project.
i. Redesign of proposed bridge structure from precast to a composite steel
bridge with poured deck.
II. Modify SECTION IX — FEES AND PAYMENTS with the following:
Eleven Thousand
1. Two aceHu existing Si Fty e Eighown ht Dollarth the new amount s and Seventy Eight fCents ($11 268.78).
Two Hundred Sixty 9
and
2. Replace existing Upper Limit Contract shown with the new amount of
Eighty Six Thousand Four Hundred and One Dollars and Twenty Four
cents ($86,401.24), plus reimbursable expenses. Reimbursable expenses
shall have an upper limit of $5,000.00.