Loading...
HomeMy WebLinkAbout22-98 RESOLUTIONRESOLUTION NO. 2 2 - 9 8 A RESOLUTION APPROVING A ENGINEERING CONTRACT IN AN AMOUNT NOT TO EXCEED $38,000 WITH MILHOLLAND ENGINEERING COMPANY, FOR THE DESIGN AND CONSTRUCTION OBSERVATION OF DRAINAGE IMPROVEMENTS IN THE BOARDWALK SUBDIVISION AND ALONG RIDGELY AND MANOR DRIVES. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS* Section 1 That the City Council hereby approves a engineering contract in an amount not to exceed $38,000 with Milholland Engineering Company, for the design and construction observation of drainage improvements in the boardwalk subdivision and along Ridgely and Manor drives; and authorizes the Mayor and City Clerk to execute said contract. A copy of the contract is attached hereto marked Exhibit "A" and made a part hereof. 4EASS D AND APPROVED this 17th day of February , 1998. 1? • 1h' _ p•,.• FCr;" I ATTEST: By: ane Heth, Deputy City Clerk APPROVED: By. Fred Hanna, Mayor ENGINEERING SERVICE AGREEMENT FOR DRAINAGE IMPROVEMENTS TO BOARDWALK SUBDIVISION AND RIDGELY/MANOR DRIVE AREA E-525 OWNER: CITY OF FAYETTEVILLE 113 West Mountain Street Fayetteville, Arkansas 72701 Telephone: (501) 575-8330 January, 1997 MILHOLLAND COMPANY Engineering & Surveying 205 West Center Street Fayetteville, Arkansas 72701 Telephone: (501) 443-4724 Fax: (501) 443 4707 EXHIBIT A AGREEMENT FOR ENGINEERING SERVICES FOR DRAINAGE IMPROVEMENTS TO BOARDWALK SUBDIVISION AND RIDGELY/MANOR DRIVE AREA THIS AGREEMENT made as of the 17M day of Fe 6. AV by and between the CITY OF FAYETTEVILLE, hereinafter called the "OWNER", and Melvin L. Milholland, MILHOLLAND COMPANY, Engineering and Surveying, Fayetteville, Arkansas, hereinafter called the "ENGINEER". WITNESS THAT: WHEREAS, the OWNER desires to have Drainage Improvements made to Existing Drainage Systems located between the east side of Mount Sequoyah and the west side of an unnamed mountain, east of Arkansas Highway No. 265, and in Section Eleven (11), T -16-N, R -30-W, Fayetteville, Washington County, Arkansas. The limits of said improvements shall be from an existing pond north of Meandering Way to the south boundary of the Boardwalk Subdivision; and along Ridgely Drive from it's intersection with Arkansas Highway No. 265 to Manor Drive, including improvements to an existing culvert located under Manor Drive approximately 500 feet west of Ridgely Drive. WHEREAS, the ENGINEER has sufficient experienced personnel and equipment to perform the work described in this agreement, NOW THEREFORE, in consideration of the mutual covenants and agreements herein contained, the OWNER and the ENGINEER, the parties hereto, stipulate and agree that the OWNER does hereby employ the ENGINEER to perform the required engineering services as hereinafter set out; and the ENGINEER agrees to provide said services. 1 ENGINEERING SERVICE AGREEMENT NOW, THEREFORE, THE OWNER and ENGINEER for the considerations hereinafter set forth, agree as follows: ARTICLE 1.: THE ENGINEER AGREES to perform the following Engineering services for the Project: SECTION A.: GENERAL: The Engineer shall serve as the Owner's Professional Representative in the planning and supervision of construction of the Project and shall give consultation and advice to the Owner during the performance of his services. [1] Copynght or Patent Infringement: The Engineer shall defend actions of claims charging infringement of any copyright or patent by reason of the use or adoption of any designs, drawings, or specifications supplied by him, and he shall hold harmless the Owner from loss or damage resulting therefrom, providing, however, that the Owner within five [5] days after receipt of any notice of infringement or of summons in any action therefore shall have forwarded the same to the Engineer in writing. [2] Insurance: The Engineer shall secure and maintain such insurance as will protect him from claims under the "Workman's Compensation Acts" and from claims for bodily injury, death, or property damage which may arise from the performance of his services under this Agreement. SECTION B.: BASIC SERVICES OF THE ENGINEER: PART I: PRELIMINARY PHASE: Work to be done under this item shall consist generally of the following: [1] Study the two options of routing the storm water that enters the Boardwalk Subdivision at the southeast corner. Option No. 1 will be to rout the storm water through the subdivision utilizing the existing storm pipe system. Option No. 2 will be to rerout the majority of the stormwater northerly in the western existing open ditch along Arkansas Highway No. 265 to a point where it will be intercepted and diverted to an existing pond north of Meandering Way. [2] Make field surveys necessary to determine the Engineer's Recommendation of Drainage Improvements. 2 ENGINEERING SERVICE AGREEMENT [3] Prepare working drawings of recommended Drainage Improvements. [4] Meet with representatives of the OWNER to discuss recommended Drainage Improvements. All services delineated under Article 1, Section B, Part I, [I] - [4], shall be completed within 30 days of written "Notice -To -Proceed" from the OWNER excluding all delays from any Governing Body such as the City Engineer, State Board of Health, Arkansas Highway and Transportation Department, etc. Also, special consideration shall be given to the ENGINEER regarding delays in Surveying due to unusual inclement weather. PART II: DESIGN PHASE: From the APPROVED PRELIMINARY PLANS, the ENGINEER shall perform the following general items: [1] Make all additional field surveys necessary to formally design the storm sewer system improvements. [2] Design of Improved Drainage System: Boardwalk Subdivision: OPTION NO. 1 - Design an underground storm pipe system through the Boardwalk Subdivision for a 10 -Year frequency rainfall with an above ground overflow swale for a 100 -Year frequency rainfall. OPTION NO. 2 - Design an underground storm pipe system that intercepts storm water runoff at the southeast corner of the Boardwalk Subdivision and transports it in the Arkansas Highway No. 265 Right -of -Way to the north side of Londonderry Drive. At this point, the storm water would be discharged into the existing ditch on the west side of the Highway and transported northerly to a point where a storm pipe system would be designed to intercept the runoff and transported to an existing pond located north of Meandering Way. The design will also include replacing three (3) culverts and determining the existing ditch capacities. The above mentioned design will be submitted to the Arkansas Highway and Transportation Department for all required permits. Ridgely/Manor Drive Area: Design an open ditch along the south and east sides of Ridgely Drive from it's intersection with Arkansas Highway No. 265 to Manor Drive including the replacement of four (4) driveway culverts and two (2) culverts under Manor Drive. 3 [3] [4] [5] • ENGINEERING SERVICE AGREEMENT Prepare a Drainage Design Report for all of the designed improvements. Meet and review Plans with Utility Companies. Prepare a detailed set of plans to be followed for Construction. [6] Prepare a set of specifications completely describing the material and workmanship required and procedures to be followed for the construction of the project. [7] Submittal of documents for Approval of Design Criteria to the Appropriate Governing Bodies, such as the City's Engineer, State Board of Health, etc. [8] Attend public meetings regarding the Drainage Improvements. All services delineated under Article 1, Section B, Part II, [1] - [7], shall be completed within 60 days of written "Notice -To -Proceed" from the OWNER after approval of PRELIMINARY PLANS excluding all delays from any Governing Body such as the City Engineer, State Board of Health, Arkansas Highway and Transportation Department, etc. Special consideration shall be given to ENGINEER regarding delays in Surveying due to unusual inclement weather. PART III: CONSTRUCTION MANAGEMENT SERVICES OF THE ENGINEER: [1] Receipt of Proposals: The Engineer shall furnish 5 sets of drawings and specifications for the use of Bidders, in submitting Proposals. He shall assist the Owner in securing Proposals for Bidders, in analyzing such Proposals, and in preparing the Agreement for execution by the Contractor. [2] During Construction: The Engineer shall provide general supervision of construction to check the contractor's work for general compliance with the drawings and Specifications and shall endeavor to protect the Owner against defects and deficiencies in the work of the Contractor, but he does not guarantee the Contractor's performance. The Engineer's general supervision shall not include furnishing a full-time resident Engineer, but shall include the following services: [a] Additional Instructions: The Engineer shall issue such additional instructions to the Contractor as may be necessary to interpret the drawings and specifications or to illustrate changes required in the Contractor's work. [b] Contractor's Submittals: The Engineer shall check shop drawings, samples, equipment, approval data and other data submitted by the Contractor for compliance with the drawings and specifications. 4 ENGINEERING SERVICE AGREEMENT [c] Constructions Staking: The Engineer shall provide construction staking for construction improvements itemized in Article 3., Section B. of this Agreement. The Engineer shall work with the general Contractor and stake each construction item once required for Construction. [d] Contractor's Requests for Payment: The Engineer shall prepare and submit to Owner, Monthly Pay Estimates for the performance of the General Contractor. [e] Visits to the Site: The Engineer shall make penodic inspections at the site to check the Contractor's work for general compliance with the Contract Documents and to determine the extent of work completed for checking of Contractor's requests for payment. [f] Special Performance Tests: The Engineer shall witness and report the results of all special performance tests required for the Project. [g] final Acceptance: The Engineer shall prepare the deficiency (punch) lists when 90% completion of the Project is claimed. When the Contractor has completed the work in accordance with the terms of the Contract documents, the Engineer shall certify his acceptance to the Owner and his approval of the Contractor's final request for payment. [h] Instructions to the Owner: Near the completion of construction, the Engineer shall arrange a meeting between the Contractor and Owner to discuss pertinent construction details for proper operation and maintenance of the Contract Construction Items furnished and installed for the Project. [I] Record Drawings: The Engineer shall prepare record drawings showing changes in the work authorized during construction and shall submit one [I] set of "AS-BUILTS" to the Owner and one [1] set to each Utility Company providing services to the Project, if requested. SECTION C. Extra Services of the Engineer shall include the following when authorized by the Owner in writing, and shall be paid for as mutually agreed in Article 3, Section D. of this Agreement: [1] A Soils Engineer or other consultant when such services are deemed necessary, including reports, test borings, test pits, soil bearing values, percolation tests, and other necessary operations for determining sub -soil, air, and water conditions. 5 ENGINEERING SERVICE AGREEMENT [2] Providing design services relative to future facilities, systems, and equipment which are not intended to be constructed as a part of the Project. [3] Providing services to investigate existing conditions or facilities or to make measured drawings thereof, or to verify the accuracy of drawings or other information furnished by the Owner. [4] Preparing documents for out -of -sequence services requested by the Owner. [5] Making major revisions in drawings, specifications, or other project documents when such revisions are inconsistent with written approvals or instructions previously given and are due to causes beyond the control of the Engineer. [6] Preparing supporting data and other services in connection with change orders, if the change is due to causes beyond the control of the Engineer and is inconsistent with the original design intent. [7] Providing consultation concerning replacement of any work damaged by fire or other cause during construction, and furnishing professional services of the type set forth in previous sections herein. [8] Providing professional services made necessary by the default of the Contractor or by major defects in the work of the Contractor in the performance of the Construction Contract. [9] Providing Contract Administration and observation of the construction after the Construction Contract time has been exceeded or extended by more than thirty [30] days through no fault of the Engineer. [10] Providing services after issuance to the Owner of the final Certificate for payment. [11] Preparing to serve or serving as an expert witness in connection with any public hearing, arbitration proceeding, or legal proceeding. [12] Providing services of professional consultants for other than the normal Engineering services for the Project. [13] Providing any other services not otherwise included in this Contract or not customarily furnished in accordance with generally accepted Engineering practice. 6 ENGINEERING SERVICE AGREEMENT [14] Construction Inspection: Inspection Prior to Expiration of the Guaranty Period of the Project and preparation of a written report listing discrepancies between guaranties and performance. [15] Land Survevs: The Engineer shall make the necessary land surveys and prepare property descriptions & plats for the Owner's use in land acquisition, boundary determination, Drainage or Utility Easements, or Temporary Construction Easements. [16] After the storm sewer alignment has been determined and approved at the Preliminary Phase of this contract, any substantial deviations of alignment as requested by the OWNER due to easement acquisition, public input, etc. after the design has begun. [17] If Design Option No. 2 is chosen for the Boardwalk Subdivision drainage improvements, any substantial additional Engineering and/or Surveying requested by the OWNER other than the services as described in Article 1, Section B, Part II.[2], due to requirements by the Arkansas Highway and Transportation Department or future improvements to Arkansas Highway No. 265. 7 TNGINEERING SERVICE AGREEMENT ARTICLE 2.: THE OWNER AGREES to provide the Engineer with complete information concerning the requirements of the Project and to perform the following services: SECTION A.: Access to the Work: The Owner shall guarantee access to and make all provisions for the Engineer to enter upon public and private lands as required for the Engineer to perform such work as surveys and inspections in the development of the Project. SECTION B.: Consideration of the Engineer's Work: The Owner shall give thorough consideration of all reports, sketches estimates, drawings, specifications, proposals, and other documents presented by the Engineer, and shall inform the Engineer of all decisions within a reasonable time 5.1.15.a the work of the Engineer. SECTION C.: Legal Requirements: The Owner shall hold promptly all required special meetings, serve all required public and private notices, receive and act upon all protests and fulfill all requirements necessary in the development of the Project, and pay all costs incident thereto. SECTION D.: Proposals: The Owner shall advertise the Proposals from Bidders, open the Proposals at the appointed time and place and pay all costs incident thereto. The Owner shall consider the Engineer's recommendation of a General Contractor, relative to Proposals. SECTION E.: PROTECTION OF MARKERS: The Owner shall protect to the best of his ability, all stakes and other markers set by the Engineer prior to the assumption of such responsibility by the Contractor. Replacement of markers or stakes which have been damaged, moved, or removed shall be paid for by the Owner as "EXTRA SERVICES" of the Engineer. 8 ENGINEERING SERVICE AGREEMENT SECTION F.: Standards. The Owner shall furnish the Engineer with a copy of any design and construction standards he shall require the Engineer to follow in the preparation of Contract Documents for the Project. SECTION G.: Review Fees: All review fees required by all Governing Authorities shall be paid by the Owner at the time requested by the Engineer. SECTION H.: Material Tests: All material quality and standards tests required for the Project shall be paid for by the Owner at the time requested by the Engineer. SECTION I.: Owner's Representative: The Owner shall designate a single person to act as Owner's Representative with respect to the work to be performed under this Contract. The person designated as Owner's Representative shall have complete authority to transmit instructions, receive information, interpret and define Owner's policy and decisions, with respect to materials, equipment, elements, and systems pertinent in the work covered by this Contract. 9 ENGINEERING SERVICE AGREEMENT ARTICLE 3. THE OWNER'S PAYMENTS TO THE ENGINEER: SECTION A.: General: [1] Payments Withheld from Contractor: No deduction shall be made from the Engineer's compensation on account of penalty, liquidated damages, or other amounts withheld from payments to Contractors. [2] Abandoned or Suspended Work: If any work performed by the Engineer is abandoned or suspended in whole or in part, the Engineer shall be paid for services performed on account of it prior to receipt of written notice from the Owner of such abandonment or suspension, together with any terminal expense resulting therefrom and including a reasonable profit. Payments to the Engineer shall be made within 30 days of Written Notice from the Owner. [3] Progress Payments: Once each MONTH, the Engineer shall prepare and submit a pay estimate to the Owner for professional services performed under Article 1., Sections B. and C. of this Agreement in proportion to services performed during the period, and for Professional Surveying Services listed herein. SECTION B.: PAYMENT FOR SPECIFIED PROFESSIONAL SERVICES: The Owner shall pay the Engineer in addition to Article 3 Section 'C', for the performance of items listed below: SPECIFIED SERVICES to be performed are limited to: [a] Flood Plain Study and survey is NOT a part of these services. [b] Services required for the Development of Project, dealing with "WETLANDS", "U.S. WATERS", "CORP OF ENGINEERS" Approvals and Permitting, D. P. C. & E. Plans and Permitting for DRAINAGE AND EROSION CONTROL, 100 YEAR FLOOD PLAIN DESIGN AND SURVEYS, and "OFF- SITE" Studies, Surveys, Designs and Reports shall Subcontract to OTHER PARTIES BY THE ENGINEER, or performed on an Hourly Rate per attached "EXHIBIT A - Professional Fee Schedule". 10 ENGINEERING SERVICE AGREEMENT [c] Professional Engineering and Surveying Services rendered at the request of the Owner which is in addition to that necessary to design said proposed Development is NOT a part of these services, but if needed, shall be compensated in addition to the "Maximum -Not -To -Exceed," by the Hour, per attached "EXHIBIT A - Professional Fee Schedule". [d] Studies and changes requested after the FINAL Design by the Engineer, shall be compensated by the hour, in addition to the "Maximum -Not -To - Exceed' for project, per attached "EXHIBIT A - Professional Fee Schedule". [e] All Review Fees shall be paid by Owner. SECTION Ct: PAYMENTS FOR BASIC ENGINEERING AND CONSTRUCTION MANAGEMENT SERVICES OF THE ENGINEER: Compensation of DESIGN AND CONSTRUCTION MANAGEMENT SERVICES shall be allocated in the two (2) Phases, as follows: [1] )'HASE NO. 1 - PRELIMINARY AND DESIGN PHASES: Compensation for said Engineenng Services shall be a hourly rate for a MAXIMUM -NOT -TO -EXCEED amount of $28,000.00. This MAXIMUM -NOT -TO -EXCEED figure includes full compensation for every item of work as described in ARTICLE 1, SECTION B, PARTS I & II and is based on an estimate of the various classifications of work at a hourly rate, plus profit, as depicted in TABLE I of this document. The hourly rates include direct cost plus allowances for indirect labor costs and overhead. [2] PHASE NO. 2 - CONSTRUCTION MANAGEMENT SERVICES: Compensation for said Engineering Services shall be a hourly rate for a MAXIMUM -NOT -TO -EXCEED amount of $10,000.00. This MAXIMUM -NOT -TO -EXCEED figure includes full compensation for every item of work as described in ARTICLE 1, SECTION B, PART III and is based on an estimate of the various classifications of work at a hourly rate, plus profit, as depicted in TABLE I. of this document. The hourly rates include direct cost plus allowances for indirect labor costs and overhead. [3] PAYMENTS FOR "EXTRA SERVICES" OF THE ENGINEER: For Extra Services defined in Article 1., Section C., the Owner shall pay the Engineer on an hourly basis as shown in "Exhibit A". 11 ENGINEERING SERVICE AGREEMENT SE TION D. METHOD OF PAYMENT: Partial payments of the ENGINEER shall be made monthly as long as the accumulative of payments do not exceed the following: [1] phase No. 1 - Preliminary and Design Phases: Ninety percent (90%) upon completion and submittal of plans and specifications. Ten percent (10%) upon approval by OWNER of plans and specifications. [2] Phase No. 2 - Construction Management Phase: One hundred percent (100%) for services provided during the period. 12 ENGINEERING SERVICE AGREEMENT ARTICLE 4.: THE OWNER AND ENGINEER FURTHER AGREE to the following Conditions: SECTION A.: TERMINATION: This Agreement may be terminated by either party by seven [7] days' written notice in the event of substantial failure to perform in accordance with the terms hereof by the one party through no fault of the other party. If terminated due to the fault of others than the Engineer, the Engineer shall be paid for services performed to the date of termination, including reimbursements then due, plus termination expenses. SECTION B.: ARBITRATION: Arbitration of all questions in dispute under this Agreement shall be at the choice of either party and shall be in accordance with the rules of the American Arbitration Association. This Agreement shall be specifically enforceable under the prevailing Arbitration Law and judgement upon the award rendered may be entered in the court of the forum, State or Federal, having jurisdiction. The decision of the Arbitrators shall be a condition precedent to the right of any legal action. SECTION C.: OWNERSHIP OF DOCUMENTS: The completed tracings and master specification sheets shall remain the property of the Engineer, and reproductions of them in whole or in part shall not be used on additions to the Project or on any other project except upon written agreement with the Engineer. SECTION D.: This Contract shall be interpreted in accordance with the domestic laws of the State of Arkansas and enforced only in the Courts of that State. SECTION E.: The parties recognize the nature of any potential liability on the part of the Engineer In order to more accurately specify his liability for services performed hereunder, the parties do mutually covenant and agree that the liability of the Engineer for any defect in design, Engineering, inspection, or otherwise, for professional services rendered by him shall have as its maximum limitation the compensation received by the Engineer for his professional services under the terms of this Contract. 13 ENGINEERING SERVICE AGREEMENT ARTICLE S.: SUCCESSORS AND ASSIGNS: This agreement and all of the covenants hereof shall ensure to the benefit of and be banding upon the Owner and his partners, successors, assign and legal representatives. The Owner shall not have the right to assign, transfer or sublet his interest or obligations hereunder without written consent of the Engineer. IN WITNESS WHEREOF, the parties hereto have made and executed this Agreement, Exhibits "A", Tables I & II inclusive, the day and year first written above. Attest: /lee/ City Clerkcxpafy Date Secretary Date //29/%ij 14 OWNS 41/141ZFred anna Mayor • .,, • y b qr "�,` ;3,•µ_,C 1 1 3 k MILHOLLAND COMPANY Engmeenng & Surveying Ronald S. Petrie, P E EXHIBIT "A" PROFESSIONAL FEE SCHEDULE: 1. Survey Crews: 3 men @ $99.50 per hour 2 men @ $86.00 per hour 2. AutoCAD Drafting: 1 man @ $45.00 per hour 3. Professional Engineer: $95.00 per hour 4. Engineer's Aide: $65.00 per hour 5. Inspector: $45.00 per hour 6. Office Computations: 1 man with computer: $45.00 per hour 7. Research and Compiling Data: 1 man $45.00 per hour 8. Secretary: $25.00 per hour 9. Printing: 8-1/2" X 11": $00.25 per sheet Blueprints $ 3.50 per sheet (any size) Mylar $15.00 per sheet (any size) 10. Mileage: $00.30 Per Mile 11. Out -of -Pocket Expenses: Actual Cost (Long-distance phone calls, etc.) 15 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 W J m Q 1- 0 C) r C0 N CD 3 � a Citi C > 0 y N•A C ep 5) IL W co C -a O d tV to 0 • 00 CO4• 6 LO 0 0 o Z 0 H2 lL Q O p CL ZX ti O O ~ O 2 5 2 X Q 2 -J Fa - 0 Section B, Parts I & II ENGR/MGR. ENGR/MGR. ENGRIMGR. CADD SURVEYOR SURVEYOR VGINEERING SERVICES 1 V IV _ III TECH II 11 1 CLERICAL TOTALS 0 0 0 0' 0 0 0 0 N NtO OD 0 0 0 0 0 0 0 0 0 0 o O o 0 C (O 6666 0 2.00 53.00 2.00 43.00 N- u-) r M N CI r r r N- O O 0 6 0 N 00 0 Ti N 00 6 CN 0 0 00000 V co N N N r N- o o O O 0oo000 000000 W N N N N O so 00 N N oa o0 N N $1,1 0000 O O O O ONO V co r o o O co N N 000000 0 0 0 0 0 0 600 (O(DIi N r r N 0 0 co O NN o o O O NN i N N 4.00 4.00 .O O Ii 194.00 $55.00 $10,670.00 00 0 00 0 O N4 N 2.001 1.00 1.001 1.001 1.00 4.00 000 000 N N N 2.00 0000 0000 ( 0 0 6 0 LO enr 0D EA 1-[1] REVIEW OF OPTIONS [2] Preliminary Field Surveys [3] Prepare Working Drawings [41 Meet with City Engineer to Review 2--[8] ATTEND PUBLIC MEETINGS (TOTAL HOURS AVERAGE WAGE RATE PER HOUR ITOTALCOSTS ___ __ _ 2-[2] DRAINAGE SYSTEM DI A) Boardwalk Storm Pipes B) Boardwalk Swales C) Ridgely Drive Ditch D) Ridgely Drive Culverts E) Manor Drive Culverts 2-[3] PREPARE DRAINAGE 12-[4] MEET WITH UTILITY C A) Survey Utility Locations B) Add to ConstructionPIa1 2-[5] PREPARE CONSTRUC A) Boardwalk Subdivision B) Ridgely/Manor Drive An 2-[6] PREPARE SPECIFICAI 00 CO4• 6 LO 0 0 o Z 0 H2 lL Q O p CL ZX ti O O ~ O 2 5 2 X Q 2 -J Fa - 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 OPt— c0 544 41 1..„ CO ao• c > m C cu c � LL ca+ 13 W N C 4a CO c tU 10 0 N 0 C 0 1- = O W c ea Q H C! .6 a8 c N 9 d N 0 as 0 m y0 N d O > > N O N 0. o 0z co 0) o c d L o 0 a 0 0 0 0 0 es el O ro 490* z 0� �O H2 Oa aW W ZX aW OO 0 0 O z D 2 Q J H O H 10.00 41.0 )0 )0 )0 )01 16.001 16.0 W 0 as Ql R L V T acc 0 m Pod M co G N w Part111 MANAGE 1NSTRUi on Stakir lonthly P on Obse leficiency rawings 3E RATE 0 0 0 0 0 es el O ro 490* z 0� �O H2 Oa aW W ZX aW OO 0 0 O z D 2 Q J H O H STAFF REVIEW FORM AGENDA REQUEST X CONTRACT REVIEW GRANT REVIEW MICROFILMED For the Fayetteville City Council meeting of Mayor's Approval FROM: Sid Norbash Engineering public Works Name Division Department ACTION REQUIRED: Approval of the Amendment #1 to the Engineering Contract with Milholland Company, Inc. For the Londonderry Drainage Improvements Project (Boardwalk Subdivision), per attached Amendment. COST TO CITY: $1,712.00 Impvts Cost of this Request 4470-9470-5817-00 Account Number 98038-0010 Project Number $228,044 (2000) Category/Project $95,011 Budget Funds Used To Date $133.032 Remaining Balance BUD ET IEW: Budge C..rdinator X Budgeted Item Londonderry Drainage Boardwalk S/D Drainage Category/Project Name Drainage Improvements Program Name Sales Tax Fund Budget Adjustment Attached Administrative Services Director CONTRACT/GRANT/LEASE REVIEW: Account)ng Manager ornneyy UL) Purchasing Officer GRANTING AGENCY: Date Internal Date Date Date STAFF RECOMMENDATION: Contract. Depar ent Director inistrativjServices Approval of 0l//7/10, r Da e Date Director //tip( Da %,7171/0I/ Date the Amendment #1 to Cross Reference the Engineering New Item: Yes No X Prev Ord/Res $: 22-98 Orig Contract # 631 Orig Contract Date: 2-17-1998