HomeMy WebLinkAbout162-98 RESOLUTIONRESOLUTION NO 16 2 - 9 8 A RESOLUTION APPROVING A PROJECT CONTINGENCY IN THE AMOUNT OF $60,000 FOR THE AIRCRAFT RESCUE AND FIRE FIGHTING STATION CONSTRUCTION PROJECT; AND APPROVAL OF A BUDGET ADJUSTMENT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1 That the City Council hereby approves a project contingency in the amount of $60,000 for the Aircraft Rescue and Fire Fighting Station construction project to cover unanticipated costs for the project. Section 9 The City Council hereby approves a budget adjustment in the amount of $60,000 increasing AARF Building Construction, Acct. No. 5550 3960 7820 26, Project No. 98059 1 decreasing Use of Fund Balance, Acct. No. 5550 0955 4999 99. A copy of the budget adjustment is attached hereto marked Exhibit "A" and made a part hereof. 1PMSJED AND APPROVED this 1� day of December , 1998. i • $^+.• ) (j ' J1/414L". e \ .4 1,LL ATTEST? cO By:tes.(Lcc Heather Woodruff, CityCle APPROVEDfilet/ •By Fred Hanna, Mayor • XX AGENDA REQUEST _ CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Council meeting of December 15. 1998 r STAFF REVIEW FORM z FROM: Dale Frederick Airport Name General Govt. Division Department n�nC� Tnn7�7 ��vycy��1��r���Tp�T The Airport requests approval of a project contingency and a budget adjustment a 4v,'[1Vt1:V4umcE2lie Aircraft Rescue and Fire Fighting Station. When the contract for the ARFF Station construction was sent up for council approval, a contingency was inadvertently omitted from the approval request: This project contingency will cover any unanticipated cost increases experienced as this project progresses (i.e. unforeseen power cable rerouting, stairwell relocation, etc), COST TO CITY: 5 60.000.00 Cost of this Request .5550-3960-7820.26 Account Number 98059-01 Project Number 5 714,100.00 ARFF Station Construction Category/Project Budget Category/Project Name 5 713,035.00 n/a Program Name Airport Funds used to date 5 1,065 00 Remaining Balance Fund Bildget Budgeted Item XX Budget Adjustment Attached Administrative Services Director CONTRACT/GRANT/LEASE REVIEW: 11/11 /a8%8 GRANTING AGENCY: Date/,%.A 1Co•rdinato ,4 % /z -47-y/ /f , I � II �I �� • �� Date la -8-98 Date 1I ernal Auditor Date STAFF RECOMMENDATION: Staff recommends approval. Division Head Date Dte e �a7/� Date Cross Reference New Item: Pre Or/Res#: Orig. Cont. Date Yes No tr4 City of Fayetteville, Arkansas Budget Adjustment Form r Budget Year 1998 Department: General Govemment Division: Airport Program: Airport Capital Date Requested 12/08/98 Adjustment # Project or Item Requested: Funding for a project contingency is requested for the AARF/ Equipment Building Project. Project or Item Deleted: None. Use of fund balance is proposed. Justification of this Increase: .,.. The funds are requested to pay for unforeseen project expenses associated with the construction of the • AARF/ Equipment Building.• • • Justification of this Decrease: • Sufficient cash and investments exist to fund this 6.•. - request and planned expenditures. ,• • • Account Name AARF Building Construction Account Name Use of Fund Balance Increase Expen e (Decrease Revenue) Amount Account Number 60,000 5550 3960 7820 26 Decrease Expense (Increase Revenue) Amount • 60,000 • Account Number •.; . ?`5550 it 0955 - 4999 99 Project Number 98059 1 Project Number Approval Signatures Re., ested By ces Director Mayo Date SvAg Date -/�li� Date Blue Copy: Budget & Research / Yellow Copy: Requeste Budget Office Use Only Type: A B C Date of Approval Posted to General Ledger Posted to Project Accounting Entered in Category Log E C:\APP\98BUD\BAADMARF CON.WK4 i STAFF REVIEW FORM AGENDA REQUEST XX CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Council meeting of N/A FROM: Dale Frederick Name ACTION REQUIRED: contract #644 with Buildings for in our current budget with Airport's Passenger Facility RECEIVF_D 593 • CITY OF FAYEEVILLE CITY CLERK rSOFFICE Airport General Gvmt. Division Department The Airport staff requests approval of and the Mayor's signature for Change Order #1 for $30,016.52 to , Inc. for the Airfield Rescue and Firefighting Building. The funds needed for this request have been provided an approved project contingency. Reimbursement for this project is provided through Federal and Slate grants, Charges (PFC), and Garver Engineers, Inc. COST TO CITY: $ 30.016.52 Cost of this Request 5550-3960-7820.26 Account Number 98059 Project Number BUDGET REVIEW: Atta $ 774,100.00 Category/Project Budget $ 742.931.00 Funds used to date $ 31.169,00 - Remaining 13alancc ARFF Station Constr. Category/Project Namc Capital Expenditure Program Name Airport Fund 13udgct Coordinator ` X Burj cted Ildm dministrativc Services Director Budget Adjustment CONTRACT/GRANT/LEASE REVIEW: 6 -/-q7 Date 6-4-99 Date GRANTING AGENCY: STAFF RECOMMENDATION: Division dead Staff recommends approval of this change order. It��i1.7■�t Adm' • stra` c rvices Director Ma or Date Cross Reference �-IDate -yy Date New Item: Yes Pres. Ord/Res#: 56-98/162-98 Orig Cont. Date: 5-5-98 No .' r FAYETTEVILLE THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE June 9, 1999 To: Dale Frederick, Airport From: Theresa Johnson, City Clerk's Office Attached are two originals of Change Order #1 for the contract with Buildings, Inc. for the Airfield Rescue and Firefighting Building. One original will be microfilmed and filed with the city clerk. cc: Yolanda Fields, Internal Auditor STAFF REVIEW FORM Page 2 Description: Meeting Date: N/A Change Order # 1 for Buildings, Inc. for the construction of the ARFF Building. Comments: Budget Coordinator Reference Comments: Accounting Manager Reference Comments: City Attorney Reference Comments: Purchasing Officer Reference Comments: ADA Coordinator Reference Comments: Internal Auditor Reference Comments: FAYETTEVILLE THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE TO: FROM: DATE: SUBJECT: FRED HANNA, MAYOR DALE FREDERICK, AIRPORT MANAGER MAY 23, 1999 CHANGE ORDER # 1 TO THE CONTRACT WITH BUILDINGS, INC. FOR THE CONSTRUCTION OF THE ARFF BUILDING. The Airport staff requests approval of and the Mayor's signature for Change Order #1 for $30,016.52 to Contract #644 with Building, Inc. for the Airfield Rescue and Firefighting Building. This change order is necessary to cover the cost of items that needed modified or added during the construction of the building. The funds needed for this request have been provided for in our current budget with an approved project contingency. Reimbursement for this project is provided through Federal and State grants, the Airport's Passenger Facility Charge (PFC), and Garver Engineers, Inc. The Federal Aviation Administration (FAA) has agreed to cover 90% of all cost except for $785.40. Garver Engineers have agreed to absorb this cost because of a miscalculation by engineers. The remaining 10% amount of the qualified FAA items will be funded by a state grant for 5%, and 5% will be provided from the Airport's funds accumulated in PFC's. DF/bjm Attachments: Contract Review Form 3 Originals of Change Order #1 Copy of the FAA's Commitment to fund Change Order MAY 20 '99 13:18 FR FAA — RR—OK ADO T 8172225987 TO 915017187646 P.02/02 r 2 AIP PROJ NO. CIO RCVD DESCRIPTION COST FED SHARE 3-05-0020-2698 12 3/16/99' Labor for Change Order 118 above $475 20 $427.68 3-05-0020-2698 13 3/16/99 Boring & conduit for telephone & gas line changes by utilities $9,991.16 $8,992.04 3-05-0020-2698 14 3/16/99 Change doors to solid core per city code $656.81 $591.13 3-05-0020-2698 15 3/16/99 Plan change to ADA requirements for door frame; costs assumed by $0.00 $0.00 3-05-0020-2698 16 3/16/99 Sidewalk extensions requested by FFD $628.10 $565.29 3-05-0020-2698 18 3/16/99 Install three (3) fire extinguishers per city code $216.46 $194.81 3-05-0020-2698 20 3/16/99 Install pressure reduction valve in water line $1,432.62 $1,289.36 TOTAL ELIGIBLE CHANGE ORDERS $30,652.12 $27,586.91 FAA approval signature is submitted only to facilitate processing the change order and to determine eligibility and amount of the change item(s) for federal participation. Reimbursement of approved change order items will be paid from sponsor entitlement funds. Sincerely, Donald C. Harris Senior Program Manager Arkansas/Oklahoma Airports Development Office cc. Mr. Michael J. Griffin, PE Garver Engineers 1010 Battery Street P.O. Box C-50 Little Rock, AR 72203-0050 Commitment to Excellence --Our Commitment to You ** TOTAL PAGE.02 ** • r' CHANGE ORDER No. 1 Date: 4/2/99 ENGINEERS PROJECT NO. 976100 PROJECT: Fayetteville Municipal Airport - Airfield Rescue and Firefighting Building AIP 3-05-0020-26 CONTRACTOR: Buildings, Inc. Contract for: ARFF Building construction Contract date: June 15, 1998 TO: Buildings, Inc. You are directed to make the changes noted below in the subject Contract: THE CITY OF FAYETTEVILLE Owner Nature of the Changes: 1. Adjust the final contract quantities and cost according to the following scheduled items and costs. SEE ATTACHED SUMMARY SHEET AND DOCUMENTS These changes result in the following adjustment of Contract Price and Contract Time: CONTRACT PRICE prior to this Change Order: $666,600.00 Increase Resulting from this Change Order: $30,016.52 CONTRACT PRICE Including this Change Order: $696,616.52 Completion Time Prior to This Change Order: 180 calendar days Current Contract Completion Dates Including This Change Order: 180 calendar days Page 1 of 2 The Foregoing Changes Are Recommended: The Foregoing Changes Are Accepted: The Foregoing Changes Are Approved: GARVER ENGINEERS, INC. By: Date: BUILDINGS, INC. 1999 By: Date: /7,s, 1999 THE CITY OF FAYETTEVILLE By: Date: Page 2 of 2 1999 • Fayetteville Municipal Airport ARFF Building - Change Order Summary 3/16/99 C.O.B Justification /Authorization Description Proposed Amount Actual Amount 1 Power supply to windsock am site Wndsork Cable *2.431.32 *2.431.32 Profit/Ovethead 1243.13 *243.13 Total *2,674.45 *2,674.45 2 Termite soil beabnent, required by dty code Temute Treatment *1.294.00 *1294.00 Pro600verfreed *129.40 *129.40 Total *1,423.40 *1,423.40 3 Routed FAA cables, Installed 8 -way dud and 150 feet dud. concrete, labor, equipment *3,564.65 13,564.65 ta,dway light conduit (revised once) Profit/Overhead *356.47 *358.47 Total *3,921.12 *3,821.12 4 Stairwell shifted by City Inspector, removed Deduct 4 Wndows (*1,411.00) (*1.411.00) windows Total (*1,411.00) (*1,411.00) 5 Not performed Change lower level carpet to vinyl 51.19200 *0.00 Profit/Overhead *119.00 *0.00 Total *1,311.00 $.00 6 Not performed Gas SeMce and Gas Meter 113.000.00 *0.00 Profit/Overhead 51,130.00 *0.00 Total *14,130.00 *0.00 6A Nol performed Furnish/Install Gas Line *14,374.00 *0.00 Piga/Overhead 11,437.40 50.00 Total *15,811.40 1020 7 Required by Oty eller design Install 8- Gate valve and 7 blowoff 51.575.00 11075.00 ProfiWverhead 1158.00 1158.00 Total *1,733.00 *1,733.00 8 Insulation not specified In plans Install Instil between living quarters/shop 11,743.00 *1.743.00 Deduct R-11 on second floor (*407.00) (*407.00) Profit/Overhead $134.00 *134.00 Total *1A70m *1.470.00 9 Water company requested location lunge of Install wateale from meter lo bldg. *4.484.00 *4.484.00 meter, Installed Y copper line Pmfi00vemead *448.00 1448.00 Total *4,932.00 $4032.00 10 Not spedfied M plans Install Floor 60 2nd Floor Closet 1702.00 1702.00 For fire rating above stairway Install Metal Frame/Gyp board unde&de stair *480.00 *480.00 Requested by FFD / Airport Install 2x2 Access to Shop *168.00 *168.00 Requested by FFD /Airpor Delete Ceiling ta Shop . - (*352.00) (*352.00) Pro84tlwmead 599.80 *99.80 Total *1,097.80 11.09720 11 Requested by FFD/Airport Flagpole *1.724.00 W00 (Not Perfomled) Prolt/Overhead *17200 50.00 Total *100600 6000 11A Requested by FFD/Airport Install 13 Plastic letters 168000 *0.00 (Not Performed) PmfMDWrlread *68.00 *0.00 Total 5748.00 60.00 12 Labor for C.0.18 Remove sheet rocs for C.O. 88 insulation 1432.00 5432.00 PmfiWveshend $4320 543.20 Total $47520 547620 13 To install telephone/gas line change requested Canduttuo es for Telephone end Gas 19,515.39 19,51539 by utilities Pmf Wverhead 1951.54 5475.77 Total $10,466.93 58,991.16 t4 Doors changed to fire -fated solid dons per Doors and Hardware - *597.10 1597.10 Cly Inspedor Pm bOve,tead *59.71 559.71 Total $65621 *65621 • 15 Change to plans Change doomrane to 36' for ADA 5376.00 *376.00 Move swftd✓dedmc heater *150.00 *150.00 Remove shed rock, etc. Set new frame, etc. 5188.00 *188.00 Profit/Overhead *64.40 571.40 Total *708.40 *785.40 16 Requested by FFD / Airport Sidewalk (17 x 5) 5375.00 $375.00 Sidewalk (10'x 5') *186.00 *186.00 Profiboverhead - $57.10 557.10 ' Total *628.10 *618.10 17 Undercut ofunsWlable material: disallowed - Budding Pad ulde,M (383 C.Y.) *3.8:0.00 *0.00 induded as bid item Paving Area undercut (159 C.Y.) *1,590.00 *0.00 Prangwrheed $542.00 $.00 Taal *5,96200 1020 ID Requimd by City Code Install 3 Fire Fatirguiahera 5196.78 5196.76 Profit/Overhead 519.68 *19.68 Total *216.46 *21646 19 Change to plans Install lou chain hoists on bay doors 51450.10 50.00 (Disallowed) ProfiVOvMoad *145.01 *0.00 Total 51,695.11 10.00 Install pressure reducing valve 11.30238 *1.302.38 20 Water line pressure too high 93 200 psi Pro6Wnahead *13024 *13024 Total *1,432.62 $1432.62 GRAND TOTAL $71,878.80 $30,016.62 L • June 16, 1998 Attention: Bob Bryant, PE Proposal Request #1 Airfield Rescue & Firefighting Building, Fayetteville Airport ° Dear Mr. Bryant: The undersigned proposes to furnish all materials and perform all labor necessary to complete the following: The cost of moving power for wind -sock pole as per attached: $2,431.32 x .10 $243.13 + $2,431.32 $2,674.45 • All of the above work to be completed in a substantial and workmanlike manner for the sum of $2,674.45. Payments to be made each month as the work progresses to the value of one hundred percent (100%) of all work completed. The entire amount of contract to be paid at completion. Any alteration or deviation from the above specifications involving extra cost of material or labor will only be executed upon written orders for same, and will become an extra charge over the sum mentioned in this contract. All agreements must be made in writing. The Contractor agrees to carry Workmen's Compensation and Public Liability Insurance, also to pay all Sales Taxes, Old Age Benefit and Unemployment Compensation taxes upon the material and labor and labor furnished under this contract, as required by the United State Government and the State in which this work is performed. Respectfully submitted, Larry Kichline Project Manager CONSTRUCTION COST .STIMATE 6 A/E ❑ CONTRACTOR ❑ USPS 0 PROJECT FAYETTEVILLE AIRPORT city 182115 AR Airfield Rescue & Firefighting Building — - .tate really BUILDINGS, INC. contract no. DESCRIPTION contractor Sheet 1 of 2 No. 1 change request no. June 16, 1998 date The cost of moving power for wind -sock pole as per attached O At an increase In the contract price of $ 2.674.45 broken down In itemized detail below) O At no change in the contract price O At a reduction In the contract price of $ (broken down In itemized detail below) O With an extension of days to the period of performance Cost Detail: a. Direct Labor(attach supporting detail estimate) N. Insurance c. Materials end equipment (attach supporting detailed estimate) d. Deduct offsetting debit or credit for materials, labor and equipment (attach supporting detailed estimate) Subtotal e. Overhead (0%) f. Profit (0%) g. Employment taxes under FICA and FUTA h. Subcontracts Subcontract Total $2,431.32 1. Contractor's Commission on Total of Subcontracts: $243.13 Total increase or decrease of contract price: $2.674.45 Company Category of Work Amount MEP Services, Inc. Electrical $2,431.32 Subcontract Total $2,431.32 1. Contractor's Commission on Total of Subcontracts: $243.13 Total increase or decrease of contract price: $2.674.45 • PROJECT FAYETTEVILLE ARK Airfield Rescue & 2 OF 2 Firefighting Building city 182115 contract no. ESTIMATE state facility BUILDINGS, INC. CONTRACTOR • No. 1 change request no. ITEM QUANTITIUNIT DESCRIPTION UNIT UNIT TOTAL LABOR MAT'L UNIT COST CHK Price of Moving - Power for Wind- sock Pole 2 4 3 1 3 2 Total Materials and Equipment 2 4 3 1 3 2 Total Cost 2 4 3 1 3 2 Profit @ 5% 1 2 1 5 6 Overhead @ 5% 1 2 1 5 7 Subtotal A 2 6 7 4 4 5 Employment taxes: FICAIFUTA/SUTA Workers' Compensation Insurance TOTAL 2 6 7 4 4 5 • • • • MEP Services, lac. Change Order Break Down Date: March 9, 1998 Project Fayetteville Airport Eire and Rescue Description: Move power wire tor Wind sock Wiring not shown on original drawings. • 9_4 2____- 370 Unit Q Maui 84 • don Material Toter Labor Total UM) Wire 0.40 181,00 110 11 2- PVC Conduit 0.37 41.00 1 en PVC Box 21.00 21.00 4 en Splice 7.00 26.00 1 It Miscellaneous Consumables 25.00 25.00 2 Concrete 60.00 120.004 1 yds It Concrete form for sleeve 300.00 300.00 2 dys Backhoe Rental • k 195.00 390.00 16 hr Labor - UT - 18.00 288.00 18 hr labor - QT - 27.00 432.00 MATER AL TOTAL 1 108.00 SALES TAX 6.82516 73.27 LABOR TOTAL 720.00 LABOR BURDEN 29.65% 214.92 SUBTOTAL 2,114.19 OH & FEE 15.000% 317.13 TOTAL ADO THIS CHANGE $ 2,431.32 • • June 16, 1998 Attention: Bob Bryant, PE Proposal Request #2 Airfield Rescue & Firefighting Building, Fayetteville Airport Dear Mr. Bryant: The undersigned proposes to fumish all materials and perform all labor necessary to complete the following: The cost of soil treatment for termite control as per attached: $1',294:00 x .10 $129.40 + $1,294.00 $1,423.40 • All of the above work to be completed in a substantial and workmanlike manner for the sum of $1,423.40. Payments to be made each month as the work progresses to the value of one hundred percent (100%) of all work completed. The entire amount of contract to be paid at completion. Any alteration or deviation from the above specifications involving extra cost of material or labor will only be executed upon written orders for same, and will become an extra charge over the sum mentioned in this contract. All agreements must be made in writing. The Contractor agrees to carry Workmen's Compensation and Public Liability Insurance, also to pay all Sales Taxes, Old Age Benefit and Unemployment Compensation taxes upon the material and labor and labor furnished under this contract, as required by the United State Government and the State in which this work is performed. Respectfully submitted, Larry Kichline Project Manager • • *CONSTRUCTION COST ESTIMATE • A/E ❑ CONTRACTOR 0 USPS 0 'ROJECT FAYETTEVILLE AIRPORT city 182115 AR Airfield Rescue & Firefighting Building an. r«mey BUILDINGS, INC. contract no. DESCRIPTION contractor Sheet 1 of 2 No. 2 change request no. June 16, 1998 date The cost of soil treatment for termite control as per attached. ❑ At an increase In the contract price of $ 1.423.40 broken down In itemized detail below) O At no change in the contract price O At a reduction in the contract price of $ O With an extension of days to the period of performance (broken down in itemized detail below) Cost Detail: a. Direct Lebor(attach supporting detail estimate) b. Insurance . c. Materials and equipment (attach supporting detailed estimate) . Deduct offsetting debit or credit for materials, labor and equipment (attach supporting detailed estimate) Subtotal e. Overhead (0%) f. Profit (0%) g. Employment taxes under FICA and FUTA h. Subcontracts Company Advance Pest Control, Inc. Category of Sitework (Div. Work 2) Amount $1,294.00 Subcontract Total $1,294.00 I. Contractor's Commission on Total of Subcontracts: $129.40 Total increase or decease of contract price: $1,423.40 • • • • PROJECT FAYETTEVILLE ARK Airfield Rescue & Firefighting Building city state facility BUILDINGS, INC. 182115 ESTIMATE contract no. CONTRACTOR • 20F2 • No. 2 change request no. ITEM QUANTITIUNIT DESCRIPTION UNIT UNIT TOTAL LABOR MAT'L UNIT COST CHK Cost of soil treatment for termite control 1 2 9 4 0 0 Total Materials and Equipment 1 2 9 4 0 0 Total Cost 1 2 9 4 0 0 Profit @ 5e% 6 4 7 0 Overhead @ 5% 6 4 7 0 Subtotal A 1 4 2 3 4 0 Employment taxes: FICAlFUTA/SUTA . Workers' Compensation Insurance TOTAL li Alia- - • t42s90 1 Gt:e. 8-7- 1 Jan -2t3799 12:07P GarvQr Inc .'rayettevi1le war..GU 00. 141 MIS PUB*Vint., Art0. • 501 443-0633 taur1 /7tle:ue," January 28, 1999 Attention: Mike Griffin Proposal Request N3 REVISED Airfield Rescue S Firefighting Building, Fayetteville Airport Dear Mr. Griffm: The undenagned proposes to furrish all materials and perform ail labor necessary to complete the following: To furnish and install addiitional split duct Item 1Seventy five Item 2 Seventy-five bent 3 Three (3) Item < Seventy-two Item 6 Backhoe' (7(i) feet of 4' split duct feel o(2" split duct of concrete hours labor (3 men, 3 days) Backfin Subtotal (Material, Labor, Ttxea) .__..._.. 5 3,564.65 Profit and Overhead 10% ........ 356.47 TOTAL REVISED PROPOSAL REQUEST AS n S 3,921.12 All of the above work to be completed in a subetaiki and workmanlike manner Payment to be made each month rifle work progresses to the value or one hundred percent (100%) of all work completed. The entire arnount of contract to be paid at completion. Any artesian or deviation from the above apedfioolmn in.dvinp ochre cod of material or labor will only be executed upon written orders for tame, and will become an at. charge over the sum mentioned in this contract All agreements must be made in %wiling. The Ccritractir ogees beam; Workrners Compensate and Public Liat lly Insurance, also to pay all Sales Taxes, ad Age Benefit and Unemployment Compensate tams upon the material and labor and labor furnished under this contract, as required by to United State Government and the Statein which this wok is performed. Respectfully submitted. Chris Hobby Prgect Manager P.02 •P.e Jan -28.-99 12:07P Garver Inc. •Faa. dttov11lo 2.0 89 411, 023 Cul wings, ,n •1 c,4.. .d-%RVIc%5 INC: ;• Data: Prcjad: ' • DascADtlat: Am Finn r Fl* pa : 1 501 443 77a0 MEP Services, Inc. Change Order Break Down 19011 lit , and Raw* •.r 1 . t! 'T'��iaiit+- A:. J.: 6 6 501 443-0533 Jan. 26 1999 113: 4a•n 04 ' • IrraMaSS a. 12 6a 41 1 INS 7 ,d. 1 r He 1 se • 1 • 1. • 01 • • 0 BAlE6 AX : RT T • , Aif011 Bt C ;r:1• a song • • le • • AL POO H19 - _ - - -• e: • • • •w: ••• • • ._.. -I: • 14.00 • 649.17 1a. - '96'9 a( P.03