HomeMy WebLinkAbout152-98 RESOLUTION• RESOLUTION NO 152 - 98 A RESOLUTION APPROVING THE 1999-2003 CAPITAL IMPROVEMENT PROGRAM. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1 That the City Council hereby approves the 1999-2003 Capital Improvement Program. A copy of the CIP is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this_17± 7`^ day of November , 1998. t ',L ft By APPROVE By red Hanna, Mayor CITY OF FAYETTEVILLE 1999 - 2003 Capital Improvements Program Executive Summary Compiled by: Kevin Crosson, Administrative Services Director Stephen Davis, Budget Coordinator Kevin Springer Financial Analyst Barbara Fell, Research Analyst CITY OF FAYETTEVILLE, ARKANSAS 1999-2003 CAPITAL IMPROVEMENTS PROGRAM EXECUTIVE SUMMARY TABLE OF CONTENTS PAGES' Letter of Transmittal I-V Program Directional Information. VI -IX CIP Project Cost Table X Summary of Project Requests 1-3 Comprehensive Detail . 4-7 Project Rankings by Funding Source 8-28 Unfunded Projects List 29-36 FAYETTEVILLE THE CITY OF FAYETTEVILLE, ARKANSAS November 18, 1998 Members of the City Council and Citizens of Fayetteville It is my pleasure to present the Adopted 1999-2003 Capital Improvements Program (CIP) for the City of Fayetteville. The City began this very important and successful annual CIP process in 1988 to provide a focused plan identifying the City's infrastructure and capital needs and identifying the funding to meet those needs. Below is a table that lists planned expenditures by project category for the 1999-2003 CIP and lists the actual funds expended for the past five years 1993-1997. It is significant to note that with all the challenges faced by the City over the past few years, we have fulfilled approximately $68 million in capital and infrastructure needs. The completed improvements and those currently planned for the next five years will help meet the needs for our current and future citizens as more pressure is placed on the City's infrastructure and capital assets as a result of the growth of our City and the region. Project Category Adopted Actual 1999-2003 1993-1997 Water & Sewer Improvements Street & Transportation Improvements Bridge & Drainage Improvements Airport Improvements Parks & Recreation Improvements Vehicles & Equipment Replacement / Expansion Solid Waste Improvements Fire Safety Improvements Police Safety Improvements Community Development Library Book Purchases and Improvements Other Capital Improvements Wastewater Treatment Plant Expansion Police/ Courts Building Purchase/ Renovation Arts Center and Parking Completion Total 113 WEST MOUNTAIN 72701 501-521-7700 FAX 501-575-8257 S 27,541,000 20.646.000 2.596.000 9.167.000 7.474, 000 9.055, 000 853.000 2,615,000 1.364.000 948.000 820,000 4.366,000 69.700.000 $ 27,006,000 11,201,000 1,115,000 7,625,000 2,025,000 8,735,000 2,490,000 845,000 742,000 597,000 324,000 2,13 5,000 1,818,000 763,000 361,000 S 157,145,000 $ 67,782,000 The 1999-2003 CIP includes $157.1 million in planned capital improvements over the next five years or approximately $72 million more in projects than the 1998-2002 CIP contained. Most of the project additions are due to a wastewater treatment plant and improvements to the City's wastewater collection system ($69.7 million), increased funding for Water & Sewer Improvements ($3.3 million), Street Improvements ($2.3 million), Airport Improvements ($3.2 million), Parks & Recreation Improvements ($1:5 million) and Fire Safety Improvements ($1.0 million). Other significant project category changes include a reduction in Town Center Construction ($7.5 million) and reduction in. Vehicles & Equipment Replacement/Expansion (S1.0 million). The projects in this CIP are funded on a pay-as-you-go basis except for the Wastewater Treatment Plant Expansion project which is proposed to be funded by bonds supported by either water & sewer revenues or a special revenue. Finally, improvements adopted in this CIP for the Airport, Parks & Recreation, and Street, Bridge & Drainage Improvements have been reviewed and recommended by the Airport Board, Parks & Recreation Advisory Board, and City Council Street Committee respectively. The Water & Sewer Projects are currently under review by the City Council Water & Sewer Committee. Status of Projects Budgeted for 1998 The City has approximately $49.5 million in capital projects budgeted for 1998. The current status of the major projects budgeted for 1998 are listed below: Street, Drainage and Transportation Improvements $ 10.6 million • Highway 265 Widening - Right of Way ($1.0 million). This project is currently in design by the Arkansas Highway and Transportation Department. The City's right of way acquisition funding has been forwarded to the Arkansas Highway & Transportation Department. The AHTD will be acquiring the necessary right of way for the project. • Sycamore Street - Leverett to Garland ($.8 million). The project is currently in design with bids scheduled for the 4th quarter 1998. • In -House Street Improvements ($.7 million). Approximately 100,000 square yards of asphalt has been laid with the following work to be completed this season: Woolsey from Sycamore to North Street; Green Acres from Township to North College; South Street from College Avenue to Archibald Yell; 4th Street from College Avenue to Church Street; 5th Street from College Avenue to Church Street; Block -Street from South Street to.6th-Street, East Street from South Street to 6th Street; and, Church Street from South Street to 6th Street. • Twentieth Street - West of South School ($.4 million). This project is scheduled for completion in the 4th quarter 1998. 11 • Mud Creek Bridge ($.7 million). The bridge construction project is anticipated to be complete in the 4th quarter 1998. • Poplar Street Improvements ($.7 million). The project will make drainage improvements along Poplar Street and is scheduled to be bid in the 4th quarter 1998. • Trailway/Railroad Corridor Construction ($.7 million). Right of way acquisition for this project is currently in progress. • Sunbridge Extension from Villa to North College ($.6 million). The project is expected to be bid in the 1st quarter 1999 with construction scheduled to begin in the 2nd quarter 1999. Water & Sewer Improvements $14.6 million • Sanitary Sewer System Rehabilitation ($4.1 million). Engineering and construction contracts for sanitary sewer system rehab planned for 1998 have been awarded. • Highway 45 East Pump Station & Elevated Tank Project ($2.6 million). The engineering and construction contracts have been awarded with completion scheduled in the second quarter 1999. • Highway 265 Water/ Sewer Relocations ($1.8 million). Due to changes in project scope, the total project is estimated to cost $3.35 million. The additional funds are included in the 1999- 2003 CIP. This highway improvements project is currently in design by the Arkansas Highway and Transportation Department. Engineering for the water/ sewer relocations will be able to proceed as soon as the highway improvement project engineering is complete. • Wastewater Collection System Improvements Engineering ($1.0 million). An engineering contract for improvements to the City's waste water collection system are pending a site location determination for the second wastewater treatment plant. • Wastewater Treatment Plant Engineering ($1.0 million). An engineering contract for improvements to the City's wastewater treatment plant is pending a site location determination for the second waste water treatment plant. • White River Water Authority Acquisition and Improvements ($.7 million). The 12" waterline connecting the City water system and the White River Water is complete. Other significant projects: • Town Center/ Parking Garage Project ($7.5 million). The architectural contract has been approved, the bond issue has been authonzed and an operating agreement between the City and the Advertising & Promotion Commission has been executed. 111 • Fire Station #6 Expansion ($.6 million). A construction contract has been awarded with a projected completion in the second quarter 1999. Significant Changes from the Prior Year Capital Improvements Program The significant changes to the 1999 projects included in the CIP are: Add - Wastewater Treatment Plant Expansion Add - Highway 265 Water & Sewer Relocations Add - Dickson Street Enhancement Project - Street Construction Add - Dickson Street Enhancement Project - Water & Sewer Improvements Add - Steele Boulevard Cost Share Add - Steele Bridge Cost Share (replaced funding used during 1998) Add - 16 West Widening Add - Fire Station Replacement #4 Add - Upgrade/Replace Sludge Dewatering System Add - Water & Sewer Operations Center Move - Lake Sequoyah Bridge Replacement to 2000 Move - Drake Street to Potential Move - East Ridgeway - Waterline Extension to 2000 Increase - Light/Medium Utility Vehicles Replacement/ Expansion Decrease - Annexation Area Street Improvements Decrease - Water/ Sewer Improvements Annexation Area Decrease - Water/Sewer Improvements Annexation Area Decrease - Street ROW/Intersection/Cost Sharing Improvements Decrease - Township Water & Sewer Relocations $ 69,700,000 2,200,000 2,200,000 500,000 300,000 400,000 817,000 650,000 400,000 200,000 (250,000) (150,000) (300,000) 126,000 (625,000) (814,000) (786,000) (242,000) (180,000) Unfunded Projects The unfunded projects list contains projects that have been identified as needed without an identified funding source. The value of the unfunded projects list has increased from $41.9 million in the 1998-2002 CIP to $55.7 million for the 1999-2003 CIP. The increase in unfunded projects is primarily attributed to identification of additional projects for Parks & Recreation Improvements and Airport Improvements. Conclusion The CIP is a planning tool for infrastructure and other capital improvements which prioritizes projects and schedules them for completion as soon as practical. The City advocates a primarily pay- as-you-go policy. This policy requires difficult decisions to be made regarding the timing and scope of capital improvements. Some projects simply have to wait. IV The CIP is a five year plan that will be updated and revised on an annual basis. These annual updates are prepared primarily to reflect changing priorities, to renew existing priorities, and to revise cost estimates. The funding requests for the projects planned for 1999 will be incorporated in the 1999 budget submitted for Council approval in November. Finally, let me express my sincere thanks to the members of City staff, the City Council, various committees, and the community for the significant effort and input that helped to shape this document. Respectfully submitted, Fred B. Hanna Mayor V CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM DIRECTIONAL INFORMATION Introduction The Capital Improvements Program (CIP) for the City of Fayetteville examines the infrastructure and capital needs of the City for the next five years. The CIP is reviewed and updated on an annual basis to reflect the changing needs of the community and changes in available monies for financing capital projects. The City's philosophy concerning the use of the CIP is that it should be considered as a financial planning tool that lists the City's capital improvement projects, places the projects in a priority order, and schedules the projects for funding and implementation. The CIP should be further considered as a major policy tool for the Mayor and City Council. Financing The City finances capital improvements on essentially a pay as you go basis utilizing revenue from the 1% City sales tax adopted in 1993, the 1% Parks Development (Hotel, Motel, Restaurant) sales tax adopted in 1996, and operating revenues from the Airport Fund, Shop Fund, and Water & Sewer Fund. Based on a resolution approved by the City council prior to the passage of the sales tax, a minimum of 75% of the sales tax revenues will be used to assist in funding capital projects. In addition, long-term debt is considered and utilized only when the City faces a project that is of such importance and sufficient financial magnitude as to warrant a bond issue. The CIP is not a financing document in and of itself. Rather, the CIP is utilized as a planning document that places projects in the Annual Budget whereby funds are appropriated for them by the City Council. Prior to actual initiation of project work, required contracts are presented to the Mayor or City Council, as appropriate, for final approval of expending funds. What Projects Are in the CIP Projects and their cumulative component areas totaling $10,000 or more should be included in the CIP. Projects costing less than S500 are not considered capital and are funded through program operating budgets. Projects that cost between $500-10,000 are handled through the budget process. Attempts will be made to fund these capital items through operating funds. Projects in the CIP can include: • obligations for labor and materials and contractors involved in completing a project, • acquisition of land or structures, • engineering or architectural services, professional studies, or other administrative costs, • expenses for City vehicles and equipment, and • renovating or expanding City facilities, grounds, or equipment. VI 11 Project Cost Determination All projects are costed in current or 1998 dollars. Then a determination of the year the project is expected start is made. Finally, determination of the projected cost of the improvement is made by referring to "Project Cost Table" that provides the project inflation multiplier to be used for the project in the anticipated project year. Priority Selection of Projects The adopted CIP will rely on priorities defined by the Mayor, City Council, Community, and City staff. As always, cnteria such as govemment imposed mandates, usefulness to the community, and impact on operational expenses, will be reviewed in establishing priorities. A priority ranking is assigned to each project by year and by funding source. Projects for which no funding is projected to be available will be placed on an "Unfunded Projects List", which will identify the cost of the project in 1998 dollars. This list identifies the project as being viable, but one for which no funding is presently available. Unfunded projects may be funded if actual revenue is above projected revenue, if costs on funded projects is below budget, or if another funding source is identified. The Parks and Recreation Advisory Board, Airport Board, City Council Street Committee, and City Council Water & Sewer Committee meetings have been held to obtain committee and public input and guidance regarding parks, streets, bridge and drainage improvements, and water & sewer improvements planned for the next five years. Impact on Operations Cost The majority of the projects planned in the C1P will have a minor impact on operational budgets. Most of the projects planned over the next five years replace high maintenance water lines, sewer lines and street segments. Performing reconstruction of these items will free up maintenance budgets to address areas that currently have a lesser priority. There are a few projects that will have a significant impact on operational budgets. The most significant of these projects are listed below: • Vehicles & Equipment: The vehicles and equipment planned for 1999 in the Shop Fund will cost user divisions approximately $225,000 annually. The user divisions are charged monthly replacement and maintenance charges which helps escrow funding for replacement units in the future when the vehicle has become obsolete or is no longer suited for service. • The In -House Pavement Improvements Project will reduce maintenance costs for each street that is overlaid. In addition, this project is projected to save the City more than $100,000 annually over contract pricing for the same work. • The Ultraviolet Disinfection System Project planned for 1999 will eliminate the need to install an approximate $400,000 worth of emergency chlorine scrubbing equipment in order to comply with new EPA regulations. VII Organization of the Capital Improvements Program Document The document is organized into three (3) primary sections, as follows: I) Introduction/Summary This section contains the transmittal letter from the Mayor, a CIP overview, and several summary schedules which explain the resources for the CIP and the planned uses of the projects. The most detailed schedule is the Comprehensive Detail, which lists the individual projects, their funding sources, and the year in which they are planned to be initiated. II) Project Details by Funding Source This portion of the document is actually found in six separate tabs, which are broken into the primary sources for the projects. The six tabs are as follows: (1) Airport Fund, (2) Parks Development Fund, (3) Sales Tax Capital Improvements Fund, (4) Shop Fund, (5) Water & Sewer Fund, and (6) Other Funds. Each section includes a priority listing of projects by project type and by year. The priority listing for each year will then denote with an asterisk (*) if the project is a continuing project from the prior year. In addition, a project detail is included for all projects. This detail will provide specific information about each project including: the project title, funding source, year(s) the project is scheduled, a project description and justification, project status, and the impact of the project on operations A visual aid is included for the project, if appropriate and available. III) Unfunded Projects The CIP document compilation process involves a review of all projects and resources during each update. Every attempt is made to identify as many current and anticipated projects as possible. Resources available are then matched up with as many project requests as possible. Unfortunately, there continue to be significantly more project requests than resources available. This has resulted in an extensive Unfunded Projects List totaling almost $56 million. All projects on this list are considered to be viable projects for which no current funding exists. Capital Improvement Policy The Capital Improvement Program (CIP) is approached as a valuable tool to be used in the development of responsible and progressive financial planning. The program is developed in accordance within the financial policies of the City. The policies and the CIP form the basis for making various annual capital budget decisions and support the City's continued commitment to sound long - range financial planning and direction. The City's official Capital Improvement Policy is as follows: VIII •a.-+-'t.a.r • The City will prepare annually and update a five - year Capital Improvement Program (CIP) which will provide for the orderly maintenance, replacement, and expansion of capital assets. • The CIP will identify long - range capital projects and capital improvements of all types which will be coordinated with the annual operating budget to maintain full utilization of available sources. • When preparing the CIP the City will seek to identify all viable capital projects and capital improvements required during the subsequent five year period. These projects and improvements will be prioritized by year and by funding source. Every attempt will be made to match projects and improvements with available funding sources. Future operating costs associated with a project or an improvement will also be given consideration in the establishment of priorities. • The City will seek Federal, State and other funding to assist in financing capital projects and capital improvements. • The City will incorporate the reasonable findings and recommendations of the City's Boards, Commissions, Committees, and Citizen task forces, as they relate to capital projects and improvements. • The City will seek input from the public by public hearings in relation to the establishment of projects and projects priorities. IX CITY OF FAYETTEVILLE, ARKANSAS CIP PROJECT COST TABLE 1999-2003 All capital project requests are first costed in 1998 dollars. Then, a determination will be made as to the year in which the project should be initiated. Once this information was decided, the information in the table below was used to obtain the future year cost of the project. Inflation Recommendations 6% factor - This factor should be used in calculating in all project categories. Example: A street project that cost $1,000,000 in 1998 dollars that is expected to be done in 2001 would use the inflation factor of 1.191. To get the expected cost of the project in 2001 dollars multiply $1,000,000 by 1.191, which equals $1,191,000. X Year '6% Factor 1999 1.060 2000 1.124 2001 1.191 2002 1.262 2003 1.338 Example: A street project that cost $1,000,000 in 1998 dollars that is expected to be done in 2001 would use the inflation factor of 1.191. To get the expected cost of the project in 2001 dollars multiply $1,000,000 by 1.191, which equals $1,191,000. X Protect Requests Airport Fund Parks Development Fund Sales Tax Capital Improvements Fund Shop Fund Water & Sewer Fund Bond Issue Fund Community Dev. Block Grant Fund Off -Street Parking Fund Solid Waste Fund Unfunded Projects Resources Available Airport Fund Parks Development Fund Sales Tax Capital Improvements Fund Shop Fund Water & Sewer Fund Bond Issue Fund Community Dev. Block Grant Fund Off -Street Parking Fund Solid Waste Fund . • City of Fayetteville, Arkansas 1999 - 2003 Capital Improvements Program Summary of Project Requests & Project Resources By Fund - All Sources 1999 $ 1,529,000 760,000 12,381,000 2,126,000 6,273,000 484,000 83,000 120,000 2000 2001 $ 2.293,000 772,000 8.599,000 1.919,000 3 216 000 3,300,000 439,000 67,000 91,000 $ 2,814,000 785,000 8,704,000 1,370,000 3,408,000 3,200,000 25,000 51,000 80,000 2002 $ 961,000 797,000 8,811.000 1,787,000 2,838,000 37,300,000 48,000 75,000 2003 $ 1,570,000 825,000 9,516,000 1,853,000 2,766,000 23,000,000 Total $ 9,167,000 3,939,000 48,011,000 9,055,000 18,501,000 66,800,000 948,000 31,000 280,000 78,000 444,000 55,685,000 $ 23,756,000 $ 20,696,000 $ 20437 000 $ 52,617 000 $ 39,639 000 $ 212,830,000 1999 $ 1,529,000 760,000 12,381,000 2,126,000 6,273,000 484,000 83,000 120,000 2000 2001 $ 2,293,000 772,000 8,599,000 1,919,000 3,216,000 3,300,000 439,000 67,000 91,000 $ 2,814,000 785,000 8,704,000 1,370,000 3,408.000 3,200,000 25,000 51,000 80 000 2002 $ 961,000 797,000 8,811,000 1,787,000 2,838,000 37,300,000 48,000 75,000 2003 Total $ 1,570,000 $ 9,167,000 825,000 3.939,000 9,516,000 48,011,000 1,853,000 9,055,000 2,766,000 18,501,000 23,000,000 66,800,000 948,000 31,000 280,000 78,000 444,000 $ 23 756 000 $ 20 696.000 $ 20 437 000 $ 52 617 000 $ 39.639.000 $ 157,145,000 1 Capital Improvement Projects By Project Area - All Sources 1999 - 2003 (12.7%) Street (06%) Community Development Block Grant Project Area (5.8%) Shop (5.8%) Airport (2.5%) Public Safety (22%) Bridge, Drainage. & Transportation (3.2%) Other (619%) Water & Sewer Airport Bridge, Drainage, & Transportation Community Development Block Grant Parks & Recreation Public Safety Shop Solid Waste Street Water & Sewer Other City of Fayetteville Arkansas 1999 - 2003 Capital Improvements Program By Project Area - All Sources Five Year Summary 1999 $ 1,529,000 883,000 484,000 1,252,000 1,363,000 2,126,000 247,000 5,359,000 9,177,000 1,336,000 $ 23,756 000 2000 2001 $ 2,293,000 874,000 439,000 1,212,000 681,000 1,919,000 131,000 2,919,000 9,079,000 1,149,000 $ 20,696,000 $ $ 2,814,000 479,000 25,000 1,229,000 779,000 1,370,000 150,000 4,522,000 .8,216,000 853,000 20 437 000 2002 (4.8%) Parks & Recreation (0.5%) Solid Waste $ 961,000 656,000 0 1,241,000 494,000 1,787,000 173,000 3,808,000 42,697,000 800,000 $ 52,617,000 2003 $ 1,570,000 601,000 0 2,540,000 662,000 1,853000 152,000 3,421,000 28,072,000 768,000 $ 39 639,000 $ Total 9,167,000 3,493,000 948,000 7,474,000 3,979,000 9,055,000 853,000 20,029,000 97,241,000 4 906,000 157,145 000 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Capital Improvement Projects Sales Tax Capital Improvements Funding By Project Category 1999 - 2003 (7.4%) Parks & Recreation Improvements (28.7%) Street Improvements (13.0%) In -House Street Improvements 111 (5.4%) Fire Safety Improvements (5,4%) Bridge and Drainage (0.9%) Solid Waste Improvements (1.3%) Transportation Improvements (8.5%) Other Capital Improvements (2.8%) Police Safety Improvements Project Category Fire Safety Improvements Police Safety Improvements Library Improvements Parks & Recreation Improvements Bridge and Drainage Improvements In -House Street Improvements Street Improvements Transportation Improvements Water & Sewer Improvements Solid Waste Improvements Other Capital Improvements City of Fayetteville, Arkansas 1999 - 2003 Capital Improvements Program Sales Tax Capital Improvements Funding By Project Category 1999 $ 1,015,000 348,000 182,000 492,000 690,000 1,124.000 4,235,000 110,000 2,904,000 127,000 1,154,000 $ 12,381,000 2000 2001 $ 320,000 $ 610,000 $ 361,000 169,000 142,000 160,000 440,000 444,000 685.000 300,000 1,185,000 1,250,000 1,734,000 3,272,000 122,000 128.000 2,563,000 1,608,000 40,000 70,000 1,007,000 693 000 (L7%) Library Improvements (24.9%) Water & Sewer Improvements 2002 $ 8,599,000 $ 8,704 000 $ 3 2003 Total 317,000 $ 353,000 $ 2,615,000 177,000 309.000 1,364,000 161,000 175,000 820.000 444,000 1,715,000 3,535,000 475,000 446,000 2,596,000 1,317,000 1,351,000 6,227,000 2,491,000 2,070,000 13,802,000 133,000 124,000 617.000 2,559,000 2,306,000 11,940,000 98,000 74,000 409,000 639,000 593,000 4,086,000 8,811,000 $ 9,516.000 $ 48,011.000 City of Fayetteville. Arkansas 1999 - 2003 Capital Improvements Program Comprehensive Detail 1 Source/Division Project Page 1999 2000 2001 2002 2003 Total Request 1 • - • ort Frmd Airport Imornvereents Airport Federal Grant & Local Matches 10 $ 98,000 5 98,000 $ 60.000 $ 60.000 5 60,000 $ 376,000 Professional Services 11 50,000 40,000 40.000 40,000 40,000 210,000 A.D.A. Commuter Ramps 12 50,000 - 50,000 Ramp Expansion 13 392.000 392,000 Terminal Ramp Rehabilitation 14 286.000 286,000 Security Access Control System 15 116,000 116,000 Pavement Maintenance 16 72,000 80,000 96,000 248,000 High Intensity Runway Lights 17 90.000 90,000 Old Fire Station Renovation 18 15,000 15,000 HVAC -Air Handlers Replacement 19 60,000 60,000 General Aviation Terminal Renovation 20 100,000 100,000 New Industrial Hangar 21 200,000 200,000 . Sound Barrier Roof 22 30.000 30,000 Airfield Marking 23 72.000 81,000 153.000 Terminal Area Improvements 24 1.089,000 1,324,000 2,413,000 T -Hangar Apron Area Resurfacing 25 964,000 992.000 1,956.000 T -Hangar Unit Expansion 26 318,000 318,000 New Access Road 27 137,000 137,000 Taxiway Improvements / Expansion 28 355,000 355.000 Parking Lot Expansion 29 108.000 395.000 503,000 Air Cargo Facility 30 180.000 180.000 Storm Sewer System Repairs 31 238,000 238,000 General Aviation Apron Area Resurfacing 32 525.000 525.000 Expand Jet -A Fuel Storage 33 216.000 216,000 Total Airport Fund Projects 1,529.000 2 293 000 2 814 000 961.000 1 570.000 9 167 000 parks Development Fund Parks & Recreation Imornvements Parks & Rec. Gids Softball Complex 36 552,000 105,000 657,000 Playground Renovations 37 33,000 50,000 50,000 50,000 183,000 ' Washington School Community Gym 38 125.000 100,000 225,000 Park Land Acquisitions 39 50,000 75,0 75,000 75,000 75.000 350.000 Other Park Improvements 40 15,000 15,000 6,000 36,000 Green Space Park Development 41 150.000 350.000 350.000 850,000 Walker Park Tennis Courts 42 110.000 110.000 , Lake Fayetteville Trail 43 80,000 275,000 95,000 450,000 Wilson Park Lighting 44 57,000 57.000 Skate Park 45 30,000 30,000 Bocce Court 46 20.000 20.000 Family Water Park 47 25,000 750,000 775,000 1 Davis Park Improvements 48 125,000 125.000 Trail Corridors 49 71,000 71,000 Total Parks Development Fund Projects 760 000 772 000 785,000 797,000 825,000. 3,939,000 1 1 1 1 1 1 1 Sales Tax Capital Imorovements Fund Fire Safetv Imnrnvements Fire Fire Apparatus Replacement - Fire Station #4 52 200,000 Fire Station Replacement - #4 53 650,000 Breathing Air Compressor - Replacement 54 25,000 Mobile Data Terminal - Communications System 55 95,000 Automatic External Defibrillators 56 45.000 Fire Apparatus Replacement - Reserve Pumper 57 200,000 Radio System Replacement 58 _ 120,000 Fire Station Expansion- #7 Escrow Funds 59 110.000 317,000 323,000 Aerial Ladder Fire Apparatus - Replacement 60 500,000 Thermal Imaging_Device 61 30,000 1,015.000 320,000 610,000 317,000 353.000 200,000 650,000 25,000 95,000 45.000 200,000 120.000 750,000 500,000 30.000 2,615.000 Police Safety Imnrnvements Police Police Handgun Replacements 63 42,000 42,000 Live Scan Fingerprinting 64 30,000 30.000 Police Telephone System Upgrade 65 54,000 15.000 69,000 PC/Terminal - Upgrade/Replacements 66 22,000 20,000 15,000 11,000 68,000 Police Emergency Generator 67 80.000 80,000 Police Office Partitions and Fumiture 68 20,000 20,000 Radio System Replacement 69 100,000 287,000 387,000 Dictaphone Upgrade 70 39,000 39.000 4 1 1 1 1 1 1 1 a Source/Division Project -k City of Fayetteville, Arkansas 1999 - 2003 Capital Improvements Program Comprehensive Detail Page 1999 2000 2001 2002 2003 Total Request City Jail Improvements 71 154000 154.000 Police Building Improvements 72 65,000 65.000 Evidence Storage Improvements 73 54.000 54.000 Specialized Police Equipment 74 47,000 47,000 Public Safety Computer System Replacement 75 309.000 309,000 348,000 361000 169,000 177,000 309,000 1,364,000 Library Material Purchases & Imnrnvements Library Library Materials Purchases 77 137,000 142,000 150,000 161,000 165,000 755.000 Library Book Detection System 78 36,000 36000 Library HVAC Replacement & Improvement 79 9000 10,000 10,000 29,000 182 000 142000 160,000 161,000 175.000 820,000 Parks & Recreation Imof09tme0ts Parks & Rec. Walker Park Senior Complex 81 176.000 176.000 Lake Fay Softball Complex Improvements 82 15,000 119,000 134.000 Playground Renovations 83 17,000 50,000 67,000 Other Park Improvements 84 15.000 9,000 15,000 39,000 Wilson Pool Improvements 85 70,000 70.000 Babe Ruth Ballpark Improvements 86 99,000 125,000 224,000 Citywide Park Master Plan 87 25.000 25,000 50,000 Lake Fayetteville/Sequoyah Improvements 88 75,000 120,000 125,000 155.000 150.000 625,000 Wilson Park Renovation 89 170,000 100,000 270,000 Lewis Soccer Complex 90 100,000 100,000 Finger Park Improvements 91 170.000 170,000 Veterans Memorial Park Playground Replacement 92 60,000 60.000 Playground Replacement-F.Y.C. 93 50000 50,000 Family Water Park 94 1,500,000 1,500,000 492,000 440.000 444,000 444,000 1,715,000 3,535.000 Bndge ane Dra nage Improvements Engineering Miscellaneous Drainage Improvements 96 70,000 305,000 250,000 325,000 300,000 1,250,000 Drainage Study and Master Plan 97 70.000 130,000 50,000 150,000 146.000 546.000 Ora Drive Drainage Improvements 98 150000 150,000 Steele Property Bridge - Cost Sharing 99 400,000 400.000 Lake Sequoyah Bridge Improvements 100 250,000 250,000 690,000 685,000 300,000 475,000 446,000 2,596,000 In -House Street-FiSioewalk Improvements Public Lands Sidewalk Improvements Street Pavement Improvements 102 281,000 298,000 316,000 334000 314,000 1,543,000 103 843.000 887,000 934,000 983.000 1037,000 4,684,000 1,124,000 1,185,000 1,250,000 1,317.000 1.351,000 6,227,000 Street Improvements Engineering Street ROW/Intersection/Cost Sharing Improvements 105 108.000 150,000 150,000 150,000 150,000 708,000 & Street Sixth Street Improvements 106 560,000 560.000 Highway 16 West Widening 107 817,000 817,000 Dickson Street Improvements 108 2,200.000 2,200,000 Steele Property- Street Improvements 109 300.000 300.000 600,000 Poplar Street Improvements 110 250,000 250.000 Hollywood Street - 6th & Sang Avenue Intersection 111 350,000 350,000 Harold Street- Stubblefield to College 112 348,000 348,000 Old Missouri Road - Old Wire to Joyce 113 150,000 1.483.000 1.633.000 Shiloh Dnve Extension 114 736,000 730000 The Cliffs - Cost Sharing 115 250,000 250.000 Gregg Avenue - Highway 71 to Mud Creek Bndge 116 360,000 380,000 McCollum Road Improvements 117 280,000 280.000 Old Wire Road - Township to Highway 45 118 160,000 1.225,000 1,365,000 Gregg Avenue Extension - Dickson to North 119 569.000 931,000 700.000 2,200000 Old Wire Road - Township to Old Missouri 120 135.000 920,000 1,055.000 Happy Hollow- Cliffs to Huntsville 121 50,000 50,000 4,235,000 1,734,000 3,272,000 2,491,000 2,070,000 13,802,000 Transoortalion.lmprovement5 Traffic Traffic Signal Improvements 123 93,000 93,000 98,000 101.000 100,000 475,000 M.l1.T.C.D. Sign Material 124 27,000 29,000 30,000 32,000 24,000 142,000 110,000 122,000 128,000 133,000 124,000 617,000 Watet&Sewerumproyrments Water/Sewer & Highway 265 - Water/Sewer Relocations 126 700,000 700,000 Engineering Sanitary Sewer Rehabilitation 127 1,054.000 1,963,000 1,608,000 1.728,000 1,806,000 8.159,000 Dickson Street - Water/Sewer Relocations 128 500,000 500,000 5 Source/Division Project City of Fayetteville, Arkansas 1999 - 2003 Capital Improvements Program Comprehensive Detail Page 1999 2000 2001 2002 2003 Total Request Water and Sewer Operations/Services Center Highway 16 West Water/Sewer Relocation Hyland Park Elevated Water Storage Tank Wilson Park Area Water Relocations Snlid Waste Improvements Solid Waste Curbside Recycling Improvements Roll -Off Containers Collection Bins - Curbside Composting Site Improvements Commercial Cart Program Other Capital Imnrovements Animal Serv. Building Maint. Cable Admin. City Wide Information Tech Mayor's Admin. Public Lands Street W/S Services Animal Shelter A/C Replacement Animal Shelter Roof Replacement Kennel Cage Doors - Woven Wire Replacement Building Improvements P.E.G. Television Center- Equipment Radio System Replacement Microcomputer Replacements Geographic Information System Local Access Network (LAN) Upgrades AS/400 Minicomputer System Upgrades Printer Replacements Research & High Technology Park - Grant Match Tree Planting Program Work Order System Telephone Upgrade - Year 2000 Compliance • Total Sales Tax Capital Improvements Fund Projects Shoe Fund Vehicles & Eauioment Fleet Opers. Police/Passenger Vehicles - Repl 1 Exp Fire Vehicles/Equipment - Replacement Sanitation Vehicles/Equipment - Repl / Exp LighuMedium U8Iity Vehicles - Repl / Exp Medium/Heavy Utility Vehicles - Repl / Exp Back Hoe/Loaders - Repl / Exp Tractor/Mower Replacements Construction Equipment - Exp Other VehicleslEquipment - Rept / Exp Total Shop Fund Projects Water & Sewer Fund Wastewater Treatfnent Imnrovements W.W.T.P. Ultraviolet Disinfection System Safety Equipment Improvements Plant Pumps and Equipment Testing Equipment Computer System Upgrade/Maintenance Upgrade/Replace Litt Stations S.M.S. Access Road Improvements Upgrade/Replace Sludge Dewatering System Water & Sewer Imnrovements Water/Sewer & Highway 265 - Water/Sewer Relocations Engineering S.C.A.D.A. System Upgrade Water and Sewer Cost Sharing Wastewater Treatment Plant Expansion Water and Sewer Operations/Services Center East Ridgeway - Water Line Extension 36" Water Line Replacement and Protection 129 200,000 600,000 130 450,000 131 132 134 135 136 137 138 831,000 500.000 800.000 450,000 831.000 500,000 2,904,000 2,563,000 1,608,000 2,559,000 2,306,000 11,940,000 35,000 20,000 17,000 55,000 20,000 20,000 20,000 50,000 127,000 40,000 70,000 23,000 25,000 50,000 98,000 20,000 34,000 20.000 74,000 148 15,000 153 154 144 350,000 149 36,000 152 142 30,000 145 111,000 147 56,000 146 65,000 143 25,000 151 300,000 141 56,000 150 30,000 140 80,000 125,000 47,000 370,000 33,000 117,000 25,000 200,000 60,000 30,000 20,000 12,000 165,000 48,000 35,000 120,000 30,000 200,000 63,000 185,000 205.000 44.000 38.000 140,000 60,000 75,000 30,000 67,000 35,000 63,000 132,000 139,000 40,000 409,000 15,000 20,000 12,000 1,030,000 54,000 229,000 370.000 174,000 688,000 116,000 140,000 30,000 140,000 700,000 66,000 312,000 60,000 80,000 38.000 200,000 1,154,000 1,007,000 693,000 639,000 593,000 4,086,000 12,381,000 8 599 000 8,704000 8,811,000 9,516,000 48 011 000 156 286,000 322,000 322,000 368,000 368,000 157 30,000 158 517,000 677,000 120,000 284,000 695,000 159 481,000 330,000 255,000 436,000 370,000 160 236,000 168,000 101,000 142,000 172,000 161 175,000 171.000 114,000 159,000 95.000 162 192,000 154,000 196,000 96,000 58,000 163 40,000 164 169,000 97,000 262,000 302,000 95,000 1,666,000 30,000 2,293,000 1,872,000 819.000 714,000 696,000 40,000 925,000 2,126,000 1 919 000 1 370 000 1 787,000 1,853 000 . 9 055 000 166 1,100,000 167 5,000 168 50,000 169 9,000 170 8,000 171 30,000 172 5,000 173 175 176 177 178 179 180 181 6,000 101,000 9,000 8,000 50,000 5,000 400,000 6,000 101.000 10,000 9,000 50,000 5,000 6,000 101,000 40,000 9,000 50,000 5,000 6,000 101,000 10,000 9,000 50,000 5,000 1,100,000 29,000 454,000 48,000 43,000 230,000 25,000 400,000 1,207,000 579,000 181,000 181,000 181,000 2,329,000 1,500,000 250,000 100,000 2,900,000 6 1,500,000 400,000 200,000 850,000 205,000 225,000 235,000 215,000 980,000 2,900,000 704,000 704,000 300,000 300,000 100,000 550,000 650,000 Source/Division Project a a: . • City of Fayetteville, Arkansas 1999 - 2003 Capital Improvements Program Comprehensive Detail Page 1999 2000 2001 2002 .182 700,000 Sanitary Sewer Rehabilitation Mt. Sequoyah Water/Sewer System Upgrade Huntsville Road - Water Line Replacements Hinkle Mobile Home Park - Water Line Rept. North Central Area Water System Upgrades Mt. Sequoyah Elevated Water Storage Tank Water & Service Imorovements W/S Services Water Meters Backflow Prevention Assemblies Water & Sewer Rate/Operations Study Total Water & Sewer Fund Projects Bond Fund Water & Sewer Imornvemenl5 Engineering Wastewater Treatment Plant Expansion Total Bond Fund Projects Community Development Block Grant Fund Community Development Imorovements C.D. Walker Park Senior Complex Walker Park Pavilion Southeast Community Center - Playground Equip. Southeast Community Center - Addition Project for Family Violence - Expansion Total Community Development Block Grant Fund Projects Off -Street Parking Fund Off -Steel Parking Imnrnvements Parking Enf. Parking Lot Ovedays Downtown Parking Master Plan Parking Deck Rehabilitation Gated Parking Conversion Total Off -Street Fund Projects Solid Waste Fund Solid_Wasteimprovements Solid Waste Curbside Recycling Improvements Dumpster Lease Program Solid Waste Rate Study Total Solid Waste Fund Projects Airport Fund Parks Development Fund Sales Tax Capital Improvements Fund Shop Fund Water & Sewer Fund Bond Fund Community Development Block Grant Fund Off -Street Parking Fund Solid Waste Fund 183 184 185 186 187 189 190 191 2003 Total Request 572,000 405,000 827,000 180,000 1.995.000 951,000 1,100,000 1,272,000 2.400.000 827.000 180.000 951,000 1,100,000 4,750,000 2,409,000 2.959,000 2,230,000 2,266.000 14,614,000 204,000 12,000 100.000 215,000 13,000 253,000 15,000 316,000 228,000 268,000 285,000 302,000 1,259,000 16,000 17,000 73,000 126.000 226.000 427,000 319,000 1.558.000 6 273 000 3 216 000 3 408,000 2,838.000 2,766,000 18,501,000 194 3,300,000 3,200,000 37,300,000 23.000,000 66,800.000 3,300,000 3 200.000 37,300.000 23,000,000 66,800,000 196 300.000 197 40.000 198 30,000 199 59.000 119.000 25,000 200 55.000 320,000 202 203 204 205 207 208 209 300.000 40,000 30,000 203,000 375,000 484 000 439,000 25,000 10,000 30,000 12,000 38.000 35,000 25,000 12,000 83 000 67 000 25,000 14,000 51,000 23,000 25.000 6,000 25.000 948.000 81,000 38.000 135,000 26.000 48,000 31,000 280,000 50.000 50,000 20.000 50,000 50,000 41,000 30,000 50,000 25.000 28,000 50,000 228,000 196,000 20.000 120 000 91 000 80 000 75,000 78 000 444,000 Projects Bvfund-All Sources 1.529.000 2,293,000 2,814,000 961.000 760,000 772.000 785,000 797,000 12,381,000 8.599,000 8,704,000 8,811,000 2,126,000 1,919,000 1,370,000 1,787.000 6,273,000 3,216.000 3,408,000 2,838,000 3,300,000 3,200,000 37,300,000 484.000 439,000 25,000 83,000 67,000 51,000 48 120,000 91,000 80,000 75 $ 23 756,000 S 20,696,000 S 20,437 000 S 7 .000 ,000 52,617,000 $ 39,639,000 $ 1,570,000 825,000 9,516,000 1,853,000 2,766,000 23,000,000 31,000 78,000 9,167,000 3,939.000 48,011,000 9,055.000 18,501,000 66.800.000 948,000 280,000 444,000 157 145,000