HomeMy WebLinkAbout150-98 RESOLUTIONRESOLUTION NO 15:0-.8
A RESOLUTION EXPRESSING THE WILLINGNESS OF THE
CITY OF FAYETTEVILLE, ARKANSAS TO UTILIZE FEDERAL -
AID MONIES FOR FOLLOWING CITY PROJECT: GREGG
AVENUE WIDENING FROM HIGHWAY 71B TO MUD CREEK.
WHEREAS, the City of Fayetteville understand that Federal -Aid Surface Transportation
Program Funds are available for certain city projects at the following federal participating ratios:
Roadway Construction
on City Streets
City Project Programmed
but not Let to Contract
Work Phase
All phases
All phases
Federal Share City Match
80% 20%
-0- 100%
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF FAYETTEVILLE, ARKANSAS•
•
Section 1 That the City of Fayetteville, Arkansas will participate in accordance with its
designated responsibilities in this project.
Section 2 The Mayor and City Clerk are authorized and directed to execute all
appropriate agreements and contracts necessary to expedite the construction of this City project.
Section 3 The City pledges its full support and hereby authorizes the Arkansas State
Highway and Transportation Department to initiate action to implement this project.
,y PASSED AND APPROVED this 17th day of November , 1998.
••
Cr? • I
ts)11/44.'
-
N.
), -%•
`o r
h• 1 11 eyY
cAPTEST:
B
Heather Woodruff, City Cl
APPROVE :
By .
red Hanna, Mayor
kor
1 "�
•
STAFF REVIEW FORM
X AGENDA REQUEST, City Council meeting
FROM: Don Bunn Engineering
Name Division
of November 17, 1998
Public Works
Department
ACTION REQUIRED: A resolution authorizing the Mayor to execute an Agreement
of Understanding with the Arkansas Highway and Transportation Department
relative to the improvement of Gregg Street from Highway 71B to Mud Creek
Bridge.
COST TO CITY:
$ -0-
Cost-This Request
Account Number
$ NIX
Category/Project Budget Category/Project Name
Funds Used To Date
Program Name
Project Number Funds Remaining Fund Category
BDGET/CONTRACT REVIEW: Budgeted Item Budget Adj. Attached
Bridget Coordinator
tA/A21771. '.�IVnutJ
Accou ng M4nag r
City'Attofa�
Ahhte
Purchasing Officer
48
Date Administrative Services Director Date
/00w -9g
Date
M- 2ti.4i
Date
1d -a9 -9%
Date
ADA Coordinator Date
Internal Auditor Date
STAFF RECOMMENDATION: It is the recommendation of the Staff that the Council
approve the execution of an Agreement of Understanding with the Arkansas
Highway and Transportation Department relative to the improvement of Gregg
Street from Highway 71B to Mud Creek Bridge.
Admin ervices/14
r
May
Director
10-29-98
Date
Date
7 4eA
Date
it/v/9r
Date
Cross Reference
New Item: Yes No
Prev Ord/Res #:
Orig Contract Date:
fi
•
ARKANSAS STATE HIGHWAY
AND
TRANSPORTATION DEPARTMENT
Dan Flowers
Director
Telephone (501) 569-2000
The Honorable Fred Hanna
Mayor of Fayetteville
113 West Mountain
Fayetteville, AR 72701
Dear Mayor Hanna:
December 21, 1998
Zpt3
P.O. Box 2261
Little Rock, Arkansas 72203-2261
Telefax (501) 569-2400
Re: Job 040299
F.A.P. STP -9142(11)
Hwy. 71B -Mud Creek
(Gregg Ave. -Fayetteville) (S)
Washington County
Enclosed please find a copy of the executed Agreement of Understanding on the referenced
Federal -aid project In order for the Department to proceed with preliminary engineering, please
forward a check in the amount of $35,000.00 (made payable to the Arkansas State Highway and
Transportation Department) to this office This deposit will be applied to the City's matching
share when a construction contract is awarded for this work.
As noted in our October 9, 1998 letter, the maximum amount of Federal -aid available for this
project is $1,000,000. If you have any questions, please contact Bill Bradberry or Steve Morgan
in our Programs and Contracts Division at (501) 569-2261.
Enclosure
Robert L. Walters
Chief Engineer
RECEIVED
Ut„ :O
CITY OF FAYETTEVILLE
MAYOR'S OFFICE
•
•
•
•
•
•
•
AGREEMENT OF UNDERSTANDING
BETWEEN
THE CITY OF FAYETTEVILLE
AND
THE ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
In Cooperation with the
U.S. Department of Transportation, Federal Highway Administration
RELATIVE TO
The widening of Gregg Avenue from Highway 71B to Mud Creek (heremafter called "the
project") urilizing Federal -aid Surface Transportation Program funds.
WHEREAS, the Transportation Equity Act for the Twenty -First Century (TEA -21) provides
80% Federal -aid funds to be matched with 20% Local funds (cash match) for improvements to
eligible routes, and
WHEREAS, the City of Fayetteville (hereinafter called "City") has expressed its desire to use
Federal -aid funds for an eligible project and to provide necessary matching cash share for such
funds, and
WHEREAS, funding participation will be as follows, subject to a limit of 51,000,000.00
maximum Federal -aid approved for the project:
Federal % City %
Preliminary Engineering: 80 20
Right -of -Way: 80 20
Utilities: 80 20
Construction: 80 20
Construction Engineering: 80 20
, and
WHEREAS. it is specifically agreed between the parties executing this agreement that it is not
intended by any of the provisions or any part of the agreement to make the public or any member
thereof a third party beneficiary hereunder or to authorize anyone not a party to this agreement to
maintain a suit or action for injuries or damage of any nature pursuant to the terms or provisions
of this agreement, and
WHEREAS. the City understands that the Arkansas State Highway and Transportation
Department (hereinafter called "Department") will adhere to the General Requirements for
Recipients and Sub -recipients Concerning Minority Business Enterprises as stated on the
attachment,
IT IS HEREBY AGREED that the City and the Department, in cooperation with the Federal
Highway Administration. will participate in a cooperative prom -am for anplemen:ation and will
accept the responsibilities and assigned duties as described hereinafter.
•
THE CITY WILL:
1. Be responsible for satisfactory maintenance and operation of all improvements on that
portion of the project not on the Arkansas Highway System and all traffic signals on the
Arkansas Highway System. Failure to adequately maintain and operate the facility in
accordance with Federal -aid requirements will result in withholding future Federal -aid
highway funds.
2. Be responsible for 20% of the project cost, which will include preliminary engineering,
construction, construction engineering, appraisal and acquisition of right-of-way, relocation
services (when required), and adjustment of all man-made improvements, including utilities.
3. Be responsible for 100% of all preluninary engineenng, right-of-way, and other costs
incurred should the City not enter into the construction phase of the project.
4. Be responsible for any and all expenditures which may be .declared non -participating in
federal funds, including any iuch awards by the State Claims Commission.
5. Repay to the Department the federal share of the cost of this project if for any reason the
Federal Highway Administration removes federal participation.
6. Submit a Letter to the Right of Way Division of the Department which either (1) stipulates
the services relative to nght-of-way acquisition, appraisal, relocation, and utilities that the
City will assume or (2) requests that the Department handle some or all of these services.
NOTE: Failure to notify the Department prior to initiating this phase of work may
result in any expenditures being declared non -participating in federal funds.
7. Transmit to the Department a signed and sealed copy of the Resolution from the City
Council which requests a project and authorizes the Mayor to execute contracts with the
Department for projects on city streets.
8. Submit to the Department five percent of the estimated project cost before preliminary
engineering by the Department begins.
9. Submit to the Department the Local matching share of the total estimated cost before the
project is awarded to contract.
10. Make no alterations to the improvements constructed with Federal -aid funds without first
consulting with the Department.
11. Maintain or adopt regulations and ordinances as necessary for proper operation of the
improvements.
12. Be responsible for the necessary enforcement of operations as required by improvements on
the Arkansas State Highway System and City Streets.
13. Hereby attest that the employment policies and practices with regard to its employees, any
part of whose compensation is reimbursed from federal funds, will be without regard to race,
color, creed, or national origin.
14. Be responsible for all costs not provided by the Federal Highway Administration.
•
15. Indemnify and save harmless the Department from all suits, actions, or claims of any
character brought because of any damage sustained on account of the operations, actions,
acts of omission, neglect, or misconduct of the Sponsor relating to this agreement and
project.
THE DEPARTMENT WILL:
1. Be responsible for administering Federal -aid funds and for project construction supervision.
2. Be responsible for developing the necessary plans and specifications for the project.
3. When requested, provide the necessary services relative to nght-of-way acquisition,
appraisal, relocation, and utility adjustments and will be reimbursed for costs involved in
performing these services.
IT IS FURTHER AGREED that should the City fail to fulfill its responsibilities and assigned
duties as related in this Agreement, such failure will disqualify the City from receiving future
Federal -aid highway funds.
IT IS FURTHER AGREED, that should the City
funds due for project implementation or fail to
Agreement, the Department may cause such funds
City's gasoline tax allotment.
fail to pay to the Department any required
complete the project as specified in this
as may be required to be withheld from the
IN WITNESS WHEREOF, the parties thereto have executed this Agreement this /' `' day of
T
� for e tAker 1998.
RECOMMENDED:
l
Assistant Chief Engines or Planning
ARKANSAS STATE HIGHWAY CITY OF
AND TRANSPORTATION DEP ' '. LENT FAYETTEVILLE
Director of Hi
D
..
1 wers
ays and Transportation
Fred Hanna
Mayor
To: Fayetteville City Council
From: Don Bunn, Assistant Public Works Director
Thru: Charles Venable, Public Works Director
Mayor Fred Hanna
Subject: Agreement of Understanding and Resolution
Gregg Street Widening, Highway 71B to Mud Creek
Date: October 26, 1998
Attached for your review and approval is a proposed Agreement of Understanding between the
City of Fayetteville and the Arkansas State Highway and Transportation Department relative to
the widening of Gregg Avenue from Highway 71B to Mud Creek from two lanes to four lanes.
The execution of this agreement will allow State and Federal Aid numbers to be assigned to the
project and be officially placed in their program of improvements. The Agreement
• Provides for a 20% match of federal funds by the City,
• Sets a cap of $1,000,000.00 federal aid for the project,
• Sets out the City's and the State's responsibilities on the
project, and
Indicates the general items of construction which are
eligible for funding participation. Those items are 1)
Preliminary Engineering, 2) Right of way costs, 3) Utility
Relocations, 4) Construction, and 5) Construction
Engineering.
You will note that a $1,000,000.00 maximum has been set on the Federal -aid portion of the
funding. This is a new provision for these types of projects and will impact the local share in the
future. However, it is felt that it will have no impact on this particular project.
•
•
This improvement is listed as a project in the Transportation Improvement Program for 1999 and
is listed in the proposed 1999-2003 Capital Improvement Program as a 2001 project. As indicated
in the attached letter from the Highway Department, it may be several years before construction
can begin on this project because of other projects already programmed. The Department will,
prior to the start of preliminary engineering on the project, request a 5 percent deposit from the
City.
It is the recommendation of the Staff that the Council authorize the Mayor to execute this
Agreement of Understanding with the Arkansas State Highway and Transportation Department.