A RESOLUTION ACCEPTING GARVER & GARVER
ENGINEERING'S PROPOSAL IN THE AMOUNT OF $26,300 TO
ADMINISTER AND OVERSEE THE CONSTRUCTION OF THE
AIRPORT'S NEW EIGHT BAY T -HANGER.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1 That the City Council hereby accepts Garver & Garver Engineering's proposal
in the amount of $26,300 to administer and oversee the construction of the airport's new eight bay
T -hangar and authorizes the Mayor and City Clerk to execute a proposal letter. A copy of the
proposal is attached hereto marked Exhibit "N' and made a part hereof.
PASSED AND APPROVED this 15±_ day of September , 1998.
.'c. •
+s _
ewe
._..t
• 'A
ATTEST:
•
Heather Woodruff, City CICt k
APPROVED.
By
Fred Hanna, Mayor
•
•
July 28, 1998
Mr. Dale Frederick
Airport Manager
Fayetteville Municipal Airport / Drake Field
113 West Mountain
Fayetteville, AR 72703
Re: Proposal for Surveying and Engineering Services
Eight Bay T -Hangar
Dear Mr. Frederick:
Garver 6 Garver, P.A.
Engineers
240 North Block
P.O. Box 590
Fayetteville, Arkansas 72702
501-443-7237
FAX 501-443-0533
Garver+Garver
A GarverPlus Company
We appreciate the opportunity to submit to you a proposal for surveying and engineering
services for the above referenced project. Please find below my understanding of the
scope of services that you require.
Scope of Services:
Surveying
+ Topographical survey
+ Locate existing features such as:
• existing utilities (using utility company marking)
• pavement edges
• building corners
• drainage pipe inverts
+ Develop existing contour drawing
Engineering
+ Prepare Drainage Report
+ Prepare Large Scale Development
4- Locate new hangar building on-site plan
+ Develop New Utility Plan
4- Show clearances between T -hangars
4- Develop Foundation Plan
Construction Observation
+ Provide Periodic Construction Observation
(In conjunction with other on-going projects at Drake Field)
Geotechnical Investigation
+ Perform three (3) Soil Borings and analyses
A breakdown as to the estimated cost to complete the above referenced scope of work
is shown in the attachments (4 pages). We are prepared to begin work on this project
immediately should you so authorize. If this proposal is acceptable to you please sign
the authorization below and return a copy for our files.
GarverPlus Engineers • 1010 Battery Street, P.O. Box 50, Little Rock, Arkansas 72203-0050.800-264-3633 • FAX 5013724042 • e-mail garvereerletotie.net
Garver+Garver, Little Rock, Arkansas, Fayetteville, Arkansas • Elliott+Garver, Jackson, Mississippi, Oxford, Mississippi
HUB+Garver, Tulsa, Oklahoma • Lee+Garver, Louisville, Kentucky WIW+Garver, Huntsville, Alabama. Brentwood, Tennessee • Urba+Garver, Mexico City
Again, thank you for the opportunity to propose on this project. Should you have any
questions or comments, please do not hesitate to give me a call.
Cordially yours,
Garver+Garver, P.A.
Bob Bryant, E
Vice Presid nt / Branch Manager
BB:II
Enclosures
Garver+Garver, P.A. is authorized to begin work in accordance with this letter of
proposal.
/PA -Wit OSA,
Title Date
FAYETTEVILLE MUNICIPAL AIRPORT
8 -Bay T -Hangar Construction - Engineering Services
Plans and Specifications Preparation, Construction Support Services
Plans and Specifications Preparation
Page 1 of 3
1. Perform needed on-site surveys to support design process. Complete airspacing forms, city -
required drainage plan, Large Scale Development, and utility searches.
2. Prepare final plans and specifications for an eight -bay general aviation hangar. Construction
documents to be prepared for a "turnkey" building project, with contractor providing detailed
construction schedule and plans. Incorporate comments from Airport staff during design Prepare
final construction and project cost estimates.
1 2 Total
Sr. Project Manager 2 2 4
Sr. Project Engineer 6 18 24
Project Engineer 0 0 0
Sr. Design Engineer 20 30 50
Design Engineer 12 40 52
Technician/Draftsman 4 24 28
Survey Crew 8 0 8
Construction Engineer 0 0 0
Construction Observer 0 2 2
Typist 0 8 8
FAYETTEVILLE MUNICIPAL AIRPORT Page 2 of 3
8 -Bay T -Hangar Construction - Engineering Services
Construction Contract Administration
1. Coordinate advertisement and bid dates with airport staff. Dispense plans to prospective bidders,
support plans through bidding process. Prepare bid tabulation, recommendation of award, execution
of contract, coordination of notice to proceed. Prepare for and conduct preconstruction conference as
needed.
2. Review and correct/approve contractor's construction materials submittals for conformance with
contract documents Prepare contractor's pay estimates. Prepare and forward request for
reimbursement forms for Board review and signature. Review and submit contractor's pay estimates.
1 2 Total
Sr. Project Manager 2 1 3
Sr. Project Engineer 8 6 14
Project Engineer 0 0 0
Sr. Design Engineer 16 12 28
Design Engineer 8 8 16
Technician/Draftsman 6 8 14
Survey Crew 0 0 0
Construction Engineer 0 2 2
Construction Observer 2 8 10
Typist 2 12 14
FAYETTEVILLE MUNICIPAL AIRPORT Page 3 of 3
8 -Bay T -Hangar Construction - Engineering Services
Construction Support Services
1. Surveys for Construction - Establish survey baselines adequate for contractor's layout of the
project.
2. Provide part-time construction observation for the estimated 45 -day construction contract
performance time. Coordinate contractor and airport operations during construction. Provide clerical
and engineering support for the construction observer. Conduct project and design engineer visits to
the job site to resolve construction problems. Prepare record drawings.
1 2 Total
Sr. Project Manager 0 4 4
Sr. Project Engineer 0 4 4
Project Engineer 0 0 0
Sr. Design Engineer 0 8 8
Design Engineer 2 0 2
Technician/Draftsman 0 6 6
Survey Crew 4 0 4
Construction Engineer 0 6 6
Construction Observer 4 100 104
Typist 0 0 0
•
•
•
FAYETTEVILLE MUNICIPAL AIRPORT
8 -Bay T -Hangar Construction - Engineering Services
Plans and Specifications Preparation, Construction Support Services
Plans and Specifications
Preparation
Construction Contract
Administration
07/28/98
Construction Support
Services
DIRECT SALARY COST MAN
HOURS
4
24
0
50
52
28
8
0
2
8
Sr. Project Manager
Sr. Project Engineer
Project Engineer
Sr. Design Engineer
Design Engineer
Technician/Draftsman
Survey Crew
Construction Engineer
Construction Observer
Typist
Subtotal - Salaries
LABOR AND GENERAL
ADMINISTRATIVE OVERHEAD (150%)
DIRECT NON -PAYROLL COSTS
Geotechnical Investigation
Reproduction
Survey Supplies
Computer Rental
Mileage/Travel
COST
$148.80
$648.00
$0.00
$940.00
$816.40
$490.00
$240.00
$0.00
$36.60
$97.60
$3,417.40
$5,126.10
Subtotal - Direct Cost
Subtotal Costs
PROFESSIONAL FEE (profit)
$2,500.00
$60.00
$75.00
$200.00
$50.00
$2,885.00
MAN
HOURS COST
3
14
0
28
16
14
0
2
10
14
$111.60
$378.00
$0.00
$526.40
$251.20
$245.00
$0.00
$74.40
$183.00
$170.80
$1,940.40
$2,910.60
$41.00
$0.00
$19.00
$0.00
MAN
HOURS COST
4 $148.80
4 $108.00
0 $0.00
8 $150.40
2 $31.40
6 $105.00
4 $120.00
6 $223.20
104 $1,903.20
0 $0.00
$2,790.00
$4,185.00
$11,428.50
$1,371.42
$60.00
$4,911.00
$589.32
$141.00
$0.00
$0.00
$27.00
$168.00
$7,143.00
$857.16
Subtotal:
TOTAL:
$12,799.92
$26,300.40
$5,500.32
$8,000.16
Date /7