HomeMy WebLinkAbout124-98 RESOLUTIONRESOLUTION NO. 124-98 A RESOLUTION ACCEPTING GARVER & GARVER ENGINEERING'S PROPOSAL IN THE AMOUNT OF $26,300 TO ADMINISTER AND OVERSEE THE CONSTRUCTION OF THE AIRPORT'S NEW EIGHT BAY T -HANGER. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1 That the City Council hereby accepts Garver & Garver Engineering's proposal in the amount of $26,300 to administer and oversee the construction of the airport's new eight bay T -hangar and authorizes the Mayor and City Clerk to execute a proposal letter. A copy of the proposal is attached hereto marked Exhibit "N' and made a part hereof. PASSED AND APPROVED this 15±_ day of September , 1998. .'c. • +s _ ewe ._..t • 'A ATTEST: • Heather Woodruff, City CICt k APPROVED. By Fred Hanna, Mayor • • July 28, 1998 Mr. Dale Frederick Airport Manager Fayetteville Municipal Airport / Drake Field 113 West Mountain Fayetteville, AR 72703 Re: Proposal for Surveying and Engineering Services Eight Bay T -Hangar Dear Mr. Frederick: Garver 6 Garver, P.A. Engineers 240 North Block P.O. Box 590 Fayetteville, Arkansas 72702 501-443-7237 FAX 501-443-0533 Garver+Garver A GarverPlus Company We appreciate the opportunity to submit to you a proposal for surveying and engineering services for the above referenced project. Please find below my understanding of the scope of services that you require. Scope of Services: Surveying + Topographical survey + Locate existing features such as: • existing utilities (using utility company marking) • pavement edges • building corners • drainage pipe inverts + Develop existing contour drawing Engineering + Prepare Drainage Report + Prepare Large Scale Development 4- Locate new hangar building on-site plan + Develop New Utility Plan 4- Show clearances between T -hangars 4- Develop Foundation Plan Construction Observation + Provide Periodic Construction Observation (In conjunction with other on-going projects at Drake Field) Geotechnical Investigation + Perform three (3) Soil Borings and analyses A breakdown as to the estimated cost to complete the above referenced scope of work is shown in the attachments (4 pages). We are prepared to begin work on this project immediately should you so authorize. If this proposal is acceptable to you please sign the authorization below and return a copy for our files. GarverPlus Engineers • 1010 Battery Street, P.O. Box 50, Little Rock, Arkansas 72203-0050.800-264-3633 • FAX 5013724042 • e-mail garvereerletotie.net Garver+Garver, Little Rock, Arkansas, Fayetteville, Arkansas • Elliott+Garver, Jackson, Mississippi, Oxford, Mississippi HUB+Garver, Tulsa, Oklahoma • Lee+Garver, Louisville, Kentucky WIW+Garver, Huntsville, Alabama. Brentwood, Tennessee • Urba+Garver, Mexico City Again, thank you for the opportunity to propose on this project. Should you have any questions or comments, please do not hesitate to give me a call. Cordially yours, Garver+Garver, P.A. Bob Bryant, E Vice Presid nt / Branch Manager BB:II Enclosures Garver+Garver, P.A. is authorized to begin work in accordance with this letter of proposal. /PA -Wit OSA, Title Date FAYETTEVILLE MUNICIPAL AIRPORT 8 -Bay T -Hangar Construction - Engineering Services Plans and Specifications Preparation, Construction Support Services Plans and Specifications Preparation Page 1 of 3 1. Perform needed on-site surveys to support design process. Complete airspacing forms, city - required drainage plan, Large Scale Development, and utility searches. 2. Prepare final plans and specifications for an eight -bay general aviation hangar. Construction documents to be prepared for a "turnkey" building project, with contractor providing detailed construction schedule and plans. Incorporate comments from Airport staff during design Prepare final construction and project cost estimates. 1 2 Total Sr. Project Manager 2 2 4 Sr. Project Engineer 6 18 24 Project Engineer 0 0 0 Sr. Design Engineer 20 30 50 Design Engineer 12 40 52 Technician/Draftsman 4 24 28 Survey Crew 8 0 8 Construction Engineer 0 0 0 Construction Observer 0 2 2 Typist 0 8 8 FAYETTEVILLE MUNICIPAL AIRPORT Page 2 of 3 8 -Bay T -Hangar Construction - Engineering Services Construction Contract Administration 1. Coordinate advertisement and bid dates with airport staff. Dispense plans to prospective bidders, support plans through bidding process. Prepare bid tabulation, recommendation of award, execution of contract, coordination of notice to proceed. Prepare for and conduct preconstruction conference as needed. 2. Review and correct/approve contractor's construction materials submittals for conformance with contract documents Prepare contractor's pay estimates. Prepare and forward request for reimbursement forms for Board review and signature. Review and submit contractor's pay estimates. 1 2 Total Sr. Project Manager 2 1 3 Sr. Project Engineer 8 6 14 Project Engineer 0 0 0 Sr. Design Engineer 16 12 28 Design Engineer 8 8 16 Technician/Draftsman 6 8 14 Survey Crew 0 0 0 Construction Engineer 0 2 2 Construction Observer 2 8 10 Typist 2 12 14 FAYETTEVILLE MUNICIPAL AIRPORT Page 3 of 3 8 -Bay T -Hangar Construction - Engineering Services Construction Support Services 1. Surveys for Construction - Establish survey baselines adequate for contractor's layout of the project. 2. Provide part-time construction observation for the estimated 45 -day construction contract performance time. Coordinate contractor and airport operations during construction. Provide clerical and engineering support for the construction observer. Conduct project and design engineer visits to the job site to resolve construction problems. Prepare record drawings. 1 2 Total Sr. Project Manager 0 4 4 Sr. Project Engineer 0 4 4 Project Engineer 0 0 0 Sr. Design Engineer 0 8 8 Design Engineer 2 0 2 Technician/Draftsman 0 6 6 Survey Crew 4 0 4 Construction Engineer 0 6 6 Construction Observer 4 100 104 Typist 0 0 0 • • • FAYETTEVILLE MUNICIPAL AIRPORT 8 -Bay T -Hangar Construction - Engineering Services Plans and Specifications Preparation, Construction Support Services Plans and Specifications Preparation Construction Contract Administration 07/28/98 Construction Support Services DIRECT SALARY COST MAN HOURS 4 24 0 50 52 28 8 0 2 8 Sr. Project Manager Sr. Project Engineer Project Engineer Sr. Design Engineer Design Engineer Technician/Draftsman Survey Crew Construction Engineer Construction Observer Typist Subtotal - Salaries LABOR AND GENERAL ADMINISTRATIVE OVERHEAD (150%) DIRECT NON -PAYROLL COSTS Geotechnical Investigation Reproduction Survey Supplies Computer Rental Mileage/Travel COST $148.80 $648.00 $0.00 $940.00 $816.40 $490.00 $240.00 $0.00 $36.60 $97.60 $3,417.40 $5,126.10 Subtotal - Direct Cost Subtotal Costs PROFESSIONAL FEE (profit) $2,500.00 $60.00 $75.00 $200.00 $50.00 $2,885.00 MAN HOURS COST 3 14 0 28 16 14 0 2 10 14 $111.60 $378.00 $0.00 $526.40 $251.20 $245.00 $0.00 $74.40 $183.00 $170.80 $1,940.40 $2,910.60 $41.00 $0.00 $19.00 $0.00 MAN HOURS COST 4 $148.80 4 $108.00 0 $0.00 8 $150.40 2 $31.40 6 $105.00 4 $120.00 6 $223.20 104 $1,903.20 0 $0.00 $2,790.00 $4,185.00 $11,428.50 $1,371.42 $60.00 $4,911.00 $589.32 $141.00 $0.00 $0.00 $27.00 $168.00 $7,143.00 $857.16 Subtotal: TOTAL: $12,799.92 $26,300.40 $5,500.32 $8,000.16 Date /7