Loading...
HomeMy WebLinkAbout43-96 RESOLUTION• RESOLUTION NO. 43-96 A RESOLUTION APPROVING A HIGHWAY/UTILITY CONTRUCTION/RELOCATION AGREEMENT WITH THE ARKANSAS HIGHWAY TRANSPORTATION DEPARTMENT FOR THE HIGHWAY 71 -GARLAND AVENUE WATER AND SEWER RELOCATION. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: 5ection 1. That the City Council hereby approves a Highway/Utility Construction/Relocation Agreement, and authorizes the Mayor and City Clerk to execute same. A copy of the agreement is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 2nd day of April , 1996. k \ APPROVED: By: Fred Hanna, Mayor porrrivm re , • AM 3 n fr398, ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT Dan Flowers Director Telephone (501) 569-2000 Mr. Donald R. Bunn City of Fayetteville 113 West Mountain Fayetteville, Arkansas 72701 Dear Mr. Bunn: April 26, 1996 1 • P.O. Box 2261 Little Rock, Arkansas 72203-2261 Telefax (501) 569-2400 RE: Job 4976 (Utilities) MAM-5089 (7) E nclosed is your copy of the utility agreement approved on April 26, 1996, covering reimbursement for the idjustment of your facilities on the referenced job. This letter confirms the authorization given to you on September 29, 1995, to proceed with advertising for bids. If you need additional right of way to accomplish your adjustments, you may proceed with the acquisition of this right of way. You are required to furnish a copy of each bid received and the bid tabulation sheet for our review and concurrence. Should you elect to award the contract to other than the low qualified bidder, the Department will participate only in the amount of the low bid. N o construction work should be performed until you receive a written work order from this office. If I may be of assistance, please advise. Yours truly (Aso Ron Ward Utility Coordinator Utilities Section Right of Way Division RWW/d a h E nclosures cc: Master Files District Engineer W/Enclosures Resident Engineer W/Enclosures #43 FAP FILE • ARKANSAS STATE HIGHWAY COMMISSION HIGHWAY - UTILITY CONSTRUCTION/RELOCATION AGREEMENT State Job No. 4976 (Utilities) County Washington AC 2] LS ID Federal Aid Project MAM-5089 (7) Route 112S Section OS Job Location Hwy. 71 - Garland Ave. (F) Utility Owner City of Fayetteville Water & Sewer Dept. t -L THIS AGREEMENT, made and entered into this it, day of n PR 1 1._ ,19%,by and between the Arkansas State Highway Commission, acting by and through the duly authorized representatives of the Arkansas State Highway and Transportation Department, with headquarters at Little Rock, Arkansas, hereinafter referred to as the "Department," and the City of Fayetteville Water & Sewer Department acting by and through its duly authorized representatives, hereinafter referred to as the "Owner" WITNESSETH: The Department proposes to make highway improvements as specified under the above referenced job number and, the, "Owner" will adjust or relocate its existing facilities as set out in the attached plans and cost estimate. The Department will participate in the cost of said adjustment/relocation to the extent that eligibility is hereinafter established Payment will be made on an actual cost basis as mutually agreed between "Owner" and "Department." This agreement is governed by all applicable State and Federal laws, rules, and regulations including the Arkansas State Highway Commission Utility Accommodation Policy adopted by Commission Minute Order 89 455 as amended and supplemented, the Federal Aid Program Guide on Utility Adjustments and Accommodation on Federal Aid Highway Projects as amended and supplemented, and the provisions of 23 CFR § 645 as amended and supplemented. DESCRIPTION OF WORK: Owner will clear construction by abandoning in place approximately 970 LF 12", 6,350 LF 8'; 210 LF 6", and 160 LF 2" waterlines, valves and fittings. Approximately 54 LF 12", 12,500 LE 8" and 200 LF 4" sanitary sewer lines will also be abandoned SerVICC will be restored by the installation of approximately 986 LF 12; 6,447 LF 8", 226 LF 20 LF 4" and 171 LF 2" waterlines. Approximately 54 LF 12; 4283 LF 8", 240 LF 4" sewer lines will be installed. The owner will also install approximately 4,302 LF 24"and 11 LF 16" waterline at no cost to the Department. 18.9% of owners lines are presently located on private easement and owner is eligible for reimbursement at that factor. A construction engineering cost of $80,000.00 has been included in the total amount Easement costs are not available and will be added later. Work will be carried out by low bid contract. The Department agrees that the required adjustment is 18.9% eligible for reimbursement for the actual cost which is estimated to be $1,087,444.00 of which $205,587.44 to be paid by the Department and $884857.56 is to be borne by Owner. Owner will not commence work until authorized by the Department, and will then endeavor to begin within 15 calendar days and complete within 240 calendar days thereafter On completion of said work, "Owner" is responsible for the cleanup and restoration of the work area including the disposal of surplus materials and debris. Final billing must include all supporting detail. "Owner" shall also submit one (I) set of "as - built" drawings at this time. Payment will be 100% of lump sum bills and 90% of actual cost bills, final 1096 being released on completion of Departments audit. Expenses incurred under an actual cost agreement may be billed to the Department monthly in increments of $5,000.00 or more. "Owner" must maintain cost records and accounts to support the agreed adjustment/relocation work. Said recorcls to be retained and available for inspection for a period of three (3) years from date of final payment. "Owner" shall be responsible for any and all hazards to persons, property, and traffic. With respect to traffic control, owner shall adhere to the requirements of the 'Manual of Uniform Traffic Control Devices", as amended and supplemented. Owner shall save the Arkansas State Highway Commission, its officers, the Department, its officers and employees harmless in all circumstances. Notwithstanding anything hereinbefore written, neither the "Owner" nor the "Department" by execution of this Agreement waives or relinquishes any rights which either may legally have within the limits of the Law or Constitution, either State or Federal. CI7Y OF FAYE77'EVILLE WATER & SEWER DEPARTMENT fTitle Mayor /112/124-1----- A Tr --sr Title CITY ctsa Title ARKANSAS STATE HIGHWAY COMMISSION Acting By and Through The HIGHW AND TRANS RTATION DEPARTMENT tor of Highways & Transportation Chief, Righ of Way Division Chief- ties Section Right of ay Division , • Engineers Ethimate . Wedington Water and Sewer Relocations CEI Project No. 10963 11/14/95 hem Description Est. Ouantity Unit Unit Price Bid Price AH70 Cost 1 ayetteville Cost Ouantity Price Ouanti Price 1 24" Ductile Iron Waterline 2 16" Ductile Iron Waterline 3 12" Waterline 4 8" Waterline 5 6" Watedine 6 4" Waterline 7 7 PVC Waterline 8 Fittings 9 24" Butterfly Valve 10 12" Butterfly Valve 11 8" Gate Valve 12 6" Gate Valve 13 4" Gate Valve 14 2" Gate Valve 15 6" Comb. AirNaccuum Valve 16 4" Comb. AirNaccuum Valve 17 7 Comb. AirNaccuum Valve 18 1" Comb. AirNaccuum Valve 19 24"x 20" ISBN 20 24"x 8" TS&V 21 16" x 14" TS&V 22 12" x 10" Tapping Sleeve and Valve 23 8" x 6" TS&V 24 6' x 4" Tapping Sleeve and Valve 25 r Transition Couplings 26 42" Split Steel Casing 27 30" Steel Casing 28 24" Steel Casing 29 16" Steel Casing 30 Fire Hydrant Assembly 31 3/4 " Water Service 32 1" WaterService 33 Single Meter Sets 34 Double Meter Sets 35 Extend 30' Casing, Split 36 Cut and Cap 12" Waterline 37 Cut and Cap 8" Waterline 38 Cut and Cap 6" Waterline 39 Cut and Cap 4" and smaller Waterline 40 Concrete Encasement 41 4' Manhole 42 Remove Manhole 43 12" PVC Sanitary Sewer 44 8" PVC Sanitary Sewer 45 4" PVC Sewer Service Pipe 46 Service Wye (8 x 4) 47 Reconnect Sanitary Service 48 Reconnect Existing Water Services TOTAL CONSTRUCTION ENGINEERING COSTS Preliminary Construction TOTAL PROJECT COSTS 4,302 LF 11 LF 986 LF 6,447 LF 226 LF 20 LF 171 LF 53,147 LBS 10 EA 3 EA 13 EA 2 EA 1 EA 5 EA 1 EA 1 EA 2 EA 1 EA 1 EA 2 EA 1 EA 2 EA 2 EA 2 EA 4 EA 110 LE 59 LF 160 LF 234 LF 21 EA 585 IF 195 LF 39 EA 13 EA 20 LF 3 EA 3 EA 2 EA 7 EA 100 LF 9 EA 1 EA 54 LF 1,283 LF 240 LF 4 EA 4 EA 90 EA 55.00 45.00 35.00 25.00 18.00 15.00 7.00 5.00 4,100.00 1,300.00 500.00 395.00 325.00 225.00 2,000.00 1,000.00 700.00 500.00 16,000.00 5,500.00 5,000.00 4,000.00 1,800.00 1,700.00 75.00 250.00 100.00 60.00 30.00 2,000.00 5.00 7.00 375.00 425.00 200.00 1,000.00 900.00 800.00 700.00 30.00 1,700.00 800.00 30.00 25.00 9.00 100.00 125.00 100.00 236 610.00 495.00 34,510.00 161,175.00 4,068.00 300.00 1,197.00 265,735.00 41,000.00 3,900.00 6,500.00 790.00 325.00 1,125.00 2,000.00 1,000.00 . 1,400.00 500.00 16,000.00 11,000.00 5,000.00 8,000.00 3,600.00 3,400.00 300.00 27,500.00 5,900.00 9,600.00 7,020.00 42,000.00 2,925.00 1,365.00 14,625.00 5,525.00 4,000.00 3.000.00 2,700.00 1,600.00 4,960.00 3,000.00 15,300.00 800.00 1,620.00 32,075.00 2,160.00 400.00 500.00 9,000.00 1 007 445.00 -1•190e 80,000.00 130,000.00 -114.37,446,00 O 0.00 4,302 236,610 00 O 0.00 11 495.00 314 10,990.00 672 23,520.00 151 3,775.00 6,296 157,400.00 145 2,610.00 81 1,458.00 18 270.00 2 30.00 164 1,148.00 7 49.00 7,788 38,940.00 45,359 226,795.00 0 0.00 10 41,000.00 1 1,300.00 2 2,600.00 O 0.00 13 6,500.00 2 790.00 0 0.00 1 325.00 0 0.00 5 1,125.00 0 0.00 0 0.00 1 2,000.00 0 0.03 1 1,000.00 0 0.00 2 1,400.00 0 0.03 1 500.00 0 0.00 1 16.000.00 0 0.00 2 11.000.00 0 0.00 1 5,000.00 1 4,000.00 1 4,000.00 2 3,600.00 0 0.00 1 1,700.00 1 1,700.00 O 0.00 4 300.00 110 27,500.00 0 0.00 O 0.00 59 5,900.00 160 9,600.00 0 0.00 229 6,670.00 5 150.00 0 0.00 21 42,000.00 585 2,925.00 0 0.00 195 1,365.00 0 0.00 39 14,625.00 0 0.00 13 5.525.00 0 0.00 20 4,000.00 0 0.00 0 0.00 3 3,000.00 2 1.800.00 1 900.00 2 1,600.00 0 0.00 7 4,900.00 0 0.00 50 1,500.00 50 1,500.00 6 10.200.00 3 5,100.00 1 800.00 0 0.00 54 1,620.00 0 0.00 520 13,000.00 763 19,075.00 240 2,160.00 0 0.00 4 400.00 0 0.00 4 500.00 0 0.00 90 9,000.00 0 0.00 190,463.00 1 816,982.03 16.9%J 81.1% -246:9404F zc. 5gal to+ 105,422.79 .9854404-.7er 67 ' • CEI Engineering Associates, Inc. • Corporate Office 110 West Central • Bentonville, AR 72712 • (501) 273-9472 • FAX (501) 273-0844 November 9, 1995 Mr. Ron Ward, Utility Coordinator Utilities Section, ROW Division Arkansas Highway and Transportation Department P.O. Box 2261 Little Rock, AR 72203 Re: Highway 112 Spur (VVedington Drive) Widening Utilities Relocation, AHTD Job 4976 CEI Project #10963.0 Dear Ron, DISTRIBUTION: Mr. Jim Beavers - City of Fayetteville PDC/TWH/DAG/R1CC/File RECEIVED UTILMES SECTION •ir 1 3 1995 t POST C IEF COORD. Following is a description of the water and sewer relocation costs which should be reimbursed to the City of Fayetteville. These work items are referenced to the AHTD project stationing. I have also enclosed one project manual, 5 sets of plans, and one copy of the quantity takeoff work sheet including an estimate of the reimbursable costs. All relocations meet City and State minimum practices for potable water systems and fire protection systems. Fresno California • San Francisco, California • Columbia, Maryland • St. Augustine, Florida • Nashville, Tennessee • Atlanta, Georgia Location Description CEI Sheet 2 4 water meter relocations on north side. Station 510+90 Reconnect West End Avenue water line to relocated water line. Sheet 3 9 water meter relocations on north side. Station 518+58 Install 8 -inch and 6 -inch water line, in casing, crossing highway. Portion of line has been upsized from replacement line; costs are based on 6 -inch line. Station 520+90 Lower sanitary sewer to clear proposed AHTD drainage plan. Station 520+95 Extend 18 -inch Forcemain casing to comply with AHTD requirements. Sheet 4 7 water meters on north side; 7 water meters on south side. Fresno California • San Francisco, California • Columbia, Maryland • St. Augustine, Florida • Nashville, Tennessee • Atlanta, Georgia Mr. Ron Ward Arkansas Highway and Transportation Department CEI Project #10963.0 November 9, 1995 - Page 2 Station 521+25 Reconnect Porter Road water line to relocated water line. Sheet 5 8 water meters on north side; 8 water meters on south side. Station 533+58 Install 8 -inch water line in casing crossing highway and reconnect to existing Sang water line. Station 537+47 Reconnect Turner Avenue water line to relocated water line. Station 540+73 Reconnect Vista Place water line to relocated water line. Sheet 6 4 water meters on north side; 8 water meters on south side. Station 545+05 Reconnect Eva Avenue water line to relocated water line. Station 545+76 Install 8 -inch sanitary reconnect to existing sewer line in casing crossing sewer line. highway and Station 547+30 Install 42 -inch split steel casing around existing 24 -inch waterline. Station 553+70 Reconnect Oak Avenue water line (north side) to relocated water line. Station 558+62 Reconnect Stephens Avenue water line to relocated water line. Sheet 7 Reconnect sanitary sewer services. Sheet 8 Reconnect sanitary sewer services. Sheet 9 10 water meters on north side. Station 567+13 Install 12 -inch water line crossing highway existing water line in casing and reconnect to If you have any questions, please call me. Thank you, Jerry C. Morrow, P.E. Project Manager Enclosures - As Noted