HomeMy WebLinkAbout116-96 RESOLUTIONRESOLUTION NO. 1 16- 9 6
A RESOLUTION AUTHORIZING THE PARTICIPATION
WITH HABITAT FOR HUMANITY IN A COST SHARE NOT
TO EXCEED $65,597 FOR THE CITY'S SHARE OF COSTS
FOR WATERLINE REPLACEMENT, WATER AND SEWER
EXTENSIONS AND APPURTENANCES.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council hereby authorizes the participation with Habitat for
Humanity in a cost share not to exceed $65,597 for the City's share for approximately 1700 If
of water line replacement, approximately 265 If of water and sewer extensions and
appurtenances. A copy of the letter agreement is attached hereto marked Exhibit A and made
a part hereof.
PASSED AND APPROVED this 5th day of November , 1996.
APPROVED:
r-.
/ 0, ��
•
FAYETTEVI LLE =
EXHIBIT A
THE CITY OF FAYETTEVILLE, ARKANSAS
October 14, 1996
Pasty Brewer
Executive Director
Habitat for Humanity
P.O. Box 1863
Fayetteville, Ar 72702
Dear Mrs. Brewer,
The proposed water and sewer line extensions to provide fire
protection and water and sewer to the lots at Fifth and Sherman
will be considered at the November 5, 1996 Council meeting. I
propose that the Council approve a joint project to include
replacing the water line on Sherman Avenue and Fifth Street based
upon the following:
1. The scope shall include:
a. Replacing the existing 2 inch water lines on Sherman Avenue
and East Fifth Street, a total length of approximately 1700 lf.
The proposed replacement is a 6 inch water line which will
provide a loop from Huntsville Road to Happy Hollow Road and
include two or three new fire hydrants (final design subject to
Fire Chief's approval).
b. The extension of water and sewer mains approximately 265 feet
to serve the two tandem lots.
2. Habitat for Humanity shall follow all normal City and Federal
regulations governing the grant and City funds, Engineering
selections and construction bids.
3. That the water line replacement, water line extension and
sewer line extension be one project for economy.
4. Habitat for Humanity shall manage the total project,
including the selection of the engineer, bidding process,
construction payments and close-out.
5. The City of Fayetteville shall provide the normal design
review and construction observation for typical water and sewer
projects.
113 WEST MOUNTAIN 72701 501.521-7700
FAX 501-575-8257
1
•
•
6. The City of Fayetteville shall contribute the difference
between the total construction costs (estimated at $97,557.00)
and the $31,960.00 grant received by Habitat for Humanity, not to
exceed $65,597.00. Any and all funds over the estimated
$65,597.00 shall require additional approval from the City.
If you agree with this scope and proposal please sign below and
return the original, or a copy, to me. Please call me at 444-
3418 if you need any additional information.