Loading...
HomeMy WebLinkAbout116-96 RESOLUTIONRESOLUTION NO. 1 16- 9 6 A RESOLUTION AUTHORIZING THE PARTICIPATION WITH HABITAT FOR HUMANITY IN A COST SHARE NOT TO EXCEED $65,597 FOR THE CITY'S SHARE OF COSTS FOR WATERLINE REPLACEMENT, WATER AND SEWER EXTENSIONS AND APPURTENANCES. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council hereby authorizes the participation with Habitat for Humanity in a cost share not to exceed $65,597 for the City's share for approximately 1700 If of water line replacement, approximately 265 If of water and sewer extensions and appurtenances. A copy of the letter agreement is attached hereto marked Exhibit A and made a part hereof. PASSED AND APPROVED this 5th day of November , 1996. APPROVED: r-. / 0, �� • FAYETTEVI LLE = EXHIBIT A THE CITY OF FAYETTEVILLE, ARKANSAS October 14, 1996 Pasty Brewer Executive Director Habitat for Humanity P.O. Box 1863 Fayetteville, Ar 72702 Dear Mrs. Brewer, The proposed water and sewer line extensions to provide fire protection and water and sewer to the lots at Fifth and Sherman will be considered at the November 5, 1996 Council meeting. I propose that the Council approve a joint project to include replacing the water line on Sherman Avenue and Fifth Street based upon the following: 1. The scope shall include: a. Replacing the existing 2 inch water lines on Sherman Avenue and East Fifth Street, a total length of approximately 1700 lf. The proposed replacement is a 6 inch water line which will provide a loop from Huntsville Road to Happy Hollow Road and include two or three new fire hydrants (final design subject to Fire Chief's approval). b. The extension of water and sewer mains approximately 265 feet to serve the two tandem lots. 2. Habitat for Humanity shall follow all normal City and Federal regulations governing the grant and City funds, Engineering selections and construction bids. 3. That the water line replacement, water line extension and sewer line extension be one project for economy. 4. Habitat for Humanity shall manage the total project, including the selection of the engineer, bidding process, construction payments and close-out. 5. The City of Fayetteville shall provide the normal design review and construction observation for typical water and sewer projects. 113 WEST MOUNTAIN 72701 501.521-7700 FAX 501-575-8257 1 • • 6. The City of Fayetteville shall contribute the difference between the total construction costs (estimated at $97,557.00) and the $31,960.00 grant received by Habitat for Humanity, not to exceed $65,597.00. Any and all funds over the estimated $65,597.00 shall require additional approval from the City. If you agree with this scope and proposal please sign below and return the original, or a copy, to me. Please call me at 444- 3418 if you need any additional information. Thank you, Jj4c%J—' Jim Beavers, P.E. Patsy Brewer, Executive Director Habitat for Humanity date /ope9 2