RESOLUTION NO. 10-96
A RESOLUTION APPROVING CHANGE ORDER NO. 2 IN
THE AMOUNT OF $54,050.95 TO THE CONSTRUCTION
CONTRACT WITH BUILDING & UTILITY CONTRACTORS,
INC. FOR THE 24" WATER LINE REPLACEMENT PROJECT,
APPROVAL OF A 5% CONTINGENCY AMOUNT OF $21,000,
AND APPROVAL OF A BUDGET ADJUSTMENT.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council hereby approves Change Order No. 2 in the amount
of $54,050.95 to the construction contract with Building & Utility Contractors, Inc. for the 24"
water line replacement project and, the Mayor and City Clerk are hereby authorized to execute
same. A copy of the change order is attached hereto marked Exhibit "A" and made a part
hereof.
Section 2. The City Council also approves a 5% contingency amount of $21,000 for
construction and/or engineering as needed and approved by the Mayor.
Section 3. The City Council approves a budget adjustment in the amount of $70,500
increasing Waterline Improvements, Acct. No. 5400 5600 5808 00, Project No. 95036 by
decreasing Use of Fund Balance, Acct. No. 5400 0940 4999 99. A copy of the budget
adjustment is attached hereto and made a part hereof.
PASSED AND APPROVED this 6th day of February , 1996.
ATTEST /J
By: //1Q� l�iltXJ
Traci Paul, City Clerk
APPROVED:
By:
✓I �I I 4e- ..V
G Ufl1 tA-- (Ci 4.5 CIerk
(Instructions on reverse side)
•
EXHIBIT A
CHANGE ORDER
No 2
PRO]ECf 24 -Inch Water Line Replacement
IMTE OF ISSUANCE January 12, 1996 EFFECTIVE DATE gantry 12, 1996
OWNER
Citi of rayettev111e, Arkansas
OWNER'S Contract No. ...'"241
Building and Utility
CONTRACTOR Building
;Int
ENGINEER .3Sliccedwinl Williams and Yates,
You are directed to snake the following changes in the Contract Documents.
Change location of proposed mbar Lisle No. y2�r(gtt kingtllot to
Dcsctiption: thert%installin cw feline in siame ditch 8s aMliigtrna and 9 ben9s
Lel
ing 500 feet
k%Lsonforalat of •� _ tonOE Sou�u �ns�rap� fired.
5�slustidra. �: a ing `oFi)an
Attachlsrent to Change Order No. (two pages) ; and ContractOr a breakdown (two Pages/ .
CHANGE IN CON'CRACT PRICE:
Original Contract Prim
$ 349,600.00
CHANGE IN CONTRACT TIMES:
Original Contract Times
Substantial camaluwn: ' 60 calendar days
Ready formal payment 90 calendar days
days«dues
Net changes horn Change Olden No.-
to No 1Net
change from Change Orders No. = to No.
1
pteviow
provioui
S
an
Contract Price prior to this Change Order
349.600.00 600.00
$
Contract Timet prior W this Change Order
Sastantms compheom 60 calendar days
Ready for lural Payment. calendar days
X90
rt or dams
Ns hiertet PASINISSI of this Change Ortkr
$ 54:05041 •
Net Increase 441/46) of this Charm Order
60 calendar days
days
Contract Price with all approved Change Orders
$ 403;650.51
Contract Times with all approved Change Orders
Substantial Completion' 120 calendar days
Ready for final 150 calendar days
payment:
4110 014•101
Wic0oodwin, Williams and
REOgMM�NDED Yates, Inc. APPROY
City of Fayetteville,
UCs
g 6 llty QOrttraOtLie,
ACCEPTED: Inc
trig. 2.
Dam: Januar? 12, 1996
By:
e
Date' a-6 -9G
gouroos
. EJCDC No. 1910-8-13(1990 Edition)
rtepned by the Engineers Joint Contract Documents Committee and endorsed by The Associated Genera( Contractors of Aneth.
Attachment
to Change Order No. 2
24 -Inch Water Line Replacement
Fayetteville, Arkansas
Project No. Fy-248
Item No. and Description Decrease
1. Add 375 L.F. of 24" Water
Line @ $70.00/L.F. $
8. Delete 1 Each 6" Gate Valve and
6" x 6" Tee @ Station 0+00 @
$2,000.00/Ea. (This item completed
by the City of Fayetteville.)
22. Delete 2 Each 24" Bend, and add 24"
Butterfly Valve, for net decrease of
$542.10. Change lump sum to
$14,457.90 ($15,000 - $542.10).
23. Delete 24" x 8", 8" Valve, 8" Sleeve,
and add 24" Sleeve, for net decrease
of $988.31. Change lump sum to
$511.69 ($1,500 - $988.31).
24. Delete 24" Tee and 24" Bend for
decrease of $3,937.88. Change lump
sum to $4,062.12 ($8,000 - $3,937.88)
26. Delete 300 L.F. Hot -Mixed, Hot -Laid
Asphalt Repair @ $10.00/L.F.
*29. Change location of Line No. 2 from
development parking lot to adjacent
to Highway 62 curb. Includes work
as defined on the attached schedule.
*30. Add 600 L.F. Replacement of Sidewalk
@ $15.00/L.F.
*31. Add 100 L.F. Replacement of 6'
Concrete Slope @ $20.00/L.F.
*32. Add 100 L.F. Replacement Curb and
Gutter @ $20.00/L.F.
*33. Add 50 L.F. Concrete Flume @
$20.00/L.F.
2,000.00
542.10
988.31
3,937.88
3,000.00
Increase
$26,250.00
18,347.10
9,000.00
2,000.00
2,000.00
1,000.00
•
•
-2-
Item No. and Description
*34. Add 400 S.Y. Sod @ $5.00/S.Y.
*35. Add 24" Sleeve to allow existing
24" x 8" Tee to remain in place.
Add 2 Each @ $1,585.85/ea.
*36. Design of Traffic Control Plan for
Highway 62. Lump Sum @ $750.00
Totals
Net Increase
*New Bid Item added this Change Order.
Decrease Increase
2,000.00
3,171.70
750.00
$10,468.29 $64,518.80
$54,050.51
Each of the required four ties to the system on Line No. 2 will
remain as bid. Payment for any additional fittings at other
locations shall be made at $2.50 per pound.
TO
BUILDING
& UTILITY CONTRACTORS, INC.
1108 River Rd.
P. O. Box 68
REDFIELD, ARKANSAS 72132
Phone 397.2594
•
Number
-PHONE
GATE
JOB NAME/LOCATION
JOB NUMBER
JOB PHONE
EXISTING CONTRACT NO.
DATE OF EXISTING CONTRACT
i
Costs:
ACCEPTED — The above prices and specifications of
this Change Order are satisfactory and are hereby ac-
cepted. All work to be performed under same terms and
conditions as specified in original contract unless other- Signature
wise stipulated.
Date of acceptance
i OWNER)
We hereby agree to make the change(s) specified below:
Variable
Costs:
Replacing sidewalk
disturbed by construction
$1 5,00__0_If
$20.00 p/lf
Replacing 6' concrete slope by the Taco_Bell
Replacing curb & gutter disturbed by construction $20.00 p/lf
Replacing sod disturbed by construction
$20.00
$2.50
$5.00
p/sy
p/lf
Replacing concrete flume
Any incidential fittings as needed
to another
location $20.00
p/lb
p/lf
Installing 611 DIP to extend the fire hydrant
NOTE: This Change Order becomes part of and in conformance with the existing contract.
WE AGREE hereby to make the change(s) specified above at this price c
$
DATE
PREVIOUS CONTRACT AMOUNT
$
\
AUTHORIZED SIGNATURE I CONTRACTOR)
REVISED CONTRACT TOTAL
$
ACCEPTED — The above prices and specifications of
this Change Order are satisfactory and are hereby ac-
cepted. All work to be performed under same terms and
conditions as specified in original contract unless other- Signature
wise stipulated.
Date of acceptance
i OWNER)
BUILDING
& UTILITY CONTRACTORS, IND.
1108 River Rd.
P. O. Box 68
REDFIELD, ARKANSAS 72132
Phone 397-2594
TO The City of Fayetteville
•
c/o McGoodwin, Williams & Yates
Number
irt5.3d Lfc L
,/ PHONE
443 3404
DATE
November 6,
195
JOB NAME/LOCATION
24" Water Line Relocation
Fayetteville, Arkansas
JOB NUMBER
JOB PHONE
EXISTING CONTRACT NO.
DATE OF EXISTING CONTRACT
These costs are the result of revision in the work.
Fixed Costs:
ACCEPTED — The above prices and specifications of
this Change Order are satisfactory and are hereby ac-
cepted. All work to be performed under same term and
Date of acceptance
conditions as specified in original contract unless other- Signature
wise stipulated.
,OWNER)
We hereby agree to
If the work
make the change(s) specified below:
to be -performed had remained as_shown_onshe_original drawings,
we_estimate
that we could install 140 LF of pipe per day. However since the plans have changed.
the delay we will experience due to the businesses will
bring. us down to an average
of 60 LF per day installation. This
will
increase our working time by 8 days
These costs are the result of revision in the work.
Fixed Costs:
384 Manhours $18.50 p/hr 7,104.00
( This includes a 6 man crew for 9 hour days, 8 days extra)
1 wk 2700 LinkBelt Trachoe 1,200.00_
1 wk 410 Backhoe 850.00
8 days Service Truck $25.00
p/day 200.00
8 days Room & Board
$200.00 p/day 1,600.00
Traffic Control 2,500.00
Landscaping(including sprinkler systems, fencing) 2,500.00
Sub - Total 15,954.00
15% Markup (not including Landscaping) 2,393.10
Total Amount Requested
NOTE: This Change Order becomes
part of and in conformance with the existing contract. 18, 347.10
WE AGREE hereby to make the change(s) specified above at this price c
$ 18,3471
10
DATE
Novembe 7, 1995
PREVIOUS CONTRACT AMOUNT
$
AUTHOR, ED GNATURE(CONT ACT)
$
REVISED CONTRACT TOTAL
�`
�
.<
ACCEPTED — The above prices and specifications of
this Change Order are satisfactory and are hereby ac-
cepted. All work to be performed under same term and
Date of acceptance
conditions as specified in original contract unless other- Signature
wise stipulated.
,OWNER)
City of Fayetteville, Arkansas
/ Budget Adjustment Form
Budget Year
1996
Department Public Works
Division: Capital Water Mains
Program:, r;
Projector Item Requested:
Additional funding is requested for the 24" Water Line Project,
Project # 95036.
Date Requested
01/19/96
Adjustment #
Project or Item Deleted:
Funding for this request is from use of fund balance and is primarily
funded by project funds estimated to be used in 1995 for projects that
are complete and the funds returned to fund balance.
Justification of this Increase:
The additional funds are needed to reroute the line replacement
and provide an additional project contingency of $21,000.
Justification of this Decrease:
Sufficient Cash & Investments exist to fund this request.
Account Name Amount
Increase
Water Line Improvements 70,500
Account Name Amount
Use of Fund Balance
Account Number . trc ; Project Number
L
5400 5600 5808 Ofni 95036
Decrease
70,500
Account Number ` Project Number
5400 0940 4999 99.
Approval Signatures
Mayor
Type: A
Budget Office Use Only
Date of Approval':`
Posted to General Ledger
Entered in Category Log
F