HomeMy WebLinkAbout20-95 RESOLUTIONRESOLUTION NO. 20-95
A RESOLUTION AWARDING AN ENGINEERING
CONTRACT IN THE AMOUNT OF $87,735.00 TO CE1
ENGINEERING ASSOCIATES, INC., FOR ENGINEERING
SERVICES FOR THE JOYCE BOULEVARD EXTENSION TO
GREGG STREET AND APPROVAL OF A CONTINGENCY
AMOUNT OF $8,774.00.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council hereby awards an engineering contract in the amount
of $87,735.00 to CEI Engineering Associates, Inc., to prepare construction plans and
specifications and construction engineering service, for the Joyce Boulevard extension to Gregg
Street, and approves a contingency amount of $8,774.00. A copy of the contract is attached
hereto marked Exhibit "A" and made a part hereof.
PASSED AND APPROVED this 7th day of February , 1995.
APPROVED:
By:
ATTEST
By: { �� 4,(1./
Traci Paul, City Clerk
EXHIBIT A
ENGINEERING SERVICES AGREEMENT FOR
JOYCE ROAD EXTENSION
FAYETTEVILLE, ARKANSAS
THIS ENGINEERING SERVICES .AGREEMENT is .made and entered :.into by and between the
City of Fayetteville, Arkansas, a.municipal corporation, hereinafter .referred to as "CITY", and
CEI Engineering Associates,. Inc., hereinafter :referred to as 'ENGIN.EER".
WITNESSETH:
WHEREAS., CITY desires ENGINEER to :design roadway :improvements for the
extension of Joyce .Street to Wilkerson Street (Johnson, Arkansas.),
NOW, THEREFORE, for and in consideration of the terms, conditions, and .covenants
•hereinafter set forth, .the :parties hereto do mutually agree as follows:
ARTICLE .I
CITY hereby agrees to retain ENGINEER :to perform .the services hereinafter .described
and agrees to compensate ENGINEER therefore in the manner provided. ENGINEER agrees
to perform the services hereinafter set' forth.
ARTICLE .II
ENGINEER shall perform or supply .all necessary engineering services:provided in this
Agreement:.in.connection with and respecting the protect.
ARTICLE III
EXISTLNG CONDITIONS•
The:.prolect'is to extend Jt yce.Road from approximately :800 feet west. of Highway
•7113 westerly to the Wilkerson..5treet irnprovements being .designed by others: The protect will
be constructed:in one..phase as designed..
ARTICLE IV
SCOPE OF WORK
ENGINEER will complete all Tasks as described beIoW..
Fayetteville, AR/Joyce Boulevard Extension:K7).
Page 1 01730/95
Task 1 - Pre -.design Investigation and Report
1. Set .horizontal and vertical control.
2. Convert electronic 'topographic :data, supplied by the CITY, to .ENG•INEER's
format.
3. Retain. services of .geotechnical consultant and direct subsurface investigations
required. Nine:bores.w.ill be:.performed; :three on the easternmost,' flat area and
.three each on two alternate alignrnents:.north.of the Lenham Heights Subdidision..
4. Survey location of bore :holes.
Investigate :two alternate .alignments :for the western portion .of the project .located
north of the Lenham Heights Subdivision. ..Provide rough construction cost
estimates to support Owner's selection of the final route. Since level .of design
is -conceptual, this estimate will be for comparative purposes only .and may not
accurately reflect actual construction cost.
Coordinate with private and public utilities to identify possible conflicts with
project. This does not include any design :of utility relocations.
Meet with .CITY or Wilkerson Street Consultant to discuss latest revisions and
coordinate tie-in to Wilkerson Street .project.
Task 2 - Preliminary Design
.1. Coordinate with Wilkerson Street designer concerning intersection oof Joyce Street
and .to coordinate drainage design.
Coordinate with private and public utilities to identify :possible .:conflicts with
project and corrective action required. This does not include any design of utility
relocations.
Review ::projected"traffic volumes provided by CITY and coordinate with CITY.
Perform.:prel.iminary design .of roadway improvements using. 5 lanes with no
m'ed'ian for the .eastern portion and 4 lanes with a :12 -foot median for the western
portion' and the intersection approach. This design does not include .any offsite
drainage design: This design to be performed in coordination with Wilkerson
Street designer to insure that Wilkerson drainage system is adequate to receive
flows from this project. The western end of the project to match existing
Wilkerson Street grade and alignment.
:.Fayetteville, AR1Joyce Boulevard Exiension.:(7).
Page 0]/30/95
Perform preliminary, design:of landscap ng forJ.oyce Street median and screening
between Joyce Street' roadway iinprovements and the northern .boundary, :of the
Lenham Heights Subdivision.
6. Prepare preliminary drawings of :improvements and submit to CITY for review
and comment.
7. Meet with CITY to discuss project design.and:status..
Task 3 - Final Design
1. Meet with Wilkerson Street designer to verify Joyce Street grades :and drainage.
Coordinate with private and public utilities to :identify possible :conflicts with
project and corrective action required. This does not include any :design of utility
relocations.
3. Perform final design ofroadway improvements using roadway sections and
vertical and horizontal alignments set' in Task 2 - Preliminary Design. :The two
lanes to be designed for the eastern section:to be determined during :.final .design.
That portion of the stormwater collection isystem which doesn't conform. :to the
preliminary design, because of final.design of:only 2 lanes, shall be as determined
by CITY. This stormwater collection system could be comprised of headwalls,
temporary sttibouts protected with riprap, or other .methods determined by .CITY.
This design is to include only the temporary stormwater .collection system
described above, the permanent drainage structures which match those described
:
inthe..preliminary design, the curb and .gutter and sidewalks along the outside of
:the :permanent 1•anes, and the traffic lanes :as described. This .design does not
include any offsite drainage design. This design to be performed in coordination
with Wilkerson Street :designer to insure that Wilkerson .drainage :system. is
adequate to-recei•ve flows from this project..
Perform final design for landscaping of Joyce Street median and screening
between .Joyce Street roadway improvements :and the north boundary of the
Lenham Heights Subdivision.
:Prepare construction drawings .of improvements.
:.Prepare a project'rnanual to include .bidding requirements, contract :conditions,
and technical specifications
Fayetteville, AR7Joyce'Boulevard Extension (7) :Page 3 :O1730795
7. Prepare construction cost•:estimate.. ,.Since EN:GI.NEER has ilii control over the
cost of :labor, materials, equipment,.or services furnished by others, or over
contractors', subcontractors'.., or vendors' methods .of determining prices, or over
competitive bidding or market conditions, ENG'INEER'S cost estimates shall be
made on the basis .of qualification and experience as a Professional Engineer.
8. Meet. with :C.ITY to discuss project design and status.
Task 4 - Bid Phase
1. Prepare advertisement :soltcrting bid's; CITY .to be ..responsible for advertising.
project.
Solicit bidders, distributeplans :and specifications, and respond to contractor and
vendor inquiries,
Conduct :one'bid opening, tabulate and analyze bids, and make recommendation
to CITY.
4. Prepare contract documents and assist CITY .in awarding contract.
Task 5 - Construction Services
ENG'I.NEER shall not be responsible for construction :means, ..methods., techniques,
sequences, procedures, or safety precautions and programs in connection with the PROJECT.
ENGINEER':s responsibility is to insure the general conformance of the constructed product with
the design.. Since ENGINEER .has to control over the resources provided by others to meet
construction contract schedules, ENG'INEER'S forecast: schedules shall be made on the basis of
qualification and experience as a Professional Engineer. :The construction.phase services to be
provided shall be as follows..
1. .Attend a pre construction conference with CITY and Contractor.
Re"establish or verify .horizontal and vertical control.
Provide :one4inie :construction staking to include .construction reference line
staking 'at 50 -foot intervals.
Provide :phase inspections of the completed work at critical `tirnes 'during :the
construction. Phase inspections shalt be performed by the EN.GI.N.EER in' the
presence of the:Contractor at 'the following „periods during ;the construction:
:.Fayetteville, :AR/Joyce Boulevard Extension• (7). Page 4 01/30795
a. Following roadway c1earing'and grtibbing.
b. During drainage Structure and curb construction.
c. Supervise .density testing .during subgrade construction.
d. ..Following subgrade construction.
e. During. laying of the roadway stone and/or asphalt base.
f. Prior to the laying of the roadway asphalt or concrete :surface.
g.. .During laying of the roadway surface course.
h. Fold.ow.ing :completion of surfacing, finish grading., and seeding.
A progress .report with any recommendations will be:.issued :directly to CITY and
Contractor immediately following .each .phase inspection. CITY may attend any
one or all of the phase inspections.
Review requests for ,.payment submitted by the Contractor 'to the :CITY. This
review to be to determine whether pay request quantities .are within reason and
that all calculations aro correct. Earthwork,. paving:, .curb .and gutter, sidewalk,
seeding, or other items which would otherwise:regiiire field measurements are' to
be paid .for at plan quantities. unless changes are requested by CITY which result
in change order. All items, such as seeding and clearing, which can be will be
bid as lump sum.
Review required Contractor submittals for conformance to the requirements of the
construction documents.
8. :Prepare record drawings for CITY based upon record :prints supplied by the
Contractor.
Task .6.=:Legal.Surveying Services.
1. Monument Right=of-Way of Joyce Street improvements covered by this project.
2. Provide easement descriptions.
3. Provide .exhibit for replat of acquired property.
Fayetteville. AR/Joyce Boulevard Extension't7). Page. 5 01/30/95
:ARTICLE V
ITEMS TO BE PROVIDED BY CITY
The following items, if necessary, :are to he provided by CITY as pre -requisites to CEI
performing services described above.
1. CITY to furnish two -foot interval topographic mapping suitable for design
purposes in AutoCad format.
CITY to provide projected traffic volumes for the .Joyce Street extension which
lists design traffic load.
3. CITY to furnish property boundary maps suitable for design purposes.
4. CITY to provide any environmental submittals or reports that may be required
before construction of project or which may impact .design of project. Any
redesign required as the result of environmental issues will be considered to be
extra work.
CITY to provide any Wetlands Delineation Report or possible mitigation plan that
may be required as a pre -requisite of construction or which may impact the
design of project. Any redesign required as a result of this will be considered to
be .extra work.
..Fayetteville, ARDoyee Boulevard Extension.(7) Page 6 01/30/95
ARTICLE V.I
EXTRA WORK
The following items, in addition to those listed in the scope of services, are not to be
performed by the ENGINEER without the express, written authorization of CITY.
The prices listed in Article IX and the above Scope of Services are based on
designing the project from start to finish without .any work stoppages, no
inordinate delays in design, .no redesign required by actions by CITY or others,
and one round of advertising. :.If the :design work is delayed for a period
sufficient to lose continuity, .redesign is required to conform to changes by others,
.construction is divided into :.multiple contracts, .or more than .one bid opening is
required for any reason this will :be considered as extra work.
2. The.costs for Task 5, Construction Services, are based .on the calendar days listed
in Article IX. If, for any reason, more time than listed is required to complete
the construction :of the project, the work required of CEI to insure satisfactory
completion of the project will be considered as extra work.
3. Parcel descriptions or :area calculations, topographic survey, or similar tasks are
not included in the Scope of Services and if requested will be considered as extra
work.
Tasks related to preparing legal document for filing .or acquiring right-of-way or
easements are not included in the Scope .of .Services .and if requested will be
considered as extra work.
5. This project is planned to be designed without use of retaining walls If retaining
walls are required they will be considered as .extra work.
The Contractor shall apply to the State of Arkansas for a stormwater .discharge
permit .during construction at this .site. This application includes filing a;Notice
of Intent (NOI), preparing a Storm Water Pollution Prevention Plan, .and all other
work items necessary to comply with State and Federal regulations.
7. The services requested by CITY during. Construction Phase .do not include the
following:
Regularly scheduled progress meetings.
b. Documentation of and preparation of change orders and work change
directives.
c. Full-time on -sight observation.
Fayetteville, AR/Joyce Boulevard Extension :(7). Page 7 01/30/95.
Field measurement of earthwork, paving, curb and gutter, sidewalk,
seeding or other items which would normally require field measurement.
These items to be .paid at plan:quantity unless changes are requested by
CITY which result in :change order. All items which can be will be bid
in lump sum quantities.
The addition of any services not .specifically liste.d in Article IV herein will be covered :by
the requirements of Article IX herein.
ARTICLE VI.I
It is understood and agreed :that CITY may suspend; cancel, or .abandon the project in
whole or in part without any liability other than payment for .the work already performed by
ENGINEER upon the .date of notification of suspension, abandonment, or cancellation In the
event .of suspension, abandonment, :or cancellation .of the project, CITY agrees to pay
.ENGINEER for all that portion .of the -work .performed.
ARTICLE VMI
It is understood and agreed that all work performed under this Contract shall be subject to
inspection and approval by CITY.
ARTICLE IX
The following amounts shall be paid to ENGINEER for completing the respective Tasks
outlined above:
Task 1 _ Pre -design Investigation and Report $ 6,335.00
Task 2 - Preliminary Design . . . . S .18,120:00
Task 3 -. Final Design .. E$ 17;020..00
Task 4 -.Bid Phase $ 2,540.00
Task 5 - ConStruction Services based on 120 calendar day
construction period . $ 37,540.00
Task 6 - Legal Surveying Services $ 3,430.00
Geotechnical Investigation $ 2,750.00
TOTAL FEE $ 87;735.00
Fayetteville, AR/Joyce Boulevard Extension (7) Page 8 01/30/95
The fees shall be charged on -a not'to-:exceed.:.basis according to the attached schedule. It
is hereby agreed that neither CITY Project Director nor any other agent of CITY has authority
to vary, modify, or add to the terms and :conditions of the .Contract. ENGINEER shall be paid
within 30 days of Cities receipt of .a statement of services rendered.
ARTICLE X
It is understood and agreed that .this Contract shall .be construed in all matters arising
hereunder, under and according to the laws oof the State of .Arkansas in force and effect at the
time of the execution thereof.
ARTICLE XI
ENGINEER shall not assign any interest in. this Contract and shall not transfer any interest
in the same, without prior written consent of .CITY.
ARTICLE XII
Any service deleted from this proposal by CITY will become the responsibility of CITY.
Any changes by CITY after the plans have been completed shall be billed to CITY .on an
hourly basis per :the attached Schedule of Charges.
ARTICLE XIII
The effective date of this Contract is the date it is fully .executed by the parties hereto.
This offer of .services, in its present form, shall be withdrawn if not executed within 60 days
from date of .delivery.
Fayetteville, AR/Joyce Boulevard Extension (7) Page 9 01/30/95
•
ARTICLE XIV
Warranty and liability subject to Schedule of Conditions attached.
IN WITNESS WHEREOF, the parties have caused this contract to be executed in multiple
copies by the duly authorized representatives upon the dates set forth immediately below.
(SEAL)
ATTEST:
abeii
Traci Paul
City Clerk
CITY OF FAYETTEVILLE, ARKANSAS
a municipal corporation
By
fed Hanna
Mayor
Date fa4rc,Ary /�/� /951S-
CEI
97C
CEI Engineering Associates. Inc.
By
L DouglaYFredeen, P.E.
Vice President
Fayetteville, AR/Joyce Boulevard Extension (.7) Page 10 01./30/95
STAFF :REVIEW FORM
AGENDA REQUEST
XX CONTRACT REVIEW
GRANT REVIEW
•
Enj.
/ men e/ 1'1
Joyce fo 6reS3
3 -w6-U
For the Fayetteville City Council meeting of N/A
FROM:
Wayne Ledbetter Engineering Public Works
Name Division Department
ACTION REQUIRED:
Approval of Amendment No.4 to transfer $ 1,5A.0 from construction phase of the
engineering contract to the geo-technical phase of the contract with CEI,
Inc.for Joyce Blvd. Extension to Gregg.
COST TO CITY:
$ -.0•-
Cost of this Request
4470-9470-5809-00
Account Number
94034-3010
Project Number
$ 2.282,753 Joyce Exten. to Gregg
Category/Project Budget Category/Project Name
$ 1,570,006 Street Improvements
Funds Used To Date Program Name
$ 712.,747 Sales Tax
Remaining Balance Fund
BUDGET REVIEW:
�mso
Budget C ordinator,
Budgeted Item
Budget Adjustment Attached
Administrative Services .Director
CONTRACT/GRANT/LEASE REVIEW:
0 s 1h 41)2 c'2.
Accoui✓ing ana•
Air _ f .
City Attorn
Purchasing Officer
3 a/-99
Date
3-x56
GRANTING AGENCY:
Date Int nal Auditor
3 -0?(, -162
Date
Date
3-21-96
Date
STAFF RECOMMENDATION:
Staff er&ommenapproval
on Head
epartment Director
Administr
s Director
Mayor
of this amendment to
L0446
Date
Date
the engineering contract.
Cross Reference
New Item NO
Prey Ord/Res At: KQS X49— %S
Ori.g Contract Date:
FAYETTEVI LLE
THE CITY OFtAYETTEVIILE, ARKANSAS
DEPARTMENTAL CORRESPONDENCE
To: Mayor Fred Hanna
Thru: Kevin Crosson, Public Works Director
Charles Venable, Assistant Public Works Director
From: Don Bunn
Wayne Ledbetter, Engineering fat
Date March, 20, 1996
RE: Joyce Blvd. Extension to Gregg Ave.
Engineering Contract Amendment No. 4
In reference to the above mentioned project, there is a need to acquire additional geo-technical
services. The original engineenng contract included $ 2,750 for geo-technical services.
However, we need to do subsurface exploration on the Nanchar property where approximately
1400 linear feet of Joyce Blvd. will be constructed. Anderson Engineering Consultants, Inc. has
quoted $ 750 via phone conversation to drill this area. This does not include testing the soil
material. We would like to reserve $ 1,500 to allow for dnlhng and testing of the soil samples.
The original •engineering contract estimated $ 37,540 for construction services. Later amendment
#1 increased that amount to $ 55,545.00. This proposed amendment would decrease the amount
of estimated construction services (amendment #1) by $ 1,500 to $ 54,045 and increase the geo-
technical services in the original contract that same amount to a total of $ 4,250.
The total engineering contract cost to date is as follows:
Original Contract $ 87,735 + $ 8,774 (cont.)
After Amendment #1 by Council 119,330 + $ 3,159 (cont.)
After Amendment #2 by Mayor 131,260 (used the cont.)
After Amendment #3 by Council 148,260 (used the cont.)
After Amendment #4 is approved 148,260 (used the cont.)
The Staff requests approval of Amendment #4 to the Engineenng Contract with CEI Engineering
Associates, Inc.
ENGINEERING SERVICES AGREEMENT FOR
JOYCE BOULEVARD EXTENSION
FAYETTEVILLE, ARKANSAS
THIS FOURTH AMENDMENT to the ENGINEERING SERVICES AGREEMENT is made
and entered into by and between the City of Fayetteville, Arkansas, a municipal corporation,
hereinafter referred to as "CITY", and CEI Engineering Associates, Inc , hereinafter referred
to as "ENGINEER".
WITNESSETH:
WHEREAS, the CITY and ENGINEER entered into an Agreement for Engineering
Services for the extension of Joyce Boulevard to Wilkerson Street (Johnson, Arkansas)
on February 14, 1995, and
WHEREAS, it is the desire of the parties to amend said contract by including additional
services to the Scope of Work to be performed by the ENGINEER, and by the
modification of the contract to reflect the additional expense required to perform said
additional items,
NOW, THEREFORE, for and in consideration of the terms, conditions, and covenants
hereinafter set forth, the parties hereto do mutually agree as follows:
I. Modify Article IX to revise the cost for geotechnical work from $2,750.00 to $4,250.00.
Modify Article IX to revise the cost for Task 5, Construction Services, from $55,545.00
(as amended in Amendment 1) to $54,045.00.
IL. Total modified fee remains the same, not to exceed $148,260.00) without written
authorization from the City.
III. The effective date of this Amendment is the date it is fully executed by the parties
hereto.
IN WITNESS THEREOF, the parties have caused this contract to be executed in
duplicate copies by the duly authorized representatives upon the date set forth below.
ATTEST:
1• N
City of Faye eville, Arkansas
By
F Hanna, Mayor
Date Mara X , l996
CEI Eng ;. ing _ ociates
B
L. Douglaredeen, P E