Loading...
HomeMy WebLinkAbout116-95 RESOLUTION• • • RESOLUTION NO. 11 6-95 • A RESOLUTION AUTHORIZING A CONTRACT IN AN AMOUNT "NOT TO EXCEED" $606,510 WITH CH2M HILL FOR A SEWER SYSTEM STUDY; AND APPROVAL OF A BUDGET ADJUSTMENT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. The Council hereby authorizes a contract in an amount "not to exceed" $606,510 with CH2M Hill for a sewer system study and authorizes the Mayor and City Clerk to execute same. A copy of the contract is attached hereto marked Exhibit "A" and made a part hereof. Section 2. The Council hereby approves a budget adjustment in the amount of $533,286 by increasing Contract Services, Acct. No. 5400 5700 5315 00 and decreasing Sewer Improvements, Acct. No. 5400 5700 5815 00 in the amount of $272,286 and Use of Fund Balance, Acct. No. 5400 0940 4999 99 in the amount of $261,000. A copy of the budget adjustment is attached hereto and made a part hereof. PASSED AND APPROVED this 19th day of September , 1995. ATTEST: By: Traci Paul, City Clerk APPROVED: By: • • • ciamiLL STANDARD AGREEMENT FOR PROFESSIONAL SERVICES CH2M HILL's Office Address 502 South Main, Fourth Floor, Tulsa, OK 74103 Project Name Fayetteville Wastewater System Facility Plan CH2M HILL Project No. 116583.D1 CLIENT City of Fayetteville, Arkansas Address 113 West Mountain, Fayetteville, Arkansas 72701 CLIENT requests and authorizes CH2M HILL to perform the following services: SCOPE: Assist the City of Fayetteville in development of a Wastewater System Facility Plan to address current and future wastewater collection system and treatment needs. This effort includes development of technical alternatives and assistance with regulatory interface and the public information exchange pertaining to the protect. A detailed Scope of Work (dated June 14.1995) is contained in Attachment A and further describes the work tasks to be performed. PROVISIONS 1. Authorization to Proceed Execution of this AGREEMENT by CLIENT will be authorization for CH2M HILL to proceed with the work, unless otherwise provided for in this AGREEMENT. 2. Salary Costs CH2M HILL's Salary Costs, when the basis of compensation, are the amount of wages or salaries paid CH2M HILL employees for work directly performed on the PROJECT plus a percentage applied to all such wages or salaries to cover all payroll -related taxes, payments, premiums, and benefits. 3. Per Diem Rates CH2M HILL's Per Diem Rates, when the basis of compensation, are those hourly or daily rates charged for work performed on the PROJECT by CH2M HILL employees of the indicated classifications. These rates are subject to annual calendar year adjustments and include all allowances for salary, overheads, and fee, but do not include allowances for Direct Expenses. 4. Direct Expenses CH2M HILL's Direct Expenses are those necessary costs and charges incurred for the PROJECT including, but not limited to: (1) the direct costs of transportation, meals and lodging, mail, subcontracts and outside servkes, special CLIENT approved PROJECT specific insurance, letters of credit, bonds and equipment and supplies; (2) Cf -42M HILL's current standard rate charges for direct use of CH2M HILL's vehicles, computing sys- tems, laboratory test and analysis, word processing, printing and reproduction services, and certain field equipment; and (3) CH2M HILL's standard project charges for special health and safety requirements of OSHA and telecommunications services 5. Cost Opinions Any cost opinions or PROJECT economic evaluations provided by CI -12M HILL will be on a basis of experience and judgment, but, Page 1 of 3 116' R31C171.DOC since CH2M HILL has no control over market conditions or bidding procedures, CH2M HILL cannot warrant that bids, ultimate construction cost. or PROJECT economics will not vary from these opinions. 6. Standard of Care The standard of care applicable to CH2M HILL's services will be the degree of skill and diligence normally employed by professional engineers or consultants performing the same or similar services at the time CH2M HILL's services are performed. CH2M HILL will reperform any services not meeting this standard without additional compensation. 7. Termination This AGREEMENT may be terminated for convenience on 30 days' written notice or for cause, if either party fails substantially to perform through no fault of the other and does not commence correction of such nonperformance within 5 days of written notice and diligently complete the correction thereafter. On termination, CH2M HILL will be paid for all authorized work performed up to the termination date plus termination expenses. such as, but not limited to, reassignment of personnel, subcontract termination costs. and related closeout costs If no notice of termination is given, relationships and obligations created by this AGREEMENT will be terminated upon completion of all applicable requirements of this AGREEMENT. except as provided for under Article 10. In the event the contract is terminated for any reason, the amount of the Faxed Fee shall be prorated in accordance with the dollar value of the work completed at the time of termination. No termination expenses shall apply in the event the CLIENT terminates the AGREEMENT for cause. 8. Payment to CH2M HILL COMPENSATION by CLIENT to CH2M HILL will be on the basis of a Cost Target of REV 7/93 FORM 124 $609,846 based on salary cost shown in Attachment 8 plus 86 percent of salary cost for general and administrative overhead plus direct expenses plus a Fixed Fee of $73,440 The not to exceed Total Contract Amount is $683,286. Monthly invoices will be issued by CH2M HILL for all work performed under this AGREEMENT. Invoices are due and payable on receipt -Interest , amounts Sauer -date of - . credited . In the event of a disputed or contested billing, only that portion so contested will be withheld from payment, and the undisputed portion will be paid. CLIENT will exercise reasonableness in contesting any bill or portion thereof. No interest will accrue on any contested portion of the billing until mutually resolved. 9. Limitation of Liability CH2M HILL agrees to defend, indemnify, and hold harmless, the CLIENT from and against liability claims an causes of action, including defense costs that may anse or may be alleged to arise, in connection with the sole negligence or willful misconduct or omissions of CH2M HILL in direct connection wth this project. No clause shall be constructed in any form or manner to waive that Tort Immunity as set forth under Arkansas State Law. 614244 - • - - 0 -aggregate, X000. This Provision takes precedence over any conflicting Provision of this AGREEMENT or any document incorp- orated into it or referenced by it 10. Severability and Survival If any of the provisions contained in this AGREEMENT are held illegal, invalid or unenforceable, the enforceability of the remaining provisions shall not be impaired thereby. Limitations of liability indemnities, and other express representations shall survive termination of this AGREEMENT for any cause. 11. Asbestos Of 44aza Sous Substances PROJCCT C IENT that CH2M ue i _ liar t ran CHH HI li 12. Loan Monitoring Services When CH2M HILL is providing PROJECT review and/or construction monitonng services to lenders. CLIENT (Lender) wit; to the maximum extent permitted by law, indemnify CH2M HILL from all claims damages, losses, and expenses, including litigation costs and attorney's fees, ansing out of or relating to CH2M HILL's involvement or presence on or near the PROJECT. CH2M HILL is not responsib'e for the duties and responsibilities that belong to the borrower(s), developer(s), constriction contractor(s), designer(s). testing laboratory(.es), t II -time inspector(s). or other parties associated with the PROJECT not in the employ of or a subcontractor to CH2M HILL 13. Interpretation The limitations of liability and indemnities will app y whether CH2M HILL's liability arises under breach of cortract or warranty. tort, including negligence strict liability; statutory liability. or any other cause of action, except the limitations will not appy to willful misconduct or gross negligence for limitations of liabil.ty or sole Page 2of3 116583\C171 DOC negligence for indemnification Said limitations shall apply to CH2M HILL's officers, affiliated corporations, employees. and subcontractors. The law of the State of Arkansas shall govem the validity of this AGREEMENT, its interpretation and performance and ary other claims related to it 14. No Third Party Beneficiaries Th.s AGREEMENT gives no rights or benefits to anyone other than CLIENT and CH2M HILL and has no third party beneficiaries CH2M HILL services are defined solely by this AGREEMENT, and not by any other contract or agreement that may be associated with the Project 15. Materials and Samples Any items, substances, matenals, or samples removed from the PROJECT site for testing analysis, or other evaluation will be returned to the PROJECT site within 60 days of PROJECT close-out unless agreed to otherwise CLIENT recognizes and agrees that CH2M HILL is acting as a bailee and at no time assumes title to said items, substances. materials. or samples. 16. Assignments This is a bilateral personal services AGREEMENT Neither party shall have the power to or will assign any of the duties or rights or any claim arising out of or related to this AGREEMENT, whether arising in tort, contract or otherwise, without the written consent of the other party Any unauthorized assignment us void and unenforceable. These conditions and the entire AGREEMENT are binding on the heirs, successors and assigns of the parties hereto 17. Subcontracting It is anticipated that portions of the PROJECT work scope will be completed with the assistance of subconsultants under CH2M HILL's direction. Subcontract agreements with both the RJN Group and McCelland Consulting Engineers are anticipated and attached to this AGREEMENT. Additionally. Dr. Phil Taylor and Dr. David Parker are anticipated to assist in the areas of population growth projections and regional water quality impacts. respectively. The CLIENT will be notified prior to utilizing the services of any other subconsultants. 18. Time of Completion The PROJECT scope of work is scheduled to be completed within a 16 month time frame ending in December 1996 This time period may be modified if there are changes in the work scope or if there are delays outside CH2M HILL% control 19. Changes Changes to specific work tasks in the scope of work are anticipated as the PROJECT evolves and may affect the estimated level of labor effort and the assoriated costs These changes will not require a contract amendment unless the overall authorized contract amount would be exceeded as a result of the changes. The CLIENT may make or approve modifications or additions to the Scope of Work that require an amendment the AGREEMENT If any such change causes an increase or decrease in the cost of or time required for performance of this AGREEMENT, the CLIENT will authorize an equitable change in the contract amount and/or time in writing. If authorized, these changes would be performed in accordance with the other terms and cond•tiors of this AGREEMENT. REV 7/93 FORM 124 Services. covered by this AGREEMENT will be performed in accordance with the Provisions stated on the back of this form and any attachments or schedules. This AGREEMENT supersedes all prior agreements and understandings and may only be changed by wntten amendment executed by both parties Approved f..- LIE By ll, 2 L vY� Title Accepted for CC HILL, INC By /1dyed� Trtle Vice PresideSt' Date 73 Date August 15. 1995 Page 3 of 3 116583\C171.DOC REV 7/93 FORM 124 • • Attachment A Fayetteville Sewer System Study Scope of Work June 14, 1995 General The purpose and goal of the Sewer System Study is to identify and evaluate alternatives for needed improvements and expansion of Fayetteville's wastewater collection and treatment facilities. The overall project goal includes recommendations for the City in meeting State and Environmental Protection Agency (EPA) regulations pertaining to sewer system overflows, as well as applicable water and air pollution requirements. The project initially includes the facility planning and this Scope of Work identifies the associated work tasks. Additional tasks will be required to complete the project; however, their particular need and scope of work cannot be developed at this time. Some of these additional tasks might include such items as: specific stream sampling/modeling; Revolving Loan Fund (RLF) program requirements including the application and rate/financing analysis; additional assistance in the area of public information/involvement; National Pollutant Discharge Elimination System (NPDES) regulatory assistance; sampling and analytical testing; environmental impact studies; and CORPS 404 permit assistance. The City of Fayetteville may authorize some of these tasks to be performed when the need is identified and the work scope can be defined. The Scope of Work for the design and construction phases cannot be specifically defined until the completion of the Sewer System Study. ENGINEER (CH2M HILL) agrees to furnish OWNER (City of Fayetteville) the following specific services: Article 1. Scope of Services Task 1 -Workshop No. 1 (Initial Project Kickoff) A. Upon receiving authorization to proceed, ENGINEER shall conduct a project kickoff workshop in Fayetteville. The purpose of this workshop is to review the scope of work, anticipated schedule, and project deliverables prior to the actual start of the project. This effort is intended to confirm and clarify the project's overall goals and the individual tasks that are foreseen to accomplishing those goals. Summarize and document the discussions at the kickoff workshop and distribute to participants. B. The City and CH2M HILL project team will review the availability of current information and focus on developing a common understanding for the existing TUL1602.D1 U;123.doc -A-1 facilities, as well as their current condition and issues that will be involved during the project Input from OMI will be included as a part of evaluating current conditions. C. Prior to the workshop, the OWNER will identify and assemble existing information and past studies that applicable to the anticipated project work efforts A brief overview of the available information will be provided at the start of the workshop. This information will provide a common baseline of information and serve as a resource for the work effort on this project. The goal will be to maximize the use of previous information and findings and avoid duplication of effort if the assumptions and conditions are still valid. D. Review and discuss requirements of the Arkansas RLF. Develop approach for incorporating these requirements into the Sewer System Study. E. Discuss and develop an overall approach to be used during the project to keep interested parties informed as to the project's status. This could include such groups as: 1. Citizens of Fayetteville 2. Fayetteville City Council and Administration 3. Area Industries 4. Surrounding Communities 5. Special Interest Groups and Environmental Organizations F. Discuss potential benefit in the formation of a Regional Task Force to develop a consensus among stakeholders in allocation of the region's finite water resources. If this appears to be beneficial and desirable, its implementation may be authorized as an additional scope item. G Provide a written summary to document issues discussed at the project workshop and kickoff meeting. Task 2 -Public Involvement A. Conduct three separate public meetings to provide information to the general public on the status and progress of the study. The OWNER will assist in making preparations and arrangements for each of the meetings These meetings will provide an opportunity to receive comment from the public and to provide a response, as appropriate, during the planning process. The public meetings are anticipated to occur upon completion of the following • Workshop No. 2 (Existing Conditions) • Workshop No. 3 (Screen Alternatives) • Draft Sewer System Study TUL6021)1IC123.doc -A-2 Attend and participate in one follow-up meeting with specific interest groups following each of the three public meetings. The purpose of the follow-up meeting will be to provide information and to identify potential constraints and solutions for implementation of the desired altemative for Fayetteville. it is not anticipated that any other meetings with groups or a public advisory committee will be necessary. Meet bimonthly during the anticipated 12 -month project duration with the OWNER's Technical Committee to review the project's status. These meetings would be scheduled to occur in conjunction with other project tasks and activities to avoid separate preparation and travel. C. Meet on three occasions during the anticipated 12 -month project with the OWNER's policy committee (possibly the Environmental Concerns Committee) to provide an overall project summary and status report. This activity will be scheduled to coincide on the same day as the bimonthly meeting with the OWNER's Technical Committee technical review committee. D. Develop a brief informational summary such as a newsletter on a bimonthly basis that is appropriate for use as a separate mailing or utility bill insert that will serve to inform the general public on the goals and progress of the study. Camera-ready copy will be provided and the OWNER will provide for reproduction and distribution as appropriate. E. Confirm that public participation Arkansas RLF program requirements are integrated into the planning process and document that these requirements have been met. F. Document meetings with regulatory agencies and the issues that were discussed. Task 3 -Regulatory Interface/Coordination Meet early in the project with the Beaver Water District, Arkansas Department of Pollution Control and Ecology (ADPC&E), the Oklahoma Water Pollution Control Board, and EPA Region 6 to make them aware of the planning study and approach being undertaken by Fayetteville. B. Arrange and meet with ADPC&E and EPA Region 6 early in the project to determine potential constraints relating to the identification of water quality issues that will impact the issuance of a revised and/or new NPDES permit. Solicit input from ADPC&E, Oklahoma Water Pollution Control Coordinating Board, and EPA Region 6 upon competition of Workshop No. 2 (Task 9) and TUTA602 1)11C 123 dot: A-3 the initial definition of alternatives. As appropriate, incorporate regulatory comments into the alternative development process. Identify any state and federal regulations relative to both water and air pollution that will be applicable in the planning process for improvements to both the collection and treatment facilities. Task 4 -Flows and Loads A. Obtain from OWNER and OMI and review the following information: historic flow and loading data for wastewater treatment plant (WWTP), previous and projected industrial growth, descriptions of major industries, and wastewater flow and pollutant concentration data for industries. B. Population and employment estimates and forecasts by the City's Planning Division for the year 2020 will be the basis for the planning effort and projection of future flows and loads. Water -use projections being developed on a separate project will also be made available by the OWNER and correlated with the development of wastewater flow projections along with the planned population growth. C. Based on historic data and information developed in Task No. 7, develop average per capita flows and loads to the WWTP. This data will then be used to project average future flows and Toads. Segregate the projected flows and loads between the White and Illinois watershed for the ultimate planning conditions. Projected basin flows will be based on a breakdown of population and industrial growth projections by subbasin developed from existing transportation zone population and employment information provided by the OWNER. C. Based on Iustonc data, develop flow and Toad peaking factors and recommend peaking factors to use as the basis for design. Use the recommended peaking factors to estimate peak -hour flows (which will be used for sizing of hydraulic elements) and the peak -month, peak -week, and peak -day loads to the WWTP (which will be used to evaluate and size treatment facilities). D. Document the results of this task in a draft technical memorandum (TM) and submit to OWNER for review. Task 5 -Treatment Plant/Sludge Land Application Facility Evaluation A. Meet with the OWNER and OMI personnel onsite to define, in general, the condition of the existing treatment facilities and its operational performance record. A 1 -day evaluation shall be conducted utilizing personnel specializing in wastewater process, electrical/instrumentation and control, mechanical, and TUL\602.D1\C 123. doc -4-4 structural technical disciplines. Identify areas of the WWTP that may need to be upgraded, replaced, or modified. B. Confirm treatment capability of existing unit processes in relation to design criteria and historical operating performance provided by OMI. (Determine need for any additional "in -plant" process testing.) C. Evaluate historical operation of the sludge reuse/disposal "sludge farm" and assess its performance relative to its remaining capacity. D. Document the results in a draft TM and submit to the OWNER for review. The TM will categorize the condition of the existing facilities. General recommendations for repair or modification will also be presented. Task 6 -Sludge Treatment/Odor Mitigation Conceptual Design A. Identify and define the existing facility capability to meet sludge stabilization requirements of the 503 sludge regulations. Identify any testing or analysis needed to evaluate the current treatment process capability. B. Review ongoing pilot efforts, operational records, and preliminary recommendations by OMI to meet 503 sludge stabilization requirements through operational changes, as well as odor mitigation measures. C Summarize existing information including previous studies relative to odor abatement to serve as a basis for development of a conceptual design for the anticipated digester improvements. D. Conduct an onsite evaluation including a 3 -day workshop to assess and evaluate available alternatives and development of a recommended approach. This effort will be conducted outside schedule constraints of the overall Sewer System Study. This approach will provide the City with the opportunity to expedite identification and implementation of the recommended sludge treatment and associated odor abatement facilities at the plant. Assess potential odor sources in addition to the aerobic digestion process within the plant and collection system that may contribute to complaints. Identify potential mitigation measures to reduce potential odor sources. F. Identify and define areas where there have been odor complaints that may be related to collection system facilities. Evaluate sources of odors and recommend structural and/or operational modifications to mitigate odor sources. TUL1602.D1CC123.doc -A-5 Document the evaluation and recommendations in a Conceptual Design Report resulting from the workshop. This report would include budgetary cost estimates and considerations of a phased implementation approach. Upon review and acceptance by the City, this Conceptual Design Report would be used to develop a design scope of work for consideration by the City. Task 7- Collection System A. Meet with OWNER's staff to define objectives and constraints associated with the evaluation of the City's sewage collection system. Confirm existing problem areas and establish priorities for evaluation. Analyze flow data from major lift stations including Porter Road, Old Wire Road, Gregg Street, Popular Street, and Lift Station No. 12 to determine current flow rates. Compare to flow data obtained during previous studies and develop dry- and wet -weather hydrographs for each subdrainage basin. Flow data from major lift stations are to be provided by the City. Using the above data, determine existing base flow loadings on a per capita and employee or per acreage basis based on population and employment information developed in Task No. 4. D. Review water usage records (obtained in Task No. 4) and industrial pretreatment records for large industrial users. Interview personnel at large industries to determine future plant expansion plans. Using population and employment projections and water usage projections provided by the City in Subtask No. 4, project future wastewater flow rates by subbasins Perform temporary flow monitoring to determine wastewater flow rates for Greenland. Wastewater flow rates from Elkins is currently being determined as part of the Illinois River Phase II Sewer Project. Flow data for the City of Farmington will be provided by the OWNER. G. Develop a City-wide collection system hydraulic model (SWMM) including all sewers 10 inches in diameter and larger from information contained in the White and Illinois River Watershed Sewer System Studies. The model development assumes that the OWNER will provide the White River model database in electronic format that is suitable for use in the SWMM model. Provide model used in this study to the OWNER and train OWNER's staff in its use Using existing data and the additional flow data obtained in Subtask 7.F above, calibrate the system model and assess the hydraulic conditions in the major TUL\602.1mC123 doc -A-6 • collection system lines, lift stations, and force mains. It is anticipated that the model will be calibrated to existing dry -weather conditions and to one selected storm condition. H. Assess the City's current approach and ongoing sewer rehabilitation efforts to eliminate bypasses and overflows and identify appropriate assumptions for future inflow/infiltration (I/I) reduction. This effort will focus on the following: • Reliability of Existing Flow Data • Rehabilitation Impacts on the Plants • Effectiveness of the I/1, Sewer System Evaluation Survey, and Rehabilitation Efforts To -Date • Direction and Focus of Future Rehabilitation Efforts This assessment will be performed based upon existing information including previous reports and hydraulic modeling results. A 4 -day value engineering workshop approach will be used to assess existing information and to make recommendations for future I/1 efforts. A summary (provided by RIN) of the current and ongoing rehabilitation efforts will be the basis of evaluation during the workshop. The first priority will be in the western area of Fayetteville and a small area in the southeast portion of the collection system. The goal will be to identify short-term solutions and recommendations in these areas for needed remedies independent of the longer-term recommendations. This will be done and reviewed with the City on an accelerated basis while the other Sewer System Study tasks are being accomplished. Utilizing flows projected and provided by OWNER under Task 4 previously, determine the existing collection system's capability to function under future flow conditions. Through model simulation of 10 -inch pipes and larger in both the White and Illinois watersheds, determine additional system improvements needed from major collectors to interceptors and any lift station improvements that may be required. These improvements will be ranked according to priority based on 1, 5, 10, 15 years, and ultimate needs. These improvements will be formulated based on the needs of each subbasin when it reaches ultimate development. K. Provide maintenance management system software and a 586 pentium computer with a monitor that is capable of utilizing the City's existing hydraulic model information and system data. Existing Sewer system inventory data from the Illinois River and White River Sewer Studies will be included in 1UL1602 D11C123.doc A-7 • • the maintenance management system. It is anticipated that the OWNER will provide the database of information from the White River Study in electronic format. Provide 6 days of onsite training. L Summarize findings of the collection system evaluation in a draft TM for review and discussion with the OWNER. Task 8 -Assess Existing Stream Water Quality Conditions A. Collect and evaluate existing information relative to water quality conditions on the White, Illinois, and Arkansas Rivers. This would include previous studies, as well as water quality sampling data that might be applicable to discharge locations that could be potentially considered by Fayetteville Ongoing study on Mud Creek will be included in this evaluation. B. Review state and federal water quality regulations and stream standards that must be maintained in the surface waters that are possible considerations for new or additional discharge loading. Assess the potential for and estimate the discharge requirements and NPDES requirements for potential discharge locations. The purpose of this effort is to generally identify the potential for and requirements of additional or new NPDES discharges so that the various options and alternatives can be realistically developed and screened for further consideration. This task does not include actual modeling or stream sampling. Identify additional detailed studies and evaluations that may be necessary. D. Prepare a draft TM summarizing the findings of the water quality issues and submit for review. Based on the projected flows and loads and permit limits, identify the treatment requirements needed to meet the anticipated limits (such as complete nitrification, disinfection, metals removal, etc.). Task 9 -Workshop No. 2(Existing Conditions) A. Prepare for and conduct a 3 -day workshop in Fayetteville The workshop will be conducted the day following the plant evaluation. It is anticipated that the workshop will be attended by the OWNER's staff and CH2M HILL's project team. The workshop will be conducted by the project manager and be organized to accomplish the following tasks: T[s.\602D1\c123.doc 1. Confirm projected flows and loads, including various scenarios involving a potential second WWTP located in the Illinois watershed. -A-8 • • • • 2 Categorize and prioritize the existing treatment facilities and equipment. Discuss future discharge requirements relative to the White, Illinois, and Arkansas River basins. Alternative nontraditional options to discharge will also be reviewed and discussed. 4. Brainstorm and screen advanced treatment processes for meeting the potential NPDES limits. Three treatment process options will be identified at the workshop for further evaluation. Review current sludge handling and disposal practices. Identify modifications required to meet the recently promulgated 503 federal sludge regulations. 6. Evaluate concept for an additional WWTP (including location) or expansion of the existing Paul R. Noland plant. Review findings of the Collection System Evaluation in Task 7 and their impact on the concept of an additional WWTP. C. Following the workshop, incorporate comments received and finalize the draft TM on Flows and Loads (Task 4) and Water Quality Conditions (Task 8). D. Make a brief presentation to City Council summarizing the status of the project following each of the three scheduled public meetings. Task I0 -Development of Alternatives A. Options and alternatives discussed in the preceding Workshop No. 2 will be developed and evaluated further. This process should result in the identification of three or four primary alternatives, each consisting of collection system, treatment, effluent discharge or reuse, and sludge handling recommendations. B. Relative cost comparisons will be developed for each of the alternatives to allow for a monetary evaluation and ranking. Nonmonetary factors such as environmental impacts and implementability factors for each of the alternatives will be summarized. D. A TM summarizing the development of alternatives will be prepared and submitted to the OWNER for review and comment. This will also serve as the basis for the,workshop where the alternatives will be initially screened. 7111.\602 Dt\C123.doc .A-9 Task 11 -Workshop No. 3 (Screen Alternatives) A. Perform a workshop conducted by the Project Manager to be attended by individuals representing the OWNER and Engineer. The first day of the workshop will be designed to accomplish the following tasks: 1. Discuss costs associated with additional treatment capacity and the specific location(s) under consideration. Collection system impacts and alternatives associated with the treatment options. The second day of the workshop will be designed to accomplish the following tasks: Evaluate treatment alternatives and select the alternative to implement including location. Evaluate final treated effluent disposal alternatives associated with an increase in WWTP capacity. 3. Identify modifications to existing sludge handling and disposal practices. B. Summarize workshop activities and further develop screening information as necessary. Based upon the results of this activity, identify the selected alternative and document in a TM Task 12 -Development of Selected Plan A. Prepare a preliminary site plan showing location of the recommended facilities including treatment, sludge handling improvements and collection system City- wide map. B. Prepare preliminary construction and operation and maintenance (O&M) cost estimates for the recommended improvements. WWTP staffing estimates shall also be prepared The cost estimates will be budget -level estimates as defined by the American Association of Cost Engineers. The OWNER will provide the ENGINEER with the City's current O&M budget, including line -item breakdowns. Prepare a draft TM summarizing the recommended improvements and presenting the preliminary site plan and construction and O&M cost estimates. Submit the draft memorandum to the OWNER for review. TUL\602 Dl\C 123.doc A -1O D. The selected plan may require further study and/or verification of NPDES discharge limits and its impact on the receiving stream If specific stream or wasteload allocation studies are required, there would be negotiated and authorized by the OWNER when the work scope associated with the selected alternative can be defined. E. This scope covers preparation of an environmental assessment and submission of an environmental information document as required by the RLF program. Preparation of an Environmental Impact Statement is not anticipated at this time. Task 13 -Sewer System Study Report A. Incorporate comments received on the draft TMs into a draft Facility Plan Report. A draft outline of the report is given below. Submit the draft report to the OWNER for review. Executive Summary Section 1 Introduction Section 2 Flow and loads Section 3 Permit Limits and Treatment Requirements Section 4 Existing Treatment Facility Section 5 Treatment Alternative Development Section 6 Sludge Handling and Disposal Alternative Development Section 7 Existing Collection System Section 8 Collection System Alternative Development Section 9 Alternative Evaluation and Selection Section 10 Selected Management Plan Section 11 Costs and Implementation Plan B Receive comments from the OWNER and incorporate them into a final Sewer System Study. Because all information presented in the draft report will have previously been submitted to and reviewed by the OWNER (in the form of TM or meeting notes), it is anticipated that only minor review comments will be received. Submit 20 copies of the Report to the OWNER, along with 15 copies of a bound Executive Summary for use by City Council. Task 14 -Sewer Overflow Basin Conceptual Design A. The purpose of the conceptual design will be to identify optional approaches to eliminating or storing potential sewer system overflows during wet weather events until the flows can be reintroduced into the collection system and TJL\602 D l \C 121 doc A -1I • conveyed to the WWTP As a result of this activity, needed facilities will be identified so that final design can proceed Through discussion with the City and existing overflow reporting records, establish locations along the 15th Street interceptors in addition to the Salvation Army and Happy Hollow Lift Station locations where overflows have historically occurred. Utilize wet weather flow projections provided by the City (from ongoing RJN project) to identify the cause and potential solutions for the overflow. Two separate and independent overflow conditions are thought to exist. They are as follows: • Evaluation of the overflow near the Salvation Army will include possible: 1) elimination of potential interceptor restrictions down gradient from the Salvation Army; 2) providing additional interceptor capacity, and 3) basin to contain and store projected overflows until they can be reintroduced into the collection system. • The overflow at the Happy Hollow Lift Station is a direct result of having to shut the lift station down to prevent overloading the WWTP's headworks pumping capacity. Resolution of this condition will include. 1) providing storage basin capacity at or near the lift station or at the WWTP and/or along the gravity force main route to the plant; and 2) evaluation of the lift station's capacity to handle the project flows. Evaluate existing excess flow equalization storage facilities at the WWTP and integrate this capacity into potential solutions. D. Develop overall system flow capacity analysis relative to the overflow conditions near the 15th Street interceptors. E Utilize the hydraulic model results and data input provided by RJN on other City ongoing project work to evaluate several different scenarios to resolve the overflow situation F. The results of the analysis and evaluation will be summarized in a TM including a recommended approach to resolving the overflow condition This will be presented to the City staff in a workshop and a decision reached of the desired approach. Applicable review comments will be incorporated along with defining the specific design criteria for the proposed facilities. The final outcome will be documented by finalizing the TM. This TM will be used as the 1111A602.])11C 123.doc A-12 basis for facility design and can also be used as a submittal to reviewing agencies if appropriate. Task IS Project Management/Administration A. At the beginning of the project, the ENGINEER's project manager will prepare project instructions for use by the project team during the course of the project. The instructions will outline procedures, summarize project goals and objectives, present schedule and budget guidelines, present quality control/quality assurance (QA/QC) procedures, and other information that is pertinent to the successful completion of the project. The ENGINEER will coordinate and manage execution of the overall project tasks throughout the project among own staff and other team members participating as subconsultants. C. The ENGINEER's project manager will monitor the status of the project to such that the project is completed within the agreed upon budget and schedule constraints The ENGINEER's project manager will discuss project status with the OWNER designated representative on a monthly basis. 7U1.\602.111\C123 doc A-13 • • • Attachment B Fayetteville Sewer System Evaluation HILL Hourly Rates* CH2M 1995 Average Classification (Engineer/Technician) Average Hourly Rate El $ 47.43 E2 53.01 E3 59.52 E4 69.75 E5 82.77 E6 95.32 E7 116.25 E8 15630 T2 38.13 T3 45.10 T4 53.47 T5 64.63 OF 32.55 *Salary Cost plus 86 percent G&A Budget Adjustment Form Budget Year 1995 Department: Public Works Division: Program: Sewer Mains Construction Date Requested September 5, 1995 Adjustment Project or Item R quested: Acciticnal funding is requested for the Sewer System Study Project* 95041. Project or Item Deleted: Funding proposed for this request is the I (WY 16 West Sewer Force Main, Project # 95043 and Use of Fund Balance. Justification of this Increase: Increased project scope of work. Original scope of work was intended primarily as a wastewater treatment plant assessment. The proposed scope of work is a detailed sewer system study to assess sewer rehabilitation efforts, collection, treatment, discharge as well as sludge management. Justification' of this Decrease: Project is proposed to be implemented m 1996. Fund balance is sufficient to fund this request and comply with City policy. Account Name Amount Increase Account Number Project Number Contract Services .533,286 5400 5700 Account Name Sewer Improvements Uac of Fund Balance Amount Decrease 5315 00 Account Number Project Number 272,286 5400 5700 _ 261,000_ _5400 0940 _ proval Signatures proval f5 / z 0/7 c 8-1t•ciS c & Svc - `Department Director Type: A B 5815 00 4999 99 Budget Office Use Only D Date of Approval Posted to General Ledger Entered in Category Log r Budget Office Copy