Loading...
HomeMy WebLinkAbout41-94 RESOLUTIONCity of Fayetteville, Arkansas Budget Adjustmen Form • Budget Year 1994 Department: Sales Tax Construction Fund Division: Program: Date Requested April 5,1994 Adjus2ment Project or Item Requested: Funding is requested for engineering work on intersection improvements al Stubb:efield Road and ad Wire Road and improvements along ad Missouri Creek. Additionally, approval of a transfer from Reserved General Fund Fund Balance is requested. Project or Item Deleted: None .7ttstification of this Increase: City Council Street Committee voted to move this phase of work on Stubblefie:d form 1995 to 1994. The transfer from General Fund ....thins a portion of the funds remaining from the early retirement of the City Sales Tax Bond Issue. Justification of this Decrease: Increase Account Nair.c Arnount Account Nurnber Project Number Street Improvements 33,450 4470 9470 5809 00 Transfer to Sales Tax Construction Fund 33A50 1010 66111 7602 47 Decrease Account Name Amount Account Number Prolect Number Transfer from General Fund 33,450 4470 0947 6602 01 Use of F.ind Balance 33650 1010 0001 4999 99 Requ ted roval Signatures C....... .. Bu get C o dina r Department Director Admin. Se:vices Director Mayo: 3—t( 3— crefLL Budget Office Use Only Type:A BCD EF Date of Approval Posted to General Ledger Entered in Category Log Budget Office Copy • • CONTRACT AMENDMENT NO. 3 FOR ENGINEERING SERVICES PROJECT: STUBBLEFIELD ROAD AND MISSOURI CREEK DRAINAGE IMPROVEMENTS E-245 THE ORIGINAL CONTRACT was made and entered into on May 24, 1989, AND THIS CONTRACT AMENDMENT NO. 3, made and entered into on this 5:12. day of Aid& , 1994, by and between the City of Fayetteville, Aikansas, hereinafter referred to as the "OWNER", and Milholland Company, Engineering and Surveying, Consulting Engineers of Fayetteville, Arkansas, hereinafter referred to as the "ENGINEER", WITNESSED THAT: WHEREAS, the OWNER Originally desired to Construct STUBBLEFIELD ROAD 31 feet in width from HAROLD STREET North and East to Old Missouri Road centered in a Right -Of -Way fifty feet (50') in width, AND WHEREAS, the OWNER has AMENDED its desires several times, as depicted in AMENDMENT NO. 2, AND WHEREAS/ the OWNER has AMENDED its desires again, as follows: I: Develop PHASE II IMPROVEMENTS to FIRST CONSTRUCT THE EAST END OF STUBBLEFIELD ROAD FROM THE P.C. (Point -of - Curvature) beginning at STA. 27+21.19 to the center of Old Missouri Road; II: RE -STAKE lost and/or obliterated control for Construction; WHEREAS, the OWNER has AMENDED its desires as to the length of the Construction of the Missouri Creek Drainage Improvements from the new Stubblefield Road crossing North, as follows: I: DEVELOP PHASE I IMPROVEMENTS to Delete the Proposed Construction of Missouri Creek Earthen Channel from its intersection with Mud Creek, South along the centerline of existing Channel, approximately 800 L.F., as listed on page 2 of the Contract Amendment No. 2, Item "SECOND" Sub -Item "E"; II: RE -FURBISH CONTROL STAKING FOR CONSTRUCTION; 1 • WHEREAS, the OWNER deemed it essential to delay and modify its original plans, and Amend, AND WHEREAS, the ENGINEER has sufficient experienced personnel and equipment to perform the work described in this Agreement, as Amended, NOW THEREFORE, in consideration of the mutual covenants and agreements herein contained, the OWNER and the ENGINEER, the parties hereto, stipulate and agree that the OWNER does hereby employ the ENGINEER to perform the required engineering services as hereinabove set out; AND the ENGINEER agrees to provide said ADDITIONAL SERVICES. SECTION 1: DESCRIPTION OF PROJECT "AS AMENDED": The Project for which engineering services are to be provided are as follows: PROJECT No. 1 - PHASED CONSTRUCTION OF STUBBLEFIELD ROAD IMPROVEMENTS FROM HAROLD STREET NORTH AND EAST TO OLD MISSOURI ROAD including, but not limited to, Street and Storm Drainage Construction, Water Main Replacement and Sidewalk Construction. PHASE I BEING FROM STA. 27+21.19 TO OLD MISSOURI ROAD; PROJECT No. 2 - MISSOURI CREEK IMPROVEMENTS as amended, herein above; which are generally described as follows: The balance of SECTION 1 AND ALL OF SECTION 2 OF THE "ORIGINAL CONTRACT" AND CCNTRACT AMENDMENT NO. 2 shall remain unchanged. SECTION 3. COMPENSATION AS AMENDED: Compensation for the various types of services to be under this contract shall be made as follows: provided PROJECTS No. 1 AND 2: STUBBLEFIELD ROAD AND MISSOURI CREEK IMPROVEMENTS: A. PART I: BASIC ENGINEERING SERVICES: (AMENDED) DEVELOP PHASED CONSTRUCTION PLANS, Compensation Construction Phase I shall be a Lump Sum Fee of $3,500 addition to the Original Contract and Amendment No. 2, states the following: for .00 in which • Compensation for Basic Engineering Services shall be a LUMP SUM FEE amount of $23,000.00 FOR AMENDMENT NO. 2 INSTEAD OF CONTRACT AMENDED AMOUNT OF $11,000.00. This fee includes full compensation for every item of work as described in SECTION 2, PART I. The fee is based on an estimate of the various classifications of work at an hourly rate. The hourly rates include direct labor costs plus allowances for indirect labor costs, overhead, and profit. B. PART I -A: RIGHT-OF-WAY ACQUISITION: Compensation for PLATS AND DESCRIPTIONS for Right -of -Way Easements shall be based on the hours of work actually required. The hourly rates shall be based on charges for the various classifications of personnel identical to those set out under SECTION 3-F. "HOURLY RATE PER CLASSIFICATION". Only work as directed by the OWNER shall be done under this section of the contract. The AMENDED total fee shall not exceed $3,800.00 INSTEAD OF THE ORIGINAL CONTRACT AMOUNT OF $2,000 00 and CONTRACT AMENDMENT NO. 2 AMOUNT OF $3,200.00. C. PART II: BIDS THROUGH AWARD OF CONTRACT: (AMENDED) Compensation for "Advertisement for Bids" through "Award of Contract" shall be a LUMP SUM FEE amount of $1,000.00 INSTEAD OF ORIGINAL CONTRACT amount of $400.00 and AMENDMENT NO. 2 amount of $600 00 D. PART III: CONSTRUCTION MANAGEMENT: Compensation for Construction Management Services described in SECTION 2, PART III, shall be as follows: PROJECT No. 1: STUBBLEFIELD ROAD: Compensation for Construction, Phase I shall be an estimated amount of $8,000.00 for AMENDMENT NO. 3 INSTEAD OF ORIGINAL CONTRACT AMOUNT OF $11,600.00. FUTURE CONSTRUCTION PHASES SHALL BE NEGOTIATED AT SUCH TIME SERVICES ARE TO BE PERFORMED. Compensation shall be based on charges for the various classifications of personnel identical to those set out under SECTION 3-D. - "HOURLY RATE PER CLASSIFICATION". PROJECT No. 2: MISSOURI CREEK IMPROVEMENTS: Compensation for Construction, Phase I shall be an estimated amount of $6,500.00 for AMENDMENT NO. 3/ AND SHALL BE A PART OF CONSTRUCTION PHASE I of Project No. 1 above. Compensation shall be based on charges for the various classifications of personnel identical to those set out under SECTION 3-D. - "HOURLY RATE PER CLASSIFICATION". 3 • E. HOURLY RATE PER CLASSIFICATION: (AMENDED) The hourly rates to be charged for the various classifications of personnel are set out below are AMENDED from Original Contract, as follows: HOURLY RATE PER CLASSIFICAT/ON: Professional Engineer Registered Land Surveyor Engineering Aide Secretary Survey Crew Resident Inspector Draftsman Computer w/Operator Travel The balance of SECTIONS 1 AND 2 OF remain unchanged. $90.00 $60.00 $65.00 $22.00 $75.00 $45.00 $38.00 $45.00 $00.30 (AMENDED) per per per per per per per per per hour hour hour hour hour hour hour hour mile THE "ORIGINAL CONTRACT" shall IN WITNESS WHEREOF, the OWNER has caused these presents to be executed in its behalf by its duly authorized representatives, and the said ENGINEER by its duly authorized representatives, and the parties hereto have set their hands and seals on the date heretofore set out. Attest: C y Cler Date: Attest: . ./C14- 1 • 'Y'W/52P14i Secretary , 1994 Date: a4cAli 1994 CITY OF FAYETTEVILLE, ARKANSAS Fred Hanna, Mayor MILHOLLAND COMPANY (17 27 e vin L. Milholland, Owner 4 • RESOLUTION NO. 41 - 94 A RESOLUTION AUTHORIZING 'rHE MAYOR AND CITY CLERK TO EX ECuTE AMENDMENT NO. 3 TO MILHOLLAND ENGINEERING CONTRACT FOR THE STUBBLEFIELD ROAD AND OLD MISSOURI CREEK DRAINAGE PROJECT AND APPROVAL OF A BUDGET ADJUsTm ENT. BE IT RESOLVED BY THE CITY COUNC11. OF THE CITY OF FAYETTEVILLE, ARKANSAS: 5_es_lionA. That the Council hereby authorizes the Mayor and City Clerk to Execute Amendment No. 3 to Milholland Engineering Contract for the Stubblefield Road and Old Missoun Creek Drainage Project. A copy of the amendment to contract is attached hereto marked Exhibit "A" and made a part hereof. Section 2. The Council also approves a budget adjustment in the amount of $33,450 increasing Streeet Improvements, Acct. No. 4470 9470 5809 00 and Transfer to Sales Tax Construction Fund, Acct. No. 1010 6600 7602 47 by decreasing Transfer from (ieneral Fund, Acct. No. 4470 0947 6602 01 and Use of Fund Balance, Acct. No. 1010 0001 4999 99. A copy of the budget adjustment is attached hereto and made a part hereof. PASSED AND APPROVED this Mb day of April 1994. APPROVED: By: ATTEST: By:._ ass -at '1 AI Sherry Thomas, City Clerk • ziA;k4P1 red Hanna, Mayor