HomeMy WebLinkAbout29-94 RESOLUTION• • RESOI UTION NO. 29-94 A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A CONTRACT IN THE AMOUNT OF $368,040. PLUS A l07c CONTINGENCY OF $36,804 WITH RJN ENVIRONMENTAL ASSOCIATES. INC. FOR ENGINEERING SERVICES FOR THE RFPI ACEMENT AND REHABILI IA I1ON OF SANITARY SEWER MAIN MINISYSTEM 18 BIC. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the Council hereby authorizes the Mayor and City Clerk to execute a contract in the amount of $368,040, plus a 10% contingency of $36,804 with RJN Environmental Associates Inc. for engineering services in the replacement and rehabilitation of sanitary sewer main Minisystem 18 BIC. A copy of the contract is attached hereto marked Exhibit "A" and made a pari hereof. PASSED AND APPROVED this 1st day of March . 1994. APPROVED: By: c's Fired Hanna, Mayor ATI EST. By:u• y Sherry L Thomas. City Clerk • • • • AGREEMENT CITY OF FAYETTEVILLE, ARKANSAS AND RJN GROUP, INC. DALLAS, TEXAS THIS AGREEMENT made this hit day of MILAILAL , 1994 by and between the City of Fayetteville, hereinafter called OWNER and RJN GROUP, INC., Dallas, Texas hereinafter called ENGINEER. WHEREAS, the OWNER has conducted a Sewer System Study for the White River Watershed and identified needed improvements to the Sewer System. NOW, therefore, the OWNER hereby engages the ENGINEER to provide the following professional services as set forth in this agreement. Section I - Basic Services of ENGINEER The ENGINEER agrees to furnish and perform various professional engineering services related to improvements to the Sewer System in Mini System 18 B/C of the White River Watershed. Services shall include preliminary engineering design, final engineering design, resident engineering, and post -rehabilitation flow monitoring for sewer improvements to City sewers located in the Mini System 18 B/C as defined in the OWNER's Consultant's Report to the City of February 1991. Extent of improvements are described in the OWNER's Consultant's Report and further delineated in Exhibit A of this Contract. Services for this contract are also described in Exhibit A. Section II - Future Services for ENGINEER The ENGINEER is available to furnish and perform, under a separately negotiated agreement, future engineering services as desired and authorized by OWNER for additional planning work, design, construction, and testing with respect to extensions of this Project or others. January 28, 1994 1 • • • AGREEMENT (Cont.) • Section III - OWNER's Responsibility Mr. Don Bunn, P.E., or other designee of the City of Fayetteville shall be the OWNER's Representative, and is authorized to act with authority on behalf of the OWNER with respect to all work tasks of the Project for which services are to be rendered by the ENGINEER. As responsible agent and beneficiary of the Project, the OWNER's responsibilities shall include the following: 1. Assist ENGINEER by placing at his disposal all available information pertinent to the Project including maps, records, and any other data relative to the ENGINEER's services. 2 Furnish to ENGINEER, as required for performance of ENGINEER's Basic Services, except to the extent provided by the ENGINEER's Basic Services, data prepared by or services of others, including without limitations any previous plans for the sewer system, TV tapes, field forms, maps, and other special data or consultations not covered in ENGINEER's Basic Services; all of which ENGINEER may rely upon in performing his services. 3. Arrange for access to and make all provisions for ENGINEER to enter upon public property, public easements, private property, as required for ENGINEER to perform his services. 4. Examine studies, reports, sketches, drawings, specifications, proposals and other documents presented by ENGINEER, obtain advice of any attorney, insurance counselor and other consultants as OWNER deems appropriate for such examination and render in writing decisions pertaining thereto within a reasonable time so as not to delay the services of ENGINEER. 5. Provide such accounting, independent cost estimating, and insurance counseling services as may be necessary for the Project, such legal services as OWNER may require or ENGINEER may reasonable request with regard to legal issues pertaining to the Project. 6. Give prompt written notice to ENGINEER whenever OWNER observes or otherwise becomes aware of any development that affects the scope or timing of ENGINEER's services. January 28, 1994 2 • • • 1• AGREEMENT (Cont.) • 7. Bear all costs of advertising the construction bid request. 8. Provide copies of all available as -built records for sewer lines in study area 9. Location and exposure of missing or buried manholes as needed. 10. Perform flow meter servicing on a weekly basis and provide flow data to ENGINEER in a timely manner. City shall also provide to the ENGINEER a meter maintenance log that gives the manual depth and velocity readings versus the metered depth and velocity readings. 11. Provide any water and water meters necessary for field inspection activities at no cost to the ENGINEER. 12. Should the City elect to provide field support personnel during the manhole inspection and resident engineering activities, the City agrees to provide the same personnel throughout the project, to the greatest extent possible. 13. Service the pump station event recorder at the North Street Lift Station on a weekly basis and provide the data to the ENGINEER in a timely manner. The ENGINEER shall provide training to the City staff in the proper operation of the event recorder. 14. Bear all costs incident to compliance with the requirements of this Section III. Section IV - Schedule of Service The schedule of services is described in Exhibit B attached hereto. The work described shall be carried out as expeditiously as weather and other physical conditions permit. The ENGINEER shall not be liable to the OWNER, if delayed in, or prevented from performing the work as specified herein through any cause or causes beyond the control of the ENGINEER, and not caused by his own fault or negligence including acts of God, or the public enemy, inclement weather conditions, acts, regulations, or decisions of the Government or regulatory authorities after the effective date of this Agreement, fires, floods, epidemics, strikes, jurisdictional disputes, lockouts, and freight embargoes. January 28, 1994 3 • 1 • • AGREEMENT (Cont.) Section V - Fees and Payments • • Compensation to the ENGINEER by the OWNER for work set forth in this Agreement will not exceed $368,040.00 without prior written approval of the OWNER. Compensation to the ENGINEER shall be as detailed in Exhibit C. Payments to the ENGINEER shall be made monthly upon receipt of the combined status report and invoice to be submitted to the OWNER by the ENGINEER. Invoices shall be due and payable to the ENGINEER within thirty (30) days of each billing. It is understood that the estimated level of effort and cost for Final Engineering Design and Construction Resident Engineering are estimated based on the Phase I recommendations contained in the 1991 report prepared by the City's Consultant. The estimated level of effort and cost may need to be reestimated at the completion of the Preliminary Design Study, should the actual level of rehabilitation and/or relief differ substantially from those given in Exhibit A, Table 1, hereto and made part of this Agreement. The estimated cost for Resident Engineering Services may also need to be modified at the completion of final engineering design should the extent of construction differ substantially from those given in Exhibit A, Table 1. Section VI - General Considerations Standards of Performance The ENGINEER shall perform all services under this Agreement in accordance with the standards of the engineering profession. Estimate of Probable Cost Since the ENGINEER has no control over the cost of labor, materials, or equipment, or over the contractor's method of determining prices, or over competitive bidding or market conditions, his opinions of preliminary or probable construction cost or total project cost provided for herein are to be made on the basis of his experience and qualifications. These opinions represent his best judgement as an experienced and qualified professional engineer. However, the ENGINEER cannot and does not guarantee that actual project cost will not vary from opinions of cost by him. January 28, 1994 4 • • • AGREEMENT (Cont.) Reuse of Documents • All data and documents including drawings, forms, computer programs, and specifications furnished by the ENGINEER pursuant to this Agreement are instruments of service with respect to the Project. They are not intended or represented to be suitable for reuse by the OWNER or others on extensions of this Project or on any other project. Any reuse without written verification or adaptation by the ENGINEER will be at the OWNER's sole risk and without liability or legal exposure to the ENGINEER. Verification or adaptation by the ENGINEER may entitle ENGINEER to further compensation at a rate agreed upon by the OWNER and the ENGINEER. Termination of Services This Agreement may be terminated by either party in the event of substantial failure. Termination may not be effected unless the other party is given not less than ten (10) days written notice (delivered by certified mail, return receipt requested) of intent to terminate and an opportunity for consultation with the terminating party. Upon receipt of a termination action, the ENGINEER shall promptly discontinue all services affected (unless the notice directs otherwise) and deliver or otherwise make available to the OWNER (subject to "Reuse of Documents" provisions) all data, other information and materials accumulated by the ENGINEER in performing this Agreement, whether completed or in process. The OWNER shall compensate the ENGINEER for any termination settlement costs the ENGINEER incurs related to commitments which had become firm prior to the termination. Controlling Law and Disputes If any of the provisions of this Agreement are invalid under any applicable statute or rule of law, they are, to that extent, deemed omitted. This Agreement shall be governed by the laws of the State of Arkansas. Successors and Assigns The OWNER and the partners, successors, legal representatives covenants, agreements ENGINEER each binds itself and its executors, administrators, assigns and of such other party, in respect to all and obligations of this Agreement. January 28, 1994 5 • • • • • • AGREEMENT (Cont.) Neither the OWNER nor the ENGINEER shall assign, sublet or transfer any rights under or interest in (including, but without limitation, moneys that may become due or moneys that are due) this Agreement without the written consent of the other, and except to the extent that the effect of this limitation may be restricted by law. Unless specifically stated to the contrary in any written consent to an assignment, no assignment will release this Agreement. Nothing contained in this paragraph shall prevent the ENGINEER from employing such independent consultants, associates, and subcontractors as he may deem appropriate to assist him in the performance of services hereunder. Nothing herein shall be construed to give any rights or benefits hereunder to anyone other than the OWNER and the ENGINEER. Insurance ENGINEER shall procure and maintain insurance for protection from claims under Workers' Compensation Acts, claims for damages because of bodily injury including personal injury, sickness, or disease or death of any and all employees or of any person other than such employees, and from claims or damage because of injury to or destruction of property including loss of use resulting therefrom. ENGINEER shall procure and maintain professional liability insurance for protection from claims arising out of performance of professional services caused by any negligent error, omission or act for which the insured is legally liable; and certification indicating that such insurance is in effect will be submitted to the OWNER within three (3) days of contract execution by both parties. Certificates shall provide for not less than 30 days prior notice to the ENGINEER of any cancellations or in the amount of coverage in the policies for the ENGINEER. January 28, 1994 6 • • • • AGREEMENT (Cont.) IN WITNESS THEREOF, the parties hereto have caused this Agreement to be executed and their seals to be hereto affixed, this i4 day of t , 1994. For the OWNER: CITY 9F F7ETTEVILLE NamO Title Attachments: For the ENGINEER: RJN GROUP, INC. in ak > Nam 014447-u•tAt Title Exhibit A - Work Plan Exhibit B - Work Schedule Exhibit C - Compensation Schedule January 28, 1994 7 • • • • EXHIBIT A SCOPE OF SERVICES CITY OF FAYETTEVILLE MINI SYSTEM 18 B/C SEWER IMPROVEMENTS • This section is a detailed description of the Work Plan that would be implemented for this project. Specific Work items were developed based on our understanding of the project needs, our familiarity with the City of Fayetteville's Wastewater Collection System, and our experience with many similar projects. The Mini System 18 B/C Wastewater Collection System contains approximately 83,000 L.F. of sewer and 350 manholes. A Sewer System Study of Mini System 18 B/C was conducted in 1989 and 1991 by a Consultant retained by the City of Fayetteville. The Sewer System Study included flow monitoring, physical inspection, smoke testing, and television inspection. The final report of the Sewer System Study dated February, 1991 contained recommendations for Phase I, Phase II, and Phased III sewer improvements to reduce the I/I entering the wastewater collection system. The Work Plan for this project includes preliminary design services to develop a plan to reduce the occurrence of overflowing manholes in Mini System 18 B/C and final design of the Phase I sewer improvements as described in the 1991 report. Work Plan Major phases of the Work Plan are listed below with work item details shown on the following pages. Item I - Item Item Item Item Project Initialization, Administration, and Management Preliminary Design Final Engineering Design Resident Engineering Post Rehabilitation Flow Monitoring The Work Plan for the City of Fayetteville includes all the necessary engineering, planning, and survey work for developing an Overflow Elimination Plan in Mini System 18 B/C. I. Project Administration and Management 1. Perform Project Initiation Activities. 2. Perform general administration and project management including meetings with City staff as necessary. 3. Procure subcontractors for such work as aerial photography. A-1 • • • • EXHIBIT A (Cont.) II. Preliminary Design Preliminary design services consists of determination of system flows, analysis of system hydraulic capacity, inspection of existing manholes to determine rehabilitation requirements, quantification of identified I/I sources to project the level of I/I reduction achievable, and data analysis to evaluate the impact of the Phase I Improvements. The purpose of wastewater flow analysis will be to determine system flows during dry -weather and wet -weather conditions. It is the ENGINEER's intent to utilize the City's Permanent Flow Metering Stations at the outlets of Mini System 18 B/C (2), Mini System 18 A (1), and Mini System 2 (1). The ENGINEER shall install a pump station event recorder at the North Street Lift Station. The City will furnish rainfall data from the City's rain gauge network. A hydraulic computer model will be developed to analyze the systems capacity to transport peak wet -weather flow and to evaluate the impact of anticipated I/I Reduction. Information from the City's existing record drawings and computer model will be used where possible. Additional information will be obtained from field surveys as necessary. Inspection of existing manholes will be performed to determine the extent of required rehabilitation and to quantify I/I rates from manhole defects. Information from the previous Sewer System Study of Mini System 18 B/C conducted by McGoodwin, Williams, and Yates, Inc. will be analyzed to determine the inflow rates from identified sources during the previous study. The quantified inflow rates from the previous study will be combined with the results of the manhole inspections activities to project the total identified inflow rates. The identified inflow rates will then be compared with the results of the wastewater flow analysis to determine if further investigations are required to identify additional inflow sources. The preliminary design services are further described in the following sections. A. Wastewater Flow Monitoring and Analysis 1. Install pump station event recorder at the North Street Lift Station. 2 Calibrate the North Street Lift Station to determine existing pumping capacity. 3. Tabulate rainfall data provided by the City. A-2 • • • • EXHIBIT A (Cont.) • 4 Provide calibration of the existing permanent flow metering stations in Mini System 18 B/C, Mini System 18A, and Mini System 2. It is anticipated that the City will service the existing flow meters on a weekly basis and provide the information to the ENGINEER in a timely manner. The ENGINEER will provide qualified field personnel to evaluate and calibrate each monitoring site. It is anticipated that the metering stations will be evaluated by the ENGINEER a total of three times during the course of the project. 5. Analyze flow data from the existing metering station and from the North Street Lift Station to determine the following: a. Average daily dry -weather flow and peaking factors. b. Peak infiltration rates if possible. c. Peak inflow rates for selected rainfall events and establish the relationship between peak inflow and rainfall (Q vs i) for each metering site. B. Analysis of System Hydraulic Capacity 1. Obtain preliminary sewer segment distances, sewer diameter, sewer slopes, and available invert elevations from City's existing computer model. 2. Perform elevations survey of all 15 -inch diameter and larger sewers. For the purpose of the cost estimate, it is estimated that 16,000 L.F. will require a field survey. Minimum pipe slope will be used for 12 -inch diameter and smaller sewers except for critical capacity sewers. 3. Fill out Hydraulic Network Forms for all City Main and collector sewers and input to ENGINEER's computer system. 4. Calibrate the hydraulic model based on the results of field investigation activities and flow data analysis. C. Below Ground Manhole/Visual Pipe Inspections 1. Perform comprehensive internal manhole and visual pipe inspection for manholes in Mini System 18 B/C. The ENGINEER shall commit a minimum of 15 minutes to searching for manholes in order for manholes to be counted for payment. The ENGINEER shall notify the City of any inaccessible or unlocated manholes. Any A-3 • • • • EXHIBIT A (Cont.) manholes exposed or made accessible by the City within 30 days following notification by the ENGINEER will be inspected at no additional cost to the City. 2. Input below ground/visual pipe inspection data to the ENGINEER' computer system, assign I/I flow rates, and obtain output reports for I/I sources and I/I rehabilitation costs. D. I/I Source Ouantification 1. Review previous Sewer System Study Report and quantify identified inflow source flow rates where possible. 2. Perform dyed water flooding test on selected inflow sources identified during the 1991 study to determine nature of defect and potential flow rates. For the purpose of the cost proposal, it is estimated that ten (10) tests will be required. 3. Combine the projected flow rates from the previous study and the projected flow rates from the manhole inspection program and compare to results of the wastewater flow analysis. Determine the level of identified inflow versus monitored inflow. E. Data Analysis and Report 1 Perform hydraulic analysis at base flow or dry -weather conditions. 2 Perform hydraulic analysis at wet -weather condition at one (1) storm for existing condition (no rehabilitation or relief sewers). 3 Perform hydraulic analysis at wet -weather condition simulating the removal of all identified inflow sources. Determine relief sewer requirements based on the anticipated I/I reduction and future upgrade of the North Street Lift Station. 4. Based on the results of the flow data analysis and inflow source quantification balancing, determine if additional field investigations may be required to identify additional inflow sources. 5. Prepare brief letter report detailing the results of the preliminary design activities. The report will also include recommendation for any additional investigation, if required. Submit five copies of the report to the City. A-4 • • • EXHIBIT A (Cont.) III. Final Engineering Design/Bidding Assistance A. Final Engineering Design 1. Manhole Rehabilitation Design • a. Review selective computer output reports from the Manhole Inspection Program to determine I/I sources to be rehabilitated. b. Evaluate site specific manhole repair alternatives including cover type, grade adjustments, sealing techniques, manhole interior repairs, and/or manhole replacement. c. Using ENGINEER's basic specifications, prepare project specifications which shall include but not be limited to: (1) bidding documents, (2) contractural documents, (3) conditions of the contract, (4) standard project forms, (5) technical specifications, (6) Schedule of Manhole Rehabilitation, (7) Location Map and(8) General Details. d. Prepare ENGINEER's Opinion of Probable Construction Cost. e. Submit two (2) copies documents to the City f. Perform final changes based on City review. Submit two (2) copies of the documents to the City. g• of the draft contract for review. to contract documents 2. Sewer Line Rehabilitation final contract a. Review the 1991 Sewer System Report prepared by McGoodwin, Williams, and Yates, Inc. to determine the extent of sewer rehabilitation included in the recommended Phase I Improvements. b. Review field inspection reports and television inspection tapes provided by the City for Phase I Improvement. A-5 • • • EXHIBIT A (Cont.) • c. Based on the results of the hydraulic capacity analysis, evaluate the options of providing a gravity relief sewer or extension of the existing force main to transport the peak flow from the North Street Lift Station. The evaluation will be based on the future capacity of the North Street Lift Station. d . Perform sewer profile leveling and site inspections for sewer replacement, repairs, and relief sewer construction. e. Investigate public utility locations. f . Evaluate pipe repair alternatives including pipe replacement and lining options if necessary because of site conditions. Provide the City with the technical information for location of the easements, if any, required for construction of the project. Information to include width and general location of the easements, and distances from the property lines. Property line information shall be obtained from existing maps provided by the City to the ENGINEER. h . Prepare contract design drawings for I/I rehabilitation, sewer replacement/relief and/or sewer lining. Drawings shall indicate permanent and temporary easements for construction based on information supplied by City. Drawings shall include but not be limited to: (1) Title Sheet/Drawing Index, (2) Location Maps, (3) Plan and Profile of Replacement and Repair Line Segments, (4) Special Details, and (5) General Details. i. Using ENGINEER's basic specifications, prepare project specifications which shall include but not be limited to: (1) bidding documents, (2) contractual documents, (3) conditions of the contract, (4) standard project forms, and (5) technical specifications. Prepare ENGINEER's Opinion of Probable Construction Cost by major items. k. Submit two (2) copies of the draft plans and specifications to the City for review. g• j. 1. Perform final changes to contract documents. A-6 • • • • EXHIBIT A (Cont.) • • m. Submit two (2) copies of the final project drawings and contract specifications to the City. n. Assist the City in obtaining permit approvals from regulatory authorities. B. Additional Final Design Services 1. Obtain typical soil boring data for replacement/relief sewer locations, as required. Ten (10) locations are estimated. 2. After approval by the City, the ENGINEER will prepare, type, and issue legal description of easements. The City will secure easements as necessary. A maximum of twenty (20) easements are included. 3. Assistance in obtaining permit from Railroad, Highway, and any other state permits, if necessary, for relief sewer. C. Bidding Assistance For the purpose of the cost proposal, it is anticipated that two (2) construction contracts will be bid. The first bidding phase shall include Manhole Rehabilitation while the second project shall include sewer line construction and repairs. The following services are included for both bidding phases. 1. Assist the City in advertising, obtaining, and evaluating Bid Proposals for the construction contract and awarding thereof. Provide assistance to the City in responding to bidder inquiries during advertisement of the construction contract, and participate in project pre-bid conference. Provide and distribute bidding documents and addendum. Non -refunded bid deposits shall remain the property of the ENGINEER for administrative, printing, and handling. 2. Assist the City in reviewing the bids for completeness and accuracy. Develop bid tabulations and submit a written recommendations of contract award to the City along with five (5) copies of the bid tabulations. 3. Consult with and advise the City on the responsibility and responsiveness of contractors, the acceptability of subcontractors, substitute materials, and equipment proposed by the project bidders. A-7 • • • • EXHIBIT A (Cont.) • • IV. Resident Engineering For the purpose of the cost estimate, it is anticipated that the ENGINEER will provide resident engineering services for both construction projects. A. Resident Engineering 1. Provide the successful bidder with three (3) sets of the contract specifications for execution and the insertion of the required insurance certificates. Provide the successful bidder with five (5) sets of the contract documents for construction purposes. 2 Assist the City in conducting a pre -construction conference with the Contractor by notifying utilities, governmental agencies, and other interested parties, and answer questions at the conference. 3 Review shop drawings, scheduling, test results, and other submittal which the Contractor is required to submit. 4 Consult with City and act as the City's engineering representative in dealings with the Contractor. Issue instructions of City to Contractor and issue necessary interpretations and clarification of the contract specifications. 5. Provide engineering survey(s) for construction to establish horizontal and vertical reference points which are necessary for the Contractor to construct the work. Coordinated the taking of preconstruction photos and surface video taping with the Contractor as necessary. 6. Provide resident observation for rehabilitation and sewer replacement construction for general conformance to the contract drawings and contract specifications. Also provide resident observation of acceptance testing and restoration work by the Contractor. 7 Provide sample, independent acceptance testing of Contractor's sewer rehabilitation construction techniques. Ten (10) location are included. 8. Review and respond to complaints received by City and report any differences of opinion between the Contractor, ENGINEER and complaining party. A-8 • • • • • EXHIBIT A (Cont.) 9. Review applications for partial payment with the Contractor for compliance with contract specifications and submit to the City a recommendation for payment. 10. Issue field orders to Contractor after consultation with the City. Review any change orders proposed by the Contractor and provide recommendations to the City. 11. Conduct an on-site review to determine if the project is substantially complete and submit to the Contractor a list of observed items requiring completion or correction. 12. Conduct a final on-site review, in the company of the City and Contractor, to verify the project is fully complete. Submit a recommendation for final acceptance of the project to the City. 13. Provide the City with one (1) set of record drawings on reproducible double matt (4 mil) mylar and two (2) sets of black line prints of the record drawings. 14. Provide the City with a report that summarizes I/I sources that have been removed and listing of line segments and their attributes that have been added. 15. ENGINEER is not responsible for the means or sequences of the construction work or the implementation program for safety of the construction contractor and subcontractors and will be stipulated as such in the contract documents v. Post Rehabilitation Flow Monitoring A. Perform flow monitoring on the collection system for a maximum of 60 days at 5 locations. It is anticipated that the City's permanent flow monitoring Stations will be used where possible. Locations will be approximately the same as in ENGINEER'S preliminary design report. B. Perform analysis of flow data as compared to rainfall events and report on the collection systems ability to transport estimated flows generated during the design storm event and compare results to those predicted in the ENGINEER's preliminary design report and work improvements completed. A-9 • • • • EXHIBIT A (Cont.) • • C. If the analysis indicates the project is not substantially achieving the design performance based on the results of the preliminary design study and completion of optional services, the Engineer shall conduct additional studies to determine the cause of the non-performance and shall make recommendations for bringing the system into compliance with the design specifications and criteria. Optional Services Should the results of the preliminary design study indicate that additional investigations are necessary to achieve the desired level of I/I reduction, the ENGINEER is available to furnish and perform future service as desired and authorized by the City. These service may include, but not be limited to, smoke testing and dyed water flooding activities to locate and quantify additional inflow sources. These services would only be initiated after written authorization by the City. The optional services are further described in the following sections: A. Smoke Testing 1. Area resident inquiries will be handled by the City. 2. Distribute smoke notices prior to performing field testing work in areas to be tested. Flyers will be distributed no more than seven working days prior to the actual performance of the smoke testing. If weather conditions prevent smoke testing within this time frame, flyers will be passed out again. Notices will be provided by the ENGINEER. 3 Perform dual blower smoke testing with partial plugging of all sewers. 4 Input smoke data computer files, obtain reports for potential cross connections or main sewer defects and develop recommendations for dyed water flooding. Prepare and submit brief letter report detailing the results of the smoke testing activities. B. Dved Water Flooding 1. Select locations for dyed water flooding based primarily on smoke testing results mental location based on the map review and reconnaissance survey. A-10 EXHIBIT A (Cont.) 2 Perform dyed water flooding on selective storm sewer sections; suspected overflows, storm and ditch sections, and other ponding areas in the public sector that may be contributing to inflow. 3 Perform dyed water flooding in private sector (drains, downspouts, etc.) with prior notification of the resident. 4. Input dyed water data to computer to obtain reports for cross connections and estimated flows. C. Television Inspection 1. Should the smoke testing and/or dyed water testing indicate the need for additional television inspection provide a listing of sewer segments requiring inspection to the City. 2. It is the intent of the City and Engineer that the City would provide all labor and equipment necessary to perform television inspection of selected sewer segments, 3. Provide field personnel necessary to perform concurrent dyed water flooding during television inspection activities. 4. Review television inspection tapes provided by the City. A-11 Maior Repair Items • Table 1 Phase I City of Fayetteville Mini System 18 B/C Summary of Improvements Manhole Repairs Main Line Point Repairs Municipal Service Line Repairs Sewer Rehabilitation Relief Sewers Estimated Quantity • • Description • 300 Consists of manhole cover replacement, frame seal repairs, frame adjustment and manhole wall repair. 9 Repair of main sewer defects as detailed in the 1991 report. 19 Repair of municipal service line leaks as detailed in the 1991 Phase I Recommendations. 10,000 LF1/ Consists of complete replacement or lining of sewer segments at locations detailed in 1991 Phase I Recommendations. 9,500 Consists of relief sewer Construction from the North Street Lift Station Force Main Outlet to the Outlet of Mini System 18 B/C. 1/ Does not include all of the sewer segments recommended for air test and seal in the Consultant's 1991 report. It is anticipated that the quantity of sewer segments requiring rehabilitation may increase or decrease based on the results of the preliminary design study. It is the intent to rehabilitate only those sewer segments that are contributing to overflows or that contain major structural deficiencies that should be repaired to restore sewer system integrity. A-12