Loading...
HomeMy WebLinkAbout99-93 RESOLUTION.1 • RESOLUTION NO. 99-93 A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE MCCLELLAND CONSULTING ENGINEERS' TASK ORDER NO. 1, AMENDMENT NO. 2, FOR ADDTIONAL DESIGN SERVICES RELATING TO OBSTRUCTION REMOVAL IN THE AIRPORT IMPROVEMENT PROJECT AIP 17. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the Mayor and City Clerk are hereby authorized to execute McClelland Consulting Engineers' Task Order No. 1, Amendment No. 2, for addhonal design services relating to obstruction removal in the Airport Improvement Project AIP 17. A copy of the Task Order, Amendment No. 2 is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 5th day of October , 1993. ATTEST: By: Sherry L.°'Fhomas, City Clerk APPROVED: BY: 41//%44-friz Fred Hanna, Mayor • AMENDMENT NO. 2 TO TASK ORDER NO. 1 Drake Field Improvements Fayetteville Municipal Airport Fayetteville, Arkansas Amendment No. 1 to Task Order No. 1 dated Mav 3. 1993, and Task Order No. 1 to the BASIC AGREEMENT executed February 2, 1993, between McClelland Consulting Engineers, Inc., (ENGINEER) and City of Fayetteville, Arkansas (OWNER) in accordance with the provisions of that Agreement is amended hereinafter for the purpose of increasing the scope of services to include Obstruction Removal and Drainage and Grading Improvements. Specifically, these revisions to Amendment No. 1 to Task Order No. 1 are to be effected by the following changes: Additional Design Services, as requested by the Owner, for additional Clearing, Grubbing, Seeding, and Fertilizing within the Runway Protection Zone for Runway 34. Revise Subparagraph 2 of Article 2 on Page 2 of Amendment No. 1 to Task Order No. 1 by adding the additional Design Services Scope and Fee as follows: (4) Plans and Limits of Clearing, Grubbing, Seeding and Fertilizing within Runway 34 RPZ. $1,800.00 Delete the Subparagraph (6) of Paragraph 1 of Article 2 on Page 3 of Amendment No. 1 to Task Order No. 1 and insert the following revised Subparagraph (6): 6. For Construction Observation Phase: The Owner shall pay the Engineer for the resident construction observation services rendered under Article 1 above. The fee will be based upon the actual hours worked at a maximum hourly rate of $43.50. The fee for the Construction Observation Service during the normal 5 day 8 hour per day work week shall not exceed an amount of $30,360 for the daily observation time stated heretofore and for a periodic observation by the Project Engineer for a maximum construction period of 120 calendar days, except as amended by separate Task Order or Amendment. The construction time will be stated in the Construction Contract. - 1 - The Owner shall also pay the Engineer for the actual number of Construction Observation overtime hours worked exceeding the weekly 40 hour time stated above, for periods of overtime work by the Contractor. The fee for overtime observation shall not exceed an amount of $12,400 for a maximum of 285 hours of overtime observation during overtime work by the Contractor. The overtime fee will be based on the actual overtime hours worked by the Contractor at the maximum hourly rate stated above. Should the Contractor exceed the time given above, the Owner shall pay the Engineer an additional fee equal to the number of days or hours worked at the rates stated above for the period of time required to complete construction beyond the 120 calendar day limit. This fee shall be obtained from the liquidated damages amount stated in the Construction Contract which shall be withheld from the Contractor by the Owner. ARTICLE 5 IN WITNESS WHEREOF, the parties hereto each herewith subscribe the same in triplicate. ATTEST: 4(r. Citi Clerk FOR CITY PE TEVILLE, ARKANSAS By: Dated this day of 7/ 1993 FOR McCLEL 1 CONSU:..,G ENGINEERS, INC. By: Dated this IS day ofs>eVIlWI�'.elr 1993 - 2 -