Loading...
HomeMy WebLinkAbout51-93 RESOLUTION• RESOLUTION NO. 91-91 A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A CONTRACT WITH TIME STRIPING, INC. IN THE AMOUNT OF $21,986.21 PLUS A 10% CONTINGENCY OF $2,198.00 FOR REMARKING THE RUNWAY AND TAXIWAY SURFACES AND "OUTLINE" MARKINGS AT DRAKE FIELD (UPON REQUEST BY THE FAA INSPECTION). BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS - Section j. That the Mayor and City Clerk execute a contract with Time Striping, Inc. in the amount of $21,986.21 plus a 10% contingency of $2,198.00 for remarking the runway and taxiway surfaces and "outline" markings at Drake Field (upon request by the FAA mspection). A copy of the contract authonzed is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 18th day of May , 1993. APPROVED: BY: Sherryt . Thomas, City Clerk red Hanna, Mayor CITY OF FAYETTEVILLE 113 W MOUNTAIN FAYETTEVILE, AR 72701 BID: 93-13 DATE: 04/01/93 TIME: 2:00 PM DESCRIPTION: RUNWAY AND TAXIWAY STRIPING BID NO. 1 TIME STRIPING, INC. C del y s P.O. BOX 1236 VAN BUREN, AR 72956 PHONE: 501 474-0452 2 SUNSHINE SERVICE CO., INC. 2340 PERRY ROAD ROGERS, AR 72756 PHONE: 501 636-9411 CERTIFIED BY: -1414SING MANAGER $21,986.21 $24,973.50 4-1-93 ' DATE • CONTRACT FOR RUNWAY AND TAXIWAY STRIPING FOR THE CITY OF FAYETTEVILLE MUNICIPAL AIRPORT This agreement made the Ara day of 1993, by and between Moe Ste-, PI telj hereinafter called "Contractor" and the City of Fayetteville, hereinafter called the "City" shall be utilized to provide the following services: The Contractor hereby agrees to provide all necessary equipment, materials and incidental items, and all labor required to accomplish every detail of the runway/taxiway striping at the Fayetteville Municipal Airport in accordance with the bid documents and specifications (bid 93-13). For this work, a total amount "not to exceed" $21.986.21 was bid. This project is to be considered a "turn key" job and shall include all items as provisions set forth in the bid specifications attached hereto and made a part hereof. The project time frame shall coincide with the number of days stated in the bid documents (5 working days) which were submitted to the Purchasing Officer. Liquidated damages of $100 per day shall be assessed at the option of the City, not as a penalty, beginning on the first day following the completion time entered on this bid to cover additional costs. If the bid exceeds $10,000, the Terms and Standard Conditions of the City of Fayetteville expressed in item 19. A/8/C shall be considered a binding part of this agreement and shall be provided by the Contractor. A 10% retainage of the total project bid shall be held by the City until the project has been completed and accepted by the City. 77,71/fra Si"; /0.".11,,„ Lac. -Carialtres--a)gce,Wiceeof TTEST: C. /LA( CITY OF FAYETT ATTEST: ILLE: CONTRACTOR: alf grill Is / 14-;“ : e CrAt 61 n 1, -vs- 4 -> CITY OF FAYETIEVILIE CONTRACT/LEASE REVIEW / PROJECT t• Ai' IP I nMAN NAhib Please review th:Cred con and CA3CA-t Dil INItN 1 A een ter 4 Ai t airf Ad/?1 te/1i e# Cra) airbaffe4r Lt93. ' Punitr-gas Li -onager (E -2.-34a bate A -e023 -43 Bittatir Date Intermit Auditor comments comments comments Lbmments bate comments PLEASE RETURN TO THE PROJECT MANAGER OR DESIGNATED PERSON WHEN THE REVIEW PROCEDURE HAS BEEN COMPLETED. 6 4 • • • FAYETTEVILLE AIRPORT • FMICIIMVILLt mikruKI TEL:501-521-1735 Jun 23,93 15:23 No.005 P.02 ILL/ VI-bit-I/oh Jun 2(25 14!10 No.001 P.02 ‘•••• MlitinOULVT FOR meuramr: TO TM Runway and Taxiway Striping Projoct R01071 aidS 93-13 AKINIDIGMTO 1 This is an intendment to tho Agreement for Runway and Taxiway Striping molouted on the 11) day of May 03 batwoon this city of Fayetteville, Arkansas and Time Otriping,Inc. Runway and Toniwey etrining At the Payettevill• Municipal Airport • ,tor Additional servioei required due Th6 addition pi passenger walkways en the commercial ramp. Sea txhibit A "MOW 411•11•1•P The Oharge tor the additional services shell not emceed CiTY OF rArtlistvILLEI Mayor c 415 , ilea / An A/ Date —013 •-• 9 3 ARes teLe AI* FAYETTEVILLE AIRPORT TEL:501-521-1735