Loading...
HomeMy WebLinkAbout98-92 RESOLUTION• • RESOLUTION NO. 98-92 A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE TASK ORDER NO. 2 FOR ADDITIONAL ENGINEERING AND CONSTRUCTION WORK WITH MCCLELLAND CONSULTING ENGINEERS IN AN AMOUNT NOT TO EXCEED $15,160 FOR THE AIRFIELD LIGHTING RENOVATION PROJECT, AIRPORT FEDERAL GRANT 13-05-0020-16. BE IT RESOLVED BY THE BOARD OF DIREC'T'ORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the Mayor and City Clerk are hereby authorized and directed to execute Task Order No. 2 for additional engineering and construction work with McClelland Consulting Engineers in an amount not to exceed 815,160 for the Airfield Lighting Renovation Project, Airport Federal Grant 13-05-0020-16. A copy of the task order authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 7th day of July , 1992. ATTEST• By: City C erk APPROVED: By This Task executed Engineers, (OWNER) in ARTICLE 1 • • TASK ORDER NO. 2 Runway and Taxiway Sign Renovation Drake Field Fayetteville, Municipal Airport Fayetteville, Arkansas Order is hereby made a part of the Basic Agreement May 7. 1991 , between McClelland Consulting Inc., (ENGINEER) and the City of Fayetteville, Arkansas accordance with the provisions of that Agreement. The Owner has received funding from the Federal Aviation Administration (FAA) for emergency renovations to the Runway and Taxiway Lighting Systems at Drake Field, Fayetteville, Arkansas to include modifications to the Airfield Signs required to bring signs into compliance with FAA Advisory circular 150/5340/180. The funding application submitted to the FAA outlines items of work to be included as follows: 1. Modification of existing runway and taxiway sign system components; including sign size, transformers and fixtures. The Engineer will provide the design and construction observation services necessary to complete the following tasks under this Task Order. 1. Prepare an airport sign plan for approval by the Owner and FAA. 2. Preparation of Final Design Plans and Specifications for the renovation to the runway and taxiway signs with approval by the Owner and FAA. 3. Bidding Phase Assistance to the Owner for advertising, answering bid questions, receiving of Bids on the various phases of work, evaluation of bids received, recommending award of bids, awarding of contracts with approval by FAA. 4. Construction Management during the construction process including attending pre -construction - 1 - conference, periodic visits to the site at least once per month, review of Shop Drawings and samples, assistance with change orders, preparation of monthly contractor pay estimates and the preparation of final "Record Drawings". 5. Construction Observation on a full time basis for the anticipated construction period in accordance with paragraph 4.14 of Article 4 of the Basic Agreement. The Engineer shall endeavor to complete the project in accordance with the following schedule following the receipt of the Notice to Proceed issued by the City. o Prepare Airport Sign Plan 1 week o * FAA Review 1 week o Prepare Final Construction Documents 2 weeks o * FAA Review 1 week o Bidding Phase 3 weeks o * Approval of Construction Change Order for Sign Renovation 4 weeks o Construction 6 weeks * The Engineer has no control over these phases. ARTICLE 2 The COMPENSATION for services to be provided in Article 1 above shall be according to the following amounts: 1. For Preparina Airport Sian Plan: The Owner shall pay the Engineer for the preparation of Airport Sign Plan under Article 1 above: a lump sum amount of $ 600.00 2. For Desian Services: The Owner shall pay the Engineer for the Design Services rendered under Article 1 above. The Owner shall pay 95% fee upon submittal of the Final Plans and Specifications and 100% upon authorization to bid by the FAA for each phase below: a lump sum amount of $ 3,500.00 3. for Construction Management Services: The Owner shall pay the Engineer for the construction management services rendered under Article 1 above in monthly installments based upon the percentage of construction complete in accordance with the - 2 monthly estimates prepared for the construction contractor. The final installment will be due upon submittal of the "Record Drawings": A lump sum amount of $ 500.00 4 For Construction Observation Phase: The Owner shall pay the Engineer for the resident construction observation services rendered under Article 1 above. The fee will be based upon the actual hours worked at a maximum hourly rate of $40.00. The fee for the Construction Observation Service shall not exceed an amount of $10,560 for the daily observation time stated heretofore and for a periodic observation by the Project Engineer for a maximum construction period of 45 calendar days, except as amended by separate Task Order. The construction time will be stated in the Construction Contract. Should the Contractor exceed the time given above, the Owner shall pay the Engineer an additional fee equal to the number of days or hours worked at the rates stated above for the period of time required to complete construction beyond the 60 calendar day limit. This fee shall be obtained from the liquidated damages amount stated in the Construction Contract which shall be withheld from the Contractor by the Owner. Additional work requested by the Owner beyond the work scope stated above in Article 1 shall be performed only after authorized in writing by the Owner. Payment for additional work shall be according to the hourly rate schedule in the Basic Agreement and actual reimbursable expenses or in accordance with a fixed amount agreed upon by the Owner. • ARTICLE 5 IN WITNESS WHEREOF, the parties hereto each herewith subscribe the same in triplicate. FOR . O _FAY FgTTEVIL .E, ARKANSAS By: Dated this 7 day of U-�..yJ , 1992 FOR McCLE D CONSUL ENGINEERS, INC. I By: l ' Dated this ` day of �� , 1992 4