HomeMy WebLinkAbout96-92 RESOLUTIONRESOLUTION NO. 96-97
A RESOLUTION AWARDING BID NO. 92-16 TO THOMAS
HARDING CONSTRUCTION IN THE AMOUNT OF $105,580
FOR RENOVATION OF THE PEG ACCESS FACILITIES AT
101 W. ROCK STREET AND APPROVAL OF A BUDGET
ADJUSTMENT.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the Board of Directors hereby awards Bid
No. 92-16 to Thomas Harding Construction in the amount of $105,580
for the renovation of the PEG Access facilities at 101 W. Rock
Street. A copy of the bid tabulation is attached hereto marked
Exhibit "A" and made a part hereof.
Section 2. That the Board of Directors hereby approves a
budget adjustment in the amount of $84,257 decreasing Use of Fund
Balance Account No. 1010-0001-4999.99 and increasing Building Cost
Account No. 1010-6600-5804.00. A copy of the budget adjustment is
attached hereto and made a part hereof.
PASSED AND APPROVED this 16th day of June , 1992.
APPROVED:
By
ATTEST:
By. City Cler
May r
ESYFT`1'EN*II LE
TW cin Of :A•RTMIII. uIAH$Sf
•
DEPARTMENTAL CORRESPONDENCE
•
TO: Fayetteville Board of Directors
BUBJ: Bids on PEG Facility
DAT!: May 29, 1992
TEE CITY OP FAYETTEVILLE: PUBLIC, EDUCATIONAL
AND GOVERNMENTAL ACCESS FACILITY
101 W. Rock Street
Fayetteville, Arkansas 72701
PROJECT NUMBER 9102
JUBCOITRACTOR KIT
P = Plumbing
H = Heating
E = Electrical
$ID TABULATION
GENERAL CONTRACTOR BABE PROPOSAL SUBS.
Thomas Harding
Construction, Inc.
Little Rock
Heckathorn
Construction, Inc.
Fayetteville
$105,580
$121,000
P = Paschal
H = Paschal
E = Ark. Elec.
P = Paschal
H = Paschal
E = Ark. Elec.
Nabholz $126,300 P = N.W.A.
Construction, Inc. Sheetmetal
H= N.W.A.
Sheetmetal
E = Ark. Elec.
•
•
ADJUSTMENT
CITY OF FAYETTEVILLE, ARKANSAS
IN -YEAR BUDGET ADJUSTMENT
BUDGET YEAR
1992
DEPT:Mministrative Ser
DIO :ltiaaellanecre
PROGRtImellmamus
DATE REQUESTED INCREASE
06/02/92 ACCOUNT TITLE
PROJECT OR ITEM REQUESTED -Additional funding for the A,ilairgg ens-
public-
fpublic aeeesa facility is requested. The original building
purchased was determined to be cost prohibitive to to -
and an alternative building tea selected. ACCOUNT NUMBER PROJ. NO.
JUSTIFICATION OF THIS INCREASE Funds utilized to
purchase the Ozarks Sports Building must be replenished
so the raeovatien of the alternate building far access
televiaian can proceed as required in the agreement with
Access 4. The funds will be replenished when the Ozarks
Sparta Building is sold.
PROJECT OR ITEM DELETED:
None
JUSTIFICATION OF THIS DECREASE
1010-6600-5804 00 90009-004
AMOUNT
84,257
moms
ACCOUNT TITLE
Use at Ilse Balance
ACCOUNT NUMBER PROJ. NO.
Use of fund balance is requested to amble the rev tion 1°10"0001-4999 99
project to ;romad. This use of find balance will be
reimbursed when the Ozarks Sparta Building im sold
DATE
Sl„
REQ
ET COORDINATOR
DEPARTMENT DIRECTOR
ADMIN. SERVICES DIRECTOR
•
ANOUNT
84,257
BUDGET OFFICE USE ONLY
Entered
Posted
DATE OF APPROVAL_____
Date
ABCDE
1 • .
7 S 1 AMERICAN
INSTITUTE 0 t A R C II I T E C T S
,
JUN 0 8 1992
i:A •r ASSCCIAfES
t;..... :.1•.Is,1+.:t.
AIA 1) aisnefft Alt)!
Standard Form of Agreement Between
Owner and Contractor
where the haste of payment is a
STIPULATED SUM
1987 EDITION
THIS DOCUMENT HAS LMPORTAI T LEGAL CONSEQUENCES; CONSUL TA 770N WITH
AV A 7TORNEl' I3 ENCOI RAGED WITH RESPECT 7D ITS COMPLETION OR 11ODIF!CA'!'!f LV.
Thr Par Esiltum of AIA lkr.7rmcat 44201. Gree'rrd GaSitrons 4 the Ct ntvucf fur Giwstna tww. is adopt i
is this document h1 nJrvr+ur l)r. *4 use wadi tar Emend tondk kiw artless this rtr*TUAreNS is 11sahlied
Tim drxunr:r has Men appr:n'rd and endure! by The Assuaged General (iaerartrlls .d Arllcrka
AGREEMENT
made as of the T wenty-nineth day of stay in the year of
Nineteen Hundred and Ninety -tiro.
BETWEEN the Owner:
(sane sad Silo)
and the Ccmtractor-
Mao and adiAay
Board of Directors
City of Fayetteville
113 Weat Mountain St.
Fayetteville, AR 72701
Thomas Harding Construction, Inc.
P.O. Box 251764
Little Rock. AR 72225
The Project is: The City of Fayetteville Public, Education i Governmental
awns sedsr.Mrw, Access Facility
101 Weat Rock St.
Fayetteville. AR 72701
The Architect Is:
[.lima awrl atshranl
Hailey/Associates/Architects
100 West Canter ST.. Suite 302
Fayetteville, AR 72701
The Owner and Contractor agree as set forth below.
QlpvnOu 191S. 19111 1921 193'. 1911. 19111. I'M1. t"(.3. 196' .974. 19'7. 819117 M The Amor r In•tuute of Art in
seta, 17M New Toth Aarms:. N s , v,'a 'Imps:rl. 1) C Ben, Ile rtultuinn at Me mend heron or uirtallul ya•:uu011
Sin pa,rnum• wailing waive permission of lir 114 rmlatc 11r myna 4an al the Mooed MAIN an.: w ds he aa•p't t to
kepi pnnetutrm
am sir sm 1 • OS NMI t 0841114C:11* At.lakMI S1 • T* tIJ• fll FIMTItri • A'A• • Mr
111E AMpw:pa lsI.11!191• to Asa III7I1l1t 1'•s \f\ Yl 4IC A17111T, Nit , tAhIIMt1 IC MAI C. 'NIMH.
A1O1-1N7 1
•
•
ARTICLE 1
THE CONTRACT DOCUMENTS
llte (:arras lklcuments combat of ohs Agreement, Condituxs of the Contract (General. Supplementary and other tannin')
Dtawrys, .Spcct katrdes, Addenda mufti prior to nvrulnn of the Aprccment other t icume ns lined In ohs Ag eemem and
Modifications 'sued abermuss rn ni aha Agmmot: these form the Context, and are a fully a pan of the Osman a If moaned
to the Agnomen' or repeated herein. The CAntam-t nlxesems dor entre and integrated agreement betwntn the panki herein and
supersedes prior negrrd/amrls, ltpreaeraatixs at 11FCCI lama. either written .r oral An cawmerau i r1 tilt Car ns t Qwwtanenra,
other than Mo iWranns, appears in Article 9
ARTICLE 2
THE WORT[ Of THIS CONTRACT
7 he °mi iends shall eaecvee the entire wads descried a1 the Coaxal Documents esteem 1n the extent specifically Indkated In
d1e (ancrod Ikuumens to be the n,gnrethuty of others, er as look)%.
ARTICLE 3
DATE OF CONSIENCEIENT ANO SUBSTANTIAL COMPLETION
3.1 The daaa of c ininencement Is the date from whish the C.: aural Tine of paragraph 3 2 Is mooted. and shall be the date of
this Agreement, as brat molten above. mnks%adlRerent Wren stated hck)w Ix promnin is Ines Mx tae date to he Shied Ina make
d, proceed reared by the Owner
Inner n SO cy nwwlw.MM,i If N drjf.n /1b ar dna .J MI 41.rr..,rl.t nit. •i ayspth.we tsar 1h r Ik re riff k (Lwma .r a mine in pndn d
Unless the dare of cairneticcment Is established by a nonce in proceed Issued by the Owner. die Cartrutnr shut nand the
Owner In writing not les than five days bd.re commencing the Wodi to permit the broody Nang of mortgages. mechanics 11e1a
and ether smudgy internis.
3.2 The Contractor shelf shim e Aulnn:uial Corr.pkian of tis• more mR Ors nm later than September 1. 1992.
!heart thetdAwiu St -n filigrafier nI .dAoui.• dal. aiarthe data ;'worest. wen. Al.. w.nl am n Isaveramoubft. milk. Srl.taaa&ca. iaea....y:n-
SIM prism. .9 sae d.af fit OM aged .4. ,two w SAr inmost l...ww eNf. /
. subject to adluitmema Oh ttb Contrat l isle a, Ix.:,xkd in the Contra' 1 Tkw-.nm7nh
IM.Nf PW nawm Ii d.11 .red bre/aid &11Q n lWW'ig 4. fa•Lr•.-,,I W.441n f.w.•/
See specifications - Section 00003-1 - 7.1
AM DOp11110! ANi • o/Wei ILII RA/ 11* MdirMI%I • fwtIflH EMI Iles • A.A. • mW
III!AMlyd AN IN•11:11104 AM 1111NH 1•1isM riAKAm PNlr Nw• tAaf:IVldON nC JION.
A101 -IMT 2
ARTICLE 4
CONTRACT SUN
4.1 111e t1arzr .:moi pew the ( 1E11h1I111 111 %urrtnI herb kr die Gutlrxair's;xrlarnuitty r:11het.nil ;al
One Hundred Five Thousand Five Hundred Eighty-- --
I q Base Bid) I, wUP1a I•: ,Itk9R1 :. a :d delhxvn i'% a. 1•
tra.IiQ halgI�00) (
4.2 the Can trait sum u hirer' ter Ihr 1 #.wing .I:amrt+, s •R11. shall ate :krrllxd m dr Com -ac;
heretn accepted by the ovencr
• Mee IA•IIYwIw% 1-11h. • .45+11/h.M n,.l do 55;4•551•8188 n.rta+ if 6.160Yv u•. fleeter JerneIM. •w t•♦ •.rh b. ria. ea n. •
b AR•a. 8858e•1 ..Bann .1 - Ia.Awr •4 q.1. .../.. i1.'•161hY •A M .ww. 11.• Q1. ••••i Aft • al N\ Ash .PLa A. N. At: J.n . N: ••
IIx t • mtrx: s.rn 1131
1 h:llars
111. 0.e t1 I • • t• < nn
111x -anent. •a1.1 al\
,Lair • • •A•• • an via m •'1
r •AM1/.
Deductive Alternates One, Two, and Three are included in the Bass Bid.
4.3 I'n.l pricer, U my. an as hllll:ws
AM 000IIMNl A101 • teams • 11.1AA/ I1•11 Al I'IIM %I • It11 111 1P.1N". • 41%0 • isle
1111 SMI RA A% I.' 11111 .n AAI1111111% I "1% Mt uNIL %%1%11 St *% Iu .P1% 111. _rung. A101-10117 3
•
•
AIITICLE 5
pitmans PAYMENTS
5.1 Bawd upn Applicati n% kr Psymctn whmsred to the Architect h} the O •n:ratty and Cenrfo atm Il x Payment hs.xd by the
Architect. the Owner 'hall nuke prugress pitman mens on anitint of t:w Ci iu;at S..rn to the C.ntraKw s pros kt:Ielow rd
elsewhere in the CtMIran Ixic;inent%
6 2 The period to•;red by inch Amin main foe i'a! mein Jug Ix• I:1w t aIen.lar rn rii11 coda"' I.n the Ian day if the ummn,14 .r
Itllbw S.
5.3 Provided m Application for P,nmem a teccfved by the Architect not later Ilam the twenty-sixth (26th)
day of a month. the ()iter shat nuke payment to the Contralti: not later than
the t th (10th) day of he _CARR month If in Appltni:n for Pat trent Is received by the
Archacci afer4Re iii lr2Cam tfiee Bred atm: paymmr man ere made by the Owner ru 4 lain drat fifteen (15)
days after the MchYnt receives the Application :or Payment
5.4 Each App'iosicn for Pay men slag be barest upon the Schedule of Val.".dtrtetett by tie Contra wt ir. antwfaxv with
the (:anent Documents. The Schedule of Values Mil allocate the enure Conrad Sum amp :he tannin portions of the Work
sadist prepared In such fan and summed by such mica w sebnantatc ms atuniv as the Ant.rct•i may impute This Schedule.
unless objeeeat to by the Architect, shill he used as a hab for reviewing the mita :nes Ap•phtatxrs kr Payment
5.5 Apphratnm for Payment slid indicate the penenrage of c»inp•ktkr. •d ea" pins vi of ibe ' t'nrk n of :he end of the period
t trcered by the Application lax Payment.
5.6 Subject to the provisions of de (:extinct Doc*sncrus.:he amount of tach pn,%sn.. payment shall he compiled as &)flim•
5.5.1 Take that pinxm of the Centra' Sum properly anal* at completed 6 nrk as determined by multiplying the prvtma(pe
completion of each portion of the C'trk by UM: thee of the total Con::at Bunt atkxated to Mat prism td the Wank in the
Schedule of Values. kss retainage of ten ;xdt:cnt
( 10 '.4 Renting Fntl tktttmhraam of cost to the ()inter of cha as in the Work amounts not m defuse se may he
included a p ividett m Subparagraph 7.i.- of the General Conditions rvr i bo.slt the (intrad wan ha non yet been adulated by
Miner Orckr.
5.5.2 Add drat Pluton .tl Che Ccruai Stmt properly alsx.tble Imainiab .mid Nap:lent delivered and mutably sated ar the
vee kir subsequern Incugx rain in the tympani cnrinnCa:inn kr. if ap;onntd m ath art by the (Nilo, suitably stored off the
She a a kxaaun agreed tier. n minutia less manage of ten
percem ( 10 ts}
1.5.5 Subtract act the apppegne of previous 1ny'nte:u made :n the Owner and
5.5.4 Sutton immune*. if any for which the Architect has ws`heW It nullified a tsnlflca( for Paynwnt as provided tn Pua-
grapb 7.i of the General Conditions.
5.7 The punting pat-nent amount determined m accordance once with Paragraph 4 h shall he Wither modified untkr the knowing
cscutraratret
5.7.1 Ath1, upxm Subaantbi Completion of the Work. a stmt suf"cs-1 to au Tease the toted paynwtis aI ninety f iva
prrccnt ( 95 Sly of de Cnntnxt
Sum les mach amavras a the Architect shad de:errir:e h:r mxtml•kte Wolk rd I n.ciilcd draft; and
5.7.2 Add. 11 frtjl .nntplencn Of he lkork n diet atter ntttar.u:v delaycd :''n44' no tun el the Contractor .ny atka:tonal
aautt,;trhi payahk k: actirda ce with Suhparagnph 9 lit.+ el the central :.x:d.rs'n,
54 Reduction or Ilmitxon of n'utagr, if any. Mall be Ar fud.'wm.
fir
11 .Sn.tld fn. hp t1d.•AM•IAr coaf* fit N a/ awl celery a. it L. r.t.N. .' IIM•, 411' 1\Y I.I.'4: •!M%IMe I. Atm IA Jr.' lmo" MY.AM le .iilytamt
ansa lb 1 IPS t . I rams Ind fA6 A INY I %NSlf S t..-. 1+7r 1.1 it I (1 AIN. • II. •14.. N.. Intel h•.. J2414 AI A.% JI • .INA moa. to Yf • • h e•ryte4 r
At any time after fifty percent (50x) of the work has been completed, if the
architect/engineer find that satisfactory progress is being made and with written
consent of the surety, the remaining partial payments will be made in full and
the payment upon substantial completion will be increased from ninety to ninety-five
percent.
Atsosousam*tel•1'wNil a4(.IICA( ill Mien. 4:ni•.wrVn1mil t•.•Awe • Ila•
1111 Agit tuhA%PAM t 11 HI Alit lir c H, r.%\r' 11'aRAVI•M I \w ,wNitt\t.l•re :t, .1•..
A101-1957 4
•
ARTICLE,
FINAL PAYMENT
`anal rumen:, . a)s1Nutmg the nen unpaid balance ol the a:n:ra 1 Stell, shall he nue to; the Dauer in Ue Contra Ittr when (1)
the ()attract has hen fully performed by the Conn -atm eu ala fig the Context w s nrxlry.hdnr ta rlantt rand la h:rnung
Wolk a mauled .n ltthpu.graph 12.2 2 al the tame tat (axxkteals and CO taiMs •.11x•:'equi a -n cls, It .in. %hut onevarey
auntie final payment. :u11,2)a foul (knelt ate for Paamxnl ra ix' .. card ns alk Ar(hutz1, yah foal p:emc 1 shAi le mak b
Ute Owner net more than in days aher cola intrad[ •If dx Archnet. s IVW Certificate for PaTnent, Of a 11.1.k+ws
ARTICLE 7
MISCELIANEOUS PROVISIONS
7.1 R herr reference :ges mak in 1hn. Apartment to a pnw Nan of the General Concha me:x another Contract Document, the ref•
teener refers to that prtn•ilu:n a ernetu:ed or stespiemksaed br other preySon of the Comm% Ikxtm mss
72 Pritlena due .t1 unpaid under the Contract shit hear interest from the date payment is one at the rate staled b rklrr. or In
the allxmce thereof. at die legal rate rereading tnxn :sr to tents at the plat n h: t the Prowet n located.
wean •n/I .4 Innnrt an•M spur q rear f
11 dun 4d• Mod nponenfnff paha ae tub riff T•UR•u 1 CRAW Al tingle 1 Ada nM *KW a..raa•svOva len. ...N".*r. .rrnaw ng r1 r1to sin aand
Contra furl fnlf oaf Ja n.rr bnl.a.• the 4a.N114 of N. twin l insa/And *rn avrl 4fir. 1 fee f aeons\ r: 4W p• ., ..Mur fa JO .4 I.rarw4f hr ,llwerann1
• Rh crystal F• dii tau .n •rrYRyuaf*..• •..nf.R.'.dard4g..ganwwf. •alA W a• NA n .ANAs. &id s.s.ar•.
7.3 Other provisions:
ARTICLE S
TERMINATION OR SUSPENSION
3.1 The ( nal nus he Intal -Att.! hl :Ice 1IAA lx de ( .11:11a10: JA kk•1 n• Sem k• 11 0l ON: Gratin t .rdukm•
5.3 1hr ale cell ru' he etyeldh•d he : e Owner a+ 14•0.•ukrl n: Arca k I•f ill dot• (groat a :.m.Lts:ru
TIM OOCl/NIR ANA • IIS'lu(:Meat 114 At411IMI%. • :II t:111111.I11.N • 4R •
7111. AMII1.1 A\1\•111111 01 AM I1:11f IA. I'rrSit It ed :01 1.1 I. •II SOH St•ll1h Ill
:nary.
AIO1.1N1S7 i
•
AmlaE
B11AEIATION OF CONTRACT DONT!
1.1 Che Contract Ikxvnlenla. except Cot fhxllfxatxlna bawd alter cara1exn elf UWI Agreement, are entitle sated a fnik,s•
9.1.1 The A$nanwns d III* cxi used StalxlaW Fax•n elf Agreenxrt Wu:e n Omni ar d (Ararat kr. AIA :kx LUTICIn A ICI. I tA1'
Edith In
9.12 The Clrtral CAxtdltkxa are the Gc rnd C Anel. 1\ til the Contract tor Caxlµtuttxtt. AIA I./acumen A:n 1.1911' Faun:.
0.1.3 The Supplementary and other akndaktu of the Canna ate Muse entrained In the Protect Mru.d dared
May 11, 1992 and are a, frlkwla.
De ameaa epos
See attached table of contents
Pages
9.1A The SpxcJk- tkrt are Marie aneamed in the Panel Manual dated as al Subpwap;taph 9.1.3. and are x. Rion
/now hat ''r 11... Alit att. M. Aero ,e n t. r A•.aa e..e•lMr Iter Ant h. IM. 111•11•01‘0•1;
Secants Thfe Pap(ea
Sea attached table of contents
AM OOC1111111T 4/a1 •1 IS NUN € aril NM 11* A(10INI N1 • 1 s IU (/1114 n* • Al/0 •e rise
Ill 001111 4S1:1•••hlfl 1101 AM 11111.1. 1 1• NIS YI MIK 4% rill 1 Mal 14411V.10M.n1 .Yllrtl.
A101.1167 6
•
•
•
•
•.I.1 the taaralpl are A111-0ras Jilt. an: anted
May 11. 1992
Oahe A. /1w111.111/411 Ar•r..r•i5. 11 .• ..r.. n.t M the 4Irn.u.g1
Nanber
See attached schedule of drawings
W1Il'+A 4 dl!liient CIJIt h shit% n 11. i s.
Tide Date
9.1.S The Addenda. it r.r are as tolls •{s
Ma lecr Once taws
One May 20. 1992 1,2.3,4.65
Iwo May 27, 1992 1
Three May 27. 1992 1
Four May 28. 1992 1
P O:W:n. Of b:tlplld. reining :. • Lsd In> g rrllulreme.:l. are nix pal ' 1? the ( I)Idral IAN. WMTIh I.II;1m A Illi' hw:d lig ll'I:LL'rcn111: JU
J tVI enunw•lalcd e1 Ihn Ankx'1
Ma Man Am • <){\le<.nlay 1.)n MANIMM.% • :1111111 1111 71114 • 41A0 • S .•1•'
Till AM1ee Aa IM1.11 It Mat 111tH ri 1'117.1{ YIIPII A% %I 1.4{,{t.IIM.l(114 1)1 2a.o
A101.1887 7
•
•
9.1.7 (kir ILlrmcnuw 1 arm, Conning p.vt .4 the Gautier 1)uunxraa are in kinw7..
nrkyr anytaakinaeiAtira-rax, a4.t army -rad t.f.r111 wf/ IM 1•.Vrwl lasfrraafi
a. sleet sprint.., nxaprtn.r Ar lav n,•0 r 0 in n• l fir • 1raIYl paned au /Rina Ylaf rang/ Rag••rMir ny r4A
Aosfr fr. as In•1 fitfre/.w Amts«frwf 1atr.�••lTIrwn.allarrwfwn alr.l nuwrnwf
Ir Armlet( lire dwarf w MUM lion � IJ rrnaaAn/ N. as :Ian •� SrNr f%wfrfPf !)arw�fa 1
1lie Agreement h entered 1 at• aF ell the• day 21(1) ru first w nttcn ah. we and a rM[tucnt1 in n kiln, three original copes rl which
l lne sin he (k•:l n.0 to tha (•. mtuct. I., 3111e 9: the .lie hx.Yt h.r trot in the Jilmirtimmiiii of the C l iitr u. and the renlam.kr to the
()Ann.
(1RNr3R board of Directors
ettevillc
4
1*&1111n/
ricd 5 \- 14.54A4Pit Dell,
;Miami fells- and 'akl Ins
(:OVERACIOR Thomas Harding natructicn, Inc.
f VRmSrn I}
Thomas Harding, Jr. President
f14nMd raid• •ori hf i7
Ay
000111111107 Alai • ('1 %FM t :J%I11M toil Al All @\ • 111, I:111111M IMI\ •AIA• • VM'
111} AMERICAN MS Inn I 110 Ala ill 11.1•.1'45 to 'mph A%1:01 ■. t A.111!x. If IN 11 C Ylgx.
A101 -19q i
• 1)t:'Ir11u•I
1. 1 1.11/111111.; 111• 1 :11.111,;d:I
:ar . .I 1(111 1••• •••t
• • :.•.1l it; 11'.11111 R
•
1 .. 11 1..1. 1: 1 1. ;1 11 1 1: IJ 1
D1�'1:i111:J 0I c.11illl 11I flll:i f F CLINI F(A1_i - 'r'.i1+1.5,
i;:t:J1UI1 i!i•.•'i1 1Abic• aF Contents;
11•:•• ••1t J:c.hedo1u of IJr awtrlcs 1
0000$ Scupe of Contracts 1
04004 Addenda •,,r s • sunri)
0.0101 Advertisement for Rids •
00420 Information Fur FSi eiders.ul
0001 %1 EJi d Form ;
I,10;.13i £•uppl emcrlt to EJsd iu1 1 n:..i: i.•.a.. t r•I.l r ..; ; 1
O 0',4a Arkansas Statutory rc•r tc-:n.'I itu ' F'.ry .1 •.I 1 L:I I.1 1
:I1J071.• beneral Condition• 1
O 003111 Supplementary Condition:: 4
00 )81 Insurance
oox•8E Wage Rates 1
DIVISIUII 1 - GLNLPAL RI.OUIREMENI,R
SEC110U 010.10 Summary of Work 4
O 1030 Deductive Alternates, 1
01 C•4fl Cutting and Patching
O 1060 Definitions and Stand.rca 3
O 1 t nS Schedules, Reports, and Pain.erlts 3
O 1205 Procedures and Contrcls: 4
01440 Submittals
O 1505 Temporary Facilities 3
O 1:•1311 F'roiect Identification 1
O 16.;1 Products and Substitutions 7
O 1-irJ:, Project Closeout 4
riIVjSlnl -. SI1E WORK.
5Cc1IQi4 - 0201:1 Pa• tial Demolition
O _:_•l} Ear thwor 1. y
DIVIS1U'1 :; •- f 014t RI 1F.
roncretn Work 11
DIVI51;r:1 a I rl"tuor.kI sl.ul :warm!
D1VI9IU11 - •I'
;:f-1:1 1: J: I • •r.:. ?0
tl a1 J•^. 1 1 C. :.nd R.•i 11 Iin=
111011`0111:1 • 1:411-r 1.:11 r•:r
:.1 I.1 11111
I.C:11r1• 1 ..1 1'1.111 1
1. 1 n I y.I I..r r,rn I r
.'. • l e 1 t VC t• .r .,1 t401.r h,.: 1
. • 1 . . • • • 1 •.
•
•
•
•
•
,DIVISION 7 - THERtAL AND MOISTURE PROTECTION
SECTION - 07200
07600
07900
lnsu:ation
Flashing and Sheet Metal
joint Sealers
•
D IVISILN 8 - DOORS AND WINDOWS
SECTION - 08100
08210
48311
08710
08800
Steel Dccrn and Frames
Wood Dours
Aluminum Sliding Glass Doors
Finish Hardware
(Glass and Glazing
D IVISION 9 - FINISHES
SECTION - 0092E0
09510
09654
09684
09900
Gypsum Drywall
Acoustical Ce.iin;s
Resilient Flooring
Careetiny
?ai:.:inu
D IVIziA N LU - SFECIALTIES
SECTION - 1052:
Fi.e En:inguishers and :satinets
D IVISION 11 - EUUIPMEN1
D IVISION 12 - FURNISHINGS'
D IVISION li
3
5
5
4
6
4
040T USED 'HI3 r-f.L•IE1 )
(NUT USED :HIS PFCJETJ
- SPECIAL CONSTRUCTION (NOT J3uD THIS PFLJErl)
D IVISION 14 - CONVEE'1NG SY2J MS
D IVISION 15 - MECHANICAL
SEZTION - 15010
15250
15411
15412
15415
15440
15610
15670
15890
(NOT USED THIS PRC.IECT)
General Mechanical Requirements
Mechanical Insulation
Sanitary Drain, Waste and Vent Pining System
Domestic Water Piping System
Natural Sas Piping System
Plumbing Fixtures and frim
Forced Air Furnaces
Split System Condensing Units
Low Pressure Ductwork and Accessories
D IMS;ilI� F,L CTFILPL
D ECTION - 16400
END OF SECTION,
9102
General Electrical Requirements
TABLE OF CCNTENTS SECTICN 00001-2
•
Alm
Ni hlh3 hl
2
3
14
• 1i1V141111 •.
1.1111111 i 11 r1.+ III, 1.11_111:1.1.1
•
St 1. *TUN U'Jv'.
. HAILDHIr UI Iif tiW1N..3
•
11 1 L 1, f .: I< ly W 1_11.4e -.
( (1Vl l::i•ILE i Lin TEIJ1
1 r•LIJL,•1, PLAIN
•
ISEtII:I I 1 :ON PI AN
n:.141 DI r,
;,
(fill L 1 ANC' DOOR D1114ILS
S
4
.1 •
rflt.t W:lRI. fLEVA110.1:3
PIIS l WART, DETAILS
SITE DLIAII_a
t1ECFl•:II:CAL/PLUMPING FLAN
EIEC1RICA:_ POWER PLAN
GF TAI(_S
nErt.::L.IED CEILING/LIGHTING PLAN
SCHEDULES
END (JF SECTION.