HomeMy WebLinkAbout58-92 RESOLUTION• RESOLUTION NO. 58-92 A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A CHANGE ORDER WITH MCCLINTON-ANCHOR IN THE AMOUNT OF $150,300.00 FOR THE CONSTRUCTION OF THE TOWN CREEK GARDEN ON THE WEST AVENUE PARKING LOT AND APPROVAL OF A BUDGET ADJUSTMENT IN THE AMOUNT OF $50,000.00. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: 5ection 1. That the Mayor and City Clerk are hereby authorized and directed to execute a change order with McClinton - Anchor in the amount of $150,300.00 for the construction of the Town Creek Garden on the West Avenue parkIng lot. A copy of the change order authorized for execution hereby ls attached hereto marked Exhibit "A" and made a part hereof. Section 2. That the Board of Directors hereby authorize a budget adjustment by transferring funds in the amount of $50,000.00 from Building Cost- Maintenance Center, Account No. 452-952-5- 804.00 into these accounts -Arts Center Project, Account No. 452- 952-7-602.16, Sales Tax Construction, Account No. 416-916-6-602.52, Arts Center Parking Project, Account No. 416-916-5-860.00. PASSED AND APPROVED this 7th day of April $ 1992. APPROVED: By. c Mayo ATTEST: City Cletk ADJUSTMENT • CITY OF FAYETTEVILLE, ARKANSAS IN -YEAR BUDGET ADJUSTMENT BUDGET YEAR DEPT: Pass Csalet &tack DIV : PROG : DATE REQUESTED PROJECT OR ITEM REQUESTED: Aack,,,jrcass.ca y44.31 i.e.. Airs (9„..etv....1. vv. LAreibt. Aut. lie....eoat aka 44.0e. acco...a.sitiktar.4. JUSTIFICATION OF THIS INCREASE Taaat.1 C 14.a. *Pon.h. k egal aL4.ij Cosie S • 4) LiceeSt Guilis-64 A-44% ;"Lina."1.‘e tetir Simit4M0 Arbil* Ljtro di/ 110.4..•./eg is tO "Ocala .sc.4..1 PROJECT OR ITEM DELETED: 0 - Wein in soLect, jai At., 1.01/24 1/44461-1,4Aut 1 .o04 •fr.) SIAS \Aft( CeOf. (RCN. 0.424 4•1•010 tfat kiira flige4 JUSTIFICATION OF THIS DECREASE ? Alble-ch• LS II, 4iak. 4.,„ plaaii, INCREASE ACCOUNT TITLE MnPti• to A4 -fl (sit& Park drisasa. nom San TA.* C...Acr. tigas 04es 244-6-40•1 ACCOUNT NUMBER ast • 1St -1-02, L4. Wt. -cif -AC.- Got 51. 4 ire- qt.L.s. . a a AMOUNT DECREASE ACCOUNT TITLE &Jai UlANI Caerfr !..1 i ne001 k jiM ACCOUNT NUMBER 451. -1SL- S tote C.° AMOUNT ADMIN. SERVICES DIR: CITY MANAGER: DATE BUDGET OFFICE USE ONLY s -31-% "••-drst—`117_ APRqL. Entered Posted DATE OF APPROVAL Type: A B C (i) E Total program adjustments to date: CHANGE ORDER (Instructions on reverse side) No 1 PROJECT: Walton Arts Center Park 'rig Lot °HASE 2 - Corstruct i or , West AvenLe Sit.p OWNER: City of Fayetteville 113 West Mounta r Street (Name, Fayettevi 1 'e, Arkansas 72701 Address) CONTRACTOR: APAC-Arcansas . Inc. McCUrtor-Ancrior Division P. 0. Box 1367 Fayetteville, Ark arsas CONTRACT FOR: Park leg Lot ConstructIon DATE OF ISSUANCE: Ape i I I, 1992 OWNER's Project No Fy-212 ENGINEER: McGoodw'n, gi 1 1 i anis and Yates, Inc. 909 Rol. ing Hills Drive Fayette/ Ile, Arkansas 77703 ENGINEER's Project No. Fy-212C You are directed to make ihe following changes in the Contract Documents. Description: Ado it ion of Tom. Creek Sarcens and Pay i ion w• th Skyl •ght See Attacrmert Nio. 1. Purpose of Change Order: Attachments: (List documents supporting change) 752,814.0C Mc„locciw r., i 11'ams sd Yatet RECOMMENDED: by Ciar es R . 1 Azir 1 21, 199? - Sep Attached Letter does or date 1 ty 0, r eTeRlt 0-76. APPROVED: • A/f.14MPZ(41°) "...4\ by Jaws pi. Co1ett6-President in ;17.W-Arcnor ,nnpany APPROVED: Chneu EJCDC No. 1910-8-8 (1983 Edition) Nepated by the Enameers' Joint Contract Document Committee and endorsed lac Assoc iaied Gereral Contracion of Amenca. . CHANGE IN CONTRACT PRICE: Original Contrac1 Price $ 612,514.071 CHANGE IN CONTRACT TIME: Original Contract Time Apri 1 21, 1992 days tie dine Previous Change Orders No to No Net change from previous Change Orders 0 $ 0 days Contract Price prior to this Change Order S 612,514.30 Contract Time Prior to this Change Order IOC Days days or dale Net IncreaseWilieadb) of this Change Order $ 150,300.00 Net Increase (decrease) of (his Change Order 0 Zays days Contract Price with all approved Change Orders Contract Time with all approved Change Orders 752,814.0C Mc„locciw r., i 11'ams sd Yatet RECOMMENDED: by Ciar es R . 1 Azir 1 21, 199? - Sep Attached Letter does or date 1 ty 0, r eTeRlt 0-76. APPROVED: • A/f.14MPZ(41°) "...4\ by Jaws pi. Co1ett6-President in ;17.W-Arcnor ,nnpany APPROVED: Chneu EJCDC No. 1910-8-8 (1983 Edition) Nepated by the Enameers' Joint Contract Document Committee and endorsed lac Assoc iaied Gereral Contracion of Amenca. CHANGE ORDER INSTRUCTIONS A. GENERAL INFORMATION This document was developed to provide a unifot m format for handling contract changes that affect Contract Price or Contract Time. Changes that have been initiated bv a Work Directive Change must be incorporated into a subsequent Change Order if they affect Price or Time. Changes that affect Contract Price or Contract Time should be promptly covered by a Change Order. The practice of accumulating change order items to reduce the adminis- trative burden may lead to unnecessary disputes. For supplemental instructions and minor changes not involving a change in the Contract Price or Contract Time, a Field Order may be used. B. COMPLETING THE CHANGE ORDER FORM Engineer initiates the form. including a description of the changes involved and attach- ments based upon documents and proposals submitted by Contractor, or requests from Ovvner. or both. Once Engineer has completed and signed the form, all copies should be sent to Contractor for approval. After approval by Contractor, all copies should be sent to Owner for approval. Engineer should make distribution of executed copies after approval by Owner. If a change only applies to price or to time, cross out the part of the tabulation that does not apply. ATTACHMENT NO. 1 DESCRIPTIONS: Item 1. The construction of Town Creek Gardens Including a pavilion, with a skylight, for public use, in accordance with detailed plans attached. The work includes all work and materials necessary to improve: landscaping; irrigation system; earthwork; stone retaining walls and reconstruct the 'Arch'; spring box modifications to pump spring water to the ponds; electrical work; sidewalks and ramps; flatwork and all necessary utility connections to the pavilion. The total cost for this change Is $146,000.00 Item 2. Replace existing three rail aluminum handrail for the retaining wall with a seven rail aluminum handrail. The price for this item is $4,300.00 . PURPOSE OF CHANGE ORDER: Item 1. To incorporate the spring, landscaping, irrigation and pavilion Into the West Avenue site. Item 2. This change is to update the handrail section to comply with current codes. ATTACHMENTS: Item 1. Breakdown of costs for Town Creek Gardens - See 'Exhibit A.' TCG3 • • EXHIBIT A TOWN CREEK GARDENS 1. CHANNEL BOTTOM $ 4,250.00 2. RETAINING WALL AROUND TREES $ 4,000.00 3. SIDEWALKS AND HC RAMPS $ 4,200.00 4. FLATWORK $ 1,300.00 5. EARTHWORK $ 3,500.00 6. STRUCT. CONC. FOR STONE WALLS $ 26,400.00 7. STONE WORK FOR RETAINING WALLS $ 27,000.00 8. SPRING BOX MODIFICATIONS $ 1,700.00 9. ELECTRICAL WORK $ 6,800.00 * 10. LANDSCAPING $ 11,500.00 • 11. IRRIGATION $ 4,200.00 12. MISC. PLUMBING WORK $ 1,000.00 13. PAVILION WITH SKYLIGHT $ 50,150.00 * TOTAL $146,000.00 • Maximum amount not to exceed. TCG3 CHANGE ORDER (Instrections on revers* side) No r. • 2 PROJECT: OWNER: Mame. Address) Walton Arts Center Parking Lot PHASE 2 - Construction. West Avenue Site City of Fayetteville 113 Welt Mountain Street Fayetteville, Arkansas 72701 CONTRACTOR: APAC -Arkansas, Inc. McClinton -Anchor Division P. 0. Box 1367 Fayetteville, Arkansas CONTRACT FOR: Parking Lot Construction DATE OF ISSUANCE: OWNER's Project No May 15, 1992 Fy-212 ENGINEER: McGoodwin, Wi 11 i arm and Yates, Inc. 909 Rolling Hills Drive Fayetteville, Arkansas 72703 ENGINEER', Project No F v -212C You ere directed to make the foNowing changes in the Contract Documents. Descripithow Increase size of various trees and add trees as shown on attached landscaping plan PuTP0se of Omit Order To comply with owners request. Attachments: aim documents supporting diens/ Breakdown of costs - see Exhi bi t 'A' Revised Landscaping Plan - See Attachment 1. McGoothsin, Wi Mans & Tates RECOMMENDED: by City of Fayetteville, AR APPROVED: Charles R. Nickles P. E. EICDC No. 1910-8-B (1983 Edition) hymns by the Enekbeeng Jena COMM', DOCMOWnli Cronies* see retried be The Atserbied Gerona Cevereeters 1 Americo. McClinton -Anchor Company APPROVE?: by Ruben Liner, Jr -Vi President Original Contrect $ 612.514.00 CHANCE IN CONTRACT PRICE: Price CHANGE Origins' Contract April Time 21. IN CONTRACT TIME: 1992 den er dole Previous Cheer Orders No. to No Net change front previous Change Orders 0 $ 150,300.00 alem Comm( Price $ 762,814.00 prior to this Change Order Contract Time Prior to this Change Order 100 Days isel or dole Net Increase khiessswelof tMs Cherie Order $ 9,052.73 Net Increase 14 (dieweese) of this Clump Order Days wr. Connect $ 771,866.73 Price with MI approved Change Orders Convect Time with May oil approved Change Orden 15 am se tell McGoothsin, Wi Mans & Tates RECOMMENDED: by City of Fayetteville, AR APPROVED: Charles R. Nickles P. E. EICDC No. 1910-8-B (1983 Edition) hymns by the Enekbeeng Jena COMM', DOCMOWnli Cronies* see retried be The Atserbied Gerona Cevereeters 1 Americo. McClinton -Anchor Company APPROVE?: by Ruben Liner, Jr -Vi President CITY OF FAYE7TEVILLE CONTRACT REVIEW PROJECT: Dk5C✓'1 CTrec& Threv'Aq Iro± Initial Date Project Manager 5/ S City Attorney 11409 c11 Purchasing cP 6 '15 Accounting +-)(A1\ 5/rs Internal Auditor /5-1-902- cf, spy (Please note, any exception on contract copy and reference at the bottom of this form.) Return to Project Manager when review procedure has been completed. ( FAYETTEVILLE THE CITY OF TATITTIVIllt ANKANSAS DEPARTMENTAL CORRESPONDENCE TO: Scott C. Linebaugh, City Manager THRU: Kevin D. Crosson, Public Works Director FROM: DATE: May 15, 1992 David S. Cox, Assistant to the Public Works Director SUBJ: adigSBISEnking The attached change order No 2. to the West AVenUe parking lot is forwarded for signature. As requested this change order in the amount of $9,052.73 increases the size of thirty three trees in the parking lot as follows: 8 Big Red Maples, 3.5" - 4" caliper, (151 - 20' tall) 3 Big Pin Oaks, 4" caliper, (15' - 16' tall) 4 Northern Red Oak, 3.5" caliper, (18' - 20/ tall) 9 Golden Raintree, 2.5" caliper, (8/-101 tall) 9 Seedless Ash, 3" caliper, (15/-16' tall) In most cases this doubles or better the size and height of the tree originally bid. It also increases in size, and changes the variety of six trees in the Town Creek Garden. This change order also extends the contract time to May 15, 1992. The contractor has said that these trees will be planted next week. DSC/dsc attachment EXHIBIT 'A' BREAKDOWN OF COSTS SYMBOL QUANTITY WAS I QUANTITY I NOW I COMMON i NAME PLANTING SIZE ADD (+) DELETE ( ) WEST AVENUE SITE BRM 0 8 BIG RED MAPLE 3 5 4' CAL 4295.28 RM 6 RED MAPLE 1.5* CAL. 75.00 LL 18 12 LITTLELEAF LINDEN 1.5" CAL. 810.00 WP 10 10 WHITE PINE 6 8' 0.00 0.00 SW 3 0 SOURWOOD 1.25 CAL 225.00 EH 7 0 EUROPEAN HORNBEAN 1.5' CAL 945.00 TM 23 12 TRIDENT MAPLE 10' 1815.00 ER 6 6 EASTERN RED CEDAR 7 8 0.00 0.00 PO 1 1 PIN OAK 1.5 CAL. 0.00 0.00 BPO 0 3 BIG PIN OAK 4' CAL (15'-16') 898.23 RO 0 4 NORTHERN RED OAK 3•5NCAL (18'-20'} 1697.64 ' GR 01 9 GOLDEN RAINTREE 2.5' CAL (8 -101 2019.69 SA OI 9 MARSHALL'S SEEDLESS ASH 7 CAL (15'-161 2073.69 CHARGE CHARGES FOR SHIPPING FOR DELETED & HANDLING TREES. OF NEW TREES AND RESTOCKING 987.00 TOWN CREEK GARDENS WW 2 0 WEEPING WILLOW 2.5' CAL . 510.00 CP 2 0 .C.P. DOGWOOD 1.5' CAL I 330.00_, A RB 2 0 RIVER BIRCH 1.51 CAL. 270.00 LP 0 2 LONDON PLANE TREE 3.5' CAL 487.75 CP 0 2 C.P. DOGWOOD 1.75-7 CAL. 350.00 RB 0 2 RIVER BIRCH 2.50_31 CAL 700.00 .. CHARGE CHARGES FOR FOR SHIPPING DELETED & HANDLING TREES. OF NEW TREES AND RESTOCKING 1 343.45 . SUB -TOTAL 13957.731 4905.00 TOTAL PRICE FOR THIS CHANGE ORDER 9052.73 • PROJECT: CITY OF FAYETTEVILLE CONTRACT REVIEW Dit3/4-)0, 63kci- Project Manager City Attorney Purchasing Accounting Internal Auditor_ V sc (oaljN Act (Please note, any exception bottom of this form.) Initial on contract Date Vifitz- /fL 1)19a - copy and reference at the Return to Project Manager when review procedure has been completed. Nu. v 4 Illinr.14:r1114 n AI THE CITY OF AYFITIVINE, ARKANSAS DEPARTMENTAL CORRESPONDENCE TO: THRU: FROM: DATE: May 28, Scott Kevin David S. C. Linebaugh, City Manager D. Crosson, Public Works Director Cox, Assistant to the Public Works Directorik// 1992 SUBJ: West Avenue Parking Lot The attached Change Order # 3 is forwarded for approval. It reduces the contract amount on the West Avenue contract by $11,139. It consists of several minor changes and a modification to the pavilion skylight and fascia from a four sided pyramidal shape to a straight gable skylight. This is a prefabricated skylight and is much less expensive than the original skylight proposed. The complete items are listed below: Additional concrete at Spring Street. add $280.00 Delete sod around corner of Dickson and West Avenue (this area may be "adopted" by Pride in Dickson Street as a garden). decrease $375.00 Add sidewalk at Dickson Street. add $425.00 Add handicap ramp at West Avenue. add $200.00 Delete upper portion of traffic control anchor. decease $450.00 Change of pavilion skylight and fascia. decrease $11,219.00 DSC/dsc CHANGE ORDER (Instructions on reverse side) No 3 PROJECT: Wa 1 ton Arts Center Parking Lot PHASE 2 - Construct ion, West Avenue Site owggEgg: (ity of Fayettevi 1 le 1/3 West Mountain Street (Name, Fayetteville, Arkansas 72701 Address) CONTRACTOR: APAC-Arkansas. Inc. MtClinton-Anchor Division P. 0. Box 1367 rayetteville, Arkansas CONTRACT FOR: Parking Lot Construction DATE OF ISSUANCE: May 20, 1992 OWNER'. Project No Fy-212 ENGINEER: McGoodvin, Wi 11 iams and Yates, Inc. 909 Rolling Hills Drive Fayetteville, Arkansas 72703 ENGINEER** Project No Fy-212C You are directed to melte the following changes in the Contract Documents. Description: See Attachment No. 1. Purpose of Change Order: Attachments: Mist documents supporting change) CHANGE IN CONTRACT PRICE: Original Contract Price $ 612,514.00 CHANGE IN CONTRACT TIME: Original Contract Time April 21, 1992 dun a doe Previous Change Orden No I to N 2o Net change from previous Change Orders 14 $ 159,352.73 days Contract Price prior to this Change Order $ 771,866.73 Contract Time Prior to this Change Order 114 Days ell dose er Net 111/111(decrease) of this Change Order $ 11,139.00 Net Increase (cfaMigkil of this Change Order 57 Days sirs Contract Price with all approved Change Orden $ 760,727.73 Contract Time with all approved Change Orders May 20 den date or &Concklin, Williams & Yates RECOMMENDED: Charles R. (tickle, P. E. EJCDC No. 19100-13 (1901 Edition) City of Fayetteville, AR APPROVED: / 4 ; r i . , .. 7 7 I McC1inton-Anchor C °many APPROVED: byg 44/11.4) 1 4 . James A. Ccoare",esiri ice -President Ilryboyyd by thy Fsgineers1Sa4 Comma floymnene• Cymytiltee and endorsed by The kneaded Centre' Coyttecion Amelielll CIIANGE ORDER INSTRUCTIONS A. GENERAL INFORMATION This document was developed lo provide a uniform format for handling contract changes that affect Contract Price or Contract Time. Changes that have been initiated by a Work Directive Change must be incorporated into a subsequent Change Order if they affect Price or Time. Changes that affect Contract Price or Contract Tune should be promptly covered by a Change Order. The practice of accumulating change order items to reduce the adminis- trative burden may lead to unnecessary disputes. For supplemental instructions and minor changes noi involving a change in the Contract Price or Contract Time, a Field Order may be used. B. COMPLETING THE CHANGE ORDER FORM Engineer initiates the form. including a description of the changes involved and attach- ments based upon documents and proposals submitted by Contractor, or requests from Owner, or both. Once Engineer has complete() and signed the form. all copies should be sent to Contractor for approval. After approval by Contractor, all copies should be sent to Owner for approval. Engineer should make distribution of executed copies after approval by Owner. 1r a change only applies to price or to lime, cross out the part of the tabulation that does not apply. ATTACHMENT NO 1. Description of Change Order: Item 1. Additional concrete paving required at Spring Street near tie-in for truck turning for warehouse. The total increase in cost for this item is $280.0O. Item 2. Item 3. Delete solid sod requirement between sidewalk and parking lot along Dickson Street and a portion of West Avenue from the site of the new pavilion and Dickson Street. The total decrease in cost for this item is $375.00 . Add sidewalk at westerly side of entrance to existing concrete parking lot of Dickson Street. The total increase in costs for this item is $425.00 . Item 4. Add handicap ramp north of southeast entrance off West Avenue. The total increase for this item is $200.00 Item 5. Delete upper portion of traffic control anchor. The total decrease in cost for this item is $450.00. Item 6. Delete the Skylight Frame System and laminated safety glazing - 16'9" X 11'4" (Kawneer 1600 S.G. Framing system with *40 dark bronze anodized finish). Raise and modify roof system as shown on revised plans, sheet 5. Add bronze aluminum frame (bronze)acrylic skylight, approximately 11'-0" long by 161-0" wide, as manufactured by Plastic Laminators Inc., as shown on the revised plans, sheet 5. The total decrease in costs for this item is $11,219.00 . Page 1 • • Purpose of Change Order: Item 1. • The area involved in this item appeared to be in a much more deteriorated state once debris was removed and construction commenced. The addition of paved area thus allows full use of truck parking and turning area as designed. Item 2. This area will be planted and maintained by a private organization and therefore will not require solid sod. Item 3. This sidewalk is being added to allow pedestrian traffic traverse to the west, along Dickson Street, on a paved surface to the University area. Item 4. This item was added to comply ADA requirements by providing direct access to the east across West Avenue Item 5. The City of Fayetteville traffic department. after considering the concerns of Walton Arts Center and adjacent properties, decided that a better location for the pole and anchor would be in the westerly sidewalk of West Avenue. Therefore, construction of the pole anchor was halted and credit was given for the remainder of the work. Item 6. The style and configuration of the skylight was changed to reduce the cost of this item. Also changes were made in the roof structure to simplify construction and reduce costs. Attachments: Item 6. Pavilion Plan and Details - sheet 5, See 'Exhibit A.' Page 2