Loading...
HomeMy WebLinkAbout51-92 RESOLUTIONRESOLUTION NO. 51-92 A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN ENGINEERING CONTRACT AMENDMENT WITH MILHOLLAND ENGINEERING IN THE AMOUNT OF $191300.00 FOR THE STUBBLEFIELD ROAD/MISSOURI CREEK DRAINAGE PROJECT. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the Mayor and City Clerk are hereby authorized and directed to execute an engineering contract amendment with Milholland Engineering in the amount of $191300.00 for the Stubblefield Road/Missouri Creek Drainage Project. A copy of the contract authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 7th day of April : 1992. ATTEST: di, City CVerk APPROVED: eTh By Mayor • • CONTRACT AMENDMENT NO. 2 FOR ENGINEERING SERVICES PROJECT: STUBBLEFIELD ROAD AND MISSOURI CREEK DRAINAGE IMPROVEMENTS E-245 THE ORIGINAL CONTRACT was made and entered into on May 24, 1989$ AND THIS CONTRACT AMENDMENT NO. 2, made and entered into this 74 day of , 1991, by and between the City of Fayetteville; Arkansas, hereinafter referred to as the "OWNER", and Milholland Company, Engineering and Surveying, Consulting Engineers of Fayetteville, Arkansas, hereinafter referred to as the "ENGINEER", WITNESSED THAT: WHEREAS, the OWNER Originally desired to Construct STUBBLEFIELD ROAD 31 feet in width from BERTHA STREET Easterly to Old Missouri Road centered in a Right -Of -Way fifty feet (50') in width, AND WHEREAS, the OWNER has AMENDED its desires several times, as follows: FIRST: Construct Stubblefield Road from Harold Street, North and East to Old Missouri Road; SECOND: Construct Stubblefield Road from Old Missouri Road, Westerly into the alignment of Bertha Street with future plans to connect directly into North College; THIRD: Construct Stubblefield Road from Old Missouri, West and South to Harold Street with the following additions and adjustments: A.) Relocate centerline of East/West portion of Stubblefield Road three feet (3') to the North; B.) Relocation of cable telephone by SWBTCO; C.) Water Main Replacement from Summerhill Drive East to Loxley Avenue; D.) Negotiation with Local Land Owners to preserve certain natural features, such as Particular trees and provide for additional Driveways and fence Relocations which have been constructed since original design; 1 E.) Construct a Concrete sidewalk along the North side of Stubblefield Road; AND WHEREAS, the OWNER has AMENDED its desires as to how the Construction of the Missouri Creek Drainage Improvements from Stubblefield Road North to Mud Creek should be accomplished, as follows: FIRST: Originally: Improve entire Channel for 50 -year Flood Utilizing open channel with option of a Concrete Box Channel; SECOND: City negotiated with Land Owners over which existing creek flows, for a specific type of construction at different locations, as approved by Land Owners, for a 50 -year Flood with 100 -year flow Flood Easement adjacent to Main Channel, with adJustments and changes, as follows: A.) Open earth channel from Stubblefield Road North to Old Well House; B .) Concrete Box Culvert from Old Well House, North to a point of interception of storm drainage from the East through a culvert under Old Missouri Road (Approx. 220 L.F.); C.) Additional drainage structure across Old Missouri Road to connect into North end of "B" above; D .) Clean debris out of existing channel from North end of Concrete Box Culvert in "B" above (Approximately 700 L.F.); E .) Construct improved earth Channel, parallel w ith existing Channel from North end of "D" above, North to Mud Creek (Approx. 800 L.F.); F.) Repair and replace broken native stone wall South of David Wilson's Driveway and protect e xisting native stone walls and stone piers at Mr. Wilson's driveway; AND WHEREAS, the OWNER deemed it essential to delay and modify its original plans, AND WHEREAS, the ENGINEER has sufficient experienced personnel and equipment to perform the work described in this Agreement, as Amended, NOW THEREFORE, in consideration of the mutual covenants and agreements herein contained, the OWNER and the ENGINEER, the parties hereto, stipulate and agree that the OWNER does hereby employ the ENGINEER to perform the required engineering services as hereinabove set out; AND the ENGINEER agrees to provide said Additional services. 2 SECTION 1: DESCRIPTION OF PROJECT AS AMENDED: The Project for which engineering services are to be provided are as follows: PROJECT No. 1 - STUBBLEFIELD ROAD IMPROVEMENTS FROM HAROLD STREET NORTH AND EAST TO OLD MISSOURI ROAD including, but not limited to, Street and Storm Drainage Construction, Water Main Replacement and Sidewalk Construction; PROJECT No. 2 - MISSOURI CREEK IMPROVEMENTS as amended, herein above; which are generally described as follows: The balance of SECTION 1 AND ALL OF SECTION 2 OF THE "ORIGINAL CONTRACT" shall remain unchanged. SECTION 3. COMPENSATION AS AMENDED: Compensation for the various types of services to be provided under this contract shall be made as follows: PROJECTS No. 1 AND 2: STUBBLEFIELD ROAD AND MISSOURI CREEK IMPROVEMENTS: A. PART I: BASIC ENGINEERING SERVICES: Compensation for Basic Engineering Services shall be a LUMP SUM FEE amount of $23,000.00 FOR AMENDMENT NO. 2 INSTEAD OF CONTRACT AMENDED AMOUNT OF $11,000.00. This fee includes full compensation for every item of work as described in SECTION 2, PART I. The fee is based on an estimate of the various classifications of work at an hourly rate. The hourly rates include direct labor costs plus allowances for indirect labor costs, overhead, and profit. B. PART I -A: Compensat Easements required. various c out under Only work section o exceed $3 $2,000.00 RIGHT-OF-WAY ACQUISITION: ion for PLATS AND DESCRIPTIONS for Right -of -Way shall be based on the hours of work actually The hourly rates shall be based on charges for the lassifications of personnel identical to those set SECTION 3-F. - "HOURLY RATE PER CLASSIFICATION". as directed by the OWNER shall be done under this f the contract. The AMENDED total fee shall not /200.00 INSTEAD OF THE ORIGINAL CONTRACT AMOUNT OF and CONTRACT AMENDED AMOUNT OF $2,600.00. 3 PROJECT No. 3: MISSOURI CREEK DRAINAGE STUDY: C. PART II: BIDS THROUGH AWARD OF CONTRACT: Compensation for "Advertisement for Bids" through "Award of Contract" shall be a LUMP SUM FEE amount of $600.00 FOR AMENDMENT NO. 2 INSTEAD OF ORIGINAL CONTRACT AMOUNT OF $400.00. D. PART III: CONSTRUCTION MANAGEMENT: Compensatitn for Construction Management Services described In SECTION 2, PART III, shall be a Lump Sum fee as follows; PROJECT No. 1: STUBBLEFIELD ROAD: Compensation for shall be a LUMP SUM FEE amount of $11,600.00 FOR AMENDMENT NO. 2 INSTEAD OF ORIGINAL CONTRACT AMOUNT OF $7,500.00 with a maximum Construction Time of 90 consecutive Calendar Days or less from date of "NOTICE - TO -PROCEED" to construction contractor. PROJECT No. 2: MISSOURI CREEK IMPROVEMENTS: A LUMP SUM FEE amount of $4,900.00 FOR AMENDMENT NO. 2 INSTEAD OF ORIGINAL CONTRACT AMOUNT OF $2,500.00 with a maximum construction time of 60 consecutive Calendar Days or less from date of "NOTICE-TO-pROCEED" to construction contractor. E. HOURLY RATE PER CLASSIFICATION: (AMENDED) The hourly rates to be charged for the various classifications of personnel are set out below are AMENDED from Original Contract, as follows: HOURLY RATE PER CLASSIFICATION: Professional Engineer Registered Land Surveyor Engineering Aide Secretary Survey Crew Resident Inspector Draftsman Computer w/Operator Travel $65.00 $45.00 $55.00 $18.00 $65.00 $30.00 $25.00 $35.00 $00.25 per per per per per per per per per hour hour hour hour hour hour hour hour mile The balance of SECTIONS 1 AND 2 OF THE "ORIGINAL CONTRACT" shall remain unchanged. 4 CONTRACT AMENDMENT FOR AGREEMENT FOR ENGINEERING SERVICES IN WITNESS WHEREOF, the OWNER has caused these presents to be executed in its behalf by its duly authorized representatives, and the said ENGINEER by its duly authorized representatives, and the parties hereto have set their hands and seals on the date heretofore set out. Attest: /it/ City Clerk /I Attest: -<1 A.••••" h !red Vorsanger, or 1 CITY OF FAYETTEVILLE, ARKANSAS Secretary MILHOLLAND COMPANY Me vin L. MI holland, Owner 5