26-92 RESOLUTION
R RESOLUTION NO. 26-92 A RESOLUTION APPROVING CHANGE ORDER NO. 1 TO THE CONTRACT WITH MCGOODWIN, WILLIAMS AND YATES, INC. FOR THE CONSTRUCTION OF THE ARTS CENTER PARKING LOTS ON SCHOOL AVENUE AND DICKSON STREET. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the Board of Directors hereby approves Change Order No. 1 to the contract with McGoodwing, Williams and Yates, Inc. for the construction of the Arts Center parking lots on School Avenue and Dickson Street. A copy of the change order authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 26th day of February , 1992. APPROVED: By: ATTEST: By Mayor • ADJUSTMENT # CITY OF FAYETTEVILLE, ARKANSAS IN -YEAR BUDGET ADJUSTMENT BUDGET YEAR 1992 • DEPT: Police DIV :Drug Enforcement PROG: Drug Enforcement DATE REQUESTED 1/28/92 PROJECT OR ITEM REQUESTED Increase transfer to cover the City of Fayetteville's matching requirements for the federal grant used to fund the Fourth Judicial District Drug Task Force. JUSTIFICATION OF THIS INCREASE The state matching funds for the Drug Enforcement Fund was denied. PROJECT OR ITEM DELETED: None JUSTIFICATION OF THIS DECREASE INCREAS$ ACCOUNT TITLE Transfer to Drug Enforcement ACCOUNT NUMBER 101-290-7-602.93 AMOUNT $22,797 DECREASE ACCOUNT TITLE Unreserved Fund Balance ACCOUNT NUMBER 101-000-1-800.99 AMOUNT [$22,797] REQUESTED BY: DATE BUDGET OFFICE USE ONLY DATE OF APPROVAL By ate cGET COORDINATO DEPARTMENT DIRECTOR: ADMIN. SERVICES DIR: CITY AGER: /-,l-9t Entered i -3o -9y Posted Type: A B C D E Total program adjustments to date: • CHANGE ORDER (instructions on reverse side) No 1 PROJECT: Walton Arts Center Parking Lot PHASE 3 - Construction OWNER: Dickson Street Site, School Avenue (Name, City of Fayetteville Address) 113 West Mountain Street Fayetteville, Arkansas 72701 CONTRACTOR: APAC-Arkansas, Inc. McClinton -Anchor Division P. 0. Box 1367 Fayetteville, Arkansas CONTRACT FOR: Parking Lot Construction DATE OF ISSUANCE: February 12, 1992 Site OWNER's Project No Fy-212 ENGINEER: McGoodwin, Williams and Yates, Inc. 909 Rolling Hills Drive Fayetteville, Arkansas 72703 ENGINEER's Project No Fy-212n You are directed to make the following changes in the Contract Documents. Description: Purpose of Change Order: Attachments: (List documents supporting change) See Attachment No. 1, McGoodwin, Williams & Yates City of Fayetteville, AR RECOMMENDED APPROVED: Charles R Nickle, P. E. EJCDC No. 1910-8-B 11983 Edition) McClinton -Anchor Company APPROVED: by�li. ua 4. t.DtY/ James A. Cole, Vice -President Prepared by the Engineers' Joint Contract Document, Committee and endorsed by The Associated General Contractors of America Original Contract $ 338.000.00 CHANGE IN CONTRACT PRICE: Price CHANGE IN CONTRACT TIME: Original Contract Time April 24, 1992 days or date Previous Change Orders No. to No. Net change from previous Change Orders 0 S 0 days Contract $ 338,000.00 Price prior to this Change Order Contract Time Prior to this Change Order 0 days or date Net Increase (MEW) of this Change Order S 69,527.00 Net Increase (decrease) of this Change Order 0 days days Contract Price with all approved Change Orders $ 407,527.00 Contract Time with all approved Change Orders April 24, 1992 &padae McGoodwin, Williams & Yates City of Fayetteville, AR RECOMMENDED APPROVED: Charles R Nickle, P. E. EJCDC No. 1910-8-B 11983 Edition) McClinton -Anchor Company APPROVED: by�li. ua 4. t.DtY/ James A. Cole, Vice -President Prepared by the Engineers' Joint Contract Document, Committee and endorsed by The Associated General Contractors of America CHANGE ORDER INSTRUCTIONS A. GENERAL INFORMATION This document was developed to provide a uniform format for handling contract changes that affect Contract Price or Contract Time. Changes that have been initiated by a Work Directive Change must be incorporated into a subsequent Change Order if they affect Price or Time. Changes that affect Contract Price or Contract Time should be promptly covered by a Change Order. The practice of accumulating change order items to reduce the adminis- trative burden may lead to unnecessary disputes. For supplemental instructions and minor changes not involving a change in the Contract Price or Contract Time, a Field Order may be used. B. COMPLETING THE CHANGE ORDER FORM Engineer initiates the form, including a description of the changes involved and attach- ments based upon documents and proposals submitted by Contractor. or requests from Owner, or both. Once Engineer has completed and signed the form. all copies should be sent to Contractor for approval. After approval by Contractor, all copies should he sent to Owner for approval. Engineer should make distribution of executed copies after approval by Owner. If a change only applies to price or to time. cross out the part of the tabulation that does not apply. ATTACHMENT NO. 1 Descriptions: Item 1. Replace existing asphalt pavement section as shown on sheet 9 of the Plans with 1 1/2" of Asphalt Concrete Hot Mix Surface Course on 4 1/2" of Asphalt Concrete Hot Mix Binder Course. Contractor shall proof roll entire site, undercutting, replacing and testing subgrade as required to ensure stability for pavement placement. The original contract provided for payment at the rate of $6.50 per truck yard for all undercut operations in excess of 100 cubic yards. This is hereby changed to provide for a unit price item of 4,650 truck yards for undercut operations at the revised price of $5.60 per truck yard, for a total estimated amount of $26,040. Item 2. Increase the hydraulic capacity of the storm drainage system at the Dickson Street site to intercept storm flow and divert it away from under existing buildings on Dickson Street. See revised Structure and Pipe Schedules, 'Exhibit A.' The total increase for this change is $41,037. Item 3. Replace existing driveway section with sidewalk and integral curb at School Avenue site. The total increase for this change is $2,450. Purpose of Change Order: Item 1. To aid in expediting the paving portion of this project, increase pavement strength and to ensure completion of the project on schedule Item 2. Increase the hydraulic capacity of the storm drainage system at the Dickson Street site to intercept storm flow and divert it away from under existing buildings on Dickson Street. Item 3. Replace approximately 800 square feet of existing driveway section with sidewalk and integral curb at School Avenue site. Attachments: Item 2. Pipe and Structure Schedules - See 'Exhibit A.' • • • • • • • STRUCTURE SCHEDULE FROM TO SIZE TYPE STRUCTURE NUMBER STRUCTURE TYPE TOP ELEVATION FLOW UNE ELEVATION REMARKS 1 DBL SURF. RtLET 1344.5 1341.50 OUT 2 Da. SURF. INLET 1343.46 1340.60 1111 1340.50 OUT 15" 3 TYPE 'A' CURB INLET 1341.88 1338.85 IN 1338.75 OUT 1' X 4' OPENING IN BACK - FL 1340.38 4 DBL SURF INLET 1339.65 1336.15 1330.11 IN OUT MODIFY CENTER FOR 48" PPE SUPPORT CLEARANCE 2.21 5 EXISTING BOX co/VERT 15" 1336.0* IN 1330.41 OUT CONSTRUCT JUNCTION BOX 6 TYPE B CURB INLET 1338.34 1335.00 OUT 7 7 DBL. SURF. INLET 133/.79 1334.bO IN 1329.79 OUT MODIFY CENTER SUPPORT FOR 48" PIPE CLEARANCE 8 7 DOUBLE SURF, INLET 1335.46 1332.50 1329.16 IN OUT MODIFY CENTER SUPPORT FOR 48" PIPE CLEARANCE, INCREASE BOX WIO1H TO 78" INSIDE. MATCH FLOWIJNE. 9 86.3 TYPE 'B' CURB RALET 1336.18 1333.00 OUT RCPA 10 TYPE 'A SURF. flLET 1336.00 1333.10 1117 on IN OUT 14 11 TYPE A SURF. INLET 1338.48 1335.50 OUT 94.0 86.3 12 DBL TYPE W SURF. INLET 13.34.00 1331.00 OUT 1330.50 15" 1.67 24 8.36 13 DBL. $URF INLET 8 1333.45 1330.25 18" 1328.62 OUT 1.92 MODIFY CENTER SUPPORT FOR 48' PIPE CLEARANCE. INCREASE BOX WIDTH TO 78" 14 11E Tb EXIST. BOX CULVERT 12 13 1328.25 IN FL MAY ADJUSTED NEED TO BE IN THE FIELD 24 9.33 3.25 PIPE SCHEDULE EXHIBIT A ATTACHMENT FOR CHANGE ORDER N0. 1 WALTON ARTS CENTER PARKING LOT PHASE 3-CONSTRUCTION-DICKSON ST. SITE REVISED STRUCTURE AND PIPE SCHEDULES ©1992 MC000DWIIN, WILLIAMS AND YATES, INC.°RA"N SV PLANS NO. CONSULTING RNGIN66RS-FAYITTRYIIti, AR[.I S.A.K. I FY -2120 FROM TO SIZE TYPE SLOPE LENGTH UN. FT. CAPACITY FULL (CFS) REQUIRED FLOW (CFS) X 1 2 15" RCP 1.73 52 8.51 1.24 2 3 15" RCP 3.00 55 11.21 2.21 3 4 15" RCP 2.95 88 11.11 3.01 4 7 48" RCP 0.50 64 101.5 86.3 7 8 48" RCP 0.50 125 101.5 86.3 8 13 36"X58" RCPA 0.60 90 94.0 86.3 13 14 36"X58" RCPA 0.60 62 94.0 86.3 6 7 15" RCP 1.67 24 8.36 0.43 9 8 15" RCP 1.92 26 8.96 1.71 12 13 15" RCP 2.08 24 9.33 3.25 11 10 15" RCP 1.00 62 6.47 0.92 10 8 15" RCP 5.70 40 15.45 2.12 5 4 48" RCP 0.50 60 101.55 86.3 EXHIBIT A ATTACHMENT FOR CHANGE ORDER N0. 1 WALTON ARTS CENTER PARKING LOT PHASE 3-CONSTRUCTION-DICKSON ST. SITE REVISED STRUCTURE AND PIPE SCHEDULES ©1992 MC000DWIIN, WILLIAMS AND YATES, INC.°RA"N SV PLANS NO. CONSULTING RNGIN66RS-FAYITTRYIIti, AR[.I S.A.K. I FY -2120