Loading...
HomeMy WebLinkAbout141-92 RESOLUTIONRESOLUTION MO. 141-92 A RESOLUTION AWARDING BID NO. 92-37, ITEM A TO INSTRUMENT AND SUPPLY COMPANY AND BID NO. 92- 37, ITEM E TO A.W. CHESTERTON AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE CONTRACTS FOR ITEM A TO INSTRUMENT AND SUPPLY COMPANY IN THE AMOUNT OF $39,076.64 FOR A DUPLEX BUBBLER CONTROL SYSTEM AND LEVEL CONTROL SYSTEM USED TO CONTROL LIFT STATION PUMPS AND FOR ITEM E TO A.W. CHESTERTON FOR A SLUDGE TRANSFER PUMP IN THE AMOUNT OF $19,634.08. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYEITEVILLE, ARKANSAS: Section 1. That the Board of Directors hereby awards Bid No. 92-37, Items a and e and authorizes the Mayor and City Clerk to execute a contract with Instrument and Supply Company for Item a, in the amount of $39,076.64 for a duplex bubbler control system and level control system used to control lift station pumps, and with A. W. Chesterton for Item e, in the amount $19,634.08 for a sludge transfer pump. A copy of the contracts and bid tabulation for execution are attached hereto and made a part hereof. PASSED AND APPROVED this 15th day of September , 1992. ATTEST: By APPROVED: e By: Lowe e Mayo • i 1 430 1 4eP O 1 •• O GC o ID r; I-1 N N en 0 • C -)In In N „ 1 FFF N 8 F 1C V r1 m gcs i E NllO 0 Cl N N s tri ri .] si•O to O l y N N S C N e R O .A • r 8^r - CO 4 2fv c % CO G y W g 1y • r - 2y t13 9 L+ a3 Or -1 •-••1--1 �1: M O 10 0 pp CI S CI CV •Ci d m ra Rj G O �+ P o el 641 1Z -r o.ON SC 3 3 PC CV Cu GO FFF-1 p .-i a uy "•• p6� ym�� Q W� 6] F6 R O Iffl ci A O 2 O m co E. GOO GO GO ESCRIP 0 M 444N 3.23 • PROJECT g22 .til°,-,--1,,�-n,.t...0.i, 1 C 4{) g / tii(,0.. (,.(lr2) / `I._3 CITY OF FAYE FEVI E r CONTRACT/LEASE REVIEW • / / / L Federal Grant #3-05-0020-14 Lighting/Fencing/Generator Project Dale Frederick Airport NAME/YRUJtt:I MANAUEKOrdersD3 IVISI1 & N N/vtt'AK 1 Mt1 Change Please review the atthed contract/lease between City of Fayetteville and McClelland Consulting Engineers • di:SA-k Urate ts t•inance Director 4 • •14A Rud a 'nordunntor Comments a e Comments bate Comments aKGoA3T 41c.cQcn -Vivo-782o 14 tilde Comments ate Comments 1 PLEASE RETURN TO THE PROJECT MANAGER OR DESIGNATED PERSON WHEN THE REVIEW PROCEDURE HAS BEEN COMPLETED. Items necessary to complete the attached letter of concurrence f dbmplete the work enumerated in memo to the FAA requesting their eat roject are included in these change orders (see om the FAA). Sufficient funds are available to hese change orders (for more detail, see attached teview. LOAPE-- Ccftt— ot2f- A442. daVi • .x21—flier)/ • ' ipo(tafl 7n rederal Aviation Administration £J'=. 0 91992 ''r. .,_`e Frederick A. iL Port :tanager ;`i ty of 'ayettevil le 113 €st mountain 1•Ayetteville. AR 72701 M:. Frederick: s^u7.1,ve,,t Regi.. MkanSas.L -u Van:Jgxc;• Texas FDr 0, reference your letter dated July 28, 1992, forwarri'_ra ;:der Nos. cne (1) and three (3) to the Security fence jh':inq contract under AIP Project No. 3-05-0020-14 .at ? eld, Fayetteville, Arkansas. ri_°.iewed the proposed change orders and they are o';:r, in the amount of $2,470.80 and $935.18 respecti‘el, r7j::rova1 is subject to the availability of Federal i n•Jt be construed to obligate the United States tc in the cost of any work not eligible for _e1 r Lp'Ation under this project, but included in the N oi— h3 n;i., orders. r and copies of the executed ch re orders to ur files. ay questions or we may be of fursery .Lot hesitate to call at any time. et •. J. Betsiil inager R. W.t'; nc, ,;:es, Y.E. -pct r:an_ cal l a i lting Fnginr, , inc. 72s . :229 ..;ETfRFR WE SUCCEED - r FAYETTEVILLE THE CITY OF FAVETTEVILLE. ARKANSAS AIRPORT DIVISION July 28, 1992 Mr. Randy Betsill Project Engineer Arkansas Development Office Federal Aviation Administration Fort Worth, Texas 76193-0630 Re: Lighting/Fencing/Generator Project - AIP 3-05-0020-14 Dear Mr. Betsill: The City of Fayetteville Airport is in the process of completing the "punch -list" items identified during the final inspection which was conducted on the above referenced project. As we discussed during your trip to Fayetteville after the final inspection, several acts of "vandalism" have occurred on the commercial terminal ramp during the last 5 months. Currently these incidents are under investigation by the FBI, however, we would like to do everything in our power to add "additional barriers" to our ramp access. The completion of the majority of the outriggers on the existing perimeter fence would aid in this endeavor. The price per foot is the same quoted in the original contract. I have also enclosed for your review, a change order for additional electrical work which was necessary to relocate the placement and provide for installation of two light poles, this was requested by a utility company with existing poles in that area. The engineers letter requesting approval of this office has also been included for your review. Sufficient funds remain in the project to cover the cost of the enclosed change orders. The fencing change order will provide identical outriggers to those already installed in this project. I apologize for the electrical change order and understand if your participation is not possible. Sincerely, Dale F?ederick Airport Manager cc: Wayne Jones, MCE Enclosures: per letter 113 WEST MOUNTAIN 72701 501 S21-17110 • OWNER: PROJECT: City of Fayetteville 113 W. Mountain Street Fayetteville, Arkansas Security Fence & Lighting Improvements, Drake Field Fayetteville, Arkansas CONTRACTOR: Mobley Contractors, Inc. P.O. Box 150 Morrilton, AR 72110 Change Order No. 1 AIP 3-05-0020-14 Date: 6-4-92 Project No. FY892158 Contract Date: 9-6-91 The following Changes to the Contract are hereby ordered: 1. Relocate five light poles along Ernest Lancaster Drive from the east and north side to the west and south side of the road. These relocations were necessary due to SWEPCO 's decision to not allow the poles as close to the power line as previously discussed with SWEPCO and as shown on the plans. The relocation includes 145 feet of additional 1; -inch conduit and 3 conductor wiring; 45 feet of additional trenching and backfill; excavation and backfill of ends of existing encased duct at three road crossings; and labor time to install the additional conduit and wiring. Increase the unit price of Item No. II -10 Access Road Lights by $49.22 each to a unit price of $1,947.11 each for a total increase of $935.18. Add $935.18 Original Contract Amount Previous Change Order Amount Previous Supplement Agreement Amounts Change Order Will Increase Contract Amount By $149,106.12 0.00 73,894.60 935.18 Revised Contract Amount $223,935.90 • • • • -2- The Contract Time will be increased by 0 calendar days. Contract Time: 90 calendar days. CONTRACTOR: Mobley Contractors, Inc. By: %%J (:e7- 2 2-yz Signature / Date ENGINEER: McClelland Consultj. g Engineer A Inc. By: OWNER: City of Fayetteville By: D e OWNER: PROJECT: • City of Fayetteville 113 W. Mountain Street Fayetteville, Arkansas Security Fence & Lighting Improvements, Drake Field Fayetteville, Arkansas CONTRACTOR: Mobley Contractors, Inc. P.O. Box 150 Morrilton, AR 72110 The Change Order No. 3 AIP 3-05-0020-14 Date: 7-17-92 Project No. FY892158 Contract Date: 9-6-91 following Changes to the Contract are hereby ordered: 1. The City and Airport Management desire to have three strands of barbed wire added to all 5 -foot chain link fence to enhance airport security. The 5 -foot chain link fence modification quantity.. for Item No. II -5 is increased to that required to complete the barbed wire addition to all 5 -foot chain link fence. Add 1420 ft. @ $1.74/foot $ 2,470.80 Original Contract Amount Previous Change Order Amounts Previous Supplement Agreement Amounts Change Will Increase Contract Amount By Revised Contract Amount The Contract Time will be increased by 21 Contract Time: 111 calendar days. CONTRACTOR: Mobley Contractors, Inc. By: Signature Ire ENGINEER: McClelland Consult iNq Engineers, Ra By: OWNER: City of Fayetteville By: $149,106.12 0.00 49,978.90 2.470.80 $226,406.70 calendar days. 7-27_9Z- Date -ZZ9LDate 7 -47.97 - Date y��1y 2 D t