HomeMy WebLinkAbout141-92 RESOLUTIONRESOLUTION MO. 141-92
A RESOLUTION AWARDING BID NO. 92-37, ITEM A TO
INSTRUMENT AND SUPPLY COMPANY AND BID NO. 92-
37, ITEM E TO A.W. CHESTERTON AND AUTHORIZING
THE MAYOR AND CITY CLERK TO EXECUTE CONTRACTS
FOR ITEM A TO INSTRUMENT AND SUPPLY COMPANY IN
THE AMOUNT OF $39,076.64 FOR A DUPLEX BUBBLER
CONTROL SYSTEM AND LEVEL CONTROL SYSTEM USED
TO CONTROL LIFT STATION PUMPS AND FOR ITEM E
TO A.W. CHESTERTON FOR A SLUDGE TRANSFER PUMP
IN THE AMOUNT OF $19,634.08.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF
FAYEITEVILLE, ARKANSAS:
Section 1. That the Board of Directors hereby awards Bid
No. 92-37, Items a and e and authorizes the Mayor and City Clerk to
execute a contract with Instrument and Supply Company for Item a,
in the amount of $39,076.64 for a duplex bubbler control system and
level control system used to control lift station pumps, and with
A. W. Chesterton for Item e, in the amount $19,634.08 for a sludge
transfer pump. A copy of the contracts and bid tabulation for
execution are attached hereto and made a part hereof.
PASSED AND APPROVED this 15th day of September , 1992.
ATTEST:
By
APPROVED:
e
By:
Lowe e
Mayo
•
i
1 430
1 4eP O
1 •• O
GC o
ID
r;
I-1 N N
en 0
•
C -)In
In
N „ 1
FFF N
8
F
1C
V
r1 m
gcs
i E
NllO
0 Cl N
N s tri ri
.] si•O to
O l
y N N
S C N e R O
.A • r 8^r -
CO 4
2fv c % CO
G y
W g 1y •
r - 2y t13 9
L+ a3
Or -1 •-••1--1 �1: M
O 10 0 pp
CI S CI CV •Ci d m ra
Rj
G O �+ P o el 641
1Z -r o.ON SC
3 3 PC CV Cu
GO FFF-1 p .-i a
uy "•• p6� ym�� Q W�
6] F6 R O Iffl
ci
A O
2 O m co E. GOO GO GO
ESCRIP
0
M
444N
3.23
•
PROJECT
g22 .til°,-,--1,,�-n,.t...0.i, 1
C
4{) g /
tii(,0.. (,.(lr2) / `I._3
CITY OF FAYE FEVI E r
CONTRACT/LEASE REVIEW • / / / L
Federal Grant #3-05-0020-14 Lighting/Fencing/Generator Project
Dale Frederick
Airport
NAME/YRUJtt:I MANAUEKOrdersD3
IVISI1 & N N/vtt'AK 1 Mt1
Change Please review the atthed contract/lease between City of Fayetteville
and
McClelland Consulting Engineers
•
di:SA-k Urate
ts
t•inance Director
4 • •14A
Rud a 'nordunntor
Comments
a e Comments
bate Comments
aKGoA3T 41c.cQcn -Vivo-782o 14
tilde
Comments
ate Comments
1
PLEASE RETURN TO THE PROJECT MANAGER OR DESIGNATED PERSON
WHEN THE REVIEW PROCEDURE HAS BEEN COMPLETED.
Items necessary to complete the
attached letter of concurrence f
dbmplete the work enumerated in
memo to the FAA requesting their
eat
roject are included in these change orders (see
om the FAA). Sufficient funds are available to
hese change orders (for more detail, see attached
teview.
LOAPE-- Ccftt— ot2f- A442.
daVi
•
.x21—flier)/
• ' ipo(tafl 7n
rederal Aviation
Administration
£J'=. 0 91992
''r. .,_`e Frederick
A. iL Port :tanager
;`i ty of 'ayettevil le
113 €st mountain
1•Ayetteville. AR 72701
M:. Frederick:
s^u7.1,ve,,t Regi..
MkanSas.L -u
Van:Jgxc;•
Texas
FDr 0,
reference your letter dated July 28, 1992, forwarri'_ra
;:der Nos. cne (1) and three (3) to the Security fence
jh':inq contract under AIP Project No. 3-05-0020-14 .at
? eld, Fayetteville, Arkansas.
ri_°.iewed the proposed change orders and they are
o';:r, in the amount of $2,470.80 and $935.18 respecti‘el,
r7j::rova1 is subject to the availability of Federal i
n•Jt be construed to obligate the United States tc
in the cost of any work not eligible for _e1
r Lp'Ation under this project, but included in the N oi—
h3 n;i., orders.
r and copies of the executed ch re orders to
ur
files.
ay questions or we may be of fursery
.Lot hesitate to call at any time.
et •.
J. Betsiil
inager
R. W.t'; nc, ,;:es, Y.E.
-pct r:an_
cal l a i
lting Fnginr, , inc.
72s . :229
..;ETfRFR WE SUCCEED -
r
FAYETTEVILLE
THE CITY OF FAVETTEVILLE. ARKANSAS
AIRPORT DIVISION
July 28, 1992
Mr. Randy Betsill
Project Engineer
Arkansas Development Office
Federal Aviation Administration
Fort Worth, Texas 76193-0630
Re: Lighting/Fencing/Generator Project - AIP 3-05-0020-14
Dear Mr. Betsill:
The City of Fayetteville Airport is in the process of completing the
"punch -list" items identified during the final inspection which was
conducted on the above referenced project.
As we discussed during your trip to Fayetteville after the final
inspection, several acts of "vandalism" have occurred on the commercial
terminal ramp during the last 5 months.
Currently these incidents are under investigation by the FBI, however, we
would like to do everything in our power to add "additional barriers" to
our ramp access. The completion of the majority of the outriggers on the
existing perimeter fence would aid in this endeavor. The price per foot is
the same quoted in the original contract.
I have also enclosed for your review, a change order for additional
electrical work which was necessary to relocate the placement and provide
for installation of two light poles, this was requested by a utility
company with existing poles in that area. The engineers letter requesting
approval of this office has also been included for your review.
Sufficient funds remain in the project to cover the cost of the enclosed
change orders. The fencing change order will provide identical outriggers
to those already installed in this project.
I apologize for the electrical change order and understand if your
participation is not possible.
Sincerely,
Dale F?ederick
Airport Manager
cc: Wayne Jones, MCE
Enclosures: per letter
113 WEST MOUNTAIN 72701 501 S21-17110
•
OWNER:
PROJECT:
City of Fayetteville
113 W. Mountain Street
Fayetteville, Arkansas
Security Fence & Lighting
Improvements, Drake Field
Fayetteville, Arkansas
CONTRACTOR: Mobley Contractors, Inc.
P.O. Box 150
Morrilton, AR 72110
Change Order No. 1
AIP 3-05-0020-14
Date: 6-4-92
Project No. FY892158
Contract Date: 9-6-91
The following Changes to the Contract are hereby ordered:
1. Relocate five light poles along Ernest Lancaster Drive
from the east and north side to the west and south side
of the road. These relocations were necessary due to
SWEPCO 's decision to not allow the poles as close to the
power line as previously discussed with SWEPCO and as
shown on the plans. The relocation includes 145 feet of
additional 1; -inch conduit and 3 conductor wiring; 45
feet of additional trenching and backfill; excavation and
backfill of ends of existing encased duct at three road
crossings; and labor time to install the additional
conduit and wiring. Increase the unit price of Item No.
II -10 Access Road Lights by $49.22 each to a unit price
of $1,947.11 each for a total increase of $935.18.
Add $935.18
Original Contract Amount
Previous Change Order Amount
Previous Supplement Agreement Amounts
Change Order Will Increase Contract
Amount By
$149,106.12
0.00
73,894.60
935.18
Revised Contract Amount $223,935.90
•
•
•
•
-2-
The Contract Time will be increased by 0 calendar days.
Contract Time: 90 calendar days.
CONTRACTOR:
Mobley Contractors, Inc.
By:
%%J (:e7- 2 2-yz
Signature / Date
ENGINEER:
McClelland Consultj. g Engineer A Inc.
By:
OWNER:
City of Fayetteville
By:
D e
OWNER:
PROJECT:
•
City of Fayetteville
113 W. Mountain Street
Fayetteville, Arkansas
Security Fence & Lighting
Improvements, Drake Field
Fayetteville, Arkansas
CONTRACTOR: Mobley Contractors, Inc.
P.O. Box 150
Morrilton, AR 72110
The
Change Order No. 3
AIP 3-05-0020-14
Date: 7-17-92
Project No. FY892158
Contract Date: 9-6-91
following Changes to the Contract are hereby ordered:
1. The City and Airport Management desire to have three
strands of barbed wire added to all 5 -foot chain link
fence to enhance airport security. The 5 -foot chain link
fence modification quantity.. for Item No. II -5 is
increased to that required to complete the barbed wire
addition to all 5 -foot chain link fence.
Add 1420 ft. @ $1.74/foot $ 2,470.80
Original Contract Amount
Previous Change Order Amounts
Previous Supplement Agreement Amounts
Change Will Increase Contract Amount By
Revised Contract Amount
The Contract Time will be increased by 21
Contract Time: 111 calendar days.
CONTRACTOR:
Mobley Contractors, Inc.
By:
Signature
Ire
ENGINEER:
McClelland Consult
iNq Engineers,
Ra
By:
OWNER:
City of Fayetteville
By:
$149,106.12
0.00
49,978.90
2.470.80
$226,406.70
calendar days.
7-27_9Z-
Date
-ZZ9LDate
7 -47.97 -
Date
y��1y 2
D t