HomeMy WebLinkAbout96-91 RESOLUTIONRESOLUTION NO. 96-91 A RESOLUTION APPROVING A CONTRACT WITH MCCLELLAND ENGINEERS IN WORK RELATED TO THE CONSTRUCTION OF THE SOUTH PART OF THE 36 INCH WATER LINE, STORAGE TANKS AND RELATED SYSTEM TIE-INS. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the Mayor and City Clerk are hereby authorized and directed to execute a Task Orders No. 1 & 2 in the amount of $741,577.00 with McClelland Engineers for engineering work related to the construction of the south part of the 36 inch water line, storage tanks, and related system tie-ins. A copy of the contract authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. r ` s f PASSED AND APPROVED this 21st day. of May , 1991. k I 1 • ' ldtf Z ATTEST: • rBy• City C erk :ig . "• ' S- • t ... APPROVED: ByL- Mayor' . .a LOWELL. `1 Beam litter �,4`reatmant went. EAST ROUTE SPRINGDALE US. 412 F ti U.A412 6" MT. COMPORT RD. 24' TIE MWY. to %EST 24' 7TE WKS T d 3 COSMO SURSE; TAMS LOCUM • CIPANIL I MIM Wila crania' USW. TANK LEGEND N i MOM STREET - MIRROR 157? ROTOR OROS - Macs 1671? • wawa 41. - =mow 1575' 4 PROM'S ICU TAMQ - MENLO, 1S FAYETTEVILLE 2r PIPE LEGEND OWING ( sm saw PROPOS® ROUTE SCHEMATIC DIAGRAM OF THE PROPOSED ROUTE FIGURE NO. 1 TASK ORDER NO. 1 GEOTECHNICAL INVESTIGATIVE, SURVEYING, DETAILED DESIGN, AND SERVICES DURING CONSTRUCTION, FOR WATER STORAGE. FACILITIES This Task Order is hereby made a part of the Basic Agreement executed November 6, 1990, between McCLELLAND CONSULTING ENGINEERS, INC. (ENGINEER) and the CITY OF FAYETTEVILLE (OWNER) in accordance with the provisions of that Agreement. ARTICLE 1 • The OWNER has determined that major improvements to its water system will be required in order to meet the long term needs of its users. .The OWNER has determined' that additional storage and distribution lines are required at this time. Studies completed by another engineer indicate that these improvements should include 12 million gallons of additional storage capacity on South Mountain and approximately 400 linear feet of conveyance piping and valving in the immediate vicinity of the water storage site. The scope of services shall include consideration of site preparation, sodding/seeding, an access roadway, tank foundations, fencing, control building, remote terminal for the City's SCADA system, and related electrical improvements. Surveys for site acquisition are also included. - Additionally, in order to "connect" the new storage facilities to a main loop within the distribution system, approximately 10,600 LF of new piping (24", 30", and 36"), valves, fittings, etc, must be installed, as well as an altitude valve on the existing Markham Hill Storage Tank. The ENGINEER will provide the following services necessary to complete the detailed design, obtain agency approval, bid, and provide engineering services during construction of the necessary improvements. o Field surveys (alignment, profile at critical locations, and boundary). o Roadway surveys (1,300 LF, approx.; assumes use of a private drive for a significant distance). o Geotechnical investigations (clearing by bulldozer, if required for access, to be provided at OWNER's expense). o Preparation of detailed Plans and Specifications. o Agency approval of Plans and Specifications. o Advertising for and receiving bids (Plans and Specifications to be sold at ENGINEER's cost). o Bid evaluation and recommendation. o Pre -construction meeting assistance. o Observation of construction for compliance with Plans and Detailed Specifications. o Review of Shop Drawings. o Preparation of Change Orders. o Preparation of Monthly Pay Estimates for work completed. o Preparation of Record Drawings. o Final review of work and recommendations for acceptance. o Preparation of legal descriptions/plats for land acquisition, right of way, and/or easements (25' wide). ARTICLE 2 The compensation to the ENGINEER for services rendered is to be provided as follows: o Geotechnical investigation - $ 3,800 lump sum o Boundary and easement surveys, and "preparation of legal descriptions and plats - $ 9,670 lump sum o Alignment, profile, topograhic, and roadway surveys - $ 10,190 lump sum o Detailed design phase $162,827 lump sum o Construction observation - * Cost + Fixed Fee of $14,162. o Based upon a 34 -week construction period for the tank construction contract and 22 -week period for distribution line contract, the "cost plus fixed fee" is anticipated to be approximately $132,000. The Engineer's costs are to be based upon hourly cost rates shown in Exhibit A and the overhead factors shown in Exhibit B. ARTICLE 3 The ENGINEER shall endeavor to complete the detailed design phase of the work by October 1, 1991, in an effort to allow the completion of construction by mid -summer 1992. • ARTICLE 5 • IN WITNESS, WHEREOF, the parties hereto each herewith subscribe the same in triplicate. ixzre!rrri ^•a r J att ;r o "$: q»' ' v,. FOR "E O� JF XETTEVILLE, ARKANSAS Dated this 0-1S0 ^ 1I` .. tdld%�/cCI(/ (Title) day of , 1991 FOR McCLEL D CONSU G ENGINEERS, INC. e) (Title) Dated this day of(:),wn.C, , 1991 • • • r { • • t EXHIBIT A HOURLY RATE SCHEDULE` July 1, 1990 T 't Principal Engineer $82.22 Project Manager/Senior Engineer $62.90 Structural. Engineer , $57.42 Civil Engineer $42.28 Senior Engineering Technician $36.54 Construction Observer $36.54 Chief Draftsman/Designer Senior Draftsman Junior Draftsman CADD Station Survey Crew (2 -Man) Survey Crew.(3-Man) Soils Lab Supervisor Soils Lab Technician Water Lab Supervisor Water Lab Technician $41.76 $31.58 $17.88 $20.36 $50.25 $66.56 $35.63 $23.49 $32.23 $22.19 Clerical Support $24.23 Hourly rates are subject to adjustment on an annual basis, beginning July 1 of the calendar year. EXHIBIT B McCLELLANO CONSULTING ENGINEERS, INC. WORKSHEET FOR SUPPLEMENTAL SCHEDULE OF COSTS BY NATURAL EXPENSE CLASSIFICATION FOR THE YEAR ENDED D ECEMBER 31, 1990. D ESCRIPTION D IRECT LABOR P rincipals Employees TOTAL DIRECT LABOR TOTAL COSTS PER INCOME STMT 157,266.10 847,186.12 1,004.452.22 INDIRECT LABOR Management 402,363.06 Gen. Office -Employees 203,890.07 Vacation 50,459.48 Sick Leave 17,730.62 Holidays 31,528.56 P roposals 20,038.14 B usiness Development 54,247.12 P rofessional Development 25,258.78 In -House Service 22,004.82 Correction Work 960.24 TOTAL INDIRECT LABOR OTHER INDIRECT EXPENSES Payroll Taxes Insurance P rofit Sharing 828,480.89 138,902.47 86,504.97 50,000.00 TOTAL OTHER INDIR. EXP. 275,407.44 GENERAL EXPENSES Advertising -Company Auto Expense Computer Expense Contributions Depreciation S ubscriptions Publications P rofessional Dues Non -Professional Dues Entertainment Copy Machine Rental Insurance 4,811.97 42,007.47 2.2,633.40 5,955.84 79,473.83 1,725.40 971.16 8,255.85 2,450.00 801.63 18,857.91 62,408.52 ALLOWABLE DIRECT EXPENSE 157,266.10 847,186.12 1,004,452.22 ALLOWABLE INDIRECT EXPENSE 402,363.06 203,890.07 50,459.48 17,730.62 31,528.56 20,038.14 27,123.56 25,258.78 22,004.82 960.24 801,357.33 138,902.47 86,504.97 50,000.00 275,407.44 42,007.47 22,633.40 79,473.83 1,380.32 776.93 8,255.85 18,857.91 62,408.52 McCLELLAND CONSULTING ENGINEERS, INC. WORKSHEET FOR SUPPLEMENTAL SCHEDULE OF COSTS BY NATURAL EXPENSE CLASSIFICATION FOR THE YEAR ENDED DECEMBER 31, 1990. DESCRIPTION Interest Miscellaneous Expense Office Supplies Officer's Life Ins. Postage & Freight P rofessional Devel. B usiness Devel. P rofessional Fees Rent .Repairs & Maint. Supplies Taxes & Licenses State Income Tax Federal Income Tax Travel Telephone U tilities TOTAL COSTS PER INCOME STMT 48,571.95 2,133.39 31,664.91 20,836.65 10,981.28 12,535.63 5,022.20 8,308.64 116,840.00 27,095.19 79,396.31 6,876.33 2,853.00 32,427.00 21,259.62 25,612.83 28,692.26 TOTAL GENERAL EXPENSES 731,660.17 ALLOWABLE DIRECT EXPENSE 19,133.66 ALLOWABLE INDIRECT EXPENSE 2,133.39 31,864.91 10,981.28 12,535.63 8,308.64 93,472.00 27,095.19 79;396.31 6,876.33 2,853.00 2,125.96 25,612.83 28,692.26 19,133.66 567,741.96 GRAND TOTAL EXPENSES 2,840,000.72 1,023,585.88 1,644,506.73 TOTAL ALLOWABLE INDIRECT EXPENSES 1,644.566.73 = 1.61 TOTAL ALLOWABLE DIRECT EXPENSES 1,023,585.88 RECONCILIATION TO FINANCIAL STATEMENT; Total Operating Expenses Add: Federal Income Tax O fficer's Life Ins. L imit on Meals Contribution Carryover Less:Reimb. Expenses TOTAL EXPENSES 3,205,342.35 32,427.00 20,836.65 2,453.00 2,536.00 (423,594.28) 2,840,000.72 McClelland Consulting Engineers, Inc., 900 West Markham, Little Rock, Arkansas 72201 Certified as correct data from the Books of Account of the Corporation. E. Elwood Bell, Accountant for the Company, March 8, 1991 • TASK ORDER NO. 2 SURVEYING, DETAILED DESIGN AND SERVICES DURING CONSTRUCTION OF WATER TRANSMISSION AND DISTRIBUTION LINES This Task Order is executed November 6, INC. (ENGINEER) and. with the provisions ARTICLE 1 hereby made a part of 1990, between McCLELLAND the'CITY OF FAYETTEVILLE of that Agreement. The OWNER has determined that major improvements to its water system will be required in order to meet the long term (20 years) needs of its users. The OWNER has determined' that additional distribution lines are required at this time, west and south of the intersection of Highway 471 and Joyce Street, and that the ENGINEER is to provide services related to the installation of approximately 37,450 linear feet of 36 -inch, and approximately 6,600 linear feet of 8 -inch pipelines. The ENGINEER will provide the following services necessary to complete the detailed design, obtain agency approval, bid, and provide engineering services during construction of the necessary improvements. o Field surveys (alignment, profile at critical locations, boundary). o Preparation of detailed Plans and Specifications. o Agency approval of Plans and Specifications. o Advertising for and receiving bids (Plans and Specifications to be sold at ENGINEER's cost). o Bid evaluation and recommendation. o Pre -construction meeting assistance. o Observation of construction for compliance with Plans and Detailed Specifications. o Review of Shop Drawings. o Preparation of Change Orders. o Preparation of Monthly Pay Estimates for work completed. o Preparation of Record Drawings. o Final review of work and recommendations for acceptance. o Preparation of plats/legal descriptions for easements (25' wide). the Basic Agreement CONSULTING ENGINEERS, (OWNER) in accordance • • ARTICLE 2 The compensation for services to be provided as follows: o Alignment and profile surveys - $ 22,800 lump sum • o Boundary and easement surveys and preparation of legal descriptions and plats o Design phase'` - $ 45,020 lump sum - $196,270 lump sum o Construction observation - * Cost + Fixed Fee of $ 17,068 o Based upon a 32 week construction period, the "cost plus fixed fee" is anticipated to be approximately $159,000. The ENGINEER's costs are to be based upon hourly cost rates shown in Exhibit A and the overhead factors shown in Exhibit B. ARTICLE 3 The ENGINEER shall endeavor to complete the detailed design phase of the project by November 30, 1991. ARTICLE 5 IN WITNESS, WHEREOF, the parties hereto each herewith subscribe the same in triplicate. -cvcxddia FOR TH ITY_ QEF By: v PG Name)" Dated this 7EVILLE, ARKANSAS (Title) day of , 1991 FOR MCCLELLP)"ND CO S ENGINEERS,, INC. By: �� . ivv� l / (W Y t P. me) 2 (Title) Dated this J day of , 1991 • • • EXHIBIT A HOURLY RATE SCHEDULE. July 1, 1990 Principal Engineer Project Manager/Senior Engineer Structural Engineer Civil Engineer Senior Engineering Technician Construction Observer Chief Draftsman/Designer Senior Draftsman Junior Draftsman CADD Station Survey Crew (2 -Man) Survey Crew (3 -Man) Soils Lab Supervisor Soils Lab Technician Water Lab Supervisor Water Lab Technician Clerical Support • Hourly rates are subject to adjustment beginning July 1 of the calendar year. $82.22 $62.90 $57.42 $42.28 $36.54 $36.54 $41.76 $31.58 $17.88 $20.36 $50.25 $66.56 $35.63 $23.49 $32.23 $22.19 • •, $24.23 s on an -annual basis, EXHIBIT B McCLELLAND CONSULTING ENGINEERS, INC. WORKSHEET FOR SUPPLEMENTAL SCHEDULE OF COSTS BY NATURAL EXPENSE CLASSIFICATION FOR THE YEAR ENDED D ECEMBER 31, 1990. DESCRIPTION DIRECT LABOR P rincipals Employees TOTAL DIRECT LABOR TOTAL COSTS PER INCOME STMT 157,266.10 847,186.12 1,004.452.22 INDIRECT LABOR Management Gen. Office -Employees ✓ acation Sick Leave Holidays P roposals B usiness Development P rofessional Development In -House Service Correction Work TOTAL INDIRECT LABOR OTHER INDIRECT EXPENSES Payroll Taxes Insurance P rofit Sharing 402,363.06 203,890.07 50,459.48 17,730.62 31,528.56 20,038.14 54,247.12 25,258.78 22,004.82 960.24 828,480.89 138,902.47 86,504.97 50,000.00 TOTAL OTHER INDIR. EXP. 275,407.44 GENERAL EXPENSES Advertising -Company Auto Expense Computer Expense Contributions Depreciation S ubscriptions Publications P rofessional Dues Non -Professional Dues E ntertainment Copy Machine Rental Insurance 4,811.97 42,007.47 22,633.40 5,955.84 79,473.83 1,725.40 971.16 8,255.85 2,450.00 801.63 18,857.91 62,408.52 ALLOWABLE DIRECT EXPENSE 157,266.10 847,186.12 1,004,452.22 ALLOWABLE INDIRECT EXPENSE 402,363.06 203,890.07 50,459.48 17,730.62 31,528.56 20,038.14 27,123.56 25,258.78 22,004.82 960.24 801,357.33 138,902.47 86,504.97 50,000.00 275,407.44 42,007.47 22,633.40 79,473.83 1,380.32 776.93 8,255.85 18,857.91 62,408.52 • McCLELLAND CONSULTING ENGINEERS, INC, WORKSHEET FOR SUPPLEMENTAL SCHEDULE OF COSTS BY NATURAL EXPENSE CLASSIFICATION FOR THE YEAR ENDED DECEMBER 31, 1990. DESCRIPTION Interest Miscellaneous Expense Office Supplies Officer'sOfficer's Life Ins. Postage & Freight Professional Devel. Business Devel. Professional Fees Rent Repairs & Maint. Supplies Taxes & Licenses State Income Tax Federal Income Tax Travel Telephone Utilities TOTAL COSTS PER INCOME STMT 48,571.95 2,133.39 31,864.91 20,836.65 10,981.28 12,535.63 5,022.20 8,308.64 116,840.00 27,095.19 79,396.31 6,876.33 2,853.00 32,427.00 21,259.62 25,612.83 28,692.26 TOTAL GENERAL EXPENSES 731,660.17 ALLOWABLE DIRECT EXPENSE 19,133.66 ALLOWABLE INDIRECT EXPENSE 2,133.39 31,864.91 10,981.28 12,535.63 8,308.64 93,472.00 27,095.19 79,396.31 6,876.33 2,853.00 2,125.96 25,612.83 28,692.26 19,133.66 567,741.96 GRAND TOTAL EXPENSES 2,840,000.72 1,023,585.88 1,644,506.73 TOTAL ALLOWABLE INDIRECT EXPENSES 1,644.566.73 = 1.61 TOTAL ALLOWABLE DIRECT EXPENSES 1,023,585.88 RECONCILIATION TO FINANCIAL STATEMENT; Total Operating Expenses, Add: Federal Income Tax Officer's Life Ins. Limit on Meals Contribution Carryover Less:Reimb. Expenses TOTAL EXPENSES 3,205,342.35 32,427.00 20,836.65 2,453.00 2,536.00 (423,594.28) 2,840,000.72 McClelland Consulting Engineers, Inc., 900 West Markham, Little Rock, Arkansas 72201 Certified as correct data from the Books of Account of the Corporation. E. Elwood Bell, Accountant for the Company, March 8, 1991 MICR SRIME STAFF REVIEW FORM AGENDA REQUEST X CONTRACT REVIEW GRANT REVIEW 'F'or Mayor'-s-approva1 and—signature: FROM: Sid Norbash Name Division ACTION REQUIRED: (1) Approval of the Task Order # 3, a change order to the Engineering contract with McClelland for the 36" water line project. Also a change order to the construction contract with HMG, Inc., to accommodate a request made by National Lumber Co, to relocate the proposed 36" w/1 at No cost to City. (2) Approval of change order #4 to the Engineering contract with McClelland for extra work caused by the construction of Wal Mart Super Center. Enaineerina EnI6-10EE1211JG- TASK oRt.ffi2 4'3 CHANIC,E OI2bE1? 'I GNange;-- O17bE/2*g- MCCLELLAn117 C.. CON) TRACY HMG- COtJT1k7ACT 3-27-q5 Public Works Department COST TO CITY: $1,252.96 Cost of this Request 5400-5600-5808-00 Account Number 90007-2010 Project Number ' -$7,151;733:.00 36" Water Line Category/Project Budget _ $.6T796 950.00 Funds Used To Date .7 354';783.00 Remaining Balance SU GE REVIEW: X Budgeted Item Budget Coordinator CONTRACT/GRANT/LEASE REVIEW: z4i . .41..- cam✓ Acco. tip":- M.! ager 7 A4<C At rney Purchasing Officer STAFF ECOMMENDATION: Approval c 3/695 Date Category/Project Name Capital Water Mains Impvts. Program Name W & S Fund Budget Adjustment Attached Administrative Services Director GRANTING AGENCY: Coordinate Date Date Int Date of the U vision C 4.�p epa.tment erector Head EcCA Administr tiveervices Director Mayor 3fro/sem Date Date 3 9s Date Date nal Auditor change orders Cross Reference Date New Item: Yes_ Noj Prev Ord/Res #: Orifi Contract Date: FAYETTEVILLE • THE CITY OF FAYETTEVILLE, ARKANSAS • DEPARTMENTAL CORRESPONDENCE To: Thru: • Fred Hanna, Mayor Charlse Venable, Assistant PWD OLJ Don Bunn, City Engineer From: Sid Norbash, Staff Engineer Date: March 13, 1995 Re: 36" Water Line Project (1) National Lumber: Task Order #3 & Construction Change Order #1 (2) Task Order #4 • In reference to the above project, attached you will find three separate documents for approval. (1) National Lumber Co. has requested a portion of our proposed 36" water main be re-routed on their property located in the vicinity of 6th Street and 71 Bypass, to accommodate the construction of their new store. National Lumber is paying for the Engineering and Construction of all the changes involved. Attached you will find a copy of the check in the amount of $43,500.00. This amount will pay for the Task Order #3, and the construction change order #1 with Kraus Construction Co. (2) When Wal Mart Super Center was constructed on 6th Street, some changes were made that involved the traffic lights as well as other physical changes. The result was that the 36" water line had to be adjusted to accommodate these changes, resulting in extra engineering expenses. We are requesting approval of this Task Order, in the amount. of $1,252.96.7'.+ THE CITY OF FAYETTEVILLE, ARKANSAS January 16, 1995 Mr. Tom Hopper, P.E. Crafton, Tull & Associates P.O. Drawer 549 Rogers, AR 72756 Re: National Home Center Future Site / 71 Bypass and 6th Street 24" Water Main Relocation Dear Tom : Per your request on behalf of National Home Center, we have asked McClelland Consulting Engineers to modify the design of our 24" water main, in order to accommodate the future development by National Home Center. As a result, two change orders have to be executed for this work to be completed. An Engineering change order in the amount of $3,837.77, and a construction change order in the amount of $39,480.00. In order for us to proceed any further, we need a check from National Home Center in the amount of $43,500.00 for deposit on this project. National Home Center will understand and agree by submitting the check, that the figures shown here are only for the purpose of estimating, and the actual cost may vary. At the end of the construction period for this segment of our project, National Home Center will be billed for the actual cost. If the actual cost is less than $43,500.00, the City of Fayetteville will reimburse the balance, and if more, National Home Center will pay the balance due to the City. Utility easement for the new location of the water main shall be provided, free of charge, to the City of Fayetteville Your earliest attention to this matter will be appreciated, and if you have any questions please advise. Sid Norbash , Staff Engineer SN/sn Attachments: 2 113 WEST MOUNTAIN 72701 501-521-7700 FAX 501-575-8257 (La+iona1j jl • • 2 • amml CORPORATE MICE PO BOX ME SPRINGDALE, ARKANSAS 12754 PH. 1601) 714170E FIRST TENNFgQFP SANK KINGSPORT, TENNESSEE B7-BO4Ht2 NOME CENTERS, INC. DATE 2-07-95 PAY Forty Three Thousand Five Hundred Dollars and 00/100 TO THE ORDER OF City of Fayetteville Attn: Sid Norbash 113 West Mountain Fayetteville. AR VOID AFTER 90 DAYS PAID TO 36692 AMOUNT ***43,500.00*** 72701 ,;kyr. n°0366920 1:064 20804 21: 11160990 1711E City of Fayetteville REMITTANCE ADVICE DETAce AND RETAM THE ATTACHED CHECKS PAYMENT FOR ITEMS BELOW. IF ITEMS OR CHECK AMOUNT ARE INCORRECT, PLEASE ADVISE PROMPTLY. DATE - REFERENCE DESCRIPTION_. GROSS AMOUNT DEDUCTIONS - NET AMOUNT 2-07-95. 1-30-95 McClelland Consulting NATIONAL HOME CENTER, INC. 36692 SPRNGDALE ARKANSA572MS 43.500.00 43.500.00 TOTAL REMITTANCE 43;500.00 CHANGE ORDER Order No. Date: 1 December 6, 1994 Agreement Date September 20, 1994 NAME OF PROJECT: _ Fayetteville Water Main Interconnection Contract Section I OWNER: City of Fayetteville, Arkansas CONTRACTOR: HMG Inc, Greensboro, North Carolina The following changes are hereby made to the CONTRACT DOCUMENTS: Revise the water main route to accommodate construction at the National Home Center. See attached list and plans. Justification: Reroute needed to accommodate construction of a National Home Center. Change to CONTRACT PRICE: Original CONTRACT PRICE $ 1,515,703.00 Current CONTRACT PRICE adjusted by previous CHANGE ORDER$ 1,515,703.00 The CONTRACT PRICE due to this CHANGE ORDER will be (increased) ) by: $ 39,480.00 The new CONTRACT PRICE including this CHANGE ORDER will be $ 1,555,183.00 Change to CONTRACT TIME: The CONTRACT TIME will be (increased) (CIMMOME14 by 5 calendar days. The date for completion of all work will be June 3, 1995 (Date). Approvals Required: To be effective this Order must be approved by the Federal agency if it changes the scope or objective of the PROJECT, or as may otherwise be required by the SUPPLE -- MENTAL GENER L CONDITIONN/ Requested by: 4 O 4 IIMG Inc. ( � C Recommended by- — K/L�C-2.. McClelland Consulting Engineers, Inc&._ City of Fet vii e4Y/ OC) Ordered by: Accepted by: N/A Federal Agency Approval (where applicable) N/A CONTRACT DOCUMENTS FOR CONSTRUCTION OF Document No. 10 Change Order: Page 1 of 1 FEDERALLY ASSISTED WATER AND SEWER PROJECTS g m lag 91-1 ++ 0 - as W w a O 4- wo aau W E of z W N o w •rl W 4-1 w 's~ •.f }i 04-1 0 Z aO zol 0 H O E •rI 4-P zo 4-) N O 0 Difference Old Route H) w H 00000000 C OOClflrl NM w orirIOlnoIn 1 C 10 M10Nrl re) rlrl++++ I 1 + + roof CD al 4N—' w 0 0.0 41.0.0.0 �o 0rIr4r•0IrI o�����. 0 o • 000000 rf •• O U) 0 0 0 O 0 .... rl O Ul • • . • • 1p V'rINNNNN (?f?fh Vl(ht?V1Li 0OO000O06o 00 Ill In01C V'Oo I 00 10 HI N rI 0 M O Ul 1 + 1 + 1 -+ - N N + + 1 ro ro of row 14Wok. WXI ,C/ .o 0 0 0 rl HI HI O H00 •00 -.- 0 • HI • •00000000 x-000 • •0OO •0 0O001n • • • 0(0 C M r i M N N N N U l f? f? IA f? VR fh fft• th IA- Ilk of W 4 WSW 1 1 1 1 1 1 1 1 rlOr4 r1 O ri I/1 ri 1n CO JNroofofofroofrororoofroof 43 roofa1of wwwwwwwwwwwwwwwwwwl><,w OCN N ri rl N HI C4 0Ill O rI NNOrI N + + + ++ 1 1 1 + 1 + 1 + 1 ++ + I + www of al of al of of of of et of 4-1 wwwwwwwwwww ed of ro N of wwwwww N rl rl CD CD ONO N N O O O N N O O rl C 4.)rororoofroroofofof61ro4-1ofroroofof WW W WWW W W W W W W W ke Gti W W W W W N O O O 0 O N r4 N O N O N 111 O r4 O O O r I 01 10 ffi 00) N H rl CO 0 i TASK ORDER NO. 3 FY902103 REVISIONS TO PLANS AND SPECIFICATIONS, EASEMENTS, AND ADDITIONAL CONSTRUCTION OBSERVATION SERVICES TO ACCOMMODATE A NEW NATIONAL HOME CENTER This Task Order is hereby made a part of the Basic Agreement executed November 6, 1990, between McCLELLAND CONSULTING ENGINEERS, INC. (ENGINEER) and the CITY OF FAYETTEVILLE (OWNER) in accordance with the provisions of that Agreement. ARTICLE 1 The OWNER authorized the ENGINEER to design interconnecting water mains under Task Order No. 1, as executed June 3, 1991. These water mains were designed and ready for bidding and subsequent construction in 1992. Due to funding constraints, the bidding was delayed until 1994. Immediately prior to the bidding process, it became apparent that revisions to the previously approved line route were desired by National Home Center owners, so that a National Home Center building could be constructed at the location of the 24 -inch water main east of Highway 71. Subsequently, the OWNER has authorized the ENGINEER to complete the necessary revisions to the Plans, Specifications and Easements, and to provide other additional engineering services, including additional construction observation as necessary to reroute and lengthen the 24 -inch water main, to accommodate the desires of the National Home Center. ARTICLE 2 The compensation for these additional engineering shall be as follows: Revisions to Plans and Specifications Revisions to Easements Additional Project Administration Additional Construction Observation Total Additional Compensation ARTICLE 3 services $2,296.21 $ 441.56 $ 700.00 $ 400.00 $3,837.77 The Plans, Specifications and Easements have been revised, as necessary to accommodate project progress. The balance of the work shall be completed during the construction phase. n < ARTICLE 5 IN WITNESS WHEREOF, the parties hereto each herewith subscribe the same in triplicate. FOR THE CITY OF FAYETTEVILLE, ARKANSAS By: �. (Name) (Title) Dated this day of MatrcA , 1995 FOR McCLELLAND CONSULTING ENGINEERS, INC. By: /%c (Name) (Title) Dated this y day of J a-r+u+ , 1995 TASK ORDER NO. 4 FY902103 SURVEYING AND REVISIONS TO PLANS AND SPECIFICATIONS TO ACCOMMODATE THE RECENTLY COMPLETED HIGHWAY 62/FINGER ROAD INTERSECTION CONSTRUCTION This Task Order is hereby made a part of the Basic Agreement executed November 6, 1990, between McCLELLAND CONSULTING ENGINEERS, INC. (ENGINEER) and the CITY OF FAYETTEVILLE (OWNER) in accordance with the provisions of that Agreement. ARTICLE 1 The OWNER authorized the ENGINEER to design interconnecting water mains under Task Order No. 1, as executed June 3, 1991. These water mains were designed and ready for bidding and subsequent construction in 1992. Due to funding constraints, the bidding was delayed until 1994. During 1994, prior to bidding, a new Wal-Mart Supercenter was constructed near the water main route and the intersection of Highway 62 and Finger Road was reconstructed to accommodate the Wal-Mart. The street intersection construction included a turn lane on the west side of Finger Road, which extended over the water main route and traffic signals for the intersection. One of the traffic signal piers directly conflicted with the water main route. To eliminate this conflict and reduce damage to the new intersection pavement, the new intersection was re -surveyed and the water main route was revised. Plans and specifications were revised as necessary to illustrate this reroute. ARTICLE 2 The compensation for these additional engineering services shall be provided as follows: Revisions to Plans and Specifications Re -surveying Intersection $ $ 743.58 339.92 Additional Project Administration $ 169.46 Total Additional Compensation $1,252.96 ARTICLE 3 The surveying and plans revisions have been completed, as necessary to accommodate construction progress and Highway Utility Permit Applications. , ARTICLE 5 IN WITNESS WHEREOF, the parties hereto each herewith subscribe the same in triplicate. FOR THE CITY OF FAYETTEVILLE, ARKANSAS By: (Name) (Title) Dated this a7fA day of , 1995 FOR McCLELLAND CONSULTING ENGINEERS, INC. By: i A (Name) (Title) Dated this V L day of J "r1 u..//y , 1995